Video summary
The Winooski Planning Commission meeting commenced with administrative formalities, including the approval of previous minutes and the election of John as Vice Chair, while positions for Chair and Secretary remained open. A significant portion of the agenda focused on the Local Historic Register established in March 2024, which now includes over 90 properties where significance is determined by qualified consultants rather than just age, thereby subjecting alterations like roof replacements to additional permit reviews. This expansion has raised concerns regarding the preservation of dilapidated structures and the potential difficulty in demolishing unsafe buildings if most of the city's stock becomes listed, with many property owners only recently becoming aware of their status through official notices.
Infrastructure updates highlighted critical challenges in water distribution and electric vehicle charging capabilities. The commission reviewed data showing that while overall sewer and water capacity is sufficient, aging infrastructure, particularly century-old wood pipes on Main Street and undersized six-inch residential lines, constrains future development by failing to support pressure needs for multi-unit projects. Discussions emphasized the necessity of identifying specific zones capable of accommodating growth now versus those requiring long-term upgrades, such as upsizing pipes to nine or twelve inches, while also addressing the logistical complexities of running utilities through existing homes in "buildings behind buildings" scenarios. Additionally, the EV charging report was finalized with submissions for Landry Park and Cavan sites, noting that public charging currently exists only at Level 1 plugs in the Cascade garage, prompting conversations about potential statewide mandates for new parking requirements.
Strategic planning efforts centered on revising the Comprehensive Plan by September 10th to align with City Council priorities for smart, sustainable development while managing community concerns about large-scale projects. A key initiative funded by a RAAPCD grant involved consultants analyzing residential design standards across various districts, concluding that adjusting lot coverage calculations and allowing eight-unit buildings instead of the current four-unit cap could make priority housing feasible without compromising structural integrity. The work plan also prioritized updating the water distribution master plan to address undersized lines based on anticipated growth from building typologies studies, alongside a free project examining design standards like street tree incorporation and flexibility for front porches in lot coverage calculations.
The meeting concluded with updates on upcoming community developments, including an opening ceremony for a new hotel on September 21st that will temporarily house staff before adjacent workforce housing apartments are ready. The Mayor shared election turnout statistics and recounted a story about encouraging a newly naturalized American citizen to register and vote, underscoring the commission's engagement with civic participation. Ultimately, the commission agreed to prioritize areas compatible with existing infrastructure while acknowledging short-term flexibility regarding growth, ending the session with a motion to adjourn after addressing the delicate balance between preserving historic character, upgrading aging utilities, and fostering sustainable community expansion.
Read the full video transcript
All right, let's start at the meeting.
You guys ready?
>> Yeah.
Uh, and you need us to introduce our
everyone so you have the names or do you
>> It's up to you.
>> Well,
we'll do that. We got Matt on the end.
>> We got Brian.
>> We got Ruby.
>> Hi.
>> We got John. We got Mike. And we got
Revy.
>> So, all right. So, we'll get started. Uh
any changes to the agendas
or not? Move on to public comment.
Anyone online?
>> No.
>> Move on from that. Approve previous
meeting minutes for those who were here.
Was everyone here at the last meeting?
>> I think so.
>> Yeah.
>> Um do I have a motion to approve the
minutes as presented or
>> there's any changes?
>> So move to approve.
>> Okay.
>> I'll second.
>> Second. Are there any progression,
changes, additions?
Hearing none, all in favor, please say
I.
>> I.
>> Anyone opposed? Anyone want to say?
>> Okay, there it is. And we're all voting,
by the way.
>> Uh, let me see.
Oh, reorganization. Oh,
Mr. Mayor,
Mr. Chair. So every year we we elect a
new chair, a vice chair, and a secretary
treasur secretary. I guess there's going
to treasure because we don't
>> chair, vice chair, secretary. Secretary
is always optional.
>> Yeah. Yeah.
>> Yeah.
We haven't had one in a while.
>> Everybody takes the minutes.
>> Yeah.
So,
if anyone wants to make a motion for
chair, if anyone's interested,
I've been the chair for I don't know how
long, and if someone else wants to step
in, that's fine. But, um, it's your
prerogative. Whatever you want to do,
I'll make a motion for you to be chair.
I'll second.
>> Any other nominations from the from the
commission? No. Second up. So, all in
favor?
>> I opposed.
>> I can't vote.
How about vice chair? Anyone interested
in being the vice chair? Consider it.
Okay. Do I have a motion for John?
>> I'll nominate John.
>> All right.
>> I'll second.
>> Second. Any further discussion or other
nominations? Hearing none. All in favor
of John as vice chair, please say I.
>> Opposed?
>> Extensions. Okay.
>> Wow.
>> Anyone want to volunteer to be
secretary?
Don't everyone jump up
a little warm.
>> It's your job as mayor.
>> Always needing something.
>> What's that?
>> Always somebody else's job.
>> Yeah. Always someone else.
>> Okay. So, that's done. Uh planning and
zoning update.
>> Yes. Yeah. So, I sent this around a
couple weeks ago, so it is a little
dated now. Uh, but I realized I hadn't
done one of these in a while, and I
typically I don't know how it's it's my
infrequent regular planning and zoning
update. Uh, so in here, I just went over
all the permits that have been issued in
the city and FY16.
Um and just summary of how of of the
breakdown of the permits issued. Um so
50 zoning permits issued in total in
FY26. So from uh July 2025 to end of
June 2026. Um permits for 15 dwelling
units, seven of which are located in 259
Main Street.
>> Which one is 259 Main? At
>> the corner of Maine and La Fountain.
>> Yeah, it's the brand new one. Yeah. Yep.
Uh, so none of the permits were for
priority housing or for inclusionary
housing projects. Um, don't think I
remember correctly, no permits for like
three-bedroom houses, anything like
that. Um, permits mainly for ADUs
um, and for uh, the 259 Main Street,
which is one bedrooms and I think one
twobedroom if I'm correctly.
uh six permits uh required review and
approval by the local resource advisory
board. So local resource advisory board
was established
in March 2024 I want to say. Um, so at
that time, Mike, you can probably
provide more information about this cuz
this was before my time that the city
decided to establish a historic district
in a sense um and establish a list of uh
structures that are considered historic.
Um, this list is largely based off of a
report done by VHB in 2020 and 2021. Uh,
that report will used our state historic
register as a foundation and then
collected some information mainly
dashboard surveys of structures uh and
provided recommendations to the city on
how uh and methods to preserve these
structures in the long term. Uh so the
city took that on and decided to
establish a local historic register and
an additional review process for any
improvements to historic structures. Um
this means that say for like a roof
replacement project um typically roof
replacements do not require a zoning
permit. They would only require a
building permit. However, if you if you
own a historic building and it's listed
on the local historic register, that
would require a zoning permit uh review
by the local resource advisory board and
then the a building permit. Uh so it's
an additional step for those historic
buildings to make sure that the historic
nature is being uh retained and
maintained over time. Um so so they've
had uh they've reviewed roof
replacements, roof repairs, porch
repairs, and window replacements. Um, so
primarily projects that uh for
non-historic structures would not have
required zoning. Um, but they've had
some interesting meetings about larger
projects uh that went had to go through
zoning anyways and required GRB review
and approval. Um, and they provided some
uh some input in those projects that
otherwise would not have been there um
previous to March of 2024.
