The Santa Cruz County Regional Transportation Commission convened its meeting on August 6, 2026, to address a wide range of critical transportation initiatives following standard housekeeping procedures. The agenda included oral communications concerning the Unified Corridor Investment Study and passenger rail projects, where public commenters voiced significant concerns regarding infrastructure priorities in Aptos Drown, specifically questioning why heavy freight bridges were planned instead of upgrades for zero-emission trains or necessary parking garages. While these discussions highlighted tensions between current planning realities and community needs for sustainable transit, the commission moved forward by approving the consent agenda with support from groups like Friends of the Rail Trail regarding seismic safety analyses. The Commissioner's report also celebrated recent milestones, including appointments to state task forces, a "Week Without Driving" initiative, and a ribbon-cutting ceremony honoring long-serving commissioner Andy Shiffron at Panther Yellow Beach Park, alongside updates on construction for the North Coast Rail Trail and Highway 1 auxiliary lanes.
A major focus of the meeting was Item 17, which involved authorizing negotiations with HDR Engineering to design the Coastal Rail Trail Southern Segment Project using Measure D funds valued at approximately $4.5 million over three years. This project aims to construct twelve new miles of trail connecting Rio Dell/Mare through Watsonville to Monterey County, a scope that includes analyzing up to four potential alignments while carefully considering equity and community impact in South County and Watsonville. Although some commissioners initially worried about who would decide the preferred route, staff clarified that the Commission retains final decision-making power after reviewing alternatives during public outreach phases. To address fiscal constraints highlighted by recent Grand Jury reports and past cost underestimation issues like the Zepert project, the commission added a directive requiring any identified preferred alternative to be returned for selection before further engineering proceeds, ensuring transparent integration of public input into critical decisions about interim versus ultimate trail options.
In Item 18, the Commission approved borrowing up to $75 million via Measure D sales tax revenue bonds to fund highway and active transportation projects under a "pay-as-you-go" strategy designed to mitigate inflation risks that could otherwise delay project delivery significantly. This financial maneuver involves issuing fixed-rate, ten-year optional redemption obligations secured solely by future revenues from the Highway and Active Transportation programs, with bond proceeds held in a dedicated account managed by a US bank trustee to pay interest before releasing funds for construction expected around 2030 or later. Commissioners acknowledged that while pledging future revenue introduces debt service obligations, it is necessary because local share funding must be spent upfront before state reimbursements arrive, creating a cash-flow gap; furthermore, the strategy hedges against rising labor and material costs which are projected to outpace borrowing expenses, ensuring timely completion of major projects like highway segment finishes by 2031.
Public commenters expressed caution regarding specific expenditures, particularly questioning whether widening Highway 1 from State Park to Freedom was necessary given modest predicted speed gains compared to the opportunity cost for road repairs or transit improvements, while staff explained that local funding requirements necessitate immediate bonding until federal reimbursements materialize over several years. Despite these fiscal concerns and debates over alignment choices and induced demand effects, the commission voted unanimously in chambers to approve both the resolution authorizing the bond issuance and a new debt management policy intended to mitigate conflicts of interest and improve credit ratings. The meeting concluded with an understanding that while there is no opposition recorded among commissioners, public comments emphasized the need for strict adherence to voter intent regarding Measure D priorities and realistic cost assessments before proceeding with detailed engineering on multiple trail alternatives.
Read the full video transcript
Good morning and welcome to the Santa
Cruz County Regional Transportation
Commission. Um, can I get a roll call,
please?
>> Yes. Good morning, commissioners. Just a
really quick um housekeeping here. Uh,
for those of us that are new to the
chambers, you can unmute your mic just
by hitting um the big button that says
mic or you can turn it off when uh by
hitting the same thing. Um, the county
has also asked us that there be no food
or drinks in the chamber. We did bring
coffee for you that you can enjoy in the
room to my left.
>> Okay. Commissioner Hurst. Commission
alternate Hurst.
>> Uh, present.
>> Commissioner Alternate Shiffron
>> here.
>> Commissioner Durpa.
>> Commissioner Koig
>> here.
>> Commissioner Martinez
>> present. Commissioner Downey
>> here.
>> Commissioner Leonor here.
>> Commissioner Kellenti Johnson here.
Commissioner um Calrans Exofficial Hill
>> here.
>> Commissioner Jensen
>> here.
>> Commissioner Keely
>> here.
>> Commissioner Clark
>> here.
>> And Commissioner Montino
>> here.
>> You have a quorum.
>> Thank you. And without any additions or
deletions to the consent and regular
agenda,
>> we posted to our website handout
handouts for items 6, 14, 17, and 18.
>> Thank you for that. And now we're going
to go on to oral communication. This any
communication um addressing the
commission
Unified Corridor Investment Study and
the Santa Cruz Watsonville multimodal
corridor program call for a zero
emission passenger rail project. Your
own studies show that it will take
upgrades to existing bridges to have
passenger trains especially in Capola.
So why are you requiring CALR to replace
the two bridges in Aptos drew in phase
three of the highway widening with heavy
freight ones? That needs to be changed.
Why are you fighting over a few parking
spots in Aptoass when you need a parking
garage to handle the estimated 100 daily
passengers for the train? What are you
going to do about Lelva and Capola where
you also need parking garages? Why were
parking garages left out of your budget?
Perhaps the cost would have killed the
project in the first place. County
supervisors have a mandate to you that
this project is for passenger service,
not heavy freight, and that parking
garages need to be added to your
estimates. And we only have, I think,
one here. Uh, thank you.
>> Thank you.
>> Good morning, Fred Guyger, Santa Cruz.
Uh, here we are again. Uh, time goes by,
the dollars trickle. We're talking tens,
hundreds of millions of dollars. I'm
here to ask you to take a look at
alternatives.
There is u very many questions about
both the PRT
PRT and the rail reports that come up
with uh some apparently inaccurate
figures. The the rail numbers seem to be
way off when compared to other similar
projects. the PRT uh had questions like
uh how many people per car fit? So they
demoted PRT and that's one of many
examples I could give you if I had more
than 20 seconds. You need to spend a
small fraction of the money that you're
spending on major projects to take a
look at alternatives. The two studies
you had on the rail and the PRT
alternative are very flawed. And I'd be
glad to talk about it more, but I have
to say goodbye. Thank you.
[clears throat]
Good morning. I'm Brett Garrett um from
Santa Cruz and I agree with Fred's
comments just now. Um it seems like
there's been a lot of focus on maybe the
wrong problem using the rail corridor
instead of providing the best
transportation which um doesn't need to
be on the rail corridor. Um anyway, I
have some following comments from Mike
Saint who cannot be here today, but I
agree with his comments as follows. We
need to give personal rapid transit a
chance. When we even mention PRT, people
say it hasn't been tried. It hasn't been
a tried and proven mass transit system.
But let's get look at some numbers from
the metro bus system which began service
in 1968. Peak wrership was in 2001 with
8 million passengers after 57 years.
Last year it had 5.3 million passengers,
a 32% decline over 24 years. So that's a
a red flag. and maybe a wakeup call that
um that we should also look at
alternatives such as PRT to help improve
transportation and yeah thank you
>> thank you anybody else in chambers
public comment seeing none anybody over
soon
>> we do not have any speakers online
>> right with that um I'm going to close
that portion of the meeting and go on to
consent but before I go to the consent
agenda I want to acknowledge
commissioners Derpa being here and
commissioner um Kelly Johnson. So, thank
you. Um and with that on the consent
agenda, if anybody have any questions on
the consent agenda?
Seeing none, um put out for the public
the consent items on the agenda.
>> Good morning, Chair Monosino and
commissioners. Matt Ferrell speaking for
Friends of the Rail Trail. We are
supportive of the recommendation for a
seismic analysis of the Capitol Trestle,
but we want to reiterate our support is
conditioned on preservation of the um
rail as part of any replacement project.
Thank you.
>> Thank you.
Excuse
my ignorance, but I thought I had to
wait till six actually came up to speak,
but he spoke on it. So, uh, I have a
question for you on the Capitol
agreement. Is it for light passenger or
is it for heavy freight because that
bridge can't handle heavy freight? And
so, I would like someone to say, what is
the plan for that Capola memo of
understanding of what they're going to
build there? Yeah, this is not a time
for an answer and question answer, but
someone will give you an answer.
>> So, come back when six comes up.
>> No, this is already on six. This is not
a question and answer portion.
>> Any other comments? Uh, go ahead,
Commissioner.
>> I think it's okay to answer the
question. Um, the staff report indicates
that the Capitol study is going to be
for trail on the rail line. It's not for
either freight or um passenger rail as I
understand it.
>> Staff can correct me if I'm wrong. Okay.
>> Thank you. Anybody else is in chambers?
Seeing none, anybody over Zoom?
>> Yes. Brian Peoples.
>> Hi, this is Brian Peoples with Trail
Now. We absolutely support item number
six, moving forward with the seismic um
analysis and upgrades for the Capitol
Trestle. Thank you.
>> That was your last speaker.
>> Thank you. Uh without bring it back for
the commissioner's um action or
direction.
>> Move to approve the consent agenda.
>> Second.
>> So it's been moved and second. Um uh we
we don't have to do a roll call because
everybody's here. So, all those in favor
say I.
>> I.
>> Any nos? Seeing none, any abstensions?
None. Um, consent agenda passes. So, now
we're going to move on to the regular
agenda. Commissioner's report. Any
commission? Commissioner Downey.
>> Good morning. Thank you. Can you hear
me?
>> Yes, I can.
>> Yes. Great. Uh, so last week the Santa
Cruz Metropolitan Transit District
announced our CEO, Corey Aldridge, was
appointed to the California Transit
Association's new transit funding task
force, which will advise association
staff on priorities for upcoming
negotiations concerning greenhouse gas
reduction fund expenditures. And this
includes the appropriation of remaining
legislative discretionary funding and
the potential revision of investment
priorities outlined in Senate Bill 840.
The task force also will identify and
evaluate potential new state revenue
sources and help guide the association's
efforts to secure additional funding
during the 27208
legislative session. Having Central
Coast representation on this task force
gives us a voice in state funding
decisions that could affect how Metro
serves our residents who rely on us
every day. Metro also announced Chief
Planning and Innovation Officer John
Erggo has been selected to serve on the
California Transit Association's
Advisory Committee and that provides
strategic input and technical guidance
for the implementation of key California
Department of Transportation policies.
These include California TRA Calrans
district plans, director's policy, and
future updates. committee members
coordinate with multiple CALR divisions,
partner agencies, and transit advocates
from across California. His appointment
ensures Metro will have a strong voice
in statewide policy decisions. So,
congratulations to both of them. Uh
planning for the second annual week
without driving held this year from
October 1st through 8th is underway with
an emphasis this year on sharing the
stories of non-drivers. Almost onethird
of our local population are disabled who
cannot drive, those who can't afford a
vehicle or gas, those who are too young
to drive or choose not to drive, and our
friends and family members who have aged
out of driving. The decisions we make
affect their freedom to move in our
community and this week highlights their
challenges. So what we fund, plan, and
build prioritizes their safety. Uh last
year many of our commissioners and other
elected officials participated by
getting out of your cars, taking the
bus, riding your bikes, and walking
during the week. Thank you, Sher.
[snorts] Uh and expect to hear more uh
soon about what you can do this year. Go
Santa Cruz County will again host the
week without driving contest where every
trip logged during the week will be
entered to win prizes from local
businesses. So please check your
calendars now and mark them to attend
our countywide event which is planned
for Friday, October 2nd from 4:00 to
7:00 at the Capola Mall near the Metro
Transit Center. Our focus this year will
be on family fun activities and events
will include local pedestrian safety
agencies and advocates and opportunities
to try out bikes, learn to ride the bus,
and about the importance of protecting
non-drivers who are all of us when we
step out of our car. the county
department of development and
infrastructure, the community traffic
safety coalition, Santa Cruz metro,
cruising together Santa Cruz County, and
this commission are this year's hosts.
So, please contact us for more
information. Thank you.
>> Thank you for that report. Um, any any
other commissioners? Uh just want to
acknowledge our ribbon cutting this week
and also want to congratulate you know
on on naming um our uh the Panther
Yellow uh beach park beach parking lot
to our commissioner that's been a
longtime commissioner you know Andy
Sheriff. I want to thank you for all
your service, you know, uh your
dedicated service so so many years and
guiding guiding our community and our
transportation, you know, needs over all
these years. I really want to
acknowledge you. [applause]
I I also want to um take this
opportunity to um uh appoint the ad hoc
committee um for commissions to de
develop a review response for the grand
jury report. Um and they will be
got a list um commi commissioner manu um
commissioner the serurpa commissioner
keley myself and commissioner um Gary
>> Jerry I'm sorry Jerry um will be u um so
keep up for an email with some potential
dates to um to meet because it's like
it's this is going to be hard
So, um, with that, I'm going to go on
to, um, the director's report.
We usually the bypass com public
comment. Um but I'll allow it. Go ahead.
>> Do what's right. And uh one of the
things I mentioned was public input. Uh
well other than giving us longer time at
the microphone uh I think this
commission
as well as the board members or even
instead of the board members you you're
basically investigating yourself which
doesn't you know inspire a lot of public
confidence when the RTC investigates
what's wrong with the RTC. So um I would
suggest a different method of going
about uh res this response which did
according to the grand jury's
recommendations on many issues include
the public and not just the commission
members. So I would like you to consider
that and think about you know the big
picture here. How does this look to the
public? How effective is it going to be
with a limited input from only the
members that are on the board. So I
think that's a consideration that's
necessary. Thank you for uh extending
public comment whether we should have
been here or not. That's that's that's
good PR right there.
>> Yeah. Thank you. I'm Brett Garrett and I
I agree with Fred's comments just now.
Um the the word I saw in the agenda that
there would be a committee and it it
looked kind of like the emphasis might
be on damage control possibly in the
form of rebuttals to the grand jury
report. I'm I'm not sure about that. But
I just want to recommend that the
emphasis should be a transparent process
to implement recommendations and also
improve processes going forward. One
possibility would be to set up a
community advisory committee that could
provide public transportation experts,
low income representation,
transportation advocates, and so forth.
It could be similar to the community
advisory council of Central Coast
Community Energy. Um, thank you very
much.
>> Thank you.
Good morning, Chair Monosito and
commissioners. Matt Ferrell speaking for
Friends of the Rail and Trail. [snorts]
Uh Friends of the Rail and Trail
supports
um recommendation one from the grand
jury regarding the
development of a capital project
advancement framework for future capital
projects. The assessment used in our
opinion between different projects being
managed by the commission is uneven and
not equal and we uh urge you to use a
comprehensive format for advancing
capital projects. Thank you.
>> Thank you. Were there anybody over?
>> Yeah, go ahead,
>> Mr. Chairman. Um having observed grand
jury reports for better part of four
decades at various public agencies, uh I
think the civil grand jury process is uh
quite helpful in the sense of uh folks
who are volunteers who look into the
operations of public agencies. Might be
a school district, might be our entity,
might be a county, might be whatever it
is. and uh those volunteer citizens take
their work very seriously. I have found
over the years that those reports are
somewhat uneven but under the law we are
required as a public agency to respond.
It is it is outlined in the law how that
works. This is not something where we
are investigating ourselves as has been
said here. This is they have already
looked this is a civil grand jury. This
is not a criminal grand jury. This is a
civil grand jury and they look at the
operations of government and those
operations that they raise questions
about uh are the operations that we're
required under law to respond to. And
Mr. Chairman, I appreciate I think being
appointed to this body to help develop
our our public response. Thank you, Mr.
Chair.
>> Thank you. Thank and thank you for the
for that response. Anybody over?
>> We do have a speaker, Brian Peoples.
>> Hi, this is Brian Peoples from Trail.
Now, we submitted a response and at the
uh essentially what we're asking for is
the RTC to recognize their failures and
be ex be accountable.
And we specifically see the the two
decades worth of time spent on this rail
plan as one of the driving problems with
this organization. You're ran by a
political machine rather than [snorts]
smart
transportation solutions. We also
advocate not to include those
commissioners on this board who have
been advocating for rail for decades and
continue to push for rail even though
it's not feasible in any way. So, we
hope that you don't have any
commissioners that were rail advocates
and we expect you to be accountable and
come up with real solutions. Thank you.
Thank you. With that, I'm going to close
that up um and go on to the director's
report.
[clears throat]
Thank you.
Good morning, commissioners and members
of the public. I have a short director's
report today. Um you can go to the next
slide.
On Tuesday, we hosted a ribbon cutting
ceremony in celebration for the new
paved parking lot and resting restroom
facilities at Panther Yellow Bank Beach.
About 50 people came out to celebrate
this exciting milestone in the North
Coast Rail Trail project, including some
of you commissioners, city and county
elected officials, community leaders,
and community members. Representatives
from the offices of Senator John Leard
and Assembly Member Gail Pelerin also
attended and presented the RTC with a
California Legislature certificate of
recognition.
The new parking lot and restroom
facilities provide greatly improved
access to the beach and surrounding
coastal areas for visitors traveling
along Highway 1. By opening the parking
lot and restrooms ahead of the full
North Coast Rail Trail completion, the
RTC aims to enhance public access and
convenience while progress continues on
the larger trail system. The event also
included a special presentation to
commission alternate member Andy
Shiffron in recognition of his 50 plus
years of service to the commission. The
pan the Panther Beach parking lot was
dedicated to him. Um, congratulations,
Commissioner Shiffron, and thank you for
your many years of dedicated service to
the RTC.
Next slide, please.
Um, I have a quick construction update
on the North Coast Rail Trail, which uh,
the construction is continuing. These
new amenities mark a key milestone in
the ongoing construction of the 7 and a
half mile North Coast Rail Trail with
construction currently focused on the
north end of the project near uh
Davenport,
including construction of the trail and
construction of another parking lot and
restroom facility in Davenport. Um the
project is expected to be completed
before the end of the calendar year and
the trail is not currently open to the
public but we look forward to opening it
later this year for the community to
enjoy. Next slide please.
Construction on the Highway 1 auxiliary
lane bus on shoulder and Mar Vista
overcrossing project is also continuing
to progress nicely. As part of the
construction work, the southbound
Highway 1 offramp at Bay Avenue was
closed on Sunday and is expected to
remain closed for approximately four
months as crews reconstruct the ramp as
part of the bus on Shoulder facility.
Detours are in place and drivers should
plan accordingly if they plan to travel
throughout this area.
Other work on the project includes
rebuilding the Park Avenue southbound on
ramp, widening work on the shoulders to
prepare for the auxiliary lanes and
drainage improvements, and work on the
Marv Vista overcrossing. Construction of
the deck of the bicycle pedestrian
overcrossing is complete and crews are
now working on finishing the pedestrian
railing. Ongoing construction updates
can be found on the RTC website and we
um suggest that folks sign up for our
e-news as well.
Next slide.
The RTC was recently awarded a CALR
planning for sustainable communities
grant to continue climate resiliency
planning work along the branch line at
two additional locations in South
County, which included an amendment to
the work program and budget as part of a
consent item that uh was approved just
now. This planning study aims to develop
climate resilient concepts threatened by
climate hazards along the southern
portion of the Santa Cruz branch rail
line, including Gallagghan Slooh and the
Paharo River flood plane and farmland
areas south of the Paharo River. This
planning effort expands on the climate
resilience work underway as part of the
climate resiliency study for the branch
line. Next slide.
We have some upcoming community
outreach. Um staff from the RTC and the
Resource Conservation District are
hosting a community workshop on
Thursday, August 27th at 6 PM at the
Seymour Marine Discovery Center. And
this outreach is about our San Vicente
and Wadell coastal resilience planning
study. The planning study focuses on
climate adaptation along Highway 1 and
the branch line near Davenport and Big
Basin State Park. These transportation
corridors are facing growing risks from
sea level rise, severe storms, and
coastal flooding. The goal of the
planning study is to develop concepts
that will protect this critical
infrastructure while restoring nearby
marsh habitats. More information on the
project and upcoming outreach can be
found on the RTC website. And that
concludes my director's report.
Thank you. Any commissioner's questions,
comments?
>> Commissioner Hurst.
>> Well, thank you very much, director. Uh
I I really appreciate the focus on South
County and the challenges that uh exist
and the progress that can be made. And
so, thank you very much for that focus.
And in addition, you know, the Highway
One construction, I did go through that
uh this morning on my 14-mi one hour uh
trip up here, and it um it certainly
does improve the uh the circumstances
from what it was previously. There's
still a lot of improvements to go, but I
say thank you very much to the entire
commission for all the Highway One
improvements that are hopefully going to
uh finally be finished someday. and that
we can actually get moving and it it
won't take an hour to go 14 minutes, 14
miles. Thank you.
>> Thank you. Any other commissioners? And
seeing none, I'm going back to the
public
to wear on the commissioners report.
Seeing none here. Anybody over Zoom?
Jack Brown.
>> Hey, good morning, commissioners. I just
wanted to uh also bring up which I don't
think was included in the in the
commissioner's report, but has been very
important for us bike riders, is the uh
pilot of the new delineators on uh uh
high on SoCal Drive. Um there are two
different types that are being done on
the one on the westbound, one on the
eastbound side. Um really liking the
ones on the eastbound. They're more like
what's on water. um but very sturdy,
much better than what we've had in the
past and hopefully we continue uh
getting good results from this and we
can redo the delineators uh along the
roadway and uh hopefully treat the SoCal
uh corridor as the jewel of our uh bike
infrastructure until the coastal
corridor is completed. Thank you.
>> Thank you. I think someone in the public
led away in in chambers.
>> And I just wanted to really thank you um
uh u director for and also the
commissioner for continue supporting our
south county and continue the
improvements. But it's very important
for our rail and continue those
improvements and hopefully all
commissioners can be able to continue to
support that because it's important for
our for city of Wasbe and in South
County. So I I thank you for that
support. Thank you.
>> Thank you. With that, I'm going to close
up um a portion of the the meeting and
move on to the Calrance report.
>> Good morning. Uh I'd like to focus on
two things this morning. Uh first you
heard about the sustainable planning
grants that our SECRTC received. Uh
Calrans is gearing up for next fiscal
year. Uh so on the 19th of August, we
will have our annual uh meeting and
we'll we'll go through what that process
is and and provide uh directions and
guidance accordingly. The second part to
this um everybody's well aware CALR is
busy out there. I wanted to focus on uh
Santa Cruz 9 and if you can bring that
up.
>> Yeah. Thank you. Um,
today was first day of school for a lot
of kids across the county and across the
state. Um, there are a lot of people out
there. There's a lot of of moving cars,
moving bikes, moving pedestrians. Uh,
pay attention, be advised. Um, they're
out there and and we would like to get
everybody safely to and from wherever
they are going. Um, but I I wanted to
focus on this because uh this has been
several years in the making. Um, there
will be complaints. Uh we are well aware
of what's going on. Um and we are we are
watching, monitoring and adjusting. We
have crews out there. Uh we have CHP out
in force uh looking trying to to see
where issues are and how we can adjust
accordingly. Um
you are going to hear complaints. Uh the
reality is you heard an hour for 14
miles. Um,
Highway Nine is a two-lane road and
there are a lot more people out there
trying to get through that in the
summertime uh than it probably will ever
be able to handle. Um, it takes us years
to get to this point, but we are going
to be building for several years. And I
just want I think this visual right here
uh which is is construction of of nine
projects over the next five years in
this corridor uh just highlights how
much effort and and time and impact we
will have um to the constituents when we
get done. It's going to be great. Uh but
it it's going to be a little messy
getting to that point. Um and so I just
I thought it would be important to to
highlight this. It's it's on our
website. Um we are are trying to
communicate it out in every way we know
how. Uh but it we're doing our best. Uh
we are trying to to uh be as least
impactful as possible while getting as
much done so that we make it better for
people in the future. Uh whether it's a
new sidewalk near the high school, um
whether it's it's new pavement, guard
rail, striping, whatnot. Um there's just
a lot going on there. So, uh, and with
that, uh, if you have any questions.
>> Thank you. Any commissioner questions?
Commissioner Jensen.
>> Yeah, thank you. Um, I was wondering if
we could get, um, an update on the Park
Avenue on ramp uh, construction
schedule. Um, uh, where we are with
that, um, at the present time with the
closure of the Bay Avenue Porter exit,
um, [clears throat] obviously uh,
traffic's really backed up and we just
like to be transparent to the community
to see if we have an update on those. um
with the Park Avenue opening. And then
my follow-up question to that is the um
on-ramp northbound to Bay Avenue um on
to Highway 1. Um I think that'll be
scheduled for some closures and if we
have any um uh dates around what that
proposed construction might look like.
>> Yes, our director of capital projects,
Amina Abuamara, is um ready to answer
that question. If you could please step
aside. Thank you very much.
>> Thank you. Um, thank you, Commissioner,
for your question. And, um, the Park
Avenue uh, southbound on-ramp has been
closed uh, for a little while and it'll
continue to be closed until the end of
September. That's the uh, that's the
current schedule for it. There's a lot
of work there. the whole u on-ramp was
basically reconstructed.
Um they're gearing up now for getting
the aggregate bays and uh and paving and
then striping and all that. So it'll
take until the um the end of September.
So yeah, we are uh we apologize for the
inconvenience, but that's how the the
schedule is for right now. And I think
your second question was about BA
Porter. Yeah, Bay Porter um the the
northbound uh on-ramp.
>> So the Bay Porter uh northbound on and
off ramp will have some work. Uh
initially we the team the construction
team Calrans and us were thinking that
while the southbound uh offramp is
closed for about four months since last
Sunday as our director uh has mentioned
we thought that the we could align that
work. It's it's not as long as the four
months needed for the southbound
offramp. So we thought it's about a
month each for for each of these u the
northbound onramp and off-ramp. So we
thought we could do it at the same time
to utilize uh you know construction
going on. But at the same but but but
that thinking was also we want to
evaluate the impact of closing the the
southbound uh offramp and see if that
makes sense to within that four months
to start closing one of these other
ramps. And we thought and it it turned
out that it's not really very u public
convenience that we do that. So, so we
have uh held held back and uh it's not
going to affect the schedule. We're
going to do the uh on and off ramp on
the northbound
uh after we open the southbound
um offramp. So, that that's realizing
that we want to try and make this as as
better for the public as possible. It is
still inconvenient closing ramps, but
that's what we have to do.
>> Great. Thank you for that. I appreciate
your flexibility looking at that. Thank
you.
>> Sure. Thank you, Commissioner.
>> Thank you. Any other commissioners?
Commissioner U Martinez.
>> Thank you and good morning everyone. I
want to start off by thanking our
partners at CALR and maybe want to talk
a little bit more about these Highway 9
improvements um for the benefit of the
public. Um first of all, congratulations
to all the children who are starting
school this morning. you know, we have
thousands of kids who are now in their
classrooms, um, including my own. And
so, it's a really important day. And in
preparation for this, my office has been
receiving a number of phone calls about
residents who are concerned about the
various um, construction projects along
Highway 9. I mean, not just phone calls.
I can't walk through town without people
talking about this. Um, and I really
want to extend my gratitude to Calrans,
um, and everyone on your team who has
been in close contact with my office
about potential improvements and ways
that we can help to, um, make this
couple of weeks a little bit easier for
folks. Um, so for example, in response
to some initial feedback that we got,
CALR was willing to adjust the location
of some temporary lane barricades to
reduce a bottleneck that was happening
around Highway 9 and Graham Hill. Um,
we've also worked with CALR to adjust
the timing of the traffic signals at the
main lights and to continue to monitor
that and make those adjustments as we
see the traffic patterns go back to
their normal routines during the holiday
or during the start of school. Um, we
have also agreed with you um to kind of
slow down non-urgent work during this
kind of two-eek period when families are
adjusting to their new routines. And and
I want to recognize that that comes with
cost. There's only some
a short window of good weather when
projects can happen. So, when we ask for
a delay to non-urgent work, it does push
things out. Um, similar to the county
public works, they've been willing to
delay some of the non-urgent projects
during this time. So, I appreciate the
county public works. And I also know
that you're working with the CHP, the
sheriff's office, and um, other partners
just to communicate and try to be
present during this time. And, you know,
these projects, like you shared, they're
they're a long time coming. Our
residents have asked for these
improvements for years. And there are
real safety implications. For example,
the Felton safety improvement project to
create a sidewalk between the
intersection and the school has it's a
priority to me. It's a priority to many
families and it does come with some some
congestion while we're building it, but
families and children are going to be a
lot safer when this project is done. So,
I really appreciate the public's
patience during this time and their
continued communication. My office sent
out a newsletter about these safety
improvements and about traffic on um
August 4th and that's available on my
county website, the Santa Cruz County um
board of supervisors and we'll continue
to provide updates. But my last question
is if if residents want updates from
CALR, how might they be able to access
that from you?
>> Uh we have a website. Um we have
multiple spots where you can find this
information out. We have a public
information office that they can contact
as well. Um, and I I think we have a
Facebook or something like that, but I
don't do Facebook. So, um, but, uh,
there are multiple ways to to contact
us. Um, and if you just Google Calrans,
you're gonna you're going to find us.
So,
>> thank you. Thank you very much. I I
appreciate the the patience of the
residents and I appreciate your work to
bring these safety improvements to
Highway 9.
>> Yeah, we we are listening. Um, we try to
make as many adjustments as we can while
continuing to move forward. Um, and it's
I guess this shows it all. Uh, it's
going to be an iterative process over
over the next several years.
>> Thank you,
>> Commissioner Coney.
>> Thank you, Chair. I want to return to
the subject of the uh Bay Porter offramp
on Highway One. Um the pretty impactful
closure uh is really the primary exit to
get to Capitol Village and so Kell
Village. Um I'm just curious what kind
of outreach uh was done before the
closure. I mean I know that I've I saw
one or two comments in uh through
through the RTC's channels. And so I
guess the the broader question is what
is the the protocol for outreach from
either RTC or CALR uh before a major
closure like this? Um and then also why
why this particular time frame um was
selected you know really the busiest
tourist season for uh this part of our
county which really depends on tourism.
>> Sure. Um so unfortunately you know the
busy season in Santa Cruz um the
summertime is also the peak uh season
for construction because some of these
major improvements such as bridges or
retaining walls major structures cannot
be done in the wintertime. they have to
be done when the weather's nice where
they can complete the work um
efficiently and as quickly as possible
so that it limits the amount of
disruption to the public. So that's just
the the unfortunate um truth about how
public construction projects work. um in
terms of the outreach that our agency
has done. So we partner with CALR
obviously to do significant amount of
outreach for um for the overall project
and as well as um any you know impactful
closures that we are proposing. So um on
a normal basis we put out regular
updates through our channels and that
includes uh an e-news we have social
media um our outreach team is really on
top of it and we work with CALR similar
to um the updates on Highway 9. Uh the
public information office partners with
our uh our staff to um put the
information out through their channels
as well. Um, in addition to that, we
have changeable message signs that we
put out um prior to closures just for
those who we missed. We also do radio
interviews every so often. Like we try
very hard to get the word out and um you
know, we've been talking about this
project for I don't know six years now.
And we've had various touch points of
outreach um throughout the project
development. And um we invite those who
are interested in in hearing more um to
subscribe to our e-news and to follow
our um you know you could sign up
specifically to receive Highway One News
or Highway 9 News. Um and so we we uh
encourage folks to sign up for those. Um
and we just try to be as as open and
forthcoming with information as we
possibly can.
>> Thank you.
Thank you. And I just want to make
comments for Calrans. You know, although
it wasn't highlighted, we also have a
lot of projects in Watsonville uh on
Highway One, on Highway 152 and 129 uh
which for the for the most part, yeah.
Um people have commented, but it's
mostly positive comments of
improvements, especially sidewalk
improvements and you know along those
lines. So, I just want to thank you.
>> Anybody else? See none.
>> Go ahead.
>> Thank you. Um, hi Bill. O, over the past
I would say
six weeks or so, I've been getting my
office has been getting a lot of
complaints about what's going on on
Highway One. And the main uh I think
issue that they're bringing up is that
they understand the work needs to
happen, but they don't ever see any
workers working. And then so I you know
I inquired on behalf of the public to am
and I you know understood that like some
of the work is going on at night but
then I'm on the highway at night right
because I go to a lot of different
events that end very late and again I
myself are I'm not seeing any work going
on at night. Um, so I'm wondering if
somebody could just help me understand.
Is it like vacation season for for our
contractor partners? No, [laughter]
>> because this isn't this it's important
like we we're everybody's been very very
patient and um we just want to see work
actually getting finished. Yeah,
>> it's a very legitimate concern that you
think, okay, why are the all these
closures and nobody's working, but I can
assure you that they are working. I I by
double check with the resident engineers
and construction team several times that
there is some work that we don't see as
public. For example,
the work that has been going on over the
last few days when the bay bay uh uh bay
bay port uh southbound offramp was
closed is not really visible to
everybody because it's the what they're
doing right now is they're dis
disconnecting the electrical work
because they there going to be some
demoing of the barrier rail and part of
the retaining wall and all that. So they
have to disconnect the electricity. And
this sometimes happens with with a crew
that is kind of like not really visible.
They're working from under the ramp,
under the bridge. And they're going to
be also installing temporary poles,
temporary electrical poles, but while
they're they're doing this work. So this
work wasn't visible to the to the
public. They thought the ramp was closed
for a few days. Nobody's working. But it
but there is work and it's conse
consequential work that you have to do
this before you do this before you do
this. Very soon you're going to see some
work on the on like like real
construction work on the on the ramp. Um
the other thing is about the the some
drainage work that happens and the
drainage work that happens also is is
not totally visible because it's to the
side of the uh of the ramp sometimes and
adjustment of uh you know basically some
uh some covers and things like that that
are not basically also uh visible. The
the the last thing I want to say is that
you know the the work at night is uh is
depending also on the window that they
choose to to to to work. So it might not
be for the all all night long but u you
know they they choose the hours that are
less impactful to the public that they
could do the work. So the work could
have happened like maybe in an hour or
two and it's done. So that when you pass
that the work was done but again it's
you know sometimes during night it's not
too busy. So they it it makes sense not
to keep on shifting the car because all
of that comes with expense. So it's
closed. We know it's not that impactful
to the to the traffic at night. So they
do the work and then they go. That's
what happens sometimes.
>> Thank you. Um, you know, and I will uh
say I I want to express my gratitude
because um your team and the Calrans
team has come together at many community
meetings that we've held with some of
the clubs and the chambers and I think
you're coming into the APTA chamber soon
to give another presentation. So I
really appreciate that and I think that
really illuminates the work that's being
done, how it's getting done, the cost
and the design. Um, so I really
appreciate you making the time to
educate the the public.
>> Thank you. Thanks.
>> Thank you. Um, Commissioner Fabian.
>> Yes. Thank you. Thank you, Chair. Um,
also I'd like to echo what uh, Chair
Montino said about um, the sidewalks
that are being repaired in Watsonville.
Um, I've seen it firsthand because I
drive every day to drop off my son and
uh, on Riverside those sidewalks were
horrible. So, thank you for that. But
one concern that I do have is that um
Calron was doing some work on a section
of Main Street in Watsonville and the
payment was repaired, but the striping
was done. Like I felt like it was a
firering
and really it's horrible. And uh I heard
it from some people in Watsonville. So,
I just thought I would bring it up to
you and uh please, you know, let's let's
take a little bit more time to uh stripe
our streets well because people do get
confused with those lines that are just
>> Yeah.
>> horrible.
I'll note um if we're working on
sidewalks, guaranteed um the last thing
we do is pave and then we stripe. So, uh
that striping I'm sure is temporary
striping. Um, it's there just to make
you aware you're in the middle of a
construction zone, so you you're already
should have a heightened alertness. Um,
it's there for a short time before the
next cut or the next patch or the next
whatnot. Um, and they'll do that
continuously through the construction
project until we get done. Um, once we
pave it black, you'll see very bright,
very wide stripe and and you'll know
it's ours at that point.
>> Yeah. and and and I feel like the work
is already completed and the lines are
still there. It's a section from Freedom
Boulevard to Fifth Street.
>> I'll take that.
>> And then there's another uh striping
that was done at the uh uh from not from
Union Street, but um uh where the police
station's at to Riverside on the main
street section.
>> And it's just like it just doesn't make
any sense. So, it's something to look
at. Thank you. Yep. Thank you.
>> Thank you. With that, I'm gonna go out
to the public.
>> Thank you, Bill Beacher. Again, um next
year or in the following year, Calrans
will be starting phase three of the
Highway One widening.
In that, it calls for the two bridges
that go over the highway now to be taken
out. And in your website, it calls for
two heavy freight bridges to be to
replace them.
Hello. I mean, the RTC has a report that
calls for a zero emission passenger rail
project. Why are we going to spend that
much extra money to put in a freight,
heavy freight bridges in Apas? I'm a
taxpayer. I don't want to pay for that.
Now, it also says the RTC and the county
board of supervisors haven't made it
clear what the hell we're going to be
doing with the rail. If you read the
sentinel,
there are a gazillion number of letters
that come in. Nobody knows what's going
on. You guys have to make this clear
that it is a zero emission passenger
rail project, not a heavy freight one.
Thank you. And get your job done.
>> Thank you. Anybody else in chambers?
>> Yes.
>> U
being that we have our children coming
in this coming week. Um I have a
suggestion that you know because we have
a lot of problems in you know the
construction especially in the area
Freedom Boulevard main street in Green
Valley and being the concern that we
have some of the parents about it and
now that the kids are riding bicycles
[snorts]
electric bicycles is that's another
problem that we're facing. So it's any
way that we can be able to have a
coordination between the law enforcement
especially the first week to be
available to be able to prevent any any
accidents within within that week at
least be able to so they can parents can
be able to understand because I know
CALR the police department and also uh
it will be able very helpful for the
kids so hopefully there's no fat
fatalities in that, you know, because of
the constructions and all the
construction going on and then the
parents driving all over the place,
bikes all over the place. So maybe the
first week we can be able to coordinate
between the law enforcement and culture
so we can be have a safety week for the
for the for the people going to school
this first week. That's my suggestion.
Thank you.
>> Thank you.
>> Seeing no one else, um, anybody on over
Zoom? Yes, Jack Brown.
>> Morning, commissioners. Uh Jack Brown
from Apptos. Just a couple things I
wanted to bring up. Uh last month, we
had a a kind of a unique situation with
CALR where District 4 decided to clear
out encampments and clear brush on what
I call the Lexington funnel at the on
Highway 17 north uh during morning rush
hour traffic. Um which caused a lot of
pandemonium for us living in District 5.
and it just felt like there was not very
good communication between districts on
that if that could be looked at in the
future uh especially in that choke
point. Uh second item I wanted to bring
up was around the uh Marv Vista bridge
which I believe the construction is
mostly uh under Calrance. The bike
detours on uh uh McGregor are kind of
like halfway done. The signs are missing
for anybody that is going westbound. Um,
and then for eastbound there's a bike
detour off McGregor, but it goes down
Mar Vista. It doesn't tell users when to
get onto like Seidge. Uh, if that can
please be fixed. That's a very unsafe
area. I'd appreciate it. Thank you.
>> Thank you.
>> You have no other speakers.
>> With that, I'm going to uh close that
portion up. So, thank you uh for that
report. And then we're going to go on to
item 17, which is Coastal Rail Trail
Southern Segment Project Contract Award.
Commissioner Monaceto, I'll be recusing
myself from that item.
>> Okay. Thank you, Commissioner Don.
>> Do I get the clicker?
>> Yeah, she's coming right behind you.
>> Fantastic.
Chair Monosino, commissioners, thank
you. My name is Riley Gerbrandt of your
staff, senior transportation engineer
and project serving as project manager
on the Coastal Rail Trail Southern
Segments project. And I'm excited to be
here before you today. This is a
exciting project. Um we're going to be
talking about the contract for the
professional engineering services.
Aha. We tested this before. We know it
does work.
Um, today we're recommending
authorization for um to authorize the
executive director to negotiate a
contract for professional engineering
services with our recommended consultant
HDR Engineering Incorporated for the
Coastal Rail Trail Southern Segments
project. for the project um approval and
environmental documentation phase of the
project for a uh contract not to exceed
amount of about $4.5 million. Over the
next few minutes, I'll be talking you
through the project background, the
scope of work, the cost, and the
schedule, and ending with the staff
recommendation.
So, first a little background. The Santa
Cruz County Regional Transportation
Commission purchased the Santa Cruz
Branch Rail Line in 2012. And the
Coastal Rail Trail has been uh
considered the spine of the Monterey Bay
Scenic Sanctuary
uh trail network. Um and more than 18
miles of that uh coaster rail trail have
either been already constructed, are in
construction, or are in development
phase. The southern segments project is
the next um phase of the project and
it's exciting as it brings 12 new miles
of the coastal rail trail beginning in
rail Delmare in the north heading
through the city Watsonville and ending
in Paharro junction in northern Monterey
County. The MBSST network master plan
refers to these segments as segments 13
through 20.
Uh this next slide here shows you what
we're working with for this project. Um
in the north we are in the coastal area
where we're dealing with coastal
erosion, bluffs and sensitive habitats.
And then the landscape changes as we go
from north to south. Um moving inland,
the alignment crosses bridges, drainage
channels and goes alongside active
agricultural land. And when we enter uh
the urban area of the city of
Watsonville, we it changes to dealing
with congested right away, street
crossings, utilities, and the like. Um
but as you know, um the vision of this
project is exciting and it's really
going to take a multid-disciplinary
um well well-informed competent team to
execute this project. And that's why
we're excited to have our team members
with HGR Engineering joining us on this
project. And we've got Chris Ogara and
Tyler Lures with us here today. Um
they're serving as a project manager and
as project engineer on the project.
And what this uh you know once fully
constructed, this project brings safe,
low stress walking and biking
connections in and around the city of
Watsonville. Um and then going north
through Rio Delmare connecting with
segment 12 in Aptas. And the project
supports our county's climate goals and
advances equity by bringing new active
transportation infrastructure to South
County where the community has been
asking for some time for for new active
transportation um infrastructure.
So what's what's this contract going to
deliver? On this slide, you'll see that
this contract is going to be providing
your project scoping and developing uh
conceptual alignments for the trail,
preliminary engineering, initial
rightaway services, and then SQA
environmental review including the
technical studies, draft and final
environmental document um and public
outreach along with overall project
management and coordination. That's
what's um before you today for this
initial contract award. Future optional
phases um such as final design, neper
review, um environmental rightaway
services and construction support are
not part of this initial award, but we
would come forward back to the
commission um if and when those services
are are um needed.
So the project contract project contract
was developed um in solicited in
accordance with the RTC's adopted
procurement policy. Two proposals were
received in response to the RFP. One
from engine HGR engineering and another
from Mark Thomasson Company.
A selection panel from including staff
from the RTC, the city of Watsonville,
and the county of Santa Cruz evaluated
the proposals and determined um a
ranking with HGR being the highest
ranked team to complete the scope of
work. HGR's cost proposal is for a not
to exceed contract amount of 4,497,545
um with an initial uh three-year
contract term. Um the contract would be
funded by measure D active
transportation category funds. And as a
quick note on the fiscal uh side, the
funding was already programmed in the
RTC's um five-year measure D plan as
well as included in the RTC's adopted
budget under a placeholder allocation.
Now that staff knows the exact contract
amount, um the budget amendment before
you today simply align um that with the
anticipated contract expenditure
categories.
So, the staff recommendation before you
today is to authorize the executive
director to negotiate and execute
contract TP2603 with HDR Engineering
Incorporated for a not to exceed amount
of $449
497,545
to complete the P AED phase of the
Coastal Rail Trail Southern Segments
project and to amend the approved fiscal
year 2627 budget accordingly.
And with that, um, myself and the
project team are here if you have any
questions.
>> Um, but before we get on to questions, I
could I just want to, uh, compliment you
on the, um, on the staff report because
really digestible that, easy to easy to
go over. Um, commissioner questions,
comments, commissioner, um, uh, Shepard,
>> I know this is time for questions, so
uh, that's what I'll do. But I can't
help but say that I'm really happy to
see this coming forward. Uh, it's been a
long time coming and it's does indicate
a real serious commitment to uh, moving
forward with the South County Trail. Uh,
one question I have is is the contract
is for three years. Is that the
estimated time that it's going to take
to complete the tasks in the contract or
do you have some sense of the timing of
that?
>> Yes, we uh it's not going to anticipated
be the full three years, but we're
allowing for um the three-year contract
in case there's additional public
outreach or um things come up through
project scoping um that need some more
time to work through. But um we're
anticipating more like around a 2-year
maybe slightly under slightly more um
time frame.
>> I just want to mention because often
times these stages of a project are a
very rough indication of how much the
project could actually cost and often
times the rule of thumb in my experience
is like 10%. Uh and so I think what
we're really talking about is a very
significant cost for this project and
you know I just I know staff will work
hard to try to find the outside funding
to make that uh available but I think
there is going to be a need for an
ongoing commitment by the commission to
pursue this project and bring it to
completion. My real substantive question
has to do with the scope of work and the
role of the commission in the process.
uh as I read the scope of work the and
my understanding of it is the the
consultants will analyze up to four
potential alignments
um initially and then from that there'll
be a decision as to what sort of what is
the preferred alternative and that
preferred alternative which is a secret
term is like the the the preferred
alternative to be look what looked at at
the secret in the secret document
In the past, um, with some of the other
segments, the commission has approved
more than one preferred alternative.
We've had two preferred alternatives
given the, you know, the the concerns in
the community. What isn't clear in the
scope of work is who gets to decide
that. And my expectation is and I think
it should be made clear that the
commission should make the decision as
to the one or more preferred
alternatives. All the alternatives will
be looked at as alternatives but the
really detailed analysis if there's only
one preferred alternative will be with
that alternative. So it's a it's a very
significant decision and I think it's
one that the commission should make. The
contract isn't clear about that. Uh so I
guess I'll start out by with my question
is what's your intention uh what's the
staff's intention as to how that
decision will be made?
>> That's a great question and thank you
commissioner alternate shifin. Um
normally in a project you know it
depends on the project and the level of
interest that the governing body has in
the project. So for some projects the
the project development team will do the
work you know normally we go out and we
go to the community um after the the
project teams defined you know what are
we trying to achieve with this project
go to the community and we then are
doing our scoping and you know it might
be 10 you know initial concepts that
people are throwing out there you know
they're they're going to be the the
community is going to be bringing
forward ideas and so that you know gets
refined over time and and the aim is to
to bring you know the preferred
alternative at the end of that scoping
phase. Um depending on the commission's
direction staff can you know the
commission can make the decision on what
the preferred alternative is um or in
some of their projects the project
development team would recommend a
preferred alternative.
So it it's kind of undefined now, but it
is uh an option for the commission to uh
review the staff recommendation on a
preferred alternative and make the final
decision.
>> Yes. And Sarah,
>> we could take that direction. This
project um you know oftent times you
have projects that are a little more
straightforward
um that the you know preferred
alternatives pretty you know a little
more obvious. In this case, we have
multiple alignments. We have San Andreas
Road. We have the branch line. We have,
you know, Beach Street and Beach Road
involved. And so, um, because of that, I
think it's probably appropriate to bring
something back to the commission in the
future before proceeding with, um,
circulation of the draft environmental
document because that's where the
preferred alternative would be
identified.
>> We could take that direction. Thanks.
>> Thank you. Um, Commissioner Jensen, then
Commissioner Hurst.
>> Yeah. Uh, thank you. Um, one thing I was
wondering if you could comment on um
maybe the lack of interest in turning in
proposals since we only had two. Um, is
there a is there a reason behind that?
Do you think? Um,
just looking for some comments,
>> you know? Um, obviously I I don't know
specifically, but um there are we we
always cast as wide a net as we can. Um
we always we on the on the back side,
you know, we communicate with uh
partners that we worked with before and
make sure that we um advertise the RFPs
um as widely as we can. Um the firms
that we got proposal from proposals from
have been, you know, very engaged with
this process and these particular
projects. So, while I can't say with,
you know, certainty why we only received
two, I know that the two that we did
receive proposals from have been very
tracking this this opportunity um very
closely. So, it's possible that um maybe
that's the reason why we just got the
two.
>> Okay, perfect. And um my other u
comments just follow up to I think uh
Andy's comments. Um, as I read through
the grand jury, you know, report and
stuff, there's a couple items that stuck
out to me that I think we should maybe
use as um um a guiding uh direction as
we move forward. I just wanted to go
over and just read both those out loud
and then just make sure they could be
like a check and balance for us. says,
you know, one was key policy choices
were not adequately grounded in
realistic assessment for the corridor
fiscal constraints, engineering
requirements, and legal represent legal
limitations and fiscal costs. And the
second one says, "As a result of the
regional transportation committee and
the public having spent years debating
options in some cases that were not
viable given financial and engineering
realities, you know, with these type of
new approach and stuff, um, are we going
to be able to make sure that those are
two forefront questions that we're going
to be able to evaluate at this time
going into this type of contract?"
>> Yes, definitely.
>> Okay, I appreciate that. I think we just
really need to focus on moving forward
in a you know uh maybe a different
direction and having the correct
information in front of us so we can
make decisions and move this project
forward wherever that direction is. So
thank you
>> commissioner Hurst.
>> Uh thank you very much chair. I'm glad
to see the focus on equity for South
County here and and I know that there's
uh it's good to have some choices too
and I'm not sure how those choices will
sort themselves out or what the input
will be about that but my question is
how are you going to work with the uh
city of Watsonville and their existing
downtown specific plan and where the
trail intersects with the urbanized
environment. How is that going to uh
coordinate with uh the existing plans
that the city of Watsonville may have?
>> It's great. Um our RT your RTC staff are
coordinating with the city of Watson of
staff very closely um you know for some
recent grant applications for instance
our two staff got together and discussed
the different visions that the city
Watsonville staff have and what they're
pursuing um looking how the RTC can
support the city staff and align with
the city staff. Um and as this project
continues forward we're going to have
the city staff on the PDT. um they're
going to be actively involved with us in
in making decisions and um looking at
information. So, active coordination um
being in in in close um discussions and
is how we're going to approach this
project.
>> Exactly what I wanted to hear and I hope
it'll be real and uh real communication
will take place. You know, how the trail
gets into Watsonville is important, too.
There's a couple of different
alternatives that uh you know, one of
them being through the Harkin Slooh, the
existing rail line through there and
such. You know, I I was fortunate enough
to to ride the demonstration trains
through the Slooh and it's just a
magnificent view and it certainly be a
huge tourist attraction to roll through,
ride through, walk through. But, you
know, there's also the coastal alignment
uh on San Andreas that would be
extremely scenic as well. And so, and
I'm sure there's some other choices as
well. So, I'm I'm really glad to hear
that there'll be [clears throat] uh
close dialogue and planners planning
together on this. Thank you so much.
>> Thank you, Scene. Um,
Commissioner Clark.
>> Yeah, good morning, Riley. Um I would
like to echo the comments regarding the
staff report. Uh thank you for that
excellent information. It makes it very
digestible for us and easy to make
decisions on. My questions are framed
around there's some legitimate concerns
out there uh that have been raised in
the community and then there's some
noise in the ether too and so um my my
uh intent here is just to take those on
head on and get the information out
there. Um this project as it stands now
does it presuppose any outcome?
>> No.
>> Thank you. And would this project be
applicable and necessary regardless of
what direction we go and whatever
decision we make in terms of trail
alignment, ultimate interim, any of
these.
>> So part of what our project will do is
identify what is the need. you know what
do we there's a project but it's got to
deliver some sort of need. So the first
step is what is that need and then how
is the project going to deliver that. So
that's one of our first steps that we're
going to do.
>> Great. Thank you. That um that addresses
those issues. Thank you.
>> Thank you. With that seeing another
commissioner questions and we go out to
the public like to weigh this item at
the agenda.
>> Thank you. We've step forward. Thanks.
Good morning, Brett Garrett. Again, um
one, um the agenda says exhibit B will
be posted by July 31st. I have not been
able to find exhibit B. Um but my main
comment is um kind of hearkening back to
the grand jury recommendation R3
um urges to evaluate options including
interim hybrid and ultimate trail
configurations for segment 13 to 20 and
I do see some of that happening in this
but but it means we should do some
thorough engineering work and cost
analysis before deciding whether it's an
interim trail or an ultimate trail or
whatever. Um what I see in the um
attachment is that the preliminary
engineering is to take place following
identification of the preferred
alignment alternative which means that
the preferred alternative is decided
before realistic pricing is determined
and I don't understand that. I'm very
concerned about it. Thank you,
>> Chair Montesino and commissioners. Matt
Frell for Friends of the Rail and Trail.
Uh we support design alternatives which
do not remove the rail line and we
especially support proposed segment 17B
alternative between Buista and San
Andreas and Paharo station.
This alternative was suggested by and
has the support of Watsonville
leadership. Thank you very much.
>> Thank you. See um no one else. Um,
anybody in Overson,
>> Jack Brown.
>> Good morning, commissioners. I support
moving forward with this planning
effort. I ask the scope not presume
railway trail is the preferred long-term
outcome. It sounds like you're going
that direction, but please give rail
with trail, interim trail, and permanent
trail through rail banking equal
consideration through the environmental
process.
I also the commission to require early
order of magnitude cost estimates for
each alternative. One lesson from Zepert
is that meaningful cost information came
too late in the process. Early cost
estimates along with realistic funding
strategy will help the public understand
whether additional local taxes or
long-term financial commitments may be
required. Finally, whenever feasible,
please keep the trail within the rail
corridor. Diverting trail users onto
roadways should not should only occur
when absolutely necessary and be
supported by a transparent engineering
and safety analysis. Um, lastly, um, for
I also want to bring up was, uh, for for
true equity, let's start the trail in
Watsonville and work our way north.
Let's give them something that they'll
love. Thank you,
>> Brian. Brian Peoples.
>> Hi, this is Brian Peoples with Trail
Now. we support moving forward with um
the engineering development plans.
However, we absolutely
recommend the preferred trail be the
interim trail and it's simple. It's
simple to understand the public wants
you to spend our money effectively.
That's why you had a grand jury report.
Also, the results of the elections of
Tony Nunez
uh being elected fourth district shows
the public is tired of the ongoing
wasted time on the ultimate trail and
the train. It is absolutely
your responsibility to act as though
it's your money. Pretend like the money
you're spending is your money. And it's
fairly simple. understand where the most
coste effective approach is. So please
don't waste our time with more studies
for an ultimate trail. Thank you.
>> Thank you.
>> You have no other speakers.
>> With that, I'm going to close it up and
bring it for commissioners's uh
direction.
>> Go ahead. Well, um, just to get it start
the discussion, I'd be willing to make a
motion to approve the staff
recommendation with the additional
direction that the preferred alternative
returned to the commission be for uh,
its selection
>> and then I'd like to uh speak to that if
I if I if I could
[clears throat]
really in a way the public testimony uh,
raised a question that I'd like to ask
staff about in terms of um what's going
to what kind of work is going to be done
to get to the preferred alternative. Um
the
reference has been made a few times to
the grand jury report and as I read the
grand jury report and we tend to read it
the way we want to read it. Um the grand
jury report did raise significant
concerns about the way the rail studies
have been carried out, but it did kind
of indicate that the trail study had
really looked at the kind of engineering
costs uh that were known at the time
before the grants were um were applied
for for sections 8 through 12. Um, as it
turns out, those estimates were wrong,
uh, because nobody really anticipated
how much it would cost to build the do
the bridges and do the structures, uh,
the protection structures. But the
the notion as I read the the contract is
that in this case there was the
intention to do you know somewhat
detailed as much as could be afforded to
the 30% level for the uh for the
preferred project. So, and I think that
the goal of that is to really understand
before going after the construction
grants what the project might actually
cost. But there having uh one one um
speaker really talked about should we
really do that kind of analysis for all
the options because um there are going
to be up to four of them and there
certainly needs to be at least three of
them um as far as I'm concerned
the
So what is your sense of how much
information is going to be collected
before we get to the decision on the
preferred alternative.
>> Um,
so there's a lot of questions in there.
Um, but but I'm kind of summarizing what
you're you're saying as um we'd like
there's an interest in getting as much
information as possible about as many
alternatives as possible before making a
decision what the preferred alternative
is. And yes, that can be done, but
you've we need to balance cost versus
um what what that achieves. So, anytime
that you you know carry on multiple
alternatives through um longer through a
process that comes with additional cost
like significant additional cost. So,
you're trying to balance um determining
as early in as possible what what the
preferred alternative is. so that you
can narrow down the scope of you know
your your cost expenditures. There is in
this scope um the option for for doing
um higher level work on up to two
alternatives um through environment or
through task B which is the preliminary
engineering phase. Um so we have
accounted for for some of that already.
Um
and there there
is an option for the commission you know
as as you included in your um action
there to this you know the commission
making a decision on what proceeds into
the the SQA analysis.
Um
what we're we're trying to do with the
current cost or the current scope of
work is to you know develop the
preliminary engineing up to about 30%.
You know these are um and and know as
much as we can at that level before
getting through the SQL analysis.
>> Okay. I I I'm just concerned given the
history with the other trail segments of
the community controversy that it's not
going to surprise me uh although it will
disappoint me that we're going to be
faced with a similar thing here. We've
heard some testimony today about options
that should be eliminated or options
that should be focused on. And um I'm
just concerned that this that's that the
staff through working with the
consultant recognize that this is a
potentially controversial process and it
needs to be there needs to be public
significant public input which I think
is in intended but I think there may
need to be and it's up to staff to
determine some decision points where the
commission would get reports Um so one
we're not wasting money and but two we
are looking at things that are going to
be important in ending up with some um
defensible cost estimates because I
think that's the real concern that we as
we've seen with some of the other
segments um you know we go forward
thinking that one option is preferred
and then find out that we can't possibly
afford to pay it and I think that is
something we really you have to try to
avoid in um the you know this next
phase. So it's just really uh a
suggestion
in the end that perhaps as the public
process uh develops and the consultant
work develops around the different
alignments. If it becomes
clear that there's one or two that maybe
need to fall off for one reason or
another, it may be worth bringing that
to commission to see whether the
commission would agree to that. so that
the consultant can really focus on those
options that seem to be the most
feasible. On the other hand, that staff
doesn't make that decision and then get
the commission mad at you because you
got rid of an option that people really
want to have further consideration.
It's, you know, given our experience, I
think it's a
it's going to be a complex process to uh
narrow down what south the south county
trails are really going to look like.
And that's very well described and I
think you um did a very um conveyed that
very well and and staff are aware of um
those concerns and we we do hear the
community concerns um and some of the
the echoes out there as uh Commissioner
Clark called them. So um thank you very
much for for conveying that to us.
>> Okay. Thank you.
Any other comments or questions?
>> Commissioners,
>> thank you. You know, uh, advancing
equity should not be controversial. It
should be a fundamental goal that we
have. And
therefore, you know, we need to examine
these alternatives. And I'm in favor of
the alternatives that uh do not remove
the the rail line. And so as we move
forward, I think that, you know, bring
bringing equity to Watsonville and South
County in whatever way we can is
important, but I think it's also
important not to cut off the future. And
sometimes it might cost a little more to
do something that's going to uh yield
some more results in the future. And we
should not uh cut off our nose despite
our faith. and we should advance equity
at any time we can. Thank you very much.
>> Thank you. See you know and
commissioners.
>> I just would like to thank um Riley um
for the work that has already gone into
this and I really look forward to seeing
the results of this study. 4 million
something is a lot of money to award to
an agency to help us plan the best way
forward um for those segments. and I am
so excited this is getting started. Um
so I just wanted to express my gratitude
um on behalf of my constituents and our
South County. Thank you.
>> Thank you. And with that um all those in
favor say I.
>> I.
>> Any seeing none no abstensions? Motion
passes. So, we're going to move on to um
number 18 um which is the issuance of
the Santa Cruz County Regional
Transportation Commission Measure D
sales tax revenue bonds staff report
please.
>> Good morning commissioners. My name is
uh Nisha Singh. I'm the director of
internal services. I'm here to present
um one of the exciting uh projects that
we are taking. We are trying to bond
against measure D highway and active
transportation. So this is a slide for
you to understand as to what we are
borrowing and how we are borrowing those
funds.
Thank you. As you know we have uh we
come to commission for five-year plan.
We come with the strategic
implementation plan and we come with
cash flow model for measure D to
commission and get their approval on
various factors as to where where the
revenue should go and how we should fund
those revenues and uh as you know we in
2016 we got approved from measure D
that's the major source of revenue for
RTC
So this is a little background of how we
uh get those uh fundings and how we
allocate those funding. Cash flow model
is one of the biggest uh item that we go
through every year. We try to analyze
how much money do we have, how we got
get this revenue and what all projects
are we funding and thereafter we decide
as to how to fund these projects and um
available cash at the year end and try
to understand our position at that
particular year end. Okay. So that's a
basic background of uh measure D and how
we get our funds and how we allocate it.
Is it working?
Okay. So, um I missed out on Okay. So,
this is a highway project financing
need. As you can see, we have three
phases with highway. Phase one, phase 2,
and phase three. If you talk about phase
one, it's almost complete. There's a
minimal funding required, which we are
about to pay uh pretty soon. When we
talk about phase two, which is Bayport
to state park, that is almost 65%
complete. From this borrowing need, we
are planning to borrow close to 50
million for highway in this fiscal year.
For this borrowing needs, we're going to
have phase 2 which is 65% complete and
we're going to fund the remaining from
the borrowings. When you talk about
phase three, which is state park to
freedom and the segment 12 for rail
trail, that's that project is about to
start in fiscal year 2627. That's the
major primary focus for Brun proceeds.
As as you can see on the right side, we
are talking about how much revenue do we
receive for measure D. As we know, we
have 6.5 million that comes from measure
D every year. Um there is a capital
expenditures that we are anticipating
close to 129 million in next 5 years for
phase 2 and phase 3 combined together.
When you look at the maximum cash flow
deficit, that's basically an assumption
telling you that if we do not go for
this borrowing, we're going to have a
deficit of 83.7 million.
So our plan is to go for a borrowing
needs of 50 million in this fiscal year
and then we are planning to go for a
next uh borrowing of 50 million in
fiscal year 2829.
Uh with this I'm going to show you our
cash flow model for the next five year
which is the main concerning uh flow of
information that you let you know as to
how we are planning these funings. As
you can see uh the upper portion shows
you without bonding. It shows you how
much funds do we have at current
position. At the end of fiscal year 2627
if you want to see 5.77
can't okay as you can see at the fiscal
year 2526 5.7 million is what we have as
a cash with us for highway when you go
forward with fiscal year 2627 you can
see there's the beginning balance which
is the carry forward from the prior year
then you're adding the interest and
you're adding all the sales tax revenue
that you're getting close to 6.7 million
and then we have the capital expenditure
which is close to 27 7 million that we
are planning to expend in this fiscal
year which is fiscal year 2627.
This leads to a ending balance of 14
million. As you go forward that 14
million every year uh with the
expenditure of 35 40 14 3.7 is turning
all almost close to 80 million by the
end of fiscal year 3031. As you know we
have already uh decided we're going to
go for the phase three. We have state
and f uh federal and state borrowings
that we uh have already received and
this project will uh will cost us this
much almost 80 million by the next five
years. So that's the reason we are
borrowing. So if you go for the second
scenario which is with with borrowing if
you see that situation we have on the
bottom which is a bond proceeds we have
added added 50 million as the bond
value. With this bond value uh there
comes a cost. So initially two years we
are planning to just have an interest
after 2 years we're going to add the
interest in principle that will lead to
3.5 3.8 3.8 and later on it'll turn into
close to 4 um four yeah 3.8 million
it'll stay at 3.8 28 million. This is
the first borrowing that proceed that
I'm talking about which is 2026 proceed.
When you talk about 2028 and 29 proceed
which we are planning to anticipate if
you see 50 million across the line from
2829 fiscal year we are planning to
borrow close to 50 million that 50
million would lead to uh initial 3 years
of just interest payment of 2 million
and after that it's going to lead to a
principal uh an interest payment of 1.5
million. So in total u so sorry that's
wrong that'll lead to a total of 4.2
million in the later years. So if you
overall talk about the highway project
and the borrowing and the needs and the
cash flow HDL has given us a projection
that since we have um got the measure D
our initial revenue was close to 17
million as you can see currently it's
close to 27.5 million it has grown grown
over the years and the same projection
they have used for the further years
where they are anticipating a close to u
3% increase over the next 30 years
cumulatively that will lead to our
revenue close to 8 million, 9 million
and 10 million in the future years which
is 5 to 10 years down the lane. With
that anticipation we are uh with this
borrowing of initial 50 million and the
next 50 million we're going to have 100
million on total death and the payment
would be for principal and interest
would be close to uh 8 million in total
for highway just for highway. So that
will be netting it out your revenue 8
million your expenditure net million
you're left with no funds for initial uh
fiscal year till maybe 3031 and then
you'll try to accumulate a little bit of
uh leftover money that you could be
utilized in the future years but that's
so minimal that I wouldn't consider that
as a major source of revenue I would
keep it as a contingency value for the
future needs that come in for
maintenance and any other projects that
we have so this is a overall highway
cash flow model which uh uh lets you
know that highway is capable enough to
take this borrowings. This is an
anticipation based on multiple factors.
If you talk about initial borrowings,
it's based on 4% rate of interest and
it's based on the market condition right
now and uh we haven't added on the
earnings that we are planning to put
that unutilized funds into the market
like a secured funds into the market and
earn some sort of return on that. So
that has not been added to this. The
other anticipation that we have that HDL
will increase 3% yearly and our revenue
will go forward based on the market
condition and it has been very stable.
We have close to 5 billion in sales tax
revenue over in fiscal year 2627.
Uh so this anticipation is based on that
we borrow currently 50 million and then
we spend 35 40 14 and 3.7 in the future
years which is a very uh uh which we
need to assess after a couple of years
and we see how much cash balance we
have. So it's a very uh hypothetical
situation for the next borrowing.
This this shows that uh as I mentioned
that highway is already capped after the
second boring it will be. So if you see
the fiscal year 32 to 3 uh7 you see that
everything is capped. The revenue is in
the orange color which is close to 8
million and the expenditure will be
close to uh 8 million and then it'll be
capped and after you go close to fiscal
year 2039
it keeps on dropping and then you have a
little margin of revenue in the future
years. So overall if you see the green
line represent 27.5 million which is
going at a 3% rate of increase in the
future years and it's going up to close
to 40 to 50 million by the end of uh
fiscal year 4647.
With this uh now I move on to the active
transportation project and its financing
needs. As you know we have coastal rail
trade project which we are funding from
um bron proceeds. We have segment five
segment 8 to 9 and segment 18 phase 2 to
three. These are the major projects that
we are undertaking and uh the borrowing
needs of 20 million will help us uh
accomplish these projects. If you see on
the right side that's the cost of next 5
years what we require from active
transportation to give it which is close
to 23.7 million. We have an expenditure
of close to 57.3 million. This doesn't
take into account what all state and
federal grants that we have received for
these projects. When you talk about the
deficit, it's close to 10.5 million and
estimated borrowing needs is 20 million
in this fiscal year and then it's a big
assumption that we're going to borrow in
fiscal year 2829 almost 10 millions.
If you see this is the cash flow model
for active transportation for next 5
years. As you can see our beginning
balance is close to 8 million which is
our ending balance of fiscal year 2627.
That means that is the cash that we have
for active transportation as it's six or
eight. Okay. Uh that's the cash that we
have as of today. When you go to fiscal
year 2627, we are anticipating that we
are going to have a revenue of 4.5
million and we're going to have an
expenditure of 23 million. That leads to
a negative balance of 10 million. That
10 million is being carried forward in
the future years to anticipate how much
do we actually need. So the first slide
on the top you'll see without bonding.
that that shows us what money do we need
and how quickly do we need it. Whereas
if you go to the bottom section which
tells you okay now with the bond
proceeds we're going to borrow 20
million with this 20 million we're going
to pay the bond proceeds of 800,000 for
the first issuance which is 20 million
and going forward when you have in
fiscal year 29 we're going to borrow
again 10 million based on the deficit
and that payment will be close to
400,000 uh and moving forward it'll be
close to the total payment of these 30
million would be close to 2.3 million uh
as I said highway doesn't have any more
capacity to do any more project. Whereas
uh on the contrary active transportation
do have a high amount of capacity to
function and uh has a remaining balance
that could be utilized in future future
projects.
This is the active transportation
revenue and depth uh services um graph
which shows green line which is your uh
measure D full 27.5 million again and
then you show the orange line which
shows about the active transportation uh
allocation which is significantly
different from highway as you see uh
when you talk about the expenditure and
the brawn pro bond proceeds there's a
lot of margin which is left and that
margin is growing over the years
starting uh even with fiscal year 2019
9. So we have a capacity in that end. If
you talk about the series bond, okay,
this basically outlines as to how we are
going to borrow this. There is uh
there's going to be an issue which would
be a fixed rate and tax exempt. We're
going to have a credit uh which will be
our um uh we will pledge the entire
measure D fund against the borrowing. So
it will not be just a one project
highway or active transportation. It'll
be entire uh it'll be the entire
measured D fund which is 27.5 million
that will be borrowing and then you talk
about the rating we're going to go for
S&P rating as you know RTC never had any
rating for us we are since we are a
small organization our rating are
anticipated to be around uh double A
category but let's see we just gave the
presentation and we should have those
answers pretty quickly when you talk
about the structure so we are planning
to have two years of without uh
principal le payment we'll just pay
interest and after 2 years we'll try to
uh have interest and principal. This is
a very common phenomena where you have
the major projects and you're trying to
uh fund those project in the initial
years and in the later years you add the
principle as well as the uh interest.
Whereas the when you talk about the sale
we'll take it into the competitive
market since our rating will be higher
and we are uh we have a good reputation.
It's better for us to take it in the
open market, have everyone come and bid
for these uh bonds and we'll take the
lowest bidder. When you talk about the
source and uses, this basically outlines
u how much is our actual borrowing and
uh how much is the additional premium
that we need to pay. How much is the
payments that we're going to have like
620,000 is our cost of issuance which is
anticipated. Major cost of issuance is
like the commission um underwriter fees
that goes almost close to 0 75. So it
could vary. That's the reason um we have
asked commission to go up to 75 million.
We have asked in our resolution that we
should borrow up to 75 million.
Basically the reason is this so that if
we have a bidder who comes and says oh
I'm going to have 72.5 as your uh uh par
value and after that we're going to give
you a discount. So your net value would
be same as 70 million after deducting
all the co cost of issuance. So that's
the only reason that we don't have to
come back to the commission. The second
reason is uh there is always uh
borrowings in the denomination of 5,000
as per our financial consultant KN&N. So
that's the reason we have asked
commission to go up to 75. We're just
going to borrow 70 and 75 is just a uh
cushion margin that we have kept so that
in case uh there's a variance we can
actually proceed with the issuance.
Um this is a uh this shows as to how we
going to borrow. So initially what
happens is currently we get the CDFA
money we uh uh it goes directly to
county and county pays us uh county
gives us the receipt. Whereas when the
bonds proceed will come into the
picture, there'll be uh a mediator.
There'll be a US bank as a trustee who
will come in play who will take all the
measured D money, take all the bonds
proceed with uh and take keep aside the
bond proceed, the principal and the
interest from 27.5 million and allocate
the rest to us. And based on that
remaining allocation, we are not going
to touch any direct allocation for city,
county and everyone. They'll be paid
full. it'll be just our highway and
active transportation category which
will receive less revenue. So this
overall uh defines as to that we are
hedging the entire funds and how will
the flow of money come into play.
These are the documents that I' have
added into staff report for approval
like uh uh security legal resolutions.
there is uh uh amendment and restate
agreement for CD CDTFA to give the money
directly to uh our US bank as a trustee
and then we have a master indenture
which is between us and the US bank and
first supplemental indenture that's the
same document whereas if you see uh the
other documents are like notice inviting
bids for people to come and bid for our
bonds then notice to intend to sell and
the purchase agreement bond purchase
agreement these are the basic documents
that has been given by the bond council
to us to proceed with this borrowing.
Whereas if you see the last one which is
uh the debt management policy, it's
always uh um a mandatory requirement for
us to go for this uh policy so that we
are rated better and we had a debt
policy in case there's a conflict of
interest at the later point of time. So
that's a debt policy that been provided
as along with the resolution and the
other documents that we have. Uh this is
basically the timeline that defines as
to how we're going to go about it. We
have already gone with meeting with S&P
we are here today to get your approval
for series of bond and uh we have uh so
furthermore we'll price our bonds in the
market and we'll have a closing series
on that date and by that date we should
have our funds available for the major
projects.
Uh so with this I would like to
recommend that we approve the resolution
for borrowing up to 75 million uh
authorizing executive directors to take
all the necessary steps and take all the
signatures and get get funding approved
and then lastly to adopt a debt
management policy which will help us
facilitate the process. If you have any
questions I'm here I have the team KN&N
and other uh bond council to give all
the answers.
>> Thank you
>> Commissioner Kelly.
Thank you, Mr. Chair. Mr. Chair, thank
you for that presentation. I thought
it's quite good. Um,
to be certain about this, uh, this is a,
as I understand it, my experience would
tell me this, uh, that, uh, it's fairly
common to have a revenue source that's
predictable and extends over a
considerable t period of time. Not 100%
predictable, but pretty predictable.
And it seems to me that what pushes
against that is the uneven pattern of
expenditures over time. So voters adopt
measure D. They say we want these things
done. Commission says all right we're
going to undertake these things and we
have this dedicated revenue source. So
the borrowing seems to me from a policy
point of view to be a very good thing
provided there's a couple of sideboards
around it. One is we're not pledging
100% of every revenue that's coming in,
but we are pledging a significant
portion of future revenue for projects
that the voters said are contained in
Measure D. And we want those things
done.
The borrowing uh the interest rate that
we'll be paying somewhere in that 4%
range depending upon what the street
says the moment we go out to sell the
bond. But assuming that it's in that
range, I think we're pretty sure that
the cost of projects, labor, and
materials are going up significantly
faster than 4% a year that we would be
paying on the interest for borrowing
against a revenue we can relatively
predict. [snorts] So, if that's the
architecture of the deal,
>> it seems to me that it makes good sense
to borrow money today and make the
investments and pay it back with cheaper
dollars in the future
>> so that we can get project delivery as
close to on time as we can. Is that the
basic structure of this deal?
>> Yes. Uh so mostly agencies uh either go
pay as we go or they borrow so that they
can expedite the project and get all the
fundings in one go and then they can
speed up the project and re reduce the
cost of inflation that might be coming
in the future years. So as you delay the
cost of doing that project is
significantly higher. So as today the
labor cost and all those as you said
you're absolutely right. So either you
do pay as you go or you take the
borrowings and expedite the project to
up to the completion and then uh
>> yes you're absolutely correct with this.
>> Okay. One one other question Mr.
Chairman. Thank you. One other question
and that is uh the pledged revenue is
only
not that it's insignificant but there's
a box around what our liability is in
terms of we're borrowing this money.
We're pledging this revenue, not any
other revenue, any other color dollars
that come in to the RTC. It's this
revenue. Is that right?
>> No. Uh that's uh that's not the right
statement. Uh we are pledging complete
27.5 million in case highway doesn't
have a capacity to pay it back or active
doesn't have a capacity in the future to
pay it back.
>> Uh US bank will directly take the money
up front. They don't uh and then after
that how we allocate will come back to
commission. if there's a extreme
situation but it hasn't I think our
sales tax has been very consistent over
the years and HDL has a done a great job
in predicting the market uh and
estimating the various factors as to
what will uh come back as a revenue. So,
>> so what what recourse would a bond
holder have
>> uh if we are pledging measure D revenues
and a bond holder believes that they
aren't going to get repaid or they're
not out of that source, what's their
recourse? They can dig deeper into our
resources.
>> Um, we may have
>> Good morning. Good morning. Brian
Forbath from Strain Yaka RTC's bond
council. Great to be here with you this
morning. It's a great question. So these
bonds are payable solely from measure D
revenues. There's no other obligation of
the commission or any other funds. But
all of it's a gross pledge of measure D
revenues
>> comes from CDTFA gets deposited in with
the trustee. There's a flow of buckets
as the money comes out. you pay, you
know, interest and principal and then it
gets released from the pledge, goes back
to RTC and then gets dispersed to the
various buckets that you all have
established.
>> So, I'm going to stay there for just a
second if you could. Thank you, my
friend. Um so let's let's say that that
we go ahead with this borrowing, we
issue the bond, we're undertaking the
projects, um and for whatever reason the
world goes into an absolutely fantastic
uh you know global financial crisis, we
won't be the only ones with a problem in
that event. But but assuming that for a
second and our revenue uh drops
significantly as a result of that and we
have a bond payment uh that is coming
due and our sales tax that portion of
our sales tax that's measure D is not
sufficient to cover that. We're not
going to default on a bond. So, we have
to cure that problem because if we
default, if any public agency defaults
on a bond, they're not going to sell
another bond or they will, but the price
will be ridiculous. So, I don't imagine
any of that is going to happen. Don't
imagine any of that is going to happen
to the point where we are uh on the edge
of a default. But in the event that
those circumstances unfold, because
that's always what you do when you're
borrowing. It's like what is the extent
and what is my protection against going
against other assets if I default?
>> So there the bond investors have no
ability to go against other assets of
RTC. It's in your equipment and your
assets or bank accounts or anything. The
only pledge and lean they have is on the
MA measure D sales tax revenues. And if
the commission or whoever other bodies
members of commission decide out of
their own generosity or whatever that
they want to solve this on their own
that's that's not an obligation of
anybody and to do.
>> Thank you. You're welcome. Appreciate
it. Mr. Chairman, that that leads me to
believe still that this is breadandut
kind of borrowing that is done by public
agencies all the time. we know what this
agency is about, what we're supposed to
do under measure D, what the basic big
three buckets are that we're using uh to
fund those uh activities that the voters
approved. So, I think this I know we're
going to get uh further input and so on,
but I I think this is there's nothing
exotic about this at all. uh what public
agencies do to make sure you get your
projects done uh on time and on budget
that if you can forecast what your cost
increases are going to be in your
borrowing costs and there's a delta
between them go ahead and do it as far
as I'm concerned. Thank you, Mr.
Chairman.
>> Thank you and thank you for that, you
know, explanation coming from a former
treasur the county [laughter]
>> commissioner Sheriff.
Yeah, just to um Oh, I'm sorry,
Commissioner Ship.
>> Go ahead.
>> I'll be quick. Um, first of all, let me
just say, wow. Uh, you have such a grasp
on this. Uh, I really hope that a
spaceship doesn't land and take you away
somewhere. Um, because your your grasp
on this is really uh very good, very
solid, like none other I've seen. Um,
also too, if they want to come after the
commission for any of this data, I have
a left-handed bowling ball they're
welcome to have. So um
[laughter]
but but onto my question here and it's
just to kind of dubtail on Commissioner
Keely's question. Let's say that there
is said financial crisis and interest
rates swing wildly one direction or
another in the course of this does that
have an effect and if so what effect
would that have?
>> The um the obligations that are being
issued are fixed rate obligations. So
they the the interest rate that the
commission is going to pay on its bonds
will be fixed [snorts] at the date