The September 2, 2026 meeting of the Waterbury Development Review Board began with Chair Dave Cingham outlining the procedural structure for the evening's hearings. As a seven-member board with five members present, a unanimous vote of four affirmative votes is required to approve any project. The chair detailed the hearing process, which involves applicant introductions, sworn testimony from interested parties, comments from town staff regarding zoning irregularities, and a round of questions from board members and the public. The board also explained that while executive sessions can be held for private discussions, the meeting remains open unless specifically closed, and applicants are encouraged to request continuances if additional board members need to attend.
The first item on the agenda was Application 039-26, submitted by Peter Milan and Victoria Comr for a subdivision of their 25-acre parcel at 700 Ring Road into two lots. The project involves dividing the property in the low-density residential and conservation zoning districts to finalize a plan originally approved in 2014 for constructing two residences. The applicants clarified that no new construction is proposed; rather, they are formalizing the existing layout where one home sits on a 14.9-acre lot and the other on a 10.1-acre lot. Key conditions were attached to the approval, including a prohibition on clearing trees within the conservation district without further board approval and the requirement to record specific easements for septic systems and driveway access once the final survey is completed. The board noted that while the property has an irregular triangular shape, the proposed division maintains necessary setbacks and addresses, with one residence predating current zoning laws.
Following the subdivision vote, the board addressed Application 044-26 from Brian and Jill Drinkwater regarding a building at 143 South Main Street in the mixed-use district. The applicants sought to convert commercial space on the first floor into a second residential unit while retaining their residence on the second floor. A significant point of discussion involved flood hazard regulations, as the garage floor is located below the 100-year flood level. The board confirmed that the property must maintain functional flood ports to equalize water pressure and prevent structural damage. Additionally, the applicants agreed to elevate a water heater currently in the garage to at least two feet above the flood plain if they proceed with interior renovations within the statutory two-year period. The board approved the change of use subject to these flood safety conditions and adherence to downtown design review standards.
The meeting concluded with administrative updates and announcements regarding future proceedings. Chair Cingham informed attendees that official minutes from the previous session were incomplete and would be finalized at the next meeting on September 16th. He also addressed a complication involving a prior barn application where a contractor indicated that a previously approved height reduction was untenable, requiring a new submission due to a significant dimensional change affecting an existing setback waiver. Furthermore, the chair announced that there would be no board meetings in October as both he and another member would be traveling or attending conferences, pushing the next available dates to November. The board also discussed potential parking optimization strategies for town facilities and confirmed that the recording system was functioning correctly for online viewers.
Read the full video transcript
Welcome to the September 2nd meeting of
the Waterberry Development Review Board.
My name is Dave Cingham. I am the chair
of the board. Uh we'll go around
starting on my left with introductions.
>> Recording in progress.
>> I'm Brooks Fortune. I'm a member of the
board.
Harry Shepard member boards
board member.
>> Um so before we get into this evening's
agenda, I'm just going to go over how
each hearing is going to be structured.
Um we are a seven member board. We'll
have five members present this evening.
We need four votes in the affirmative
for any project to be approved. Um if at
any point you would like to have your
project continued in hopes that for more
to allow for more board members to be
present that is you right and you can
ask for that at any time and then we'll
continue it to a date certain for each
application. I will announce the uh
application from the agenda have the
applicants consultants introduce
themselves and come up to the table um
and I'll inquire about any members of
the public to be heard on the
application. will then swear in
everybody who wishes to speak on that
application at the same time.
We'll first go through some housekeeping
measures. Um and then they'll turn it
over to the applicant and their
consultants to explain their project.
Um I'll then give town staff an
opportunity to comment on any zoning
irregularities that may be part of the
application.
And then we will go around the table and
each board member will be given the
opportunity to ask questions, make
comments. Um staff will then be also
given that opportunity.
After that is done, um I'll just open it
up to the board members for any
follow-up questions. Once the board
members are through with their questions
and comments, I will then open it to
public questions and comments. Um
anybody who is in the room and wishes to
ask questions, please come up so that
the microphones can hear you.