Is there any push back from residents or
anything? Because that's kind of a new
thing. I know like New York seating
stuff, landmarks and stuff is always
contentious. I'm just curious.
>> It's it's it's had some weird growing
pains. Uh to say the least
when the local historic register was
established,
most of the property owners didn't know
that their properties were listed.
Um, so at the beginning of the summer,
we sent out a notice to every single
property owner letting them know that
their property is listed and then we had
uh one of our open houses that featured
historic preservation and invited them
to attend so they could ask um members
of the local resource advisory board
about their property, why it's
significant, why it's listed. Um and
even that has had some interesting
hiccups too.
Um just because uh it's so the the local
historic register in includes structures
that aren't typically considered
historic, meaning that they're not older
than 50 years
>> of age. Um so it's it's had some
interesting uh conversations and quirks.
And I I know that some of the people who
got the letters were very confused about
what it meant. I can't remember if it
was because it said you've got a
historic structure and if you do
anything you have to
>> have what
>> is what is the criteria for being on
>> it?
>> Is it the same national registry?
>> It is similar to but not uh the same.
Um, so if a building is I think ours
might be a little looser. Let me just
pull up the language so that way I can
read it out.
>> Know there's a house on Florida Avenue
that we have to add to it.
>> This all the stuff you learn at the
polls, you know.
Uh
yeah, so historic structures are just
are it appears to be if they're um
evaluated by a qualified historic
preservation consultant and they
determine the significance and they ask
the local resource advisory board to
have their property listed, then the
local resource advisory board can
recommend to you to have that property
listed. Um so the uh local historic
registered is register is embedded in
our zoning regulations meaning that to
list a property requires a change in the
zoning regulations and to remove a
property requires a change in the zoning
regulations.
>> It's pretty it's pretty heavy.
Um so so so that's the entire process in
a nutshell. There's no age requirement
like with state historic register uh
qualifying structures or national
historic register qualifying structures.
Um it would just require an evaluation
by a consult by historic preservation
consultant and a review by the local
resource advisory board before it goes
into the amendment process with you.
>> So we be like discussing like
individually like properties whether or
not they get added or removed. That is a
great question that I think the board is
still figuring out too. So, it's it's
it's a bit odd and I think it'll come to
you too what council's stance on it is
at the end of the day. Um, from my
understanding, um, the local resource
advisory board isn't, uh, tasked with
actively
soliciting structures to be included.
like they're not reaching out to
property owners and saying, "Hey, we
think your building is important. You
should get this evaluated or or anything
like that. Um it's it's more of a if a
property owner wants the building to be
listed, then they can go through the
process to have it being listed.
But if there's a house that's supposed
to be demoed
and it's a older structure that may not
be on on a list, do they have the the
the the right or the ability to
look at it and say, "Wait a minute. This
this should not be torn down because
it's historic for whatever reason."
>> Not at the moment.
>> Okay.
So that's again like another piece with
the
>> with council kind of considering this
too. But I I think I would consider this
to be a little bit too heavy-handed to
have because for for Wooki that could
cover most of the structures in the
city. Um, so then that would mean that's
a demo structure would require uh some
sort of review by the historic resource
advisory board before it could even go
forward, which um I don't think we're
trying to encourage. I think that the
way that I see it is that we'd want to
preserve our landmarks and the
foundational elements to that recognize
historic character,
>> but I I think that
>> so so a little background. Sorry. Go
ahead.
>> One concern that
one concern that
I had had a former mayor had had with
this is we're given a list of a lot of
properties that could be considered
historic.
And some of them to say it nicely did
not look great anymore. So my concern
is, are we going to preserve something
because it's old
but it's falling into disrepair?
>> If we were like a city that had like
money to throw at it and be like, we're
going to make this look like it did
beautifully in its heyday in 1840,
great. But if we can't do that,
I'm wary of preserving a property that
then could get torn down when in reality
it should get torn down because it is
already falling down. Now, if something
is beautiful and you know, somebody very
important live there or something like
that, that's different. Like that falls
into like historic property, it's pretty
obvious. But like I want to make sure
we're not just preserving old homes just
because they're old. They're old and
there's a reason for them to be
preserved. That's I love that big
history buff.
>> But just for old sake, that's not what
I'm looking to do. So,
>> just so you know, some of the kind of
happened when we were talking.
>> Yeah. I'll also add that in Rooki too,
so much change has happened over time
with many houses that many historical
elements have been lost to time like
original sighting um for many houses or
or vinyl siding that's now on a house
that could that that qualified by age um
or additions to um front facades that
affect the interpretation of the
building. So you can't even tell whether
it's really historic or not at the end
of the day. Um so that that makes uh
preservation challenging. Um and
arguments for preservation challenging
for some properties in the city.
And as background, what happened when I
think it was in 2015 or so when we redid
zoning, we had in there about historic
structures and you had to get approval
of the state historic
preservation committee, whatever it was.
The first one that came along was the
mansion up on the corner of Mansion
Street and Main Street.
>> Uh
the Vermont Historic people said, "Oh,
we don't do that." sort of like what it
anyway. So since then we've been trying
to come up with some way to get some
language in that we could uh save some
of the really historic buildings.
>> Anyway,
>> and I thought that that um I won't say
her name but is doing a survey. Did she
finish the survey of of buildings? Uh it
was going to be on a map or something.
question.
>> Yeah, we kind of started that idea of
like I think the the direction that I
was trying to give the board was are
there any landmark buildings that are
missing from the map and it kind of
became let's just document all the
historic buildings and I was like no no
no that's not the purpose of this
exercise because if we do do that then
we'll enter into this rabbit hole of
like figuring out that you know 75% of
the houses in Wooki would qualify by
your uh by your standards. It's it's
making sure that are we missing anything
important and um and I and we kind of
like put that on pause just because that
I think the the meaning was lost with
that.
>> Um but I mean it goes back to like the
like kind of like with mansion or kind
of like with with like the Wooki blob,
right? Those are landmark buildings.
Um and uh it's good to know whether
there are any other landmark buildings
that were missing. Um not not just um
sorry but houses.
>> Okay. And and has there been any
discussion that group about districts?
You know, for example, you could say
here's the mill district or whatever.
>> Not yet. And I think that is an
important discussion that we need to
have.
Um, so more information to come with
that.
>> Any other questions about this whole
thing?
>> I think Go ahead, Brian.
>> Okay. I think you already covered this,
but could you repeat like what is the
list that of properties that are
currently on the register? Is that
coming from that initial like 2021 study
or are these have these already been
like submitted by the property owners?
>> So I'll just pull up the map. Um
so this map
share
and
will it come? Nice. There it is. So,
this map was adopted um back in February
2024. Um this map hasn't changed since
adoption. Um this map is based off of
the VHB study and our state historic
register. Um, so, uh, so for for the
creation of this map, um,
I think this is a question more for
Mike, you Mike or or Thomas, like I
don't I don't know if property owners
were informed
that they were going to be listed on
this map. I couldn't find any record of
it. I don't think they were
because I think these were properties
that were already on. There was a stud
there was a a study done in like in the
70s that identified um historic
structures, but over time I mean if you
bought one, you may not have you may not
know it, you know. No. Uh and I don't
think anything was done to to say, "Oh,
Matt, your house, by the way, is on the
National Register." Um it was just this
map came up and if you didn't see it,
well, you didn't see it. Um but then you
sent a letter to everyone this summer
whose properties were on it. And
>> from what I understand, because my wife
was on that committee,
>> there were several who were surprised
that their house was on the register
um and didn't know what quite what it
meant.
So yeah, it it comes up for like most of
the applications that come to the local
resource advisory board. Uh when I talk
to applicants and I tell them, "Oh,
zoning is required for this. Your
property's on the local historic
register." And they're like, "What are
you talking about?"
Um
>> so, and I I think even with the notice,
it's still going to happen. Um because
there are um like 90 plus properties on
this list. Um, but I think more and
more, you may or may not know that that
the historic society um has a program
where you can you can order a plaque to
put on your house.
>> And I'm trying to think how many again,
Sue has been working on it. There must
be 20, 30, 40 that they've sent out
>> so far at least.
>> Yeah. Yeah. That's cool.
>> Yeah. So, um, more and more people are
getting them. Mhm.
>> Uh but that doesn't mean that they're on
the national register because your house
has to be over 50 years old.
>> Yeah.
>> You know, but everyone that she's done
so far, I'm going to guess that the
newest house was probably built in the
20s. Most of them are 1800s and and
whatnot.
>> Yeah. So, yeah, there more information
about that on this Historical Society
website. You can order a plaque. What
was it like 40 bucks? I think it's a
hundred bucks.
>> No, it's 100.
>> Yeah. Well, it's the plaque and then
>> you get all the research.
>> S does all the research.
>> Yeah.
>> And it's perfect research, by the way.
>> I hope you heard that, S.
>> Anyway, sorry about that.
>> No, you're good. You're good.
>> Any other questions about this? Any of
the properties that are listed? Uh,
anyone see their house on there and they
say, "What?
>> Chicks is on there.
>> Chicks is on."
>> The weird one is down in Memorial Park,
but that's on there.
>> Um, can you bring that?
>> Yes. So, Memorial Park is an
archaeological site.
>> Oh, okay.
>> So, it's there is it's archaeologically
significant there. I'm not aware of any
structures down there, but I I am aware
that it is archaeologically significant.
And I think the oldest buildings in the
city are the Stonehouse
>> on East Allen Street, the mansion,
and I'm not sure what after that would
be. I I I think that the um
>> Yeah, the list has it.
>> Yeah. But like that it used to be the
what is the RVA now
>> up the hills?
>> I don't know that it's here on the other
side of the tracks.
Oh, there you go.
>> Yeah. So, this is all in the zoning
regulations if you want to take a look
at the list.
>> Um, and then the entire state historic
register is on the city website. Uh, the
VHB report that was done a few years
back is also on the website.
Okay.
Okay. So, on to other topics on um that
planning and zoning update. Um what did
I even write? Um yeah, so
uh permits for drawing units is way
down. Um but Wooki historically has kind
of had these interesting like booms and
busts every single every year. It's like
there's a there's a year that's that um
there are many uh houses uh permitted
and then there are years that there are
none and it just kind of goes up and
down. Uh sometimes in alternating years.
>> I'm going to guess recent permits have
been for multi-unit structures as
opposed to single family. There's not
many new
>> Yes.
>> single family homes being built.
>> Yes. Yeah. Single family dwellings are
uh few and far between. It's it's mainly
been for um like ADUs um multi-unit
um additions that were multi-unit
projects like that.
Um the DRB reviewed eight projects and
one appeal uh last year. Um and then in
the last uh seven eight months um the
internal process has been refined a
bunch
uh with more input from DPW early in the
process rather than later. Um it's from
my understanding that DPW is involved in
projects after zoning typically and then
they work with the applicants or the
developers on water sewer connections
and things like that. Um I think there's
been some recent complications um from
projects. Uh so we've shifted DPW review
to the beginning. Um and then
determining uh completion of a zoning
permit only after DBW's completed their
review. Uh because that would determine
whether uh utility impacts are being
satisfied and water wastewater
connections are being satisfied. Um so
that's extended our review time for for
projects uh significantly. Um so
turnaround times for government
applications requiring public works
review can be between like 6 to 8 weeks
at the earliest. Now, um, so for
example, for a couple projects that the
DRB reviewed, um, one project that the
DRB reviewed, uh, last month, I had been
in conversation with that applicant
since January
>> and, um, they only met kind of the basic
requirements in May and then DPW
uh, and I had a conversation and I
brought that back to the applicant. And
so there was further refinement that
needed to happen before they were ready
for DRB reviewed. Um similarly uh
another project for an ADU that was um
reviewed back in I want to say April
that also that process also started in
January. Um and that and they were uh
further along in the process when they
came to me. Uh, but that still required
some back and forth and refinement
before it could be ready for for DRB
review. Um, overall though, it's made um
review processes with the DRB a lot more
straightforward, a lot cleaner. um like
uh the meeting uh in last month I think
that was 25 minutes
and the DRV didn't really have any
questions because we we covered all the
bases pretty much um so I think that's
one of the results out of this is even
though we are extending review times um
we are uh stream streamlining it in
certain parts too uh to make sure that
these products are comprehensive and
complete before they are permitted.
>> But even 6 to 8 weeks, I mean, in the
scheme of review in the state of
Vermont, that doesn't seem too bad.
>> You know what I mean? I mean, if you
have to go through Act 250, that will
under your hat.
>> Yeah.
>> Right.
>> Yeah. In general, say it weeks for a
permit
>> in a big city would be good. Mhm.
>> Is the majority of that time to work out
those like back and forth questions
between the public works department and
the applicant or is there a factor of
like staff availability that's part of
that?
>> Uh a bit of both for public works. Um
right now is their busiest season. Um so
they're uh
capacity to review projects is pretty
limited. Um, usually we sit down once a
month and just go through every single
permit that's on my desk and and then we
iron out all the details and then bring
that back to the applicant and the
applicant comes back with a revision.
Um, so it's it's a bit of both on DBW's
side mainly just because it's the
summer.
>> Any other questions?
Okay. Um, building technologies is now
complete. Um, that's in front of you.
>> It is complete.
>> It's complete.
>> Okay.
>> Um, so yeah, a couple weeks ago when I
was writing this memo, um, we were still
working out finer details in the report,
but now it's complete complete.
>> Um, if you do notice any typos or
anything like that, feel free to let me
know. Um,
there's one. We'll get to it. Yeah. So,
it's not complete.
>> Yeah, I think they can fix a like final
typos. That's fine.
>> Yeah. Um
I think for me, I I picked out a lot of
typos and then I just got probably got
tunnel vision.
>> So, if you notice anything, yeah, let me
know. But they're open to answering any
questions that you have about the report
itself. Uh typos aside. So, if you do
have any questions, um, feel free to let
me know and I can forward them on to
Jeff and Keith and they can give you an
answer.
>> So, in terms of of discussing this, I
don't know if we have to accept this or
whatever, but we probably at the next
meeting have a further discussion about
this.
>> Yeah.
>> Give us time to read through this.
>> Yeah. Yeah, I think that would be good.
Um yeah, I think it' be good for you to
accept it. Um does council
>> maybe forward to maybe we have to
forward it to council for approval to
think.
>> Yeah. Yeah. I think um from what I
understand from me council doesn't
necessarily need to accept it or
acknowledge it, but they do should see
it and and understand that it's been
completed and make sure that we're
operationalizing it.
What's the dumb question, but I'm going
to ask it anyway. Um,
what's the purpose of this and where's
it going to sit? I mean, it's going to
be somehow melded into our zoning
regulations.
>> How do you envision that?
>> That is a good question for the work
plan.
>> Okay.
>> Because it it's going to be deeply
connected to the work plan and the other
item in the work plan. So, I can You
want me You want me to wait and hold it
until we discuss the work plan? Okay.
>> Yes,
>> I can do that.
>> Thanks.
>> Um,
>> but remind me when we get there.
>> I I'm gonna
I'm definitely going to bring it up, so
don't worry.
Um, I think yeah, the last two things I
have here are comp plan updates. So, uh,
the open house on July 29th, uh, was
well attended, so thanks for coming out.
Um, and and thanks to Watt for for
tableabling and doing some marketing for
it. Um, the next one is on August 27th,
which is Thursday. So, uh, there won't
be a second meeting, but if you can come
out to the open house, feel free to stop
by. It'll be focused on the safe healthy
connected people section. uh safe
healthy connected uh the commit the safe
healthy connected committee
is uh going to be uh doing some
activities with that too. Um so this
will be u from 5 to 7 at the senior
center and hopefully if the weather
holds up then we can be outside. That
that's my goal.
Yeah.
Um and then with the uh master plan
municipal plan, it's now expected to
expire at the end of 2027. So under
recently adopted act 152, any regional
or municipal plan due to expire in 2026
or 2027 shall have its expiration date
extended until December 31st, 2027. So
that gives us uh some breathing room uh
to review and uh approve the the comp
plan. Um, but I'm still holding firm on
the original timeline uh to make sure
that we have it adopted around March.
Um, I think that I I'm I'm seeing this
comp plan as as a lighter update um
based on all the work that the city has
done on public engagement and all the
reports and studies that they've done.
Um, so I'm but I'm very well aware that
come
2035,
we're going to have to do a lot of work.
So, it's not only on like the the
municipal plan side, but probably on the
um bike pad plan side because that uh is
a couple years old now. And uh we have
accomplished uh a number of items on the
bike ped uh plan. Uh and our economic
development strategic plan is I would
say it's obsolete. It's from 2017. Um
it's still workable and we are still uh
using it operationally. Um but I think
by 2020 2035 it'll it'll be obsolete. So
we're going to need to update that that
too. So, um, during the next adoption
cycle, I think it's going to be a
multi-year effort with all the different
plans that we have to need to be updated
all at the same time.
>> You guys need to be thinking about that
in 2035 because I won't be here.
>> When you compare that to like what
Burlington's doing right now with plan
BTV, I think they have like four
different plans that they're bundling
together in the public engagement
process.
>> Yes. Yeah, I think by by probably 2032
2033, we're going to be in a similar
situation as Burlington with multiple
plans that are staggered but also all
equally obsolete. So, it makes sense to
think of it all uh synergistically and
all at once.
>> EV charging.
>> EV charging. Uh yeah, the report's
finished. uh the was finished back in
the winter um back in February. Uh gave
a presentation to city council um at
that time. Uh we're still continuing to
work with CCRPC and the state on
potential EV charging installation
funding and opportunities. So um there's
been I don't know if you've familiar
with some news about um Vrans uh doing a
call for uh potential places for EV
charging. Um so I've submitted uh forms
for that for uh um Landry Park um for
Cavan. Um and
I yeah I think for those two locations
um one of the two locations Landry Park
was scoped in our EV charging plan. Um
we have a quote for the Cassavant
um site so we understand the constraints
with that. Um
>> how many EV charging stations do we have
in the city right now?
>> Publicly.
>> So when in the garage I assume
>> yes. So,
in the in the Cascade garage, I don't
remember how many plugs there are there.
Um,
but in the Cascade garage, we have level
one plugs. Um,
and I think with the new garage, it's a
work in progress on public EV charging
for the new garage. Um but other than
that um there are no other public EV
chargers available. All of the chargers
that are available are private either at
individuals homes or uh at apartment
buildings.
>> Is there EV charging signs? No actual EV
charging.
>> Oh, here
>> at the school.
>> Oh, at school. So the school's wired for
it.
>> The So the school has all the conduit
there. They just need to we're trying to
figure out is there a way for them to
get money uh to put in a charger. Um so
yeah, I did submit a form for the school
I think too or maybe I don't remember.
Either way, um the school and I have
been in contact about this project and
trying to figure out um what their needs
are and figure out what are some
pathways for them to get the supply
equipment to to plug in. That's all
they're missing. Are there any statewide
requirements for like a minimum amount
of EV charging? Like Massachusetts has
requirements for new parking areas a
certain percentage like 10% or whatever
needs to be. Is that something or
something we would even want to think
about? Like the only new parking is over
by Casan. It probably won't happen again
>> anytime soon, but it's just something I
guess to throw out there to think about.
>> Yeah, I mean we can definitely think
about that locally. um we can put that
into zoning as a requirement instead of
an incentive.
>> Um that is uh there's been a guidance
document that's now a bit dated I think
eight years old from Vrans on um how you
can incorporate EV charging requirements
into municipal zoning um in the most
recent residential and commercial
building energy standards uh that
required EV charging.
>> Okay. Um, so for I think for
municipalities that adopt stretch code
like South Burlington, they would have
that EV charging requirement for larger
projects. Um, but with the executive
order shifting back to the 2020 building
energy standards requirements uh,
statewide, I think that is only for
wiring but not for chargers if I'm not
mistaken.
>> Okay.
>> Um, and it's only for certain projects
of a thresh of a particular threshold.
>> Yeah.
>> Um,
Yeah. So, it's a bit of yes and no.
>> Yeah, that's good to know.
>> Yeah.
>> Is that it for that?
Any questions?
Everyone, can you hear me?
>> Oh, yeah. You had a question on the
chat, right, Trevor?
>> Yeah, I did. I'll just so people can
hear. We were talking about Act 250 a
couple minutes ago and I'm just
wondering cuz I read where it was
written and there didn't there wasn't
more context to inform me. So maybe you
know or maybe someone else knows but why
was it decided statewide to extend the
expiration date for municipal plans
until the end of 2027? I just have no
background on this.
>> I think it has to do with the status of
the regional plan timelines.
Um so now with the uh
trying to forget remember which one I
think it's under act 181 that we have to
include our housing goal the regional
plans housing goals into our uh
municipal plan um along with uh their
map of
um the their future land use map into
our zoning. um I think only in the last
week that um CCRPC's plan was adopted.
Um so because and they're one of the
first. So I think in order for everyone
else to catch up with the plan
requirements uh if the state decided to
extend those timelines so that way
municipalities can meet those
requirements that are in act 181.
>> Okay. Thank you for the info.
>> Okay.
>> Let's move on to let's see what would it
be the work plan.
>> Yeah.
So
we have a work plan a draft one. Um the
basis of this work plan um kind of stems
from previous year's work plans. This is
how previous year's work plans were set
up where um we would highlight uh city
council's priorities that intersect with
planning and zoning and um identify our
role in that. Um so it's the first three
are a continuation of previous uh
council priorities from previous years.
Um so develop continue to update the UDR
address housing priorities carry out the
equable housing needs assessment which
will be finished the end of this year.
Um update the comp plan um and then the
last one's a new one the water
distribution system master plan update.
Um and then the planning commissions
role um I pulled from previous work
plans uh speaks very generally. Um so we
can word smmith that if you'd like um
but I I would like to talk a bit about
the water distribution system master
plan update. So um one of the
constraints um that the city has isn't
um water supply itself but the water
lines. Um, so the water lines in the
residential districts are uh sized for a
uh single typical single family
residential neighborhood. It's a they're
6-in water lines. Um, so we have been
mainly DPW's been running into some
issues about connecting u multi-unit
housing projects to 6-in lines. Um the
main concern isn't um water itself but
but the pressure um because if you have
undersized pipes and you have larger
needs for it then you would have less
pressure and um so that's what we're I'm
working with DPW to figure out where are
we anticipating growth. So therefore
which lines should be um uh switched out
to larger wider lines to accommodate for
future growth. Um so that's part of uh
the building typologies itself. So with
building typologies um
I think it it helped DPW and I to think
about what is anticipated buildout, what
could build out look like in our
residential districts. Um and how would
it look? Um, and so based off of that,
if we were to look at building forms,
building forms in the RC district, then
we would know, okay, this is the
expected growth that we should
anticipate in the RC district, and
therefore we should upsize certain lines
in particular locations for that growth.
Uh, so we could prioritize particular
lines over, say, locations in the RA
district that weren't part of the study.
Uh, and and those could be dep
prioritized for now. and um regarded
later uh at a later time for upsizing.
Um so I think that thinking about um I
think for for me and for DBW thinking
about um the building typologies project
and then this water distribution system
master plan update that is I think going
to inform um further conversations about
how we want to implement the building
typologies
about which areas do we want to see
further density? Do we want to see
different forms um and potential uh
changes to other parts of the zoning
regulations to accommodate that type of
form, that type of built environment u
versus other parts of the city? So
that's where it all intersects.
>> Is there any issues with wastelines?
>> No.
Well,
>> again, I think the age of a lot of the
infrastructure, especially sewer lines,
there there's some pretty old pipes in
there.
>> I know when we did some back in the
early 2000s, we were finding 100-y old
um clay tile pipe.
>> So nice,
>> and finding lines that or not knowing
where lines were.
So, but that's all been I think it's
pretty well updated. So, they've got
mapping of there was a time when there
was no maps of where water lines were.
Uh, and I I tell John Rosher this. There
was in the late 90s, I think it was,
there was a water there was a water main
break. They couldn't find the shut offs.
They had to shut the water off in the
whole city
>> to fix the break. and they found the
shut off under six or eight layers of
pavement, but they didn't have any maps,
so they didn't know where it was. But
that has changed, thank goodness.
>> Yeah.
>> Yeah. The the last water distri system
master plan update was in 2016,
I think. So, yeah, we have precise maps
on where water lines are and where sewer
lines are. It's it's a matter of testing
out its distribution capability and
determining which um lines do we want to
upsize over time and which we should
prioritize.
>> And as Revy said, we have last I knew
and Thomas, you can correct me if I'm
wrong, we have plenty of of sewer
capacity and water capacity to to
accommodate new growth. Quite a bit of
new growth. It's just the distribution
lines.
>> Yeah.
Yeah.
Yep.
I think that's all I have for the work
plan. Any questions, suggestions, edits?
It's a lot of stuff we've always we've
been doing all along. So, it doesn't
change much year to year, but
and I should add that
part of our job and and with the zoning
regulations or unified land use
development regulations, whatever the
heck it is. Um, uh, I always look at it
as a living document that needs to
change and update. So if you if you see
something you think we should discuss
this, let's discuss it. Something may
need to be changed.
>> I guess I do have one comment here, but
just making sure we have the city
council's priorities, like making sure
we we know what those those are. I guess
>> we don't know that. I know at the end of
like the last sessions with some people
they felt like maybe we're diverging
from maybe what the city council wanted.
So maybe just making sure we know those
are very clearly.
>> It sort of says it but no we do need to
because anything that we propose
has to get approved by the council. So,
it doesn't make sense for us to to um
propose something that's contrary to
what the city council wants. If we're
going down that route, we have to have
the discussion ahead of time and figure
out where we are. You buy that, Thomas,
or
>> Yeah, I mean, I think that, you know,
not much has changed in terms of the
like overall council priorities. If we
want we want you all finding ways that
will encourage development in the city
and be that smart development, right?
Like we don't want Franklin Street
problems popping up everywhere just to
develop things, but we want development
to happen. So we do have a fun job of
figuring out how to make that happen. Um
but yeah, not nothing there that has
changed. Like we're not uh we haven't
been briefed on anything besides, you
know, this water distribution situation,
but other than that, like we haven't
heard any reasons to why we need to
alter our desires for development. So
that's the
>> that's the plan. I think with a
comprehensive plan I think we need to
have a discussion of just
I'll say how much development we want
some parameters in other words do we
want to go crazy and you know get as
much development as possible or do we
want to look at it and say do we want
this city to be one of of you know a
population of 9 or 10,000 or 12 or
15,000
>> because there is some cost to develop
velment and one of them is the
infrastructure,
>> right?
>> You know, so I I think we need to have
that discussion with the council uh and
with the other groups that that you know
we're going to be working with um to to
give us a path forward. And it may be
let's go crazy and do whatever we can or
it may be let's kind of rein it in a
little bit. one development but you know
>> we've seen
recently right that there have been a
thought and belief in the city that like
any development was great that clearly
was not the case like people have turned
out in droves against some specific
projects so not that that has changed
any desires develop but I think it's
like
we're we're not where some of us thought
we were in terms of where people are
willing to see big structures go up and
things like that. So, um you know, like
I think we've decided like the
corridors, right? Like we can going to
put big buildings there. There are still
people who will complain, but like I
think as a city we can all kind of come
to the agreement that like we're all
okay with that.
>> Um
>> but not in my backyard.
how somebody's going to hear. Oh, you
know, I'm not thrilled here. No, like I
definitely developing the city, but like
the this room has never been as full as
you saw it as DRB saw or as we saw it
when Franklin Street happened. So like
>> Well,
but not for
35, but like
>> in the past five years. So like
>> it was also pretty full when we were
proposing the Armory project too with a
lot of people speaking in support of it.
So I think you know
>> I'm not
saying Franklin Street for a reason.
>> Yeah. Yeah.
>> Like there I think and maybe all of you
but maybe not can recognize like the the
neighbors did not want Franklin Street
to happen. So we had thought a lot of us
that people would want Franklin Street
to happen. It seemed that they didn't.
So like we've got some more parameters
from conversations that we've had over
the years.
>> Um the armory is a whole different
thing. Like there are people for them
who I haven't heard anybody before
Franklin Street.
>> Yeah. Yeah.
>> So like that's why I use that example.
The armor is different. There are
definitely people for that project.
Definitely people against that project
but there's more of a discussion there
um which hope we continue on. Yeah,
actually, can I back up just the the
water distribution, how pressing is
that? Like, is that is there any
development that that's holding up or is
uh um or is there some more development
that can happen with the current 6- in
lines? Um and it's just like down the
road we'll need to expand or is there uh
does that question make sense? I think
it it's a little
I'm I I think I'd be a little out of my
wheelhouse to to to make that
determination because I'm not an
engineer.
>> Like booster pumps and stuff.
>> Yeah. And things like that.
>> I think Yeah. And I think that with the
with the from my understanding at least
um
there aren't any projects that are being
holding that are being held up and
public works just like I feel like the
rest of the city like code enforcement
public works they always find a way to
make it work to make sure that the
building is accessible and that they are
able to to to maintain their operations
and and and work towards solutions. Um
it's it's a matter of for these future
buildings or even for these current
buildings, is there going to be enough
water pressure for them? And uh one
piece that causes them alarm is
buildings behind buildings. Um because
that is an extension of a of a
connection of an existing connection
that goes through a house. Um we don't
create any new connections. Typically,
um if someone is building a duplex
behind an existing duplex,
uh water and waste water has to go
through the existing house and out to
the street. Um so that creates some
complications operationally for them uh
that they've uh made known to me and I
would and I think that would also create
some complications in terms of water
pressure um just to have the extra
infrastructure uh 100 ft of
infrastructure potentially to go out to
the street. Um so I think that to uh
circumvent any future uh issues like
that um this is why they're looking at
what is distribution like and how do we
make sure that we are prioritizing
um the upsizing of particular lines over
others at the moment as we continue to
maintain our infrastructure. Um, and I
also think that this is also a piece
that they've voiced concerns to me about
like is there a way Revy to consolidate
all the units into one building so that
way there's just one connection out to
the street instead of this connection
this these connections between
connections. Um so and I think that's
going to be a broader conversation um at
at a later time of how do we incorporate
some of these recommendations as we
continue to maintain infrastructure and
upsize infrastructure to make sure that
we are growing incrementally and also
growing in a way that is uh sustainable
operationally for our city staff. I
think one one um question that we need
answered on the water especially water
distribution system is 6-in pipe as I
understand it from what you said and and
whatever is good for a single family
home or or several single family homes.
>> How large of a multi-unit building is
adequately served with a 6-in pipe? So,
in other words, if I have a sixunit
building, do I need to upgrade it to a
12 in or a 9 in pipe or something? Is it
10 units? Is it 20 units? You know what
I mean? And that's not something you can
answer, but I think if we get some
information from public works,
>> I think that would help us because then
we can say, well, geez, we're allowing
all these six unit buildings, but it
needs an upsized pipe
>> or maybe it doesn't.
>> Yep. I think so. Yes. Exactly. we we'll
have some flexibility in in the short
term and the near future um because uh
we're not seeing uh you know growth
overnight. We're not seeing houses being
demolished and turned into four-unit
buildings overnight that are going to
cause pressure issues. Um, but we need
to be mindful of
which parts can accommodate growth right
now, which parts are going to be
prioritized for growth, and which parts
of the city are
have a much longer time frame for
upgrades. Um, in terms of density,
>> you or Thomas probably don't know, but
I'm wondering with the Main Street
reconstruction, did they upsize the
water um, distribution line there to
like a 12 in or something?
>> I
I'm very sure
>> they upsized it. I can't say
>> I don't put I don't know what they had
pulled out.
>> Some of the sections were wood pipes.
>> They were wood like with like metal
bands around them like barrels.
>> It's wild, but they lasted for over 100
years.
>> That's what I'm saying.
>> Yeah, that's the exact problem.
>> Yeah.
what's coming.
>> Yeah.
>> I can tell you stories of surprise some
surprises that have been found in this
city.
>> Oh, John showed us one meeting like when
they were doing scoping and I forget
about Oh, a fire hydrant had been like
tapped into one of those like I think
about building codes, but like they're
not supposed to do that. So, there's
like
I don't
>> old stuff going on down there. I don't
remember the specifics, but where the
veterans housing is down here on West
Canal Street, when they were digging the
foundation
>> down deep, they found an old um like
storm water discharge pipe that was I
think it was wooden and I think it was
like 36 in or 48 in diameter.
>> They didn't know it was there.
>> But that's all been ironed out.
>> Yeah. So be confident that that's all
that was said Mike figured that all out.
>> No, not quite.
>> I just kind of scratched my head and
laughed.
>> It's interesting. It'll be interesting
too with the pressure stuff. These like
lower areas normally have higher
pressure and stuff. So it might dictate
areas that'll
can actually have develop a bit more
>> and others that can't. I don't know if
that works, but you know that I know a
lot of our water comes from the the
water towers up on Water Tower Hill in
Colchester because
>> back in the early 90s we contributed to
putting those 425,000galon
>> storage tanks up there
>> so it could serve because Champagne
water the water coming into the city uh
I think there wasn't enough or
something. Anyway, they had to put two
tanks up there. Yeah.
>> Oh, interesting.
>> I know. I got plenty of pressure at my
house. So,
Yeah. So,
>> anyway, we we digress.
>> Yeah. Uh, but that's okay.
>> That's typical, by the way.
>> Yeah.
>> Sometimes you have to get me in line.
But I think talking about timelines, um,
so I think for the remainder of the
year, the way that I have it sketched
out is that we focus more on the comp
plan and the the revisions to the comp
plan based on public input that we've
been receiving. Um, so I think during
the next meeting on September 10th,
we'll reintroduce the comp plan and
start going through it section by
section. Um, depending on agendas, we
might add in like building typologies or
talks or talk about stuff. But I mean,
we I want to make sure that I'm not
overloading you because these are going
to be like weightier meetings. Um, and
then I think probably uh going into next
year once we've cleared out the the comp
plan as well and we'll probably go back
into thinking more about building
technologies with the water master plan
update work potentially and equitable
housing needs assessment work that's
going to be finished at the end of the
year and then and open up the UDR and
and figure out which recommendations we
want to take into consideration and how
do we want to take them into
consideration.
I I I mean I think you're right. We the
comp plan is, you know, hanging over us.
We got to get we got to get moving on
that. So
>> I think that'll be our priority in the
next several months anyway.
>> And I think one other piece that I've
been working on on the side with the
comp plan is trying to figure out in a
very general sense where do we want to
see growth and which parts of the city
can accommodate more growth. So I think
we we should have that conversation
>> as part of the comp with the comp plan
and that should be in the background as
we talk more about building typologies
at goodwell housing assessment and uh
water master plan.
>> Okay. Any comments questions?
>> This question is mainly about the comp
plan but could apply across these
priorities. Do you are we already
planning on or do your foresee
opportunities to have additional joint
meetings like with the other departments
or commissions
on the different sections of the comp
plan or are those conversations
happening already separately?
>> So I have been meeting individually with
all of the committees. So I've met with
um
all of the committees at this point
multiple times on the goals and actions.
Um so the draft goals and actions that
are in the surveys that are being shown
at the open house um have were created
after multiple discussions with all the
respective committees. Sanszu. Um so I
think
if we want more input at a later time um
from those committees we can definitely
get them. Uh if we want to hold a joint
meeting we can definitely do that. Um,
but it I think it'll depend on what the
other committees how they feel and
whether there's anything missing from
our work because I I'll definitely be
keeping tabs on that, making sure that I
didn't miss anything in their uh
observations and experiences working on
those particular se sections as we work
on those sections in in these meetings.
>> On that note, I could see DPW being
useful at some point planning for that.
Yeah,
>> we already implied that, but
>> yeah. Yeah.
>> Yeah.
>> And as Revie said, if we want to have a
joint meeting with one of the other
commissions, we we can do that. We can
ask for that.
>> Yeah.
>> We can't force them, but we can ask them
very nicely.
Anything else?
All right. Building typologies.
>> Yeah.
>> Is this where I had a question that you
wanted me to bring up or was that on the
work? I already addressed it with the
work plan, but I think
>> you probably did. Yeah,
>> I forgot the question. So,
>> Thomas, Thomas,
>> how deep are we diving into this right
now? So, we were just saying next time,
but
>> I don't think we want to dive too deeply
into it.
>> No,
>> we just
we've seen some of it before, but folks
like Ruby and Brian have not. So,
>> Matt, I think you were here when they
gave that they were
>> Yeah. for mainly for for Ruby and for
Brian. Um
>> Trevor, you were you were here when we
had Jeff and Keith, right?
>> Yep. Met with them a couple times.
>> Yeah. Yeah. So, at the beginning of the
year, um yeah, probably like last
December, um the regional planning
commission reached out to me and said,
"Hey, we have a bunch of money for um
transit oriented development projects
and we don't know where to spend it. Do
you have a project?" And I was like,
>> "Absolutely
>> I do."
Um so working with the regional planning
commission and um working with their
focus on transit oriented development um
in which in Wooki we have transit that
serves our neighborhoods. The number
nine bus you know goes up and down
Hickok and sneaks its way through the
neighborhoods. Um we kind of we came up
with a project idea for um residential
building design. What is the design that
we want to see in our residential
neighborhoods? um and what are the
elements that we need to highlight in um
creating residential building form
standards. Um a lot of this stem from
Franklin Street um we were already
having some observations from planning
commission members at the time about
Franklin Street and its design um and
looking at the regulations and seeing a
gap. Um, so this uh helps to address
that gap that's in our regulations uh
while also helping us think more uh
proactively about how the city could
look in the future uh if we were to have
these design standards. Um, another
piece with this uh project I
specifically asked our consultants to
look at is whether our regulations
actually enable the priority housing
that the city is deeply interested in
seeing. Um, do the dimensional standards
make sense? Do they work? Um, are they
functional? Do they need to be changed?
Um, so they took that and they pretty
much ran with it with the with the with
the form pretty much. Um, so our
consultants, uh, Jeff Frell and Keith
Coington, um, Jeff Frell worked on our
formbbased code, um, and he developed it
back in 2015, 2016. Um, so they came on
board. um they were pre-selected by the
regional planning commission. Um so I
had so there was no consultant selection
process by me. Um because this was a a
grant that the regional planning
commission received from uh I don't
remember which agency but I know it was
a raise grant and it there was there was
nothing that we needed to pay for that
project. So this project came to us free
of charge uh through the raise grant
program through CCRPC.
Um so Jeff and Keith came on board uh in
mid to late January to work on this
project. Um and they came out to the
city in
late was it late February? No, late
March I want to say.
>> I would have guessed March.
>> March. I just remember it being cold so
that's why I was like is it February or
March? That's right. We did a walk
around.
>> Yes.
>> Yeah. So with um uh so for this project
um I not only solicited you for guidance
but also the housing commission and
local resource advisory board. So they
all had a part in providing input for
the project and uh were in the meetings
with Jeff and Keith during their
presentations providing input to them.
Uh I think they did uh I want to say
they they came to a meeting probably
they online um sometime in February came
in person in March uh did a walk around
uh and then did another draft
presentation in late April
um and then based on all those meetings
uh came up with the report that's in
front of you. Um many of the forms and
designs that are in part three um most
of you have already seen in previous
meetings. Um and they refined it a bit
to make sure that it had uh some of the
design elements that you were looking
for and the information that you were
looking for take from it. Um overall uh
they were able to uh show that priority
housing could be built on uh city lots.
Um they looked they didn't look across
the city and look at every single lot.
They took a sampling and I guided them
and said take a look at you know lots in
um PickOP and West Street. Take a look
take a look at lots on um Manso and on
Hood. Um look at the standard sizes and
determine whether the building forms can
be developed. Um standardized lots in
many sections of the RB district are 50
by 100. Um many of the lots that are in
uh like Hickok and West uh they can
range in from like 30 to 60 ft of
frontage. Um and then with
175 ft of lot depth. Um so that's what
they used as as dimensions.
um kind of off the off the bat um
looking at the the map looking at uh
transit accessibility
um the consultant said we're not going
to touch the RA district um so they said
that this is not uh based on what's
there mainly single unit houses um far
from transit in many locations without a
sidewalk um this would not be uh
suitable for having multi-unit buildings
there. Um so they said disre let's
disregard that and let's look at what
could what we should be planning for for
growth which is closer to transit closer
to our arterials um and areas that are
suitable for higher density development
and in locations that already have
multi-unit buildings already. Um, so all
the designs that are there, um, they
feature, um, mainly threebedroom
dwellings and fourbedroom dwellings,
mostly three-bedroom dwellings. I think
they had a few that might have been
two-bedroom dwellings because of the
space and um, they had a unique uh,
configuration setup with the tuck under
parking. So in those designs it would
have a ground floor two-bedroom uh unit
and then the top this the second and
third floor would be three-bedroom
units. Um they showed designs. Yes.
>> I mean wasn't the whole
purpose of it to to see how many
>> Yes.
>> threebedroom prior to home. So
threebedroom more unit.
>> Yes. So yes. So, they showed this with
um at 50% of law coverage. And I think
at the 50% lot coverage, that's where
they were towing a line on whether they
can actually get 50% lock coverage with
uh with all three-bedroom units. When
they got 65% lock coverage, they were
able to comfortably put in three-bedroom
units uh for all the dwelling units. Um
and even for the 50% lock coverage, they
suggested
some flexibility with that. too. So, um
removing um front porches from lock
coverage calculations um because that is
a quality that we want to see in in
buildings in Wooki. Um and we don't want
to penalize them for having it. Uh and
um and even with that too, they
suggested going from a base 50% lock
coverage to 55% lock coverage to allow
for more flexibility with maneuvering
and uh parking and uh building sizes. Uh
so so that is I think the general gist
of it that captures most of uh the
report. I think um they do have certain
um other recommendations as well.
um such as allowing for eight-unit
buildings instead of four-unit buildings
or more units in a building than our
current four unit building cap in the
residential districts. Um along with a
number of other smaller suggestions,
>> there was also street tree
recommendations that we hadn't seen
before, I noticed. Was there I guess
more to that maybe to mention? Yeah. So,
that was something that we had some
conversations about with how do we
encourage more street trees? And so,
they provided us um pretty much their
typicals for um street trees on a
rideway that's 49 1/2 ft, which is
standard size for for roads in Vermont,
three rods. Um what that could look like
and how that would appear. Um, I think
that's something that we could
incorporate into zoning, too. Um, for
for new streets. Um, it gets kind of
tougher with existing streets. Um, and
something that we'd have to uh have more
conversations about with council on how
we'd want to create more street trees on
our existing roads.
Okay.
>> Any other questions on this?
All right.
we'll move on.
>> There's probably I mean I think it would
be outside the scope of this but I guess
one thing I am thinking about is like
expected cost per unit which I think
that might have a big impact on which of
these we actually do see developed here.
Um but um yeah I guess I don't really
have a question but uh um you know just
one I think pretty important factor
that's just outside of the scope of
this. Yeah. And they they've been
acknowledged that in some conversations
that this the way that this the project
scope was defined to them was looking at
affordable 3-bedroom
uh dwelling units. And for projects that
involve affordable three-bedroom
dwelling units, that's typically done by
an affordable housing developer who is
getting um HUD funding, tax credits,
some sort of external funding in order
to to build it. Um so, so they kind of
took funding out of the question knowing
that it's going to be for a particular
uh audience. Um I think once we talk
about market rate, that's going to be a
whole other question of design and form.
Um, but I think that it's interesting
for us to look at to think about design
parameters. So that way when a developer
who's able to feasibly develop a 4unit
building at market rate wants to build
it, then we can at least say this is
what we're aspiring towards and these
are the design standards that we have.
So try to move towards that.
Okay,
move on to city updates and we'll start
with Mr. Mayor. Do you have any updates
for us?
>> Um, we're on our like August recess. So
no wa wa
>> like Congress just
none of the pay. But uh
>> we the um
there was an election uh which was thank
you to those who volunteered. Thanks to
those who ran. Congratulations. Um,
and it was I'm trying to unpull the
numbers now because the turnout was
actually 4867
or something.
>> It was
so
Yeah. 1,437
voters.
>> I overshot by 30. I'm sorry.
>> 81 voters who registered right there and
then to vote. So that was huge. So you
were there when we had a gentleman come
in who was obviously a new new American
who'd never voted before
>> and he he went to register with with
Jenny
>> and I think he was he was getting kind
of frustrated because you have to show
ID and stuff and he started to he said
well no I'm not going to do it
>> and there are about six of us
>> he wants you to vote we want you to vote
and he kind of looked and he says nah
and we kept after him he and He said,
"Okay." So, he went back and he voted.
>> And when he left, as he was leaving, he
he made a point of thanking all of us
for letting him vote. He thought it was
great.
>> Yeah. Really nice.
>> And you see that here quite a bit at the
polls, and I would encourage if anyone's
interested in working the polls
>> to do it. It's a It's
>> It's serious, but it's fun.
>> Yeah. No, it's really nice. I I love
doing it. Do it. Never. I'm not on the
ballot. And that's that's a really nice
way to to experience democracy and just
see
>> democracy in action, especially when a
new American, an older new American
comes in with like their grandson or
granddaughter who translates for them
>> and tells them what to do. So, it's kind
of cool.
>> That's It's nice. It's really nice. Um,
what else will be interesting to you
all? Uh, hotel should be opening up
September 21st.
Um,
let's see. Um, the
um the workforce housing next to it is
starting to open up. They thought they
were going to be open the end of June.
That just didn't happen. The leases that
they've signed, all of the people who
signed those leases, they put them into
hotels
um until until their apartments are
ready. So, that's good. Um, but there
people should be moving in if they
haven't moved in already to the top
floor and they're just working right
now.
>> Is that was that 87? How many units is
that?
>> 83.
>> Yeah.
>> Yeah. It's nice. We did a tour the other
day. Really, really nice apartments. Um,
>> the uh hotel manager is trying to get
some of his people living in the in the
housing right next to work and got like
that. But
>> that pretty much completes the downtown.
Yeah, I mean that's started 25 years
ago.
>> Yeah, that's that's the last piece is
the hotel. So,
>> well there there are technically two
left,
>> but that's not considered done
and
>> No, I I I understand cuz one of the lots
probably can't be built on and the other
one
>> the east pad site I'm talking about was
proposed and the west pad site. Okay,
>> I'll leave that at that.
>> Is the hotel gonna have preeies?
>> What's that?
>> I heard a rumor.
>> Yes, but that the creamies are for
guests. So, you have to do this
location.
>> What' you ask?
>> I heard a rumor there might be creamies
at the hotel.
>> Yes. When you when you check in, you'll
get a creamy
>> at a rooftop restaurant.
>> But there's a rooftop restaurant
>> station.
It's It's night if you can if you can
swing it. A nice little station would be
good there. Right.
>> The rooftop restaurant is not a rotating
restaurant.
>> No. No. I guess
>> And the restaurant's open to the public.
>> Yeah. Restaurant. There's a restaurant
on the roof. There's a coffee bar
slashbar in the lobby that's open to the
public that will have like its own
entrance. So, if you just want to go for
a drink or for a coffee, you can easily.
Um the
Yeah.
But yeah, not the one piece. They
thought about silent time and they were
just like didn't want to deal with
having to figure out the whole
infrastructure. So, it's just a few
checks.
>> Future improvement.
>> Uh yeah, I'll go with that.
>> That's it for your report.
>> That's it.
>> Okay. I said I'm on August recess, but
here I am.
>> Well, thank you for coming, Thomas. hold
you off of your recess.
>> Uh is that like in kindergarten when we
had recess?
>> Kind of.
>> Okay.
>> Do we have a a liaison from the um
inclusion and belonging commission?
>> I don't know. I know that they're still
>> they're doing
stuff.
>> They're doing some restructuring.
>> Okay. Um, I've been including King in
the emails out or agendas and for for
future meetings. Um, but I'm not sure if
King is still the liaison. Um, so I
think that's to to be determined once
they figure out their structure.
>> All right. So, we'll jump to updates
from city staff. That's you, Revie.
>> Yeah. Um, let's see. Uh, so we have the
open house in two weeks for Safe,
Healthy, Connected. Um DRB is meeting
next week to talk about ULUDR updates
that we've all done. Um no applications
currently.
Um the the Armory application is on my
desk uh and it's undergoing internal
review right now. Hasn't been warned
yet. So um yeah, it's to be determined
for that. Um, I think
that might be the most that I have.
>> Okay.
>> Yeah,
>> that's okay. We might get out of here by
eight.
>> Yeah. Wow.
>> Uh, any other business from members of
the planning commission?
>> Trevor,
>> I did just start thinking about how
there's a surprising lack of creamies
available in Wooki. There's no
>> chicks.
>> Yeah, I got one last
plug.
>> I ran into some tourists who were
walking out of chicks asking if there
were other creamy options and um they I
wasn't able to give them one in Wooki.
So, something to think about.
>> Waterworks happened for a little bit,
but not enough of us were buying
premiums apparently. M well if you want
to start a business
>> there you go
>> vacant uh well say so
>> all right um I think that's it if
there's nothing else I'll look for a
motion to adjourn
>> I make a motion
>> okay
>> second
>> all right uh before we vote on it thank
you all for coming Ruby Brian Matt John
Trevor
Thomas Revy And all in favor of leaving
a journey.
>> I thank you Mike also.
>> All right. Good night everyone.
>> Thank you.
>> Thank you. But bigger.