Video summary
The fifth meeting of the Transport Committee in 2026 focused extensively on safety measures and operational challenges within Scotland's rail network, particularly regarding violence against women and girls and the recent launch of the new ScotRail app. Witnesses confirmed that significant investments have been made to enhance security, including expanding CCTV coverage at major hubs like Glasgow Central and Edinburgh Waverly, tripling the number of body-worn cameras for frontline staff, and deploying a dedicated Travel Safe Team to monitor hotspots. While reported assaults on the Caledonian Sleeper have increased, officials suggested this may reflect improved reporting confidence rather than a genuine rise in incidents, though they acknowledged ongoing societal challenges regarding antisocial behavior linked to fare evasion, which has been successfully reduced from 8% to just over 2%. The committee also addressed the chaotic debut of the new app by Silver Rail, which faced thousands of complaints due to technical failures and contractual constraints preventing a soft launch; although the First Minister noted the reputational damage, witnesses apologized and emphasized that user numbers have since recovered as stability is restored.
Financial policies and infrastructure planning were central to the discussion, with the government assessing the impact of abolished peak fares and a fare freeze on revenue and decarbonization goals, noting that while passenger numbers rose by 7%, revenue growth remained minimal due to frozen prices. To combat ticketless travel and antisocial behavior, a minimum fare of £10 was introduced in July, a decision deemed appropriate to deter evasion without being prohibitive. The session highlighted significant concerns regarding competition from the rollout of a two-pound bus fare cap, which has already caused a modal shift on some routes, raising fears that a nationwide extension could severely impact intercity profitability; however, electrification projects are progressing to enable new rolling stock by the end of the 2030s. The aging fleet, with an average age of 25 years, presents further challenges as two-thirds will reach end-of-life within the next decade, necessitating a transition from current diesel trains to refurbished Class 222 units and eventually new electric fleets once long-distance lines are electrified.
Beyond immediate operational issues, the committee examined climate resilience, station accessibility, and future service expansions. Witnesses reported that Network Rail is ahead of the curve in addressing climate change impacts, dedicating £400 million of a £2 billion renewal budget to stabilizing earthworks, improving drainage, and managing vegetation against threats like coastal erosion and potential Super El Niño events. Accessibility improvements are being integrated into new electrification projects to create step-free access, while heating issues on the West Highland line are being addressed ahead of winter. The discussion also covered the potential for expanded Sunday services to meet leisure demand, which requires complex negotiations with unions regarding staffing, as well as the progress on the Clyde Metro project expected to complete in mid-2027 and the pending decision on the new Winchburgh station. The meeting concluded with reflections on the integration of Great British Railways, where witnesses praised Scotland's existing alliance model as a trailblazing example for improving decision-making and emphasized that successful integration relies on cultural change rather than just political restructuring.
Read the full video transcript
Good morning and welcome to the fifth
meeting of the transport committee in
2026. We've received apologies from Zen
Gani. I welcome Martin D um who's
attending as Zen substitute.
As this is Martin's first appearance at
the transport committee, our first item
of business is to invite Martin to
declare any relevant interests.
Uh, thank you. Uh, I have no relevant
interest to declare, but I will try and
make my contributions as exciting as I
can. [laughter]
Thank you, Martin. Right, so the next
item on our agenda is an evidence
session on Scotland's rail services. And
I welcome our guest this morning. Graeme
Cook, director of rail delivery at
Transport Scotland. Welcome Graeme. Joan
Magcguire, managing director of Scot
Rail. Hannah Ross, chief executive of
Scottish Rail Holdings Limited. And Liam
Sumpter, managing director of Network
Rail Scotland. So, welcome all. Um, can
I ask members and witnesses to try and
keep our questions short and our answers
short and snappy? Um, of course you need
time to answer them in properly, but
we'll try and speed things along. Um, so
we're going to open with questions from
Colette Stevenson.
>> Okay. Thanks very much, Convenor, and a
very warm welcome um to our panel today.
So, I'm going to touch upon um violence
against women and girls. And you've
obviously are aware that there has been
several reports um of assaults occurring
on the Caledonian sleeper and and whilst
I completely understand that you can't
comment on what is subjuditial, I wonder
if you could give me um more information
on what the numbers are and the nature
of the incidents which have been
reported
um how they were handled um and whether
there's any operational or safeguarding
in place um as a result of of these
incidents. Um I don't know Joanne, do
you want to come in first? Thanks.
>> So thank you Miss Stevenson and I'm
happy to talk about safety.
>> Joan, just wait. There we are. That's
it. On you go.
>> So morning everyone. Um thank you for
the question Stevenson. I'm absolutely
happy to talk about safety across um our
railway. Um Hannah might want to talk
about sleeper um in particular. So the
safety of our passengers and our staff
is of absolute paramount importance to
us and it probably not surprise you to
hear that the safety of women and girls
is particularly personally important to
me and since we came into public
ownership we have been backed by
government to make a significant
investment in safety at personal safety
across the railway. So we have one of
the largest CCTV networks in the UK that
cover our stations and we also have on
train CCTV
specific to Scott Rail. We've also
trebled the number of bodywn cameras
that we have. So we've gone from 300 to
1,000. So our commitment is that every
frontline member of staff has a bodywn
camera available to them and there are
reports that show that they reduce the
number of offenses on the railway.
We also have an uninterrupted power
supply to all of our help points and we
have help points on every platform.
Those connect directly to one of our two
CCTV centers. So be that Paisley or Den
Firmland and you can talk to a human
being 24 hours a day, seven days a week
if you feel you you are not safe on a
platform and you want to connect with
someone and on our trains we have that
second member of staff. So the driver
and a member of train crew to talk to.
We also have expanded our travel safe
team. So they work permanent back shift
and initially we had a team who booked
on in Paisley. We now also have a team
who book on in Hay Market and they cover
the east of the country and we work
proactively on that team with BTP. We're
very proud of our partnership with the
transport police and I know myself and
Liam work very closely with them on a
weekly basis and our teams work with
them on a daily basis and we work with
them to focus the work on the travel
safe team where we have known hotspots.
And the final thing I'll say before
handing over to Hannah is we also know
that antisocial behavior is linked to
ticketless travel. So we have our
revenue protection team. We've invested
in frontline staff to make sure our gate
lines are closed and we're checking
tickets. In 2022 we had 8% ticketless
travel and we're now just over 2%. So
under public ownership we have driven
down ticketless travel which is also
helping to combat antisocial behavior.
But on the specifics around sleeper you
Hannah.
>> Thank you.
>> Thank you. I just want to acknowledge
this is a really uh serious and crucial
issue and I also want to give you
assurance that the board of Calonian
Sleeper and the executive team at
Caledonian Sleeper take it incredibly
seriously and are motivated to respond
fully to it. There have been a handful
of issues of antisocial behavior and
violence against women and girls on the
Caledonian sleepers, some of which are
reported. Um, in order to respond to
that, there's been a real look at the
culture um, within the sleeper team both
on board and in the HR team that has
included um, sexual harassment training,
safeguarding training and policy
development. Um, there has been uh, a
real focus on escalation of grievances
and how we respond to those completely
and fully. uh a re a refresh of training
around what what counts as sexual
harassment, for example, to ensure
that's fully recognized and what counts
as sexual assault. Um and all of the
issues which are uncovered or happen on
train are now escalated to the board for
and and to the sh committee uh the
safety, health and environment committee
of Caledonian sleeper for focus. So,
it's a real area of focus for the team
and as I say, the executive team are
highly motivated to respond to it. To
Joe's point about body warn cameras as
well, they are also working with the
union to expand the use of body warn
cameras on the sleeper.
>> And that that's reassuring to know that
as well. Um I maybe want to just ask a
bit more in terms of is there further I
know I know CCTV can be it's not
preventative if you know that that the
incident's already occurred for but what
sort of security arrangements are
actually in place on the sleeper um
particularly because it's overnight and
the other thing I want to ask about is
that alcohol now allowed to be drunk
back on the trains again and is that
have you seen an increase in incidents
occurring the causing that?
>> So I'll ask Joe to come in on the
alcohol question. Um as you'll be aware
alcohol has been served on the Calonian
sleeper for a number of years and we
don't see that as a particular factor.
Um, in our incidents, a couple of recent
antisocial behavior incidents have
involved alcohol, but it's not, I think,
a common theme. In terms of CCTV, there
is CCTV on the sleeper. Uh, but it's in
the public areas. It doesn't it doesn't
include the whole train. I just ask I
take it within the sleeper
you
is the the alcohol times are as what you
would be if you were to go and buy
alcohol in the in the shops.
>> Uh I'll need to double check that. I
don't think there is a cut off for
alcohol service on the sleeper. Uh but
can I just double check that to be sure
of myself and and respond to the
committee.
>> Okay. I really appreciate that. Thanks
very much. Um I don't know if anybody
else wants to come in on that. Joan,
regarding alcohol,
>> of course. So specific to Scot Rail
services, we categorically have not seen
an increase in antisocial behavior since
the alcohol ban was lifted. Um and
alcohol can be consumed on Scotil trains
between 10:00 a.m. and 2100. So not
exactly the same, but not dissimilar to
um alcohol licensing in retail premises.
And but we have not seen a spike in
antisocial behavior since we lifted the
ban. And we are not seeing a link
between the consumption of alcohol on
our trains and antisocial behavior.
>> Okay. Does anyone else want to come in?
Liam, thanks.
>> Yeah. Um good morning, committee. Um I I
share I share the comments um from from
my colleagues um about um how um
unacceptable this sort of behavior is.
Has no place in society and it
absolutely has no place on our railway.
Um I wanted to focus on Glasgow Central
Station because that's probably um the
location where um we have uh the largest
number of reports of these sorts of
incidents. Um and to try and give the
committee some confidence in how we're
reacting to that. Um we are investing
very heavily in improving the CCTV
coverage at um at Glasgow Central. So,
we've got a3.7 million pound program to
renew all of the CCTV. And as part of
renewing it, it includes increasing the
coverage to places that um aren't
currently covered or haven't previously
been covered by CCTV to improve the
coverage. We've got a dedicated British
Transport Police team there. We have
regular meetings with them to try and
work with Scott Rail, with BTP to try
and sort of eliminate the um the scourge
of this sort of activity in that
station. Um, and we're also going
through a process of training and
retraining everybody who works at that
station so they're able to try and
identify um signs of where this sort of
activity might be uh might be starting
to um to percolate um but also to
intervene and um and to to de deescalate
um where possible as well. So Glasgow
Central is a is a location where we we
see more of these these issues. Um and
we are we're absolutely responding to
that to try and stamp it out.
>> Thank you. Um Graeme, do you want to
come in? Thanks.
>> Thank you. Thank you. And good morning
everybody. I wanted to add uh a reminder
um to the committee that the Scottish
government along with all of the the
partners in the railway um set up a rail
enforcement powers working group to
address the rise in antisocial behavior
on the railway which of course is part
of a wider societal uh escalation of
antisocial behavior. It reported in
February this year. It made 11
recommendations, all of which were
endorsed and supported by the previous
cabinet secretary for transport and
officials are working with the railway
um to implement those 11 recommendations
and interest of time, I won't go through
all 11.
>> Thank you.
>> Thank you. Thank you. One one last
question is I'm just trying to look for
the the the number that you can call. Is
that widely advertised in the trains as
well so that women and girls that they
they can see it at a glance? Should it
be more readily be advertised?
So it's we can always look at doing more
and it's advertised on our trains
physically and we also include it in our
on train and at station announcements.
So we can we remind people to contact
BTP for women and girls. We also
launched um ourselves and network rail
jointly launched a campaign with crimes
stoppers as well specific um to
supporting women who are suff um
experiencing fog.
>> Okay. Thank you. That Thanks.
>> Thanks Colette. Um Irish Dwayne.
>> Thank you so much and thank you members
for joining us today. [clears throat] I
just wanted to jump off a comment that
you had said Hannah. You noted that
there'd been a um a handful of issues on
the Calonian speaker. I was just hoping
uh between you and Joanne, are we seeing
a decrease in this um violence against
women and girls on the Calonian sleeper
and and the trains? Are we seeing an
increase? And um how have you responded
to to that?
>> So, we have seen an increase in reports
being made to us. I would
not like to speculate about whether that
is a genuine increase or if it's an
increase in reporting and understanding.
and Joan if you
>> so across our network we have seen an
increase in reports um of assaults
however that would be proportionate in
some cases to the numbers traveling and
we would we also encourage reporting
both from our staff in fact we do more
reporting with our staff than most other
train operators um and our h customers
so for example we'll look at um verbal
assaults we'll look at physical assaults
we look at them very closely we work
with our trade unions on them. But we
have seen an increase. Unfortunately,
there is a societal challenge as the
committee will be aware of with
antisocial behavior
>> and the railway experiences that.
>> No, of course. And like you said,
Hannah, that may be an increase in in
confidence in reporting, not potentially
um incidents. But just slightly jumping
off something that Colette said, is
there um any internal discussions about
how to best um I guess cascade the
information of of how you are supporting
individuals? I know you you have stuff
on stations, but I was very impressed to
hear um that you've tripled the amount
of body warn cameras that the amount of
CCTV that is available. And when I speak
to my constituents, especially um
younger women, teenagers, and and often
mothers, there's a lot of fear of
allowing people to be on trains or on
stations later at night. So potentially
there's there's also a campaign in there
about making sure people have confidence
not only where to report, but um that
there is also support in that area.
>> So one of the areas we're working on is
our um with and through our partners,
the transport police. So something that
we're very proud of at Scott Rail um
around two years ago. So all of our
frontline staff come for at least one
annual safety briefing. Um and we made
the commitment that senior managers
attend that briefing so that we can take
feedback directly from the front line on
what is happening because our staff know
much better than me and my team what's
happening dayto-day. We actually had a
dedicated member of transport police, an
officer who joined those briefings for a
year and we're going to we've restarted
that as of this year and we're having a
dedicated member of transport police. So
they are working with our frontline
teams to break down barriers to explain
what happens when you send a text
message. We've looked at the best
information you can give so our staff
know. Give the carriage number, give the
service you're on, give the next train
you're stopping at, and that that is the
best chance of BTP being able to meet
the train or being able to meet it a
couple of stations along. So, we are
working to educate our staff on the best
ways to work with the transport police
because they can't be everywhere and on
every train. Um, and then we'll look at
what we can do as well with the public.
As I say, we do announce um through our
public information systems and it is
advertised on train. We obviously need
to do more.
>> That's very helpful. And one final
question on on this topic. Just of
course um full confidence in that the
intention of keeping every station
great, but some of the less service
stations sometimes we hear of problems
potentially with lighting. Is that
something that is often considered and
and do you know how quickly incidents
such as that are responded to?
So we have lots of ways in check of
checking that our stations are operating
properly including our unstaffed
stations. So, as I mentioned, um, we do
have the help points and they're
unstaffed stations as well as staff
stations. And we do, we know we need to
encourage more people. If you feel
unsafe, press the help point and you
will be connected to a I use the
example, they'd be able to say to me,
oh, we can see you've got a Navy jacket
on.
>> Don't worry. Do you want to keep talking
to us till your train arrives or do you
want us just to keep an eye on you till
the train arrives? So, they can do
either. In terms of checking, um, our
managers will check every station on at
least a 30-day cycle. So, that includes
our unstaffed stations. Um, and we also
have an audit regime, um, by Transport
Scotland where they will go around and
check, they provide feedback direct to
us and every and we review that feedback
and property services teams take action.
Um in terms of further enhancing safety
and we have around 70 senior managers in
the business and we carry out one safety
audit period. So every four weeks
everyone including myself goes out and
engages with the front line on safety
and we record our actions through that.
They're auditable and they're followed
up.
>> No problem.
>> Thank you [clears throat] Graeme
Simpson.
>> Yeah, thanks. Thanks Kavina. Just a
couple of quick questions on CCTV.
Um, I think it'll be Joanne will answer
the first and maybe Liam might be able
to help with the second. So Joanne, um,
my question to you is the CCTV that's on
Scot Rail Trains, is that monitored
live? And Liam,
>> [clears throat]
>> um, of course Scott Rail is not the only
operator that has trains in Scotland.
Um,
I do know that certainly up until a few
years ago, Cross Country didn't have
CCTV on all its trains. Um, do you know
if that's been rectified? Do you do you
know of any other operators that don't
have it? So, maybe Joanne first.
>> So, h thank you Mr. Simpson and I know
you've been to visit our CCTV center in
Paisley. So, you've seen firsthand the
investment um that we've made with
backing of the government. So at um
stations, our CCTV absolutely is live.
Currently, it is not live on our trains.
We can access that footage. And part of
that is why we're also encouraging staff
to wear bodywn cameras because we know
we get better footage from the bodywn
cameras. Also, it's in closer proximity
to the action.
>> Okay, Liam. So, um, first of all, in
terms of CCTV in stations, if I touch on
that first, Glasgow Central and
Edinburgh Waverly, we have a control
room at both of those locations that has
live CCTV in it. We have somebody in
there watching that as part of their
overall duties in the station um, at all
times when it's open. Um, I I can't
comment on on which other operators have
CCTV on every single service or not. I
think that'd be a question for those
operators.
>> Does anyone know?
>> Graeme,
>> thank you. I I don't know the answer. Um
but the the all of the crosscountry
operators other than the sleeper are of
course overseen by the department for
transport um UK government. Um so that's
it's a matter for for DFT to decide
whether that's an appropriate um policy
to roll out and I'm afraid I don't know
if that is the case on all of the
operators.
>> Okay. Yeah, that's fine.
And thank you very much for answering
those questions. Those were substantial
answers and we appreciate your time on
that. And I want to turn to the app.
So um it was reported that there was
3,000 complaints in the first 10 days of
the roll out. What's the number of
complaints at now Joanne?
>> Thank you convenor. So the number of
comp Thankfully the number of complaints
hasn't increased significantly since
what you've seen reported on the 3000.
>> I want to start by saying that we know
>> you have a number
>> I don't have the exact number as of this
morning but we can certainly get back to
your convenor.
the launch of the app hasn't been good
enough and for that I apologize
apologize to the committee and I
apologize that um all of our passengers
that we've spent four years building up
the confidence of and investing in
improving our services and we know that
day one wasn't good enough. We had
significant challenges with loons and
there have then been six other days when
we've had challenges and the service
we've provided hasn't been good enough.
Um, for the long term, this app is an
investment that will make improvements
for our passengers. Unfortunately,
you've not seen them yet because what
we're focused on is stabilizing the
day-to-day delivery and operation of the
app.
>> Okay. Can I just go back to the numbers
though?
>> Yes. I would have hoped you would be on
top of exactly how many complaints and
the trends of what's happening because I
am a frequent user of your services and
almost every day that I travel I see
people having problems. I myself had a
problem last week going into Glasgow
Queen Street returning to Edinburgh
where my return ticket wouldn't show on
the system. Now your staff were very
good. They let me through. Um but I see
other people um encountering similar
problems. So I'm disappointed you don't
have the numbers.
Do you have have you got anything in
your papers there that can tell us?
>> So I I don't have the exact number as of
of this morning in terms of where the
complaints have got to. I can tell you
that this morning we have had a handful
of customers come to us who couldn't
access their flexi passes. Um, and as
frustrating as that is for the customer
experience, those issues were resolved
by signing in and signing out and
signing back in to the app. We also had
a challenge um on Monday morning with
payments which lasted around half an
hour. We had a hundred contacts to
social media on Monday morning um that
we worked with customers to resolve. But
in terms of specific complaints because
they generally will come into customer
relations, I wouldn't want to mislead
the committee. So I'd rather give you an
exact number which we can get up to this
morning for you and we can get that to
you later today.
>> Okay, that's fine. Okay, so £83 million
over 9 years.
>> Yes.
>> Um but only one bidder
in hindsight. Is that an error?
>> So there were several biders. There was
only one compliant bidder.
>> So we work within the frameworks of
Scottish government procurement. um and
Silver Rail where the compliant bidder.
Um hindsight is a great thing and we are
carrying out a lessons learned exercise
to really examine what could have been
done better, what we should have done
differently. Um and we will be sharing
that with our boards and with Transport
Scotland. Um but there was only one
compliant bidder when we ran the tender
exercise. Did were you would or should
have you been able to predict that you
would only have one compliant bidder
because of the way that you shaped the
contract?
>> We had about five people there either
five or six tendered but only one
compliant.
>> Um
>> was that predictable?
>> No, I don't believe it was.
>> I don't believe it was. We we put a lot
of require we built a lot of
requirements in because we want an app
that will enable future developments and
we will be compliing
which is an ambition of the government
and so there were a lot of requirements
built into the procurement spec. Um
however we did not foresee that we'd
only have one compliant bidder. Why?
Surely with the advisor that you have on
site, you would know who was out there
that would be compliant. Was that not
something you foresaw?
>> Um, it was not something that we in
hindsight. Um, so we chose the decision
to go or we made the decision to go to
the market because our contract with
Train Line was coming to an end. Um, and
the contract we had with Train Line
prohibited us from making further
developments that we wanted to. Um,
as I say, hindsight's a great thing. I'm
sure there are things will have been
done differently. Um, I didn't see any
reason. I've read the 494 page contract
that we have, and there was nothing in
there that told me that we wouldn't find
another compliant bidder. Unfortunately,
like many aspects of the railway, our
supply chain is quite constrained.
Um, but no, we didn't we didn't see this
arising.
It is as frustrating for us as you
>> are you not alarmed by that that with
all the myriad of people that you've got
advising you the support from Hannah and
her team you know the the experts that
exist within the system that you didn't
foresee that it was just going to be one
compliant bidder.
>> Can I Well, if I could go back in time
um
>> No, but it's not going back in time
though, is it? Yeah,
>> cuz actually, you know, this is a
publicly owned railway. We expect it to
perform better, but one of the biggest
contracts that we're going to award for
the next few years. We just get one
compliant bidder and we have these
myriad of problems. Surely that was
foreseeable.
>> So, up until the week before launch, um
we were assured that everything was
going to plan with regards to launch of
the app. We let our passengers down. Um
it was notified us at very short notice
that Silver Rail had made a change to
the system. Um on the compliant bidder h
it was not foreseen by us. But I don't
know if you wanted to comment Hannah.
>> I was just going to provide some
assurance that Joe and her team have
identified that one of the areas to be
looked at as part of the lessons learned
is the procurement process. um and that
bid and I think that you know it will
come through the lessons learned when we
undertake that as to the market the the
the market engagement and the
understanding of the market's appetite
for risk.
>> Silver Rail had a problem when they
rolled out an app for Southwest Railways
and GWR as well. So they've got a track
record of having problems of rolling out
new systems. Um was that did that come
up in your risk register at all? Was
that identified as a problem?
>> So we were assured that um Silver Rail
had learned from that and the
improvements had been made to their app.
Um as I said unfortunately there was
user testing ongoing since May and there
was very low late notification that
changes had been made to the app and
which caused our customers significant
frustration which we are very sorry for
since the launch of the app. Does does
that not knock your confidence in silver
rail? I mean, how how do you judge about
what they're going to do next? Because
if the problems are continuing, and this
is what, six weeks on now.
>> Um, have you really got confidence in
Silver Rail that they're going to be
able to deliver this 9-year contract?
>> There are um it it is a 9-year contract.
However, um there are clauses within the
contract where we could terminate. Were
>> you thinking of breaking?
>> That's not the point. we're at just now.
Okay.
>> We are committed to making this right
and we are working very hard with Silver
Rail, including my team still meeting
them multiple times a day until I have
the assurance and the public have the
assurance that they can pick up the app
without thinking about it and they know
that they can either buy a ticket,
search for a journey or their ticket
will be there. And as soon as we have
that stability, we will be making that
publicly known and we will then be
working with Silver Rail to make
enhancements to the app and improvements
to the customer journey. It is not good
enough right now.
>> So you did um internal testing, but
there was no soft launch.
Why was that? So part of our contract
with the outgoing provider meant that
[clears throat and snorts] there wasn't
an opportunity to do a soft launch
because Train Line had exclusive rights
on retailing our tickets.
>> So there was no way is it there's that
train line insisting that there had to
be
>> contractually I'm I'm informed that
contractually we could not make the
change in a phased basis that will be
picked up as part of the lessons learned
review.
I find that remarkable that there was
the companies of the experience of train
line and silver rail could not reach an
agreement between the two of them to
have a more a softer transition between
the two. I mean this is well known isn't
it across IT system rollouts that you
know you have teething problems and you
need to just soft launch you need to
test the system publicly but you're
saying they couldn't reach an agreement
between the two of them
>> to be fair to the two companies. So
Train Line were the outgoing provider so
I would be fair to them and say they
were possibly less motivated um to work
with Silver Rail. Silver Rail tell us
that they couldn't separate retailing
and information to run a soft launch,
but that is going to be forensically
examined as part of the lessons learned.
>> And did you not call a halt at that
point when you realized there couldn't
be a soft transition?
>> I mean, it was a steep cliff you were
jumping off.
>> Everything was going well up until less
than 24 hours before the launch.
>> Okay.
Okay. And so there was no other
opportunities to do like a pre-download
window. that wasn't possible.
>> So, there had been internal user
testing, not unfortunately, and we
hadn't been able to use our test um on
our quarter of a million passengers who
choose to travel with us every day who
were very thankful for and thankful for
their patience during this time. Um, as
I say, we will be forensically examining
through the lessons learned, what could
have been done differently. The
information I'm sharing with the
committee is the information I have at
this time.
Okay, Lloyd Melville,
>> thank you for that. Um,
reputationally, uh, it doesn't do a lot
for, uh, our publicly owned railway and
indeed the first minister himself has
said that the the launch of the app has
damaged the [snorts] reputation of Scot
Rail, um, as an operator. What are your
reflections on that? And how are you
looking to build back up Scott Rail's
reputation going forward?
>> Yeah. Um, thank you for that and I I'll
offer my reflections and then Hannah
might want to say a few words as the
chair of our board.
As I mentioned when we talked about
safety, we know we've had significant
investment from the Scottish government
and since coming into public ownership
and we're really proud of a lot of the
improvements that we've made under
public ownership. Um, you know, we've
invested in our driver numbers. We've
reduced the number of services we're um
cancelling. We've driven up our revenue.
Um, our passengers are currently
benefiting from peak fairs being gone
for good, which was a significant
investment by government. And we're also
currently investing in new fleet. Um,
there was a lot that was going very very
well for us up until unfortunately we
didn't deliver a successful launch day
in the 30th of July. We are acutely
aware of that and we're acutely um aware
and that it wasn't good enough.
Not to undermine that it wasn't good
enough in any way. That same week was
the busiest week we've had since coming
into public ownership and we continue
since the 30th of July. We are
continuing to exceed on our revenue
targets and we're continuing to deliver
on journey growth which we have done for
the whole year. But we know that we need
to rebuild our passenger confidence, but
we also need to rebuild our stakeholder
confidence.
So what we are doing is in addition to
continuing the good work that we do day
in day out to improve our service
reliability and to work on our future
improvements, we are absolutely
committed to putting this right and
ensuring that the app is delivering sta
a stable service. and we will then be
looking to publicly announce
improvements to the app, but only when
it's the right time to do so. But we
know, as I said, we're very fortunate
that um our passenger numbers and our
revenue continues to be a success story,
but we know that that's not good enough
and we're not complacent about it.
>> Come back in though because uncertainty
about being able to to to use the app
might actually cause some people to
switch away from using the train if
they're not sure they're going to be
able to use that functionality. Is that
something that you've modeled in?
>> So, in the first couple of weeks, what
we actually seen was a slight increase
in people going back to buying from a
booking office um or buying from a
ticket vending machine or indeed from
our staff on train, which again we're
very fortunate that we have staffed um
ticket offices and we have a second
member of staff on every train. So,
we've seen the first couple of weeks we
did see a small spike in that. that has
started to decrease again as people are
going back to using our app and we have
um around 800,000 users um of the app
signed up.
>> Just back on reputation, Hannah, did you
want to come in on the reputation
aspect?
>> You know, I absolutely associate myself
with Joe's apology for the um
difficulties that people have faced in
using the app since it was launched. the
um from a board perspective,
we see firsthand the very hard work that
Joe and her team and all the staff at
Scott Rail put into the reputation of
the organization in terms of delivering
high performing service um and a safe
service. Uh and so it has been really
disappointing to see the hit on the
reputation, but I agree with Joe that
the focus now needs to be on stabilizing
the app and then growing the benefits of
the app. Um that's absolutely key to um
to getting back the confidence of the
consumer in using the app so that they
can understand what it is that the new
functionality can bring.
>> Thank you.
>> Joanne, you said that Silver Rail made
changes to the system 24 hours before
launch. What were the changes? So it it
was background changes to the um the
operating system that we weren't aware
of as I say till very shortly before the
launch. Since the launch um there have
been um updates to the app to rectify
the changes that they made.
>> Okay. Um I read that there was an FOI
request and it showed that Scott Rail
exchanged around 600 emails with Silver
Rail over a two-day period.
That is a lot of emails. What was the
tone of those emails?
>> Um, so I wasn't copied on most of these
emails. I have certainly myself
personally been speaking them to their
chief commercial officer um to ensure
that I'm kept up to date and also to
express my concern and dissatisfaction
at the service they have provided to us.
Um whilst we've been keen to express
that what they've done is not good
enough, we have also had to work with a
lot of their frontline staff and ensure
that they remain motivated to fixing. Um
and that included Scott um Silver Rail
actually basing themselves in our
offices at our request to be available
to work with us in the early days as we
rectify the challenges of the app.
>> So they're in where? Glasgow.
>> Yes. We we sorry we we asked them to
work with us in our offices in Glasgow.
>> And are they still there?
>> Um some of them um are still in Glasgow.
We're having daily calls with them um
that start h at 7:00 a.m. every morning
as well. We're having repeated calls
throughout the day to have that assurity
um that the service is running steadily.
>> I'm I'm still not clear as to why you
needed a new app. Um
maybe I haven't explained it properly
but yeah to me if you have a new app it
needs to do something different to the
old app. The old app seemed to work um
in terms of you know if you just want to
buy tickets that's what it did um and
this doesn't even do that properly.
>> So that's absolutely a fair challenge.
And so we were coming to the end of our
contract with Train Line. Train Line is
a legacy contract that we inherited from
the Abelio franchise. um and we were due
to retender. We are absolutely committed
to getting to a stage where you um and
all of our customers um Mr. Zimpson will
have the confidence that you will pick
the app up in the morning and be able to
either search their journey or buy a
ticket. In the longer term, Train Line
improves Train Line couldn't deliver the
functionality. So, a couple of um very
simple examples um that will be
transformative for some of our users. So
on our new app um you can actually book
passenger assistance at the time when
you buy a ticket. Previously you would
have needed to have gone to a separate
app or made a phone call. So for any of
our passengers who require assistance
they will be able to assure themsel of
that at the point of buying a ticket. Um
and also um we're about to come into
storm season which is one of those times
when we need to be able to communicate
with our customers more often than ever.
So the new app will enable push
notifications. So those notifications
like you'll see you might get from the
BBC or other providers will flash up on
your screen if there's disruption to our
services. Those are just a couple of
examples. There are lots of other
functionality to Silver Rail that once
we have a dependable platform day in day
out we will start to launch um further
functionality and you will see that it
is improved versus the previous
provider. If I use train line, which I
have occasionally, um I will get those
notifications telling me if trains
delayed.
Did it Did did your old app not do that?
>> No, the previous app did not.
>> It didn't do that. Even though it was
run by train, it didn't.
>> Okay. So, just one more thing. you you
mentioned that the app
once we got the basics right then you
may want to add to it um and it could be
used for multimodal ticketing could be
were you asked by government to build
that in
>> so my team are part of the national
smart ticketing advisory board um which
was set up by transport Scotland
>> there's a bit of a dirty word on this
committee I have to say.
>> So um as part of the procurement spec we
did detail the requirement for the app
to be able to to be built in such a way
that it can cope with multimodal
ticketing. Um so yes obviously it
requires further development and when
the scheme is developed it may require
different bus operators for example. So
we would need to work with individuals
but the capability is absolutely there.
>> Okay. Thank you.
>> So, are you saying that Train Line
refused to make the changes to the app
that they've got available on other
parts of their system in [snorts] terms
of this functionality?
>> So, they were invited to bid um against
>> through the through the previous
contract. Did they not make those
improvements?
>> So, due to the contract have been set up
by Abelio, we weren't able to make
changes within the constraints of the
contract we inherited.
>> Okay. But in future they hadn't refused
to do that. But the way that you had
constructed the contract to make it if I
call it vertically integrated, you're
doing the whole system rather than just
the app. Um that was something that
they're not experts on and I understand.
Um so the way that you constructed the
contract effectively excluded train
line, did it not?
>> The the contract wasn't constructed to
exclude anyone. It was to enable Scott
Rail to be able to participate in the
delivery of government ambitions for
example around multimodal ticketing.
>> But the way that you did it constructed
it to do the whole system including you
know the ticket machines and the whole
as well as the app and the technology um
that was not something that Train Line
um um were able to do and they were not
prepared to put a joint venture together
in order to make that possible. So was
that not effectively the way that you
constructed it was that not effectively
excluding train line effect I know
you're not I know you didn't design it
>> purposefully to exclude train line but
was that not the effect of it
>> it's so you're absolutely correct
convenor as you would expect that the
contract was not just for the app it was
for delivering our station retail
systems and our on train retail systems
and that isn't train line specialtity
and they as yeah they chose not to work
with someone else which they they've
required to do
>> and how long are the problems going to
last for
>> um we are working on a dayto-day basis
to ensure that we reach a point of
stability. I'm absolutely committed to
delivering that as quickly as we
possibly can
>> by Christmas.
>> Um I absolutely give this um committee
my commitment that we are working day in
day out and um it will be as early as we
possibly can. So you're not confident by
Christmas?
>> Um we will do everything we possibly
can.
>> Okay. Um why didn't you um join in the
efforts of CR British Railway to do
their joint system? So we have we would
have an integrated system between all
the crossber services as well as uh
Scott rail. And why was it why was it
not deemed appropriate to join in the
larger UKwide effort?
So um we uh are very much um kept up to
date with the work that's going on. In
fact, I was at a briefing meeting with
um all of the other train operating
company managing directors last Thursday
afternoon where we were given an update
on the development um of retail and
ticketing under GBR. Um our contract
with train line was expiring this year
and our commitment is to delivering
multimodal ticketing. Part of our
commitment is delivered multimodal
ticketing. um as an operator who's owned
by Scottish government.
>> So were you told by ministers you
couldn't join in GBR?
>> Absolutely not.
>> Okay.
You're absolutely confident that if you
judged that it would been appropriate to
join in the GBR effort in order to meet
your objectives, you would have been
free to do that.
>> So that's not a conversation we've had.
Um and I'm sure that we don't rule out
in future working with GBR in various
ways. Um, however, we certainly haven't
had any type of instruction like that.
>> Okay, just to recap, this has been
utterly chaotic. I see it on a daily
basis. People complaining to your staff
and your staff have been very good as I
say, but it is a repeated problem that
is, I would say, knocking your the
confidence in the company significantly
and you'll have to go some to recover
that reputation. Um, and I hope that the
app is worth it. Um, because so far
we've not seen it. So anyway, thank you
for answering the questions on that. I'm
going to move on um to Lloyd Melville.
Thank you, convenor. Um, I want to talk
about fairs. Um, the abolition of peak
fairs for good. Very welcome uh uh
commitment and policy by the government.
Um, have you noticed a change in
people's travel patterns since then? Are
people moving from car onto the train?
are the moving from bus onto the train
since that policy came in.
>> So, um, thank you, Deputy Convenor. I
might say a few words and then Graeme
Cook might want to say a few words on
behalf of Transport Scotland. Um, so our
[snorts] C customers were delighted um
with the news that peak fairs were gone
for good. In addition to making um it
cheaper to travel at certain times of
the day, it's also simplified the fair's
offering. So, for example, we had
evening peaks in some areas and not in
the others. So it's very reassuring to
our customers that they can buy a ticket
and travel at any time of day. Um in
terms of the annualized position and
it's only this month that we have
actually annualized the position on
removing um peak fairs um and we also
have the fairs freeze um which again um
governmentbacked as it was a policy
decision by government and our customers
um are very happy with in terms of our
passenger numbers and um year to date we
have seen about a 7% increase across our
network and year on year um in terms of
journeys, but in terms of that
multimodal modeling and looking at the
impact on other aspects um of public
transport, that's something my team are
participating in, but it's certainly
being led by Transport Scotland.
>> Grim, thank you. Um so work is underway
to assess the impact of the removal of
peak fairs and also of the fairs freeze.
Um the statistical analysis will
conclude um we think in early 2027
that's the the target. It does take time
to do meaningful useful statistically
relevant analysis. Um not least because
excuse me [clears throat]
patronage is is sensitive to a number of
different factors um including weather
for example. Um so we need to get a
large enough sample size to make it
meaningful. Um but yeah early 2027 is
when we expect that analysis to be
complete.
>> Thanks. And and you you mentioned Joan
um about kind of about support from the
government. Um and it's a significant
investment by the government to um scrap
peak fairs. Um has it paid for itself
yet?
Um so as I said so we've only just
annualized um in terms of journeys and
its contribution to the broader
decarbonization agenda by government. We
are seeing that increase in journeys um
we will be closely monitoring our
revenue figures now that it's
annualized. So this month
>> but it's not paid for itself yet. So
given that we have um a fairs freeze on
last year despite our increase in
passenger numbers our revenue growth is
our revenue growth is around half a
percent to a percent as I say that's
contributed to by both the fairs freeze
and the removal of peak fairs but the
good news story is that um in terms of
decarbonization we're certainly seeing
more passenger journeys
>> okay do you think the um the fierce
freeze in the scrapping of peak fairs
has been value for money so far for
passengers.
>> So um four years into public ownership
and last year um we had an external
survey conducted and jointly by oursel
and network rail that tells us that rail
contributes 4.1 billion to the broader
Scottish economy. Um, so I'd say that in
some ways answers a value for money
question.
>> And you'll have seen
there's been some concern about the
minimum fair, um, which I I appreciate
is is is largely for for ticketless
travel. The minimum fair is is £10. Was
that the figure that you wanted it to
be?
Um so we looked um at various iterations
of the minimum fair um and we took
various proposals to our boards um and
to transport Scotland before we actually
introduced the minimum fair on the 1st
of July. We had a three-month education
period. So that was opportunity for our
staff to engage directly with customers
especially those buying on train and at
gate lines to explain that they would
pay the minimum fair in future. um and
it is absolutely paying dividends for us
both in terms of um revenue generation
but also in terms of the other
consequences. For example um as I
mentioned earlier antisocial behavior is
often committed by those choosing to
travel um without a ticket.
>> So who signed off on the final figure?
>> So the final figure would make it all
its way up. So we I send it on to
Scottish Holdings who then um send it
onwards to Transport Scotland for
approval.
>> Graeme, do you want to speak to who in
Transport Scotland made the decision?
>> The so the the decision is endorsed. Um
so it was supported as a policy,
>> not least um because of the impact on
antisocial behavior. Um but of course
the revenue we we do need to address the
net cost of the railway. Um Joe's
mentioned the the gross value ad of over
four billion. So it does represent
enormous value for the taxpayer.
Nonetheless, that that doesn't mean that
we can't address um the level of
subsidy, which is significant 1.6
billion pounds a year.
>> So in terms of the options to press this
point, obviously we've we've got to a
point where it's £10. Were there higher
options considered for a minimum fair?
>> [clears throat]
>> I think that's better better answer by
John.
>> Um so so we did have a proposal where we
could have looked at a higher option
part of the process um of coming to a
decision also involved in a quality
impact assessment as part as one part of
the decision-m process. Um and 10 pounds
was deemed to be um an appropriate
minimum fair to deter those people um
who were trying to claim um for example
shorter journeys than they'd actually
taken and also to deter um those who
were trying to travel without a ticket.
>> Okay. Um coming to uh impacts of of of
other public transport policy. Um you'll
be aware that the two pound busfare cap
is now um fully operational across the
west of Scotland and indeed has been in
in the Highlands and Islands for for
some time. Have you made any assessment
of the impact of that on passenger
numbers on your services?
>> So thank you. So in terms of the two
pound bus cap, um we've been working
very closely both with Scottish Rail
Holdings and with Transport Scotland um
since the manifesto commitment was
announced to roll it out to the rest um
of Scotland. Um there was the trial h in
the north of the country um which we are
aware of and we're we've been modeling
the impacts of that with Transport
Scotland. Um just last week the two
pound bus cap rolled out um broadly
across the Strath Clyde area. So it's
very early days in terms of the impact
of that. We are very aware um that we
need to ensure that we are as
competitive as we can be um and we build
customer confidence um in choosing us
whether that be for a leisure journey or
to get to work. H we know that in Strath
Clyde on journey time in large parts of
Strath Clyde we are much quicker than
the bus and and we know that especially
for commuters in their decision- making
processes they are very led by journey
time and so we will be watching it
closely and we are working um with
Scottish Rail Holdings and Transport
Scotland to understand um when [snorts]
the two pound bus cap will be rolled out
to other parts of the country and how it
will operate.
But in terms of your kind of initial
data, I appreciate that it's still quite
early days. Um, but uh I would have
thought you would have received some
data uh for the Highlands for instance
uh from your stations. Is there anything
that you can share with the committee
about that?
>> So in terms of the trial in the
Highlands, so I'm sure some of the
committee will be even more familiar
with this than I. Um but the trial
happened around the time where there's a
lot of tourist travel um in the
Highlands. So we did see about a 10%
extrapolation. That's what we'd call it.
So shift modal shift. And we know that
in some parts of the highland bus can
actually be quicker than train due to
the stopping patterns of our trains. And
but again that's something that we are
continuing to monitor. Okay.
>> And we're also aware obviously that 40%
of the population already qualify for
free bus travel. So, you know, we we've
always been in competition.
>> Okay.
>> And given that um there's such a big
price disparity now between the bus and
the train, are you looking at other
ticket price incentives, for instance,
if if your data was to tell you that
there has been a big shift from the
train to the bus because of the price
element, will you be looking at at price
incentives to try to get people back
onto the railways? Um so and the short
answer is we're always looking um at
ways in which we can innovate. We know
there's a cost of living crisis and we
know the challenges around child poverty
in Scotland. Um you know we've had great
backing from the Scottish government in
terms of peak fairs being gone for good
in terms of the fairs freeze. We're
proud of the value for money we already
offer for example on kids for a quid
where a fair paying adult can take um
four children out with them um for a
pound on a return journey anywhere in
the network. Um we've promoted our great
value um holiday passes where families
can travel together um and we're
promoting that again for the October
holidays that are upcoming. So we are
committed to looking at ways in which we
can bake in better value for money. Um
and as part of our budgeting rounds and
indeed as part of um the smart ticketing
advisory group and other um groups that
we are involved in across industry,
we're always looking um to develop our
fairs in terms of the value for money
offering.
>> Okay. Does anyone else want to come in
on that point?
>> I think I just echo Joe's comments but
and and also the um I think it's you
mentioned about trying to extract people
back out from buses. You we do try not
to see ourselves as in competition
across public transport modes but more
working um together and of course the
different people have different
motivations for uh taking uh you know
whatever mode of transport they choose
for some journey time may be the most
important thing in which case we're
likely to retain them. If price is the
most important thing if bus is the
cheapest option then then then they will
choose that option and that's now
available to them.
Okay. Anyone else?
No. Thanks. Come here.
>> So, um, Glasgow to Inesse
two pound on a bus potentially if it's a
national scheme. What would you say to
that Joan if that was to come forward as
a proposal?
>> So, at this present time, um, we are
working hard to, um, replace our
intercity trains. Um so we will be
replacing them um with the treble twos
that are um current that are going to be
um refitted h and um have some
maintenance improvement work done before
uh you see the first trains in service
in late 2027. So we are absolutely
committed to improving um our customers
journey experience on inter city Glasgow
tess being one example of that um part
of that um business case um was
developed on the basis of the fairs that
we currently charge. So um2 um on that
journey on that corridor would be a
concern to us. However, we will
absolutely be committed um to marketing
um our uh services as best we can to
ensure that we retain customers and are
always looking to build our customer
base. As I say, um you know, things like
our kids for a quid and our family
passes where we offer unlimited travel
across Scotland for £50 um during the
holidays um are value for money and
we're always looking to improve value
for money. But if government were to say
that the two pounds would apply um
across intercity routes then yes that
that would be a concern to us. Have you
heard that Graham? What's your thoughts
about that? Did are you hearing what the
concern from Scott Rail is about if the
scheme is rolled out nationally
and there's two pound versus I don't
know what's the fair to from Glasgow to
Veress 20 plus. Um what what's your
response to that Graeme? So we are
committed to introducing the legislation
for a nationwide two pound bus cap
before the end of this parliament. Um it
it is a priority for the government to
roll this out to the rest of Scotland.
[clears throat and cough]
The analysis is ongoing. Um the data
coming in from the Highland pilot and
the data beginning to come in um from
the Strathclide um interim roll out will
inform exactly what the nationwide roll
out will look like and of course
information coming back from uh
alternative modes as well will will form
part of that analysis and that picture.
>> What what I don't want is the process
describing about how you're going to
reach decision. What I would really like
is just a quality assessment of what
Joan has just said that it would be a
direct threat to their intercity
services if you could get on the bus.
Some of the quality of the buses now is
quite remarkable. They're very
comfortable. That would have a dramatic
impact on Scot Rail, publicly owned Scot
Rail services. So, what are you advising
ministers on that? So the analysis
hasn't yet been done on on those numbers
on those data.
>> We don't have a but we don't have an
intercity service just now. So how can
you make any assessment?
>> We we do have an intercity service just
now. It's run run with the HSTS which
are being replaced by the 222s. So
>> we're talking about an intercity bus two
pound. We don't have that just now. So
how can you make the assessment? not at
two pounds but of course 40% of the
population can travel for free on those
intercity buses right now. Um but in
terms of the analysis and the data being
gathered to inform that advice to
ministers then absolutely um the
feedback from not just Scott rail but
all of the rail operators for example
LNER go right up to Aberdine that's an
important intercity service within
Scotland. So the input, the data, the
concerns um and the opportunities being
fed to us by all of the rail operators
and other modes will absolutely form
part of that analysis and part of that
ultimate advice.
>> Okay, Lloyd Melville.
>> Thanks Camil. The point I was just going
to make is that um if you wanted to get
a bus from from Glasgow uh Buchanan bus
station to um UK Pier for instance it's
it's actually4 pounds because it's two
pounds capped within one region and then
two pounds capped in the other. But I
think the the point is is a very fair
one. you know, the price disparity is is
significant and and I think that um it
would be um a dereliction of duty, I
should say, if you didn't model um that
and and we look forward to seeing that
data coming forward.
>> Okay. Right. We're going to move on and
Graeme Simpson.
>> Um thanks very much. Uh we won't quite
move on because I just uh want to just
follow up on on that and then I'm going
to ask about the uh rolling stock uh and
then we'll move on to freight if the
convenor will allow that. Very good. Um
so just on just on the the discussion
we've just had um I've I've got to say I
will I will at current price point
always get the train from where I live
in East Coid into Glasgow. Um, it costs
more than the bus, but there's a time
factor as well that people have to
factor in. Um, and it's significantly
quicker by train. And actually, I like
your trains. So, I will continue to do
that when I'm going into Glasgow. Um,
Graeme, I think it was you that said
there's the subsidy um is 1.6 billion
billion was that a year?
>> 1.6 billion to track and train. So that
pays for infrastructure and the the
Scott Rail and Caloni sleeper services.
>> Okay,
>> that's for this financial year.
>> Okay. I mean that's it's a significant
amount. Um are we doing anything to
reduce that figure?
>> Absolutely. So the the the track and
train with it the short hand for the
entire system um is constantly vigilant
um both in managing costs and in seeking
opportunities for further revenue. Uh
there are savings there have always been
saving targets across the railway and of
course rail reform um is an opportunity
to integrate the railway to put it back
together again um after 30 years of
track and train being separate um and
that will bring opportunities for
further efficiencies as well. So from
the top to the bottom of the railway
system, the the rolling stock and the
infrastructure
um both revenue and costs are are very
carefully managed to ensure that the the
railway in Scotland continues to deliver
significant value to the taxpayer.
>> Joan, you were nodding at that point.
>> Yep. So thank you Graeme for those
comments. In terms of efficiency at Scot
Rail, we look at it in two ways. One is
what can we do to increase the revenue
we're bringing in. So we look at
passenger revenue but also how can we
best use our station estate. So working
with for example retailers to ensure
that we are maximizing um the income we
have from retail estate. So what can we
do to bring more money in but we also
deliver on efficiency and so this year
we are delivering a12 million pounds
efficiency program program. Last year we
delivered around 20 million pounds of
efficiencies. So we are absolutely um
focused on delivering efficiencies into
the system as well.
>> Tasked with with doing that to reduce
that subsidy.
>> Um so we are um two two ways we are
always tasked um with looking at how we
can deliver more efficiently but we also
look at working um on our own
initiative. Um and as a Scott rail
executive and also working with Liam and
his colleagues through the alliance um
executive we look at ways in which we
can deliver more efficiently together as
a whole system as well.
>> Okay. Um I shall move on to the fleet.
Uh you touched on it already Joan but I
was having a quick look. Um, and correct
me if I've got this wrong, but the Scott
Rail fleet at the moment is older than
uh the Rolling Stock average across the
UK
um at around 25 years.
Uh that compares to a UK average of 17
years. So it's among the older operator
fleets. Although if you're unlucky
enough to travel by Chilton Railways,
uh that is older. Uh that is the oldest.
Um we've got some newer fleets. Um Lumo
3.8 years, Greater Anglia 3.9 years. Uh
and indeed the Sleeper um 6.2 years. So
you just explain to us in a bit of
detail what you're doing to bring that
figure down.
>> Yep. Absolutely. And there are there are
some um UK charts which um Scotland
Railway tops. This is not one of them we
want to top unfortunately and but we do.
So you're absolutely right um Mr.
Simpson and twothirds of our fleet um
are going to reach the age where they're
no longer fit for continued operation
within the next 15 years or so. So we're
absolutely committed to a program of
replacement.
Um I touched on the replacement of our
HSTs which are largely um an intercity
fleet just now. So we have um acquired
the Treble 2s which will be going
through an overhaul both in terms of
maintenance in terms of the repaint and
the internal um passenger layout to
improve familyfriendly spaces to improve
wheelchair spaces um and to improve um
the overall environment for our
customers. and you will see those trains
start to enter service in late 2037.
Um, and then with regards to suburban
fleet, so these are fleets that you
would see around you will see around
Eastco Bride um, in the 2030s when
they're introduced. You'll also see them
around areas like Fif and the borders
um, and the Glasgow sort of inner
suburban roots. So Glasgow to
Motherwall, Lark Hall, Lanarch and
places like that. So we're currently in
the invitation to negotiate stage with
biders um for our suburban fleet. Um and
h that process is ongoing. So um as I
said 2030s we'll be looking um to
introduce our new suburban fleet. Um I
also touched on Eastco Bride because
linked to everything we do. So suburban
fleet is likely to be a mix of EMU and
BMU. are battery electric trains as well
as electric trains. Um but everything we
do on fleet replacement um we do closely
and in partnership with Liam's team and
there's been some great examples of
joint working in terms of planning for
new fleets um and the electrification of
Isco Bride last year um was a good
example Miss Stevenson I remember you
being at the re the opening of our new
Hammer new hair meer station because we
remember electrification just isn't
about new fleets it's about the
accessibility of the railway so we were
able to deliver two new stations. We we'
be able to deliver um lifts at stations
where passengers wouldn't have been able
to if they'd had um if they were
disabled, they wouldn't have been able
to travel between platforms previously.
So, there are lots of opportunities to
electrification, but electrification is
also key to our fleet replacement and
that's why the work is currently ongoing
in FIF and the borders um to electrify
those parts of our network. So we are
progressing through our new fleet
program and we're thankful to government
for their backing um on that. Um Hannah
I don't know if there's anything you
want to say about new fleets. I think on
the basis of keeping things short I
we'll leave it there.
>> Thank you. Um
I'm just m
>> it was no the other one is on. There we
go. Sorry. Apologies everyone. Um I I
may have misheard Joel, but I I think
she said the 222s will be introduced in
late 2037. It's late 2027 that the first
222 will come into service.
>> Um I heard us say 2027. I've got that.
>> Ah well apologies to everybody then.
>> Yeah.
>> Um uh yeah, I was also at the uh opening
of Hair Meyers. Um startled one or two
people by cycling there in my shorts.
That probably was unnecessary, but um
anyway, if we could break it down, um if
we could look at the class 222 trains,
they're going to be are they going to be
refurbs?
>> So, they are um having a maintenance
overhaul and also being refurbished.
That's correct. Yes. Before they enter
service late next year.
>> And are they diesel trains?
>> They are diesel trains. They are less
diesel. They're less emitting than our
current HST fleet. However, the joint
work that we done um across Scotland
Railway, but um principally between Scot
Rail and Network Rail was around the
time scales for the replacement of our
current HSTs
um and the possibility um to electrify
the route, which led us to conclude that
there was a requirement for an interim
diesel fleet. So they're diesel because
the the roots are not electrified.
>> They will not be electrified in time for
the replacement time scales required for
the HSTS
>> by 2027
>> late next year. Yeah.
>> Right. So when when will the roots be
electrified?
>> So I'm going to pass that question to
>> Yeah, I could perhaps
mic I perhaps come in on that. Um so
we've got a rolling program of
electrification which I think you'd be
familiar with. As uh as Joe referenced,
we successfully electrified the East
Club bride line on time and on budget
last year and we're currently um on the
ground in F and B is electrifying that
as part of the next trench of rolling
program and the rolling program is
really important because it enables us
to transfer the skills and the project
teams between projects um so that we
retain the capability but can also
continue to deliver better um more
efficient electrification. So we're
reducing the cost bit by bit. Well, when
it comes to the long distance intercity
stuff, um that that requires a a funding
commitment that will um will exist over
over multiple years and we're not yet at
a point where we've got that funding
commitment and to enable us to commence
that electrification. What we would
anticipate is in order to comply with
the requirement to electrify or
decarbonize the railway by 2045 that
we'll be in a position to electrify um
that th those lines by the end of the
2030s in time for the introduction of
the permanent replacement of the
intercity trains.
>> Who do you who do you need the
commitment from? Is it the UK
government?
>> No, it's uh Scottish government provide
the commitment for all of our
enhancement. So all of our enhancements
are are funded through Scottish
government. Yeah,
>> we've got the commitment already, as I
said, for five and borders, which is
a£342 million program that's ongoing at
present. And when we've made sufficient
progress through that, we will turn our
attention to planning for the intercity
routes as well. And that will come at a
a different cost um and uh and we'll
we'll start to plan for that with
Scottish government so that we can sort
of sequence it and continue that rolling
program
>> and then you'll replace the diesel
trains.
>> Well, that with electric trains.
>> Yeah. I mean Joe really u I thought
described it really well in that
electrification is not is not just
something in in and of itself. It is
there to facilitate the introduction of
more efficient um and greener rolling
stock. So we'll electrify so that um so
that we can introduce the new rolling
stock and um and that's that's done as
part of a team across Scotland's
railway.
>> Okay, Graeme.
>> Thank you.
>> Thank you. the the Scottish government's
ambition for electrification
decarbonization of the railway is set
out in a document called rail recharged
um and so that sets out the fleet
transition plans but also the
electrification plans um that includes
the policy to electrify um those
intercity routes that have been touched
upon um but yeah the ambition is set out
in that document which I'll be happy to
send to the committee
>> okay that' be useful um If I could just
ask about the suburban trains then are
they brand new?
>> So they will they will be. Yes,
>> they will be. Okay, simple answer. I
don't know if anyone else convenor wants
to come in on this before I move on.
>> Anybody else on this section? And before
you do freight, could I bring in Martin
first? That'll be okay. And then we'll
come back to you. Yeah, Martin D.
>> Yeah, it's it's freight that I want to
to go on. Um, and I suppose this is
really directed to to Graeme. Can you
can you tell me what is being done to
support the modal shift from road to
rail for freight?
>> Thank you. Um, so Scotland within a a GB
context has shown genuine leadership
when it comes to freight on the rails.
Um, Scotland was first to actually set a
growth target for freight. Um over the
past decade 40 million pounds has been
invested in re in rail freight specific
projects. Um and in addition over41
million pounds in wider projects that
have [clears throat] freight benefits
that that would include for example
electrification.
Um the freight facility grant um has
been a significant intervention as well
helping uh West Fraser Limited and John
G. Russell Transport Group um take
millions of Lori miles off the system.
Now to illustrate what's been taken off
uh with support of these in in 2025 26
just over 10,000 commercial freight
trains moved around 4 million tons of
goods saving around 58 million lorry
miles in Scotland and that's around
233,000
tons of carbon um reduced relevant uh
compared to the equivalent road journey.
by diesel HGV.
>> Right. That sounds very impressive. How
did we manage to do that with a freight
facilities grant that sits at 1.3
million?
The well freight facilities, freight
heads, rail heads are already part of
the system, of course. So, it's it's not
just um new facilities um that are part
of that intervention. Um and Network
Rail has very specific targets um set by
Scottish ministers to drive freight to
work with um logistics firms um and to
to put more and more um onto the rails.
So it's it's greater use of existing
facilities as well as new facilities.
>> Okay. You you mentioned that that we've
made very good progress. Now the targets
we've got in this CP7, we're sort of two
years into the current period. How how
well are we doing towards making that
8.7% shift? We've had some significant
dents um some big losses any um changes
there um has impacted on the the number
uh let's say the tons um on the rails um
but with specific relation to the
targets um I would look to to Liam to to
answer the specifics.
>> Yeah, I'm happy to come in there. Thank
you, Graeme. Um, so we are we are behind
our rate growth target for the control
period. As you rightly said, we're
halfway through the control period. The
target for growth is 8.7%. Across the
across the uh the control period and at
the moment with what we currently now,
we expect to outturn around about 4% of
growth, maybe a little bit higher.
That's with things that um we believe we
can control and uh and there are things
within this system as Graeme correctly
pointed out that we we cannot control.
So the loss of the the Inos traffic and
also the loss of Royal Mail who shifted
their operations from rail to to road
that cost around 6%. So in effect our
target became 14.7% if you were if you
take the 8.7% um target growth plus the
6% loss and we recover 10% of that 14 I
think in the in the current control
period. It is not just um new facilities
as Graeme said. Um we work very closely
with freight community with with the
freight community to improve um things
such as uh train length um improve
overall train performance. We've got a
really good record of train performance
for freight at the moment. So um
cancellations um for freight are below
one below the 1.4% target for each of
the last three years. That's really
strong considering some of the weather
implications that badly impacts freight
traffic. So we are working very closely
with freight community. We're working
closely with and increasingly closely
with businesses who could choose freight
in the future to try and make life
easier for them to work out what is it
that would attract you to um come to
rail and to stay in rail. But freight
even more so than passenger rail is
affected by exogenous factors out with
the direct control of the industry. Um
notwithstanding that we'll continue to
work with Transport Scotland and the
freight community to try and get closer
and close to that um that growth target.
Um and I've given that number of roughly
4% by the end of the control period
because I'm confident that we can get
there. There are other elements of
growth that um perhaps I have more me
medium level of confidence on that could
get us closer to the 8.7%.
>> Yeah, that's all very interesting. Now I
I'm trying to think well where would be
the easiest way to get more freight off
roads and onto rail? Um, and if I look
at my own area, um, we have the port of
Grangemouth, which is Scotland's largest
container port. Now, currently, no
freight going in or out of Grangemouth
on rail. Now, the port itself has spent
several million upgrading its inport
facilities. It's well capable of that.
Um, but the difficulty seems to be
finding operators that can fill trains
in both directions. So, so, you know,
what can you do to assist with that?
because that surely would make the
biggest dent in our road to rail
transfer if we could get stuff to the
ports going by rail.
>> Yeah. Uh you're quite right. Graange
mouth is a is an opportunity for us. Um
we've been talking to to freight company
about how we can support them to provide
that um that that multi-direction um
stuff. the um the the big growth
opportunity for us I think is in some of
the en energy sector and some of the
project work that is going on um across
Scotland and how we can support that
through rail and that's where some of
those conversations talk about that 4%
growth and that above 4% growth as well
that's where those conversations are.
We're trying to remove barriers to entry
into the industry. Um and I think that
uh we are increasing our capability in
that space but there's probably a lot
more that we can do to go direct to
business and convince them because there
are um you know road is there are fewer
barriers to entry.
>> Yeah.
How how much have we spent say in the
last few financial years on the mode
shift revenue support
>> on revenue support to freight? So not
[clears throat] netware don't don't
spend that directly directly to Graham.
Yeah.
>> So I have the the 40 million over the
past decade um specific to rail freight.
Um I've got some figures on some
specific interventions. Um but I think I
don't want to miss the job. I'll write
to you with with the exact figures if
that's okay. Mr. D.
>> Thank you very much.
>> Okay. Thanks very much. Back to Graeme
Simpson.
>> Well, Mr. Day has done a sterling job.
Uh, and I think, uh, he's covered
freight admirably. Um, I did have a
slightly different question.
>> Yeah.
>> Um, not on freight. We were keen to
explore last week. Um, I think this
maybe a question for you, Mr. Cook. um
what happens
um when Transport Scotland is uh moved
into government that we're
>> we're going to come to
>> Are we coming to that?
>> We're coming to that later. That's okay.
>> Right. Well, I've got no further
questions.
>> All right. Okay. That's fine. Um I'm
going to come to Donald McKinnon.
>> Thank you, Convenor, and thank you to
the panel. Um I'm going to turn to Rail
and the Highlands um briefly if we
could. Um and I I'll just briefly pick
up on the point that um that Simpson was
making around uh replacement of rolling
stock as well. And am I right in
understanding that the replacement of
some of the rolling stock in the routes
that were discussed earlier in the
central belt and then the intercity
trains that some of that rolling stock
would then be cascaded down to um the
Highland lines. Um, I understand that at
the moment
the the trains servicing the West
Highland line are currently
um as old as 19 from 1987 to 1989. These
are old trains already and these
services could be being replaced with
with even not older stock but but again
with with H handme-down trains from
other parts of the network. Is is that
correct? Maybe Joan if you could take
that first. Of course. So, uh, thank you
for the question and yes, with regards
to the replacement of our trains. So,
inter city is up first. Um, our HSTs um
are some of our oldest rolling stock.
That will be followed by suburban. And
then we'll be looking at a replacement
of some of our rural fleets. But you're
absolutely right, in the intervening
years, we will be looking to move our
rolling stock around so that the age
profile overall will decrease. Um so
there will be um removal a bit like the
interim intercity fleet. So the where
we're replacing intercity it's on an
interim basis on an interim basis as
rolling stock has moved
>> and what sort of time scale would that
look like for for seeing seeing um
beyond that incident period for for the
Highland lines.
>> So as it stands our new suburban fleets
um will be introduced in the 2030s. So
you are looking at after that
>> quite a while. It it is quite a while.
Um in terms of the new suburban, it will
take us around it takes around five
years from commencing a procurement um
exercise until we see trains in service.
Um but we are committed to looking at
other improvements and we have already
delivered other improvements um in the
far north and the west highland lines.
>> Thanks for that. Um in the interest of
time, I'll move on from this uh this
point. um was looking at reliability um
across the the highlands um and the the
far north line caught my eye. Um in the
past in 25 26 there was nearly 5%
cancellations on on that route. In the
past 3 years it was over 5% approaching
six in 23 24. [snorts] Um there's
clearly some issues in that line um
pushing these cancellations above the
the the average. Um
and I'm also aware of um commitments in
the past or at least discussions in the
past about improvements to the line in
the far north particular particularly
looking at a a loop um in Mu Reward um
and um something that would would
improve reliability and improve the
service and and and the times as well um
which is another issue on that line in
particular. Um,
I was wondering if you could pick up on
that point around cancellations around
in on the far north line, but also that
wider point about improvements in real
infrastructure in in the north and in
the highlands. And in the interest of
time, I'll also add in the the West
Highland line there as well and aware of
some works taking place there. Um, Joan,
I don't know if you you want to start
and then maybe if pick up with Network
Rail and
>> Yep, that's it. So thank you for that.
So since coming into public ownership,
we've been committed to improving
performance across our network. Um and
there is a significant amount of work
that has been done. The two biggest
challenges for us um on performance have
been around the availability of our
train crew. So that's our drivers and
our on train staff and also our aging
fleet which the committee um have
touched upon. Um, with regards to train
crew, we have absolutely focused um, on
delivering driver training and we are
currently delivering with the back of
the Scottish government the biggest
driver training program in the UK. So
we're training 160 drivers per year. Um,
and through that we are reducing
cancellations overall across the network
and we are sitting at 2% cancellations.
Um and that is a statistic that many
operators especially with as challenging
a geography as ours um would bite your
hand off for. Um in terms of our fleet
that remains our biggest challenge. So
we've been addressing the driver
challenge. We're addressing fleet. Two
ways in which we're addressing fleet.
One is with the fleet replacement
program. But as you say um for some that
means there will be some years before
they see new trains. they'll see newer
trains and then it'll be some years
before they see new trains. So again um
with backing of government we are
investing in a capital improvement
program and we are doing improvement
works on our existing fleet to improve
their reliability
um which will lead to um reductions in
cancellations um and also providing uh
seat capacity. So, the number of seats
we've committed to um across across
Scotland um 92% of our customers tell us
they're satisfied. That's verified by
Transport Focus, our watchdog. And
again, relative um to other train
operators, that puts us um certainly one
of the highest for a large operator. So,
there is more to be done, but we have
actually um driven down cancellations
and public ownership. and we are
committed to both maintaining our
commitment to driver training and train
crew training and but also to improving
our fleets whilst we um wait for our new
fleets. Um but I'm sure Liam will want
to talk on infrastructure.
>> Yeah, thanks Joe. Um so I everything Joe
said is obviously spot on in terms of um
overall levels of reliability. We have
very low levels of cancellations in
Scotland compared to the rest of the uh
the rest of the network and that's
something we're really proud of. We know
it's really important to our to our
customers. Um over the last so far in
this control period, we've we've
committed and we've started to spend
roughly 40 million pounds on renewing um
parts of the infrastructure in on the
far north line, which is a significant
investment for that line of route, but
that's renewing what is is is currently
there. You mentioned um a potential
enhancement around um around a passing
loop effectively. that would be an
enhancement. Um and uh and that's
something that Graeme might want to to
comment on.
>> Thank you. So Liam's mentioned the
enhancements so far. Um as phase two of
enhancements to the far north line. Um
Network Rail have worked on an outline
design of a new passing loop. Um the one
you mention um there's no funding for
that this year. Um, and any decisions as
to whether or not that's one of the next
investments in the railway will of
course be subject to affordability
considerations and and constraints, but
the work has been done to start to
understand um what it would take to to
build that additional loop. Um, in terms
of um significant investments in the
Highlands, lots have been made, but
convenor I won't I won't list them now
um given the time.
>> Yeah, thanks for that. Um just um um one
one final question before we move on
from this and uh it was around
accessibility at stations. Um and
uh the picture across the highlands
isn't great. Um but actually the picture
across um the the the whole country um
could could be better. Um I I understand
that 26% of uh stations in the highlands
are fully accessible. Um but the picture
across Scotland um is 37% as far as I
can make out. Um what steps are you
taking to improve accessibility full
accessibility uh that is at stations um
in the highlands but but across Scotland
and across the wider network and maybe
uh start with Gem on that one.
>> Thank you. Um so accessibility is a a
reserved matter in the railway. Um that
doesn't mean of course that that
Scottish ministers or transport Scotland
are are disinterested. Um funding um
does come uh from two sources there. Um
and ultimately it is um network rail um
and the funding uh let's say the GB side
of the railway that will decide which
priorities come first. Um so I I'll hand
over to to Liam to talk further on that.
>> Yeah, certainly happy to. So um as as
Graeme says the access for all program
is a department for transport program
rather than a uh transport Scotland
funded one. It effectively provides a
pot of funding distributed across
Scotland, England and Wales to improve
accessibility at a variety of stations.
We generally deliver those improvements
um and that would um usually include
stepf free access at stations um in
control period six. So, we're in the
halfway through the five-year period
known as control period 7 at the moment.
In control period six, we delivered
improvements at um at six stations to
make them step free access. Um in the
current control period, funding is going
to be less for that program. So, at the
moment, the only station we've got
committed by through the access for all
fund is Belgrove station. So, Belgrove
will be the only station at present
which will get the full access for all
treatment during this control period.
though we do have some funding to do a
detailed design at Falerk Grahamston as
well. So um there is less funding for
that program during this control period.
So in order to supplement that and we
know we know that's coming. So in order
to supplement it we have developed
across Scotland railway um railway for
everyone program which looks at things
that we could do that [clears throat]
are easier than the full access for all
scheme to improve accessibility at our
stations. We look at all the stations
across the entire network and whether
they uh and the extent to which they're
accessible from a perspective of getting
to the station, moving around the
station, getting on the train, and then
getting off your eventual eventual um
train as well. Um and we break it down
to try and see well what elements of
that can we deliver to improve overall
quality of accessibility within um
within existing funding arrangements
within Scotland to supplement
effectively supplement the access for
all program. A good example of the work
we've done is at Dumbar and I was
recently at Dumbar with the cabinet
secretary looking at a new footpath that
has been put in in place on one side of
the station which dramatically improves
accessibility of that station um through
some funding that's come from local
council and from from other sources um
to to improve the overall accessibility
of the station outside out with the um
the generally more expensive uh
arrangements of an access program. So um
we've done a lot of work in the past in
in the last control period we're doing
less work because there's less funding
effectively in this control per grid but
when we build new stations when we do
electrification projects we take that
opportunity I think Joe mentioned it
earlier actually we take that
opportunity to improve accessibility as
well so um when we're going through the
east bride when we're through east bride
project improved accessibility and
create a step free access at hair meers
and the new east bride station and when
we're doing five and borders we'll do
more of that and then when we um when we
go beyond that with the next stage of
the rolling program of electrification,
we look to include um include more
activity at that time.
>> Thanks. That's everything for me. Thank
you.
>> Right. So, we're already out of time.
We've got lots to cover yet. So, I'm
hoping you might be able to stay for a
little bit longer. Yeah. You okay for
that? Um, but before we move on from
that, there was a Times report in
November of last year that said, "Old,
cold and dirty West Highland line is
going off the rails." And there was
concerns from a lot of users about not
just the age of the trains, but the fact
they were cold and the fact they were
dirty. Um, and it was described as the
first train in the morning thing from
Glasgow was described as the Polar
Express. Um, is that going to change
this year? Are we going to have them
better maintained, clean, and warm? Do
you think that's going to happen,
Joanne?
>> Um, so thank you, Convener, and yes, I
do vividly remember reading the report
at the time. Um and we know that it's
not good enough for customers and we
have experienced um heating issues um
with some of the fleets that serve um
that area and our engineering team have
been consistently looking at new ways to
ensure that we can provide um a better
passenger experience on those lines. Um
so we we are making improvements um for
this winter for those passengers um on
on those lines.
>> Okay, that's fine. Right, I'm going to
move on to Irish Dwayne.
Thank you so much, Convena. I was just
hoping to move slightly on to climate
change. I know it tangently relates to
what Graeme was saying about
electrification. Um and as we've seen
recently down in England and Wales to an
extent there's been a significant amount
of heat waves which may have we wait for
the investigation to conclude uh have
led to some buckling of some train lines
and some disruption on the services. I
understand of course there's the uh the
clement action plan for for Scott Rail.
I was just wondering if we could dive a
little bit deeper into what preparations
we're making in the case that that
starts to happen up here and are we
concerned that there will be uh
continued levels of disruption due to
changing climate in Scotland?
>> I'd be I'd be happy to answer that. Um,
so everything you say is absolutely spot
on and of course um we're very um sad to
hear of the uh the derailments that took
place in um in England in in in most one
of the most recent heat waves. Um we
also had our own heat waves here
probably not quite as hot obviously but
um but it's still a relevant factor for
us as as Scotland gets warmer as well.
But we are are I think ahead of the
curve on climate change in Scotland
compared to the rest of the network
because we've of course have started to
see the impact of climate change on our
railway for a um for a longer period of
time and most obviously and most
tragically at Carmont um in uh back in
2020. So um we um in anticipation of
climate change and the impact the house
on the railway've started to invest very
heavily in preparing our network for it.
So, I've mentioned on a couple of
occasions that we're roughly halfway
through control period 7, five-year
funding period. Through that fiveyear
funding period, um our to the total
expenditure through um operations,
maintenance and renewal of the railway
is roughly4.2 billion pounds. Um and
half of that around 2 billion is spent
on renewing the network. Um so,
replacing what is currently there. And
of that two billion around 400 million
is dedicated to climate change
resilience activity. So there's a lot of
investment going into um stabilizing our
earthworks um improving drainage um
resilience of our structures and that's
generally um as a result of and and
preparing for inclement weather in
Scotland particularly associated with
precipitation and high levels of of
rainfall. Um, we're also investing 100
million pounds as part of that in the
removal of vegetation from the line side
because that has an impact during storms
with trees coming down and creating a
hazard for trains. Um, and and that's a
significant increase on the previous
funding period as well. So, we've made
really good progress on all of those
activities. We're reducing the number of
sites that are susceptible to flooding
on the railway. We're stabilizing our
embankments. You will see some of those
things. So, if you're traveling about on
the train, you will see some of the
innovative things such as if you see
these little vertical poles pop up along
the line side. They are um Earthworks
monitors that will tell our control
center when anything starts to shift,
particularly during weather. We've also
got a dedicated weather um weather ops
delivery center in in Scotland. We're
the only part of the railway that has
that in Britain where we've got 24/7
meteorologists, weather weather and rail
experts working together to um to
monitor when weather patterns start to
shift in real time, how we respond to
them and what operational things we want
to put in place to mitigate the impact
of them. So there's a huge amount of
work already ongoing. Um but of course
the um you know climate change marches
on very very quickly and we will face
more challenges like that. So when we go
into discussion, we're commencing those
discussions now about the next funding
period, which will be known um
confusingly as funding period one rather
than control period 8. Don't get me
started on that, but um when we go into
those discussions, we will be making the
case for continued ongoing and greater
investment in climate change resilience.
Um and I think we will need to reflect
on the experience of south of the border
and the heat um of this summer and
whether that is caused um to require
more investment in management of heat
which isn't traditionally something that
we need to manage in quite the same way
that our colleagues after the border
need to.
>> That's very helpful and actually you
touched on something that I was going to
pull up on. Obviously climate change is
anything but predictable. We don't know
exactly what's going to happen at times
and recent reports have indicated that
we are now going to miss our targets of
keeping the heat down. How far in the
future are you guys looking when you're
are so-called future proofing uh the
tech and um how adaptable is that
because things really can change at a
hat when new reports come out when we
see differing effects.
>> That's a it's a really good question. We
the answer is we look a long long long
way in the future. So we will look at
for example coastal erosion that's uh
that is a feature in parts of Scotland
particularly on the east coast where the
railway is quite close to the coast. We
look at projections over a hundred year
time frame. And when we when we [snorts]
did our first projections on that um we
we set a range of possible um coastal
erosion um scenarios. Um that started
with well we'll see not much erosion to
we'll see lots and lots and what we are
now seeing around eight years since we
first did that analysis is that we are
right at the upper end of that. So we
are seeing the the worst and and
actually more so than we we even
anticipated in the worst case scenario.
So, we do need to adapt very quickly to
those things. We have seen um increased
amounts of um precipitation throughout
um throughout throughout this autumn and
winter seasons as well. We're expecting
to see more of that. So, we look really
far out for changing climate um
scenarios and we try and plan
accordingly. our structures when we
renew them, our earthworks renew, we do
that on the basis of protecting them for
30, 50 or 100 years into the future
rather than just getting us through a
few seasons. But at the same time, we do
have to look at the short term as well.
Um so I'm sure some of you will have
read about or seen the super El Nino
phenomena that is likely to hit us. So
that's all about whe um the temperature
of the oceans in the Pacific and then
that has an impact on our climate and on
and specifically on our railway probably
sometime in the spring of 2027. So we
are looking at what that means as well
and what what extra we need to do to
prepare ourselves for the short term as
well as the long term. This is a really
dynamic environment. We've got some
brilliant climate change experts in
network rail that are looking at all the
different scenarios and what we're going
to do to prepare the railway um and help
to prepare Scotland for that um for that
future. And we're not just working
within rail. We do first of all we we do
learn from railways um abroad that that
experience different types of weather
and we're also engaging with different
um different uh transport networks in
Scotland and uh and other other uh
utilities such as water and canals and
people like we we talk to all of them
about the impact of climate change
because it doesn't just affect the
railway.
>> Thank you so much. And if you'll indulge
me, just one more supplementary
convenor. And you're virtually very good
at anticipating what my next question
will be. Um, when looking at at things
such as El Nino, um, and bringing it in
the short to medium term, climate change
often for many feels very tangental. Um,
are we expecting significant disruptions
to current services that we're seeing?
Is there any ways that you are
considering and communicating that to
consumers as to why that's happening or
why we're unable to adapt to it per se?
>> So um obviously these things are very
difficult to predict. Um we really don't
know um the the scale of the challenge
that we're going to face in in the next
year. It's it's um it's something we we
model different scenarios. Um, and if we
if we have I think we're sort of
expecting windier and wetter weather in
the late winter, early spring, and we're
expecting hotter air temperatures, which
can lead to hotter rail temperatures in
um in the summer as well. The extent to
which that affects Scotland's railway is
is really unknown at the moment, but we
make our preparations in advance. I
think it'd be far too early to say that
we anticipate disruption. But if we do
get closer to the time frame when we do
think, well, actually there's going to
be really severe storms or there's going
to be extreme heat that we can't cope
with, then we will look to communicate
that, we'll work with Scott Rail to
communicate that um to plan accordingly
um as best we possibly can. We actually
have a really good way of working around
these weather events where we'll have a
strategic um meeting about how we're
going to face into some of these weather
events. We'll determine the range of
outcomes that could happen from a storm
for example and what we are going to do
with the service. If we lose lots of the
network because there's trees down or
because of any other thing, then how are
we going to reopen it? How are we going
to rep prior how we're going to
prioritize? We work handin glove with
Scott Rail on on working through that
and obviously with communicating that to
passengers as early as we possibly can.
Joe is always on my case during these
events say look let's tell passengers
early early early and I'm well we don't
quite know how things are going to work
out yet. So we work really closely
trying to trying to model what the
outcomes might be to give as much well
to minimize service disruption but to
give as much confidence in what's
actually going to happen um for
passengers as we possibly can.
>> That's very helpful and thank you. It's
a deeply impressive system. So hopefully
>> thanks very much Iris. We've witnessed
your partnership working when we
visited. So, um, we do recognize,
including the sticks by the side of the
Royal Wheel lines, as I call them.
They're probably more sophisticated name
than that. Um, but we're going to try
and pick up the speed a little bit. Um,
we've just got a few subjects left. Um,
so first over to Lloyd Melville.
>> Thank you. I wanted to talk about uh
weekend uh rail travel. um there has
been an uptick in in weekend rail travel
as as people are um looking to to um get
out and about h for leisure purposes. Do
you consider weekend services to be
meeting that demand currently? Joan,
>> so thank thank you for the question and
we we absolutely recognize that you know
in a post-pandemic world leisure travel
is more important to us um than it ever
has been. Um, and we are seeing some
really busy weekends. You know, just
this year we've had the combination of
the Edinburgh Festivals and the
Commonwealth Games in Glasgow and making
for a really busy summer for us. Um, and
some of our busiest weeks and some of
our busiest Sundays in fact since
entering public ownership. Um, we review
our timets twice a year. um and we go
out and we consult um broadly on those
timetables um across Scotland and in
fact I myself go out and hold um
meetings um in different parts of
Scotland um around every six weeks. Just
last week, two weeks ago we were in um
offering to meet local MSPs um and local
counselors and other elected
representatives. So we consult broadly
in terms of building the timetable. we
have ambition um to do more um on a
weekend specifically on a Sunday. Um
>> you know what I'm going to ask next.
>> However, um we um we know that this is
this is a whole system approach. So um
we can't just look at the Scot Rail
timetable whether it be Sunday or any
other day. We can't look at that in
isolation. Um when we look at running
more services, we need to um consider
what that does to the impact on
engineering and improvement works that
might be carried out at a weekend or
indeed overnight. We we've spoken about
freight. So what impact might it have on
freight paths if we have ambitions to do
more? Um and we also need to look at a
staffing perspective um both from Scott
Rail um and from a network rail point of
view. Um committee members may be aware
that when we came into public ownership,
we did make a public commitment to bring
Sunday into the working week at Scot
Rail. Um so like most train operators in
the UK, we run services over seven days
of the week and but staff are largely
contracted to work across Monday to
Saturday, so six days of the week. Um so
we have um developed a proposal um that
is going through um the necessary
approvals um because we'd need to be
able to negotiate with staff on their
terms and conditions because we're going
to ask them um to contractually um work
on a Sunday. Um and we'd also need um to
increase the number of train crew we
have um to be able to deliver our train
services reliably because again you're
stretching your resources across a 7-day
commitment rather than six. Um so that
is um something that we have ambition to
deliver and are committed to doing so
because we also know there's a revenue
potential and that decarbonization
impact of getting more people onto the
train and out of their cars on a Sunday.
>> Thank you. appreciate that. Um, Bony
Feith though, the trains run past Bony
Feath on a Sunday. They don't stop
there. Now, this is a small growing
community. It's seen big uptick in
passenger numbers since services have
expanded across the the other six days,
which is very very welcome. Um, but on a
Sunday, train will stop at Broy Ferry,
it'll go past Monie, it'll stop at
Kerni, and then it'll keep going. Um,
why can't it stop at Monie?
So um stopping patterns um aren't just
uh dependent on a train passing a
station. There's lots of different
variables [clears throat] including
journey time um including um staff
availability. H certainly um it's
something that we're happy to take off.
I know that um we met with Graeme on
more than one occasion um around this
matter and it's certainly something that
we'd be happy to come out um and meet
with you on very specifically um and
look at the possibilities but um
unlocking Sunday in the working week is
going to be key um to improving our
Sunday timetable.
>> That would be useful. I mean I think in
particular because um it is something
that has been uh longstanding
particularly within the community and
you and I have had discussions about
that previously as well. If I can turn
though away from my own constituency
towards um late night services um
because um they are uh limited and I'm
aware that Scott Rail particularly when
big events are are on do try to put on
more services and that is very much
appreciated but I think what people are
looking for particularly if they're safe
they're going out to Edinburgh on a on a
Friday night um they want to go out and
have a nice time they want to be able to
get back reliably um how are you looking
at building in later services as you're
evaluating the timetable going forward
Yeah. So um it it's very good challenge
and it's challenge that we have heard
before and again you know I refer to a
whole system approach. So um I'm sure
most of the committee are probably aware
but um a lot of our maintenance is done
overnight.
>> Um so whether that be uh cleaning the
train and and I' I've been out and seen
the the very hard work that our train
presentation staff do on cleaning trains
overnight um and maintaining our trains
overnight. And as I say, there's work
done by um Liam and his teams um largely
overnight when the railway is not
operating. And not to forget um that we
have freight trains which run through
the night and services like the
Caledonian Sleeper. Um so as we continue
to deliver the biggest driver training
program in the UK, so 160 drivers a year
um and unlock Sundays in the working
week, we can also look at other
possibilities. But I say it's all about
whole system change and what we can
operate and when and obviously new
fleets as well will give us
opportunities to do things differently.
>> Okay. I don't know if I have time to go
into the performance uh piece.
>> Yeah, I think we'll just we've still got
quite a few other things to do. So move
on.
>> I'm happy. All right. Thank you.
>> Okay. Colette Stevenson.
>> Thanks very much convenor. Um I'm
delighted that Esco Bride's real
enhancement has been showcased very well
today and um you answered quite a few of
the questions in terms of like the
actual rolling stalk and the electric
trains as well. One of the things um
that we also touched upon um is the
actual project value of these
infrastructure uh programs such as
accessible
clean toilets, clean carriages as well.
But one of the things and G I met with
them actually network really bride was
the social value. So it's like community
benefits. So there was 11 young people
that get taken on um during that time um
as part of the real academy. I'm just
I'm just curious to know um if how they
got on in terms of their employment, but
also do you keep a register of what
community benefits that you provide as
well? Um I'll ask Liam that. Thanks.
>> Yeah. Um thank you for the question on
that. Um I think the the rail skills
academy that you referred to is one of
the initiatives that um I think you know
I'm probably proudest of um within uh
within what we do in infrastructure. So
Ekkill bride much like um the leave and
mouth project for example um are
projects delivered by a series of um
contractors. So um somewhere between six
and eight depending on the particular
type of skills that we require and the
skills academy um enables um enables us
to bring on young people who perhaps
wouldn't have an opportunity to get into
the industry might actually not have an
opportunity much employment opportunity
at all by giving them experience within
one of those one or many of those um
companies during the um during the
project itself. And then at the end of
the project or a certain time during the
project um they are interviewed for um
permanent roles and um to use your
example of Eastbride um I think all 11
of those young people managed to get a
permanent role within the industry which
is transformative for their life
experience and you know we should all be
very proud of that and it's some it's a
model that we're hoping to continue with
um with future projects as well because
we see so much social value in it.
Brilliant brilliant thing. Um and we do
keep a record of all of the uh community
um value that we bring through these
projects and we have somebody within my
communications team who's uh who's sort
of responsible for for covering that. So
if you would like we'd be happy to share
with you some more details um of exactly
what that is outside of the committee.
>> Yeah, that would be really helpful.
Thank you very much. Just quickly on
future projects, um, Clyde Metro, which
has appeared in so many transport
strategies since a way back in 2009,
but there's there's still nothing as as
Graeme and I too, it's just a squiggle
really.
So I I'm wondering if um you are aware
or you can comment, Graeme, I say you in
terms of when is this going to be
completed? what are be going to the you
know the details of it as well and and
and particularly for the public as well
because it's been mitted about for for
quite a while now and who is ultimately
responsible and accountable for it and
um quickly will bride fair in that as
well.
>> Thank you. Um so in November 2023 the
then cabinet secretary for transport net
zero and just transition endorsed the
outcome of govern governance discussions
uh around this and at that time um it
was decided that Strath Clyde
partnership for transport and supported
by Glasgow City Council um would be the
the primary partners um to look at
delivering the Clyde Metro and Transport
Scot Scotland performs an assurance role
in that. Now that assurance role is
about making sure that any business
cases that come forward um are of a a
form that could be supported by Scottish
ministers and the necessary um checks
and balances that come with significant
investment. So it's up to SPT and the
Glasgow City Council to come up with
that case for investment. That's
currently anticipated to be complete in
mid 2027.
>> Thank you. Yeah, that's me.
>> Thank you, Colette. Graeme Simpson.
>> Yeah. Um, I'm going to ask you about
Winchra. Before I do, if I could just go
back to the Sunday service. Um, and
getting drivers on a Sunday roster. Um,
is that dependent on hiring new drivers
on new contracts?
>> Nope. That is not part of our plans. Um
our plan is to work um with ALF who are
trade union who represent drivers and as
you'd expect we've had ongoing informal
conversations with ASL um about
implementing Sunday in the working week
because there was a very public
commitment made to that and through our
2022 pay deal. As I referred to, we
would need additional drivers as we'd
need additional um train crew to run to
run um Sundays in the working week
contractually. Um but it would be about
negotiating a change to existing
contracts.
>> It would and are ASL being cooperative?
Are they resistant to the idea?
>> We are very proud of the relationship we
have with all four of our recognized
trade unions and it's something that
we've been able to work very hard on
since coming into public ownership. Um,
so we have been very much having
conversations with ASL and meeting them
with them as we do regularly um, in
developing a proposal around Sundays in
the working week.
>> That didn't quite answer the question.
Are ASL opposed to the idea or not?
>> Absolutely not opposed to the idea. It
will always be a negotiation as it would
with any trade union.
>> Okay. Um, winch
>> they've signed up to it.
>> They've signed up to it.
>> Well, through the through the pio
they've signed up to made a commitment
to Sundays in the working week.
>> Good for them. Good for them. Um,
Winchbr um long-standing proposal to
build a new station. I don't know who
wants to answer this, Graeme Cook. Um,
so the proposal's there. We've got the
business case. We just haven't got the
money yet. Nobody's agreed to pay for
it. So, Mr. Cook,
who's going to stump up the bill, and
when are we going to see a new station?
So as co-promoters um of the new station
um the West Loing Council and Winburgh
Developments Limited retain
responsibility for that that business
case. The OBC so the outline business
case is broadly concluded and and the
mitigations to address um any risks
within that um will be covered by a
final business case. Officials in
Transport Scotland are investigating the
financial options available for delivery
in advance of putting an evaluation of
those options to Scotch ministers.
>> Right. So what's the time scale?
>> So the advice will be going up
imminently. It's not quite ready yet. Um
I can't put a specific
>> advice to ministers.
>> Yes.
>> So that's going to be soon. And if
ministers say go for it, then when can
we expect to see a new station?
>> I I'm afraid I don't know how long it
would take to um run tenders and
establish the supply chain and so on,
but perhaps Liam could give an idea.
Well, I what what I can say is that we
would need to go through a detailed
design phase that would probably take
about a year before we would then be
able to enter into um enter into tenders
and into the delivery stage.
>> Okay. So, we still need we need a
decision from ministers. We need the
advice to ministers first, then a
decision from ministers, then go out to
tender. Somebody needs to design it.
That could take a year, then we've got
to build it. So all this could take
several years. Meanwhile,
Winchra continues to grow and it doesn't
have a train service. It's not very
good, is it?
What I would say is that since 2020,
we've funded the railway industry to
construct 24 new stations across the
Scottish network. So, um, yes, it does
take a long time to establish the right
due diligence and to make and do the
right designs. Um, it has to be safe. It
has to be robust and we need to be able
to demonstrate to taxpayers that it was
the right investment and achieving that
does take time. Yes, but we've got a
significant track record of delivering
new stations in Scotland.
I'm I'm not doubting you have delivered
new stations, but this one is
desperately needed. I'll leave it there.
>> We'll excuse the pun of your track
record.
>> Thank you.
>> But we're going to conclude um with some
quick questions from from Irish Dwayne.
>> Just very very briefly as I'm aware of
the time. Obviously, Great British
Railways is now a new and large factor
in the way that we are providing our
railway service. some of that will how
that looks in Scotland will come down to
political decisions both made at
Westminster uh and made here at
Hollywood. But I just thought very
briefly if whoever wants to take it if
we could reflect on what you think would
be the most effective way to integrate
British railways with our existing
services.
>> Yeah. So I mean others might want to
comment but um the one thing that I
would like to comment on is that in
Scotland we we are proud that we've been
trailblazers in terms of the way the
railway works together. You know the
convenor mentioned that he had seen that
in action firsthand when he came out to
visit our integrated control center. So
the work that both Liam's team and I do
day in day out to deliver best outcomes
from passengers has been seen as
trailblazing in terms of our alliance
work. Um but I don't know if other wants
others want to comment.
>> Yeah, I mean I'm happy to come in as
well. Um um I've worked in this industry
for 23 years now. Um and I'm absolutely
convinced that a more integrated railway
is a better railway. We will make
quicker decisions. We will make better
decisions that are um really aligned if
our incentives are the same, if our
reasons for doing business are exactly
the same. Um, and it's not that they
are, you know, really different at the
moment, but I think the more that you
can give clarity to that, the better.
So, I'm really interested in how we
integrate. I think we had an a
conversation earlier about nighttime
services, for example. Now, I think
there is an opportunity in a more
integrated environment to really look at
nighttime services and determine whether
we could run later trains to service the
nighttime economies. um in you know
particularly in Edinburgh for example
run later services but then um maybe
stop services a little bit earlier on
different days of the week or different
times of the year in order to ensure
that we can still carry out the
necessary maintenance work. That's
that's stuff that we could do now. It's
just it's just quite complicated because
of the industry arrangements, but a more
integrated railway should be able to
make those decisions more dynamically
and and more easily. So, um, I'm really
excited about what integration can mean
for Scotland's Railway and we really
look forward with the interest to see
how it plays out here.
>> Any further reflections?
>> Yeah.
>> So, I'm like Joe and Liam, I think it's
really exciting the prospects of more
integration for the railway and that
kind of the way that we work together to
the benefit of all the passengers and
the taxpayer. What I would say is that I
appreciate that the the political
decisions you refer to those are often
about the structure that we that that is
chosen for the basis of that
integration. I think what's really
important is we look at the the cultural
change because the structure will be
what what it is. Um I think that
building on the existing alliance work
of um both Scot Rail and Network Rail
will be absolutely key to to bringing
forward that integration. And I think
you know the the leadership we
demonstrate uh today to to make that
real.
>> Well, fair enough. I [clears throat]
guess go ahead.
>> Thank you.
>> We we have heard from colleagues in
Whiteall and we've heard from
Westminster um that it very much is the
case um that rail reform um has been
inspired by the success of Scotland's
railway alliance. Um, so we've heard
that from significant figures and we
hear it again and again. Um, so I am
very confident that not only is Scotland
already benefiting from the benefits of
a more integrated railway, um, also that
we'll benefit even further when there's
[clears throat] changes to the
underlying legislation that will enable
further choices to be made to better
integrate the railway.
>> It's nice to see everyone singing from
the same sheet. Uh, in the interest of
time, I think I'm happy to leave my
question.
>> We've got we're going to squeeze one
very last small one in Graham Simpson.
>> Um, I've got to apologize for the late
running of this particular train, but
you're not entitled to compensation, I'm
afraid. Um, [snorts] if I can go back um
to the question I was trying to ask
earlier um about just to get a sense of
how you think the new arrangements for
Transport Scotland might work in
practice.
um when it's brought into government. We
were exploring this last week. Um don't
think we're I'm certainly not clear how
it's how that would work um on the
ground. Do any of you have any any
thoughts? Yeah, Mr. Cook. Thank you. So,
Transport Scotland has played a pivotal
role um in transport um over the last
almost 20 years in Scotland. Um but
policy shifts, the opportunities of
public service reform as well as the
fiscal pressures mean it's time to look
again um to see if we if there are
opportunities um to [clears throat] do
things differently. Now two of the
stated aims of the public service reform
program are to be more efficient and
productive and to be more preventative.
So it's inevitable that having multiple
layers of accountability in a system
comes with complexity and a degree of
duplication of reporting. So removing a
reporting layer will give the
opportunity to release staff time to
being more preventative. I I would say
that's being more efficient and
delivering the the benefits the stated
benefits to be delivered through public
service reform. What what's the
reporting layer that's that would be
removed though?
>> Well, Transport Scotland reports into
government. So, um Allison Irvin, our
chief executive um is an accountable
officer. Now, that requires sets of
accounts to be prepared. Those have to
be submitted to the core government.
Those then need to be scrutinized by the
core government and then they need to be
considered by the director general. um
that will be removed by Transport
Scotland moving into the core. Um
something as simple as the accounts will
become part of the wider account system.
Um so there isn't that same reporting on
accounts and then that scrutiny
scrutinizing of those accounts and those
accounts being wrapped up into the
Scottish government accounts. So there
there's one opportunity if you like of
um a more efficient system uh by
removing a layer of reporting.
>> So do we not have an accountable officer
then?
>> The accountable officer um will be the
director general and the permanent
secretary as as the primary accountable
officer. So there will still be
accountable officers um and they will
absolutely be accountable to this
parliament. Um but yes the that just the
the the layers will reduce the numbers
of reports layers of scrutiny and so on
will reduce. So there's there's an
opportunity for um being more productive
and more efficient there.
>> Okay. I know we're going to want to
explore this further but we don't really
have time. collect you on a very very
very short
>> it's very quickly but I think you're
right Graeme we probably do need to look
at this further because the taking that
I take it transport Scotland's a
registered charity
>> transport Scotland is a nondep
departmental government body
>> right okay so I take it then when you
transfer over will the staff will be
getting to appealed over
>> so the we're actually sorry transport
Scotland is an agency um and so all of
the transport Sport Scotland staff are
um already part of the civil service.
There will be no change in employment
whatsoever. It's the same same legal
entity. So as as an agency, Transport
Scotland is the same legal entity as the
Scottish government. So there won't be a
change of terms. There won't be Chupy or
Kosop.
>> Okay. Thanks.
>> Thanks very much, Colette. Um thank you
for your indulgence. um we've stayed
much longer than I promised at the very
beginning, but you can't trust
politicians. So, um you should expect
that. But thank you very much for your
evidence this morning. There's been some
challenging questions, but we appreciate
your answers that you've provided today.
And so, that brings us to the end of
this morning's evidence session. I thank
the panel. Um and that concludes our
meeting in public. I'm now going to
suspend the meeting before moving into a
private session. Thanks again.