If after all questions have been asked,
comments made, uh the board feels they
have enough information to make a
decision, um at our discretion, we may
vote on the application at that time or
we may go into an executive session at
the end of the hearing. The concessions
are private and you can reach out to
town staff in the morning to find out
what the outcome of that is. We go into
executive session. We won't necessarily
close the meeting because we may have
further questions that come out of that.
Any questions?
All right. Um,
>> if I could just please remind everyone
to speak loudly and clearly, especially
toward the owl so that our our folks
online can also hear. That can be
something of a a
>> funky system.
>> And we've got two sets of speakers.
We've got the microphones for
>> the TV and we've got a microphone for
the owl. And this is the recording. This
is the official recording of the
hearing.
>> Okay. And our live attendance on online.
>> Yep.
First item on the agenda is application
039-26
Peter Milm and Victoria Comr. Uh owner
applicants 700 Ring Road Merberry
Center. Applicants proposed to subdivide
their 25 acre parcel into two lots. Lot
one 14.9 acres and lot two of 10.1
acres. Property is in the low density
residential and conservation zoning
district as well as in the Ridgeline
hillside steep slope overlay district.
Projects in the overlay district require
development review board review.
Please come up
and
online right there. Okay.
>> Zoom. Peter's on
>> and uh he sent me a message saying for
having me here today. I do apologize.
I'm I'm not hearing uh the whole entire
conversation, but do wanted to let you
know I'm I am here and trying to trying
to listen in.
>> Thank you.
Uh there are members public present to
be heard on this application.
Seeing none, please raise your right
hands. You swear the evidence you shall
give to this board shall be the truth,
the whole truth, nothing but the truth.
>> I do. I do.
>> Here.
Thank you. All right. And in our packet,
we did have the butter letter and the
notifications.
So, we've got that.
>> Yep. The certified notice are in there.
>> Yep. Uh, all right. I will turn this
over to guess John
>> or I'll take on it. So, um, yeah, this,
as Dave said, this project's for Pete
Milan and uh, Tori Comr up at 700 Ring
Road. They have two residences on the 25
acre parcel because in 2014 we gained
approval from this board to construct a
second residence and under section 403.
Basically at that time we had to display
a possible subdivision to meet the
requirements of section 403 for two
primary dwellings on one parcel. And so
we are back here now to finish that
subdivision.
It is uh remains the same as it was
approved in 2014 in terms of the lot
line in between the two buildings. The
only change is is that lot one
uh was originally proposed at a smaller
size.
Um and so therefore in this final
rendition we have a lot one of 14.9
acres and a lot two of 10.1 acres. Each
proposed lot has one of the existing
residences on it and each residence
meets the applicable setbacks
uh for structures
and uh this is a low density
conservation zoning districts. the
conservation the zoning line kind of
bisects the property almost in the
middle and in either case though both
proposed lots exceed the acreage
required for the conservation zone.
Um both residences are actually located
in the low density residential section
of the property. Um the existing
driveway was approved in 2014 as well to
the second residence which is 730 Ring
Road on lot two there. And so that
driveway is will be subject to a right
of way across lot one to access lot two
um centered on the ground.
Uh the septic system for uh the 730 ring
road lot is by easement on the other lot
as shown here. Um the existing property
is of an odd triangle shape with a wedge
cut out of it where the Kazinski
property is. And so there, you know,
this division we feel like is makes
plenty of sense given the shape of this
land. And again, it is the same concept
subdivision from 2019 plus or minus a
change in that acres. [snorts]
the homes the homes are constructed in
the same location as previously pro
proposed and approved. So we really do
feel that we're kind of bringing you
back the same proposal short of the
change.
>> So this is Monica Ken. She's a me board
member.
>> Oh. Well, I guess in kind of conclusion,
there is no like new construction
proposed. The driveway, the residence
that was approved in 2014 exists. Uh
like John said, you know, per the plans
there built where it was uh proposed.
And so this application doesn't propose
any new construction
exists.
>> All right.
Harry,
>> I think I heard the thing that I wanted
to just hear was that there's kind of
going to be proper cross easements
for the new lot across, you know, the
portion of the existing lot that's on
the lantern and Maine.
Um,
at this scale it's hard to kind of
detect everything, but so I am I seeing
like there's three buildings on
the existing lot.
>> Uh, there might be a shed, but there's
only one primary.
There's a larger.
>> Yeah, there is. There is one shed behind
the uh 700 ring road, a small probably
10 by 12 shed. And I don't know if it
shows up, but there's a chicken coupe in
front of the uh 7:30 [clears throat]
about the size of a shed.
>> It's a septic easement here, not a
structure. Correct. Correct. Okay.
>> There is a chicken coupe right below
that septic that Pete just mentioned. It
is not of a zonable structure size. It's
a small shed.
>> So, it's not shown, but it is there.
And we will on the final subdivision
survey have that 50 foot rightway across
700 down to 73
centered on the existing drive.
Pretty simple since the drive already
there.
And Dave, I think I heard you say
earlier and just for the record that
this is
off of a private portion of Ring Road.
This is beyond the end of the
>> class 4 town.
>> Correct.
>> That is correct. It's the same private
rightway that serves John's lot actually
adjacent here and a number of lots now
that I think you guys are aware of
multiple projects.
>> Yep. That's exactly it.
And this so it's also
>> this this new lot can be conveyed
rights across that private portion of
Ring Road.
>> There's a meandering 50ft rightway that
follows Ring Road all the way up through
and everybody has needed access to that
right away.
No further questions,
bud.
>> Yeah, it is a rather bizarre law.
[clears throat] Just wondering about
this ratio of width to depth
one and five. Is has that been looked
at? Is that
has that come in right here?
Um, I don't have an exact measurement on
it, but I can.
>> It's just that the depth isn't supposed
to exceed five times. [snorts]
>> The width is
>> I think it was exceed
on the existing lot.
>> I would doubt it. How do you
>> I think it was a non-conforming lot to
start with.
>> The width of the depth on the triangle
is a little
>> How do you do that?
>> I don't know how to measure it. Oh,
don't worry about it.
>> Be honest.
>> That's why I asked the question.
>> This bench boy was created by that lot.
So, like [clears throat] there is
already a width there.
>> There isn't like necessarily any magic
to the lot layout. Like you wanted to
make sure [clears throat] at least 10
acres on each. So, we didn't have to
>> cuz we had talked about like with the
split zone, do we do a 5 acre and then
at least 10? Let's just do both do them
10 once you get beyond the homes. It was
kind of
>> woods out in there. And so I mean we
picked this 10 acre lot to go with the
700 sorry the 730 the [clears throat]
14 to just remain with the smaller home
but 700
>> and just for reference this is the shape
of the lot. Yes.
>> Oh, the exist.
>> It's got 300 ft of farting. So, it would
need
>> less than 1,200 ft of depth,
1500 ft of depth.
Okay.
>> But there's no meets and bounds here, so
I can't tell you what the depth is.
>> Well, hopefully the neighbor won't gain
control of that real narrow portion.
>> You got more depth than that. I think
that's
>> one 100 plan.
>> It's got
I mean I guess if you're going to the
point of the triangle, which you would I
guess this is an odd shape, but I think
we have 1700 ft of depth there on that
700 mark.
There's there's there's no way to do it
that doesn't exceed that five to one.
>> Well, it's already there. So,
>> I just thought I'd throw monkey wrench
in.
>> Some of these lots were created when
Ring Road was there was no zoning
obviously, but more literally this was
all camps.
>> Yeah. Triangles shaped like such a rare
shape. I don't know how that
>> Well, this is more than that. It looks
like some kind of chicken. It was it was
it was it was a triangle-shaped block
and they took a chunk out of it for
>> to get the Kinsky
>> to sell it to whoever before Kazinski, I
guess.
>> Yeah.
>> And that's all I have.
>> I I do just want to note too as we're
talking about each of these lots, lot
one and two. The the map right now um
has the has lot two labeled as 700 ring
road and lot one labeled as zero ring
road. But the E911 for the house on
>> lot two is 730.
>> Correct. Correct.
>> And the other one E911 is 700. So
there's no more zero ring road there.
>> No, there is no 730.
>> Just to make sure we're talking about
the same addresses and the same lots.
>> We are.
>> The final survey will have it labeled
correctly.
>> Thanks for pointing that out.
Looks like the drive is something the
fire truck.
>> Yeah. No, this isn't again this has to
get a ring.
>> Yeah, I know.
>> This access was reviewed there in 14,
but yeah, this is a nice
drive access. Nothing steep.
>> Monica, you have questions or comments?
>> Yeah. Brooks.
>> Um, out of curiosity, why is the lot two
size smaller
um, uh, than it w than it is or than it
was as proposed in 2014?
>> Well, I think uh, Pete
>> No, I think it's Well, yeah. Okay, this
one's smaller. Sorry.
>> So, I mean, correct me if I'm wrong, but
I think anecdotally, I think um Pete
intended to uh keep the property at 730
Ring Road and then sell off 700. And so,
he wanted more land of the house he was
going to keep. His plans may have
changed. So, he may be keeping 700 and
selling 730. who wants to keep the land
where the property he's going to hold
larger, but that's
>> that's an accurate representation. Um,
we plan to potentially sell uh 730 Ring
Road and keep 700 Ring Road. Um, and you
know, I just asked Chris and John to
come up with the, you know, the most
reasonable lines um for the two
properties given the irregular shape.
So, um, this was what they had showed me
as being a reasonable chunk of land to
to and nice clean lines to go with the,
uh, with 7:30 ring road and then the odd
shape remaining on the on on, uh, 700.
So, that that's an accurate
representation.
>> All right. Thank you. And, uh, even
though 7:30 Ring Road doesn't
technically exist yet,
>> they both exist. They they they
houses exist. The addresses exist.
>> They do. Well, the address exist exists
only for 911 purposes.
>> Both both exist.
>> Okay.
>> Yeah. It's just that this map didn't
align with that in terms of how the two
lots were labeled.
>> Yeah. I map has a label issue. The 730
residence on the 10acre lot is there
>> and the 700 ring residence on the 14acre
lot is there.
>> Yes. the the
>> 700 Great Run residence predates zoning.
You know that house was built in the 70s
>> and it was it was actually a camp first
and in 2005 it was turned into an
allseason residence.
>> Okay. Um and then permit um permit
43-14-T
in 2014 allowed the second residence on
site um as long as in theory if they
were a subdivision that residence met
the setback requirements for the zoning
district. And so they submitted a
concept subdivision plan at the time in
order to get the approval to build this
second residence on the lot. And now
they're doing the subdivision in actual
fact with just a slightly adjusted size
lot. And the setbacks are still met by
that second residence as well as the
first one that had been there
since decades.
>> Two addresses, two residences, one uns
unsubdivided property as of right now.
>> Correct.
>> And that is and that is not in terms of
E911. That is not um unusual when folks
do say a a non um
a se a detached sorry that was the word
a detached ADU because it is a distinct
structure on its own. E911 requires its
own number. So the u the land records
will generally go by um the primary
residence or first residence. So, it's
listed on our land records as 700 Ring
Road, but it does have two addresses on
it, and the state E911 board recognizes
those two addresses as two distinct
locations for emergency purposes.
>> Okay. Um my my question is as to the the
easements um the easements for um the
septic and for ingress and egress. Have
those been actually recorded or are
those just easements in principle?
>> We would record those once the
subdivision is approved and final and
the myar is recorded and then those
things would be put into the deeds when
the land is sold.
>> Okay. But our final survey will show
them
uh and so therefore as the properties go
to be conveyed all those rights will be
shown. It'll also be detailed in your
permit
you know there needs to be access. We
usually wait to do the final survey in
case some sort of change happens here at
TR meeting that we get the permit and
then we'll file a myar because filing it
coring another one on top
and he owns all the land in both houses
now. So there's no separate ownership to
have a
easement in place at the moment
if that makes sense.
All right, that's all I've got. That's
good.
>> Yeah. My only comment was, you know,
show the show the right of way. Um, is
that a mound system for a setting?
>> It is.
>> Okay. So, it doesn't need any extra
space.
>> Now, all my all my questions were asked.
Any further questions or comments from
the board?
Any members of the public to be heard on
this application?
>> Cheryl, do you have any further comments
or
>> Thank you.
>> Um, does the board feel enough
information to make a decision? And if
so, do you want to do that now or do we
want to discuss this?
>> I agree with Bob. Very good. Okay. And
that's fine. we'll entertain a but
before we do that um
so a couple
conditions for this
um
so
how does the board feel about and the
applicant feel about a condition that
there'll be no clearing within the
conservation district without board
approval
Yes,
>> you're good with that, Pete. Right.
Makes sense.
>> All right. Um, I'm sorry. I heard
something about a conservation district,
but I didn't hear the whole sentence.
There's a there's a condition on this
approval that would be on the plat that
there would be no clearing within the
conservation district without DRV
approval.
>> Is it
>> where exactly does the conservation is
that on the other side of the the creek?
>> On the other side of the brook,
>> correct?
>> Yeah.
Um,
>> can you see uh not yellow and green?
>> No tree cut on the other side of the
brook.
>> Well, you can't clear it. So, you can
selectively thin it for logging,
>> but no clear cutting.
>> No clear cutting. Yes, that's
>> without without DRB approval.
>> Yeah. It's not to say you can thou shalt
never clear it. You could come in and
maybe get an approval, but
>> Right. But
>> but it would be okay for me to go to and
take a couple trees for firewood and you
know here and there every year.
>> Yes.
>> Just just not hiring somebody to come in
with it
>> here and mow everything down.
>> Correct.
>> Correct. Correct.
>> This is partly because it is in the
conservation district and it is also in
the
uh the hillside ridge lines deep slope
overlay district.
>> Yeah.
>> Yeah. I'm okay with that condition.
>> Okay. And that that is something we do
typically put on conditions in this in
these districts.
>> Yeah, it's pretty standard for this
district. Question
>> is just above the the dot um just above
there is the line between low density
above and conservation below and the RHS
overlay covers in in its entirety.
>> Correct.
>> Just for reference.
Um, and then there is a standard
condition that you have 160 days.
>> 180 days.
>> 180.
>> Well, we'd like to see it
>> within 160. We'd like to see it in 160
and then that gives us two weeks to get
it signed then get reported beneath the
180
map reflect the accessing between
>> show the right of way the address
there's no need to download
there will be
>> yeah I say I'm not I'm not going to list
all those things you need to do Those
are standard. Yep. We get that. All
right. Board with those conditions. Any
other discussion or suggestions,
right? Entertain a motion.
Sorry. Entertain conclusion.
>> Sure. I'd offer. Based upon these
findings and subject to the conditions
set forth below, the board concludes a
proposed project by Peter Melm for the
subdivision of 7art Ring Road into two
lots as presented in application number
039-26
and supporting materials meets the
criteria set forth in sections 504
and 1202
Waterbury zoning regulations.
Um, because this lot has two addresses,
we either add the second one or
reference it by the parcel ID number.
>> Which way should
I'm happy to amend the conclusion
accordingly?
And then I would offer on behalf of the
Waterberry Development Review Board, I
move to approve application 039-26
with the following requirements.
The applicant should complete the
project in accordance with the board's
findings and conclusions and the
approved plans and exhibits.
Uh there should be no clearing within
the conservation district without future
board approval.
and they're uh to submit a final record
myar plaque for review and within 160
days
>> and there's standard language that goes
in that to meet the 180day statute that
I'm happy to make that the motion we
have a seconded
by bud. All in favor?
>> I I opposed.
>> Thank you, gentlemen. Thank you very
much. Thank you for being appreciate.
>> Hey, thank you very much for your time,
all. I do appreciate it. Hope you have a
great night.
>> This can be completely off the record,
but we are very impressed with the new
zoning administrators. We are very
>> going very well in our opinion.
>> Um, you guys submit I appreciate that.
>> Plans in the future. Can you also
include a digital copy? It's just really
hard to read the scanned version.
>> Definitely.
>> Oh yeah,
>> for sure. Yeah.
>> And that Oh, yeah. I did I scan that?
Yeah, I
>> Okay, we will make sure. Yeah. Thank
you.
>> All right. Next item on the agenda,
application 044-26.
Brian and Jill drinkwater applicants and
Phyllis Simon Honer 143 South Main
Street in Waterberry. Applicant proposes
to change the use of a building on the
parcel in question currently zoned as a
mixed residential and commercial use in
the mixeduse zoning district and the
design review overlay district and
special flood hazard area overlay
district. that propose converting the
commercial space to a second residential
unit. Change of use in the overlay
district require DRB approval.
>> Brian and Jill.
>> Yes.
>> Just for the record, could you introduce
yourselves?
>> I'm Brian Water.
>> Welcome. And maybe members oppose be
heard on this application
hearing. Seeing none,
>> I do have one amendment to it.
>> We'll get sorry. Okay.
Um, raise your right hand. Swear the
evidence you shall give to this board
shall be the truth, the whole truth, and
nothing but the truth.
>> Excellent.
Um, and we did have the
notice to the letters and the
right um receipts in our packets. So
that
all right.
>> Uh, the only amendment I need to make is
that we are now currently owners and
>> Okay. Closed on.
I guess I open my questions. I'm
planning on buying it actually. All
right. So, I'll turn it over to you to
please.
>> Yeah. I guess it was at some point
Simons ran their business out of the
first floor and lived on the second. Um
an office. Uh we're working to turn it
back into a residence. Two bedroom
rentals property and we're living on the
second floor. actually
um just some kind of overall any changes
to the outside of the building.
And then the garage, nothing being added
in the garage
as far as renovating it, making it more
habit.
No, we'll um divide off um one day
with the [clears throat]
>> Okay.
All right. Um Harry, questions.
>> No, and I didn't drive by before and
to see that they do [clears throat] have
flood ports.
Um there are three on kind of the north
side
>> and then two in the southwest corner.
So I think at one point we might have
had there were going to be some flood
ports in the garage doors also
going back but I want to say it looked
like it would work fine.
>> All it's just a it's a ratio of area to
area enclosed space.
>> Right. So, uh,
>> is that what they were saying?
>> Yes. But again, the whole buying process
when you're asking people water,
>> they they allow flood waters in and out.
>> Okay.
>> Of that phase
of building the garage floor is a couple
foot below the 100 flood level.
>> Yeah.
>> And so it it really kind of equalizes
pressure on both sides so that you don't
create structural problems with
flooding.
And so it's important to keep them
functioning.
>> That was good. Otherwise,
>> okay. No,
>> um, it says in here that the current
water heater will also be moved to the
garage.
>> It's a possibility. Yes.
>> Okay.
>> Because right now it's in a closet,
>> right?
>> The home inspector didn't like the fire
didn't like either.
to get a deal.
>> Okay. So, that's is is that a change to
the garage then?
>> That would be what we consider a change
to the garage. So, that that would have
to be up in the garage 2 ft above the
flood.
>> Yeah. Yeah. Yeah. Yeah.
>> 4 foot level.
>> Yeah.
>> Yeah. Any electrical going to it. That
would all have to be up. Um, and you
when if and when you decide to do that,
you should come back and talk to Cheryl
about that because you may need a permit
to do that because the enforcement of
our flood plan regulations is what helps
people in town get a discount on their
flood insurance.
>> To get it period
>> to get it period. Yeah.
>> So, and those are important matter
factors in in that.
>> Okay.
Since that um potential change interior
was in their application, their project
description, I can include the relevant
um flood hazard bylaws uh pertaining to
that and ensure that a condition is that
the water heater will be elevated.
That works if they plan to do it in the
next two years.
>> Okay. Why two?
>> Because there's only permanent expires
after two years.
>> You have two you have two
>> you have two years to start your
project. So
>> I mean yet yes we can do that but
understand that if you do it it's been
longer than two years you still have to
come back. Yeah. And actually all all
activities permitted
by this have to be complete within 2
years say the bylaws.
>> So um so anything that's not completed
on this per bill you'd have to come back
after two years.
>> No I don't have any questions. Thanks
David.
>> Oh
this is a great project to see some
more.
>> Good.
>> Yeah. I think I think before it became
office space, it was a a residential.
>> Yeah, they never took it off the water.
>> Yeah, I was reading that email.
>> Welcome to H.
>> Thank you.
>> Uh members of the public seeing not
board feel they have enough information
to make a decision?
>> I do.
>> Ready to proceed with that? will
entertain
a conclusion.
>> I don't have a script for this one. Did
we get a script?
>> No, because and my apologies. I just
slammed the last week.
>> Something. So, so it's the same language
as the ring road one except that the
sections are 301
site plan review and
what's flood plane? Um flood plane is
um
>> 604
development standards.
>> 604
and um
>> 301 for site plan review.
>> 301 for site plan review. Um
and 108
What is that one for?
>> Downtown design review over Lake
District.
>> So you are in the downtown design over
Lake District. So you can change that
Cheryl if you want to change something
about the exterior of the building.
Okay.
>> Make sure you come.
>> Okay.
>> Um and also um 16 05B with regards to um
permitted uses in the mixeduse zoning
district. And
>> number again please. 1605
>> 16005B.
And that's of the
>> that a two family dwelling two units is
a permitted use in that district.
[clears throat]
>> All right, let's give it a go.
So based upon these findings and
subjected to the conditions set forth
below, the board concludes the proposed
project by Brian and Jill Dink
with
>> an
[laughter]
at 143 South Main Street.
Um,
>> everything's filled in but the
highlighted stuff
>> as presented in application 044-26
and supporting materials meets the
criteria set forth in sections 301 604
11108
and 1605B
of the Waterberry zoning regulations
>> and the unified development bylaws phase
one. That was right there, too.
[laughter]
>> And on behalf of the Waterberry
Development Review Board, I move to
approve application
44-26
with the following requirements. that
the applicant shall complete the project
in accordance with the board's findings
and conclusions and the approved plans
and exhibits.
>> And the water heater is the the water
heater moved to the garage is elevated
um according to
>> 2 ft above the
>> two feet above two feet above the flood
plan.
>> That's my motion.
>> We have a second.
>> I'll second now. Second by bud.
>> Well done.
>> All in favor?
>> I
>> I.
>> Any opposed?
>> Congratulations.
>> Thank you very much.
>> I I assume cut
>> Japanese notweed. Yes.
>> Thank you.
>> So there are a few more steps in getting
the paperwork finalized and signed and
so forth. So, you will be hearing from
me um in the the next couple of weeks to
get this completely
>> permitted and official.
>> Thank you so much for your help.
>> Thank you.
>> Appreciate it.
>> Yeah. I apologize for not seeing the
front gates. I was looking at the doors.
I [laughter]
>> Well, the garages is where you most
frequently see them.
>> Yeah. Well, my one eye didn't pick up on
the ice.
>> That's all right, bud. We got you
covered. I know.
>> Well, and my apologies to everybody for
not having the ordinances filled in on
the staff report. Um, I have been
slammed.
>> Absolutely. No problem.
>> It's what I was working on when I muddle
through
it.
>> That was great teamwork.
What
>> you
person?
>> Oh, what's what's going on? Why are you
Why are you so busy? No, you didn't.
>> All right. Um,
>> I assume we don't have any public
comments this evening.
>> I don't think we have public.
>> We are moving the town's business, are
we?
>> We're moving along.
>> Um, we also do not have minutes to
approve because when I finally got a
chance to look them over, I found that
they were only um half uh half updated.
It was sort of a a template from the
last meeting where the last meeting
information was half of it. So, we're
going to have to do that next time on
September 16th.
>> Okay. And was I wasn't at that last
meeting.
Was that application approved? it was.
But in um zoning administrator business,
[clears throat]
um those folks have come back to me to
acknowledge that um due to an illness,
they had to switch to a new contractor
who said that the plans they submitted
for the height of the barn um with the
15t setback waiver, you folks remember
that one. um
>> uh were were untenable and that the
height needs to be 29 ft and not 19 ft.
And since there was a setback waiver
involved in that approval, um I wanted
to get your recommendations on whether
this needs to be um redone, amended, um
how to proceed because there's a
dimensional change to that mark. That's
considerable.
>> That's significantly different.
>> I mean, that was part of it that it sat
down well and the roof elevation wasn't
very high.
>> Um,
>> so that's the that's what happened
there.
>> I would have applications.
>> If it was one foot higher, they'd have
to come back.
>> No, it's it's 10 ft.
>> Of course.
>> So, and I and I said to
>> we we could determine that to be a minor
issue.
>> Yeah. Yes. I guess you're right.
>> Right. only. But no 10v definitely not.
>> Yeah. Only because there's a setback
waiver in otherwise I would have taken
care of this. But that setback waiver
>> we could say we we could say we hope
it's not untenable.
[laughter]
>> I don't 10.
>> Yeah. That's that's a strange word for a
contract,
>> right?
>> Or maybe he said it's not going to work.
Sorry.
>> I editorialized.
[laughter]
>> Okay.
>> I like picturing him saying Unable.
>> All right. that. So that is going to
come back to you. Um we don't have time
for that to be um next time September
16th we will meet and um review the
Chittenden application that was
originally scheduled for tonight. They
did not do
>> that
>> certified mail um in time. So I
rescheduled them for next time and moved
that process along. Um, and then an FYI,
there will be no meeting in October
because um, the first week of October I
am in Ireland. Um, and Neil is
unavailable to cover for me. And the
second meeting in October, Neil and I
are both at a planning conference in
Manchester. Um, so neither one of us is.
>> So, do we have any do we have any timing
potential timing issues? If something
comes in that doesn't work out with
that,
>> the only potential timing is this
setback.
>> The setback. Yeah, they've got the barn.
>> They've got to submit a whole new
application. That can't just be
considered a continued application.
>> Okay.
>> Right. So, so there's that. We do have
um at least one that is amendable to
November, which would be the next
available meeting dates.
>> You're going to have one from me
tomorrow.
>> An application.
>> Right.
>> Great.
>> Not in October.
>> So,
>> it is what it is.
>> Just what I need.
>> That's great.
>> Um
>> so October 14th is not happening.
>> No. So, our next meeting is the first
one.
>> So, it's October. The next one is this
month and then and then November.
>> Great.
>> October 7th or October 21st are the two
scheduled meeting dates.
>> Oh, okay.
>> And Neil and I are both indisposed on
those nights.
>> Vacation, right?
>> Right. 7th and 21st.
>> Great.
>> I will be turning 50 in Ireland and not
caring what you all are doing.
>> Um,
>> and the other one's work will be at a
conference. Um, and that's
that's it for me this time around.
>> Oh, we could use a little spatical.
>> We could we could I'm just going to do a
plug. We could um meet with the planning
commission.
>> I I was I'm about to suggest that.
>> That's brilliant.
>> Yep.
>> Because I know that they want to pick
your brains a little more and get some
>> I think that's I think that's a great
plan.
>> Great plan.
>> I can't do Oh, I can't do it on the set.
I can't do it on the 14th.
>> Interesting.
>> Okay.
>> I like that. We wanted to make more
parking spaces by reducing the length of
the ones we have.
>> The length of the width.
>> The length.
>> If all the parallel parking spaces could
shorten,
>> we could gain more space.
>> That's true. As long as we all drove
small cars.
>> All right.
>> All right. You plan on
>> Yep. You can turn the recording off.
Okay.
>> [music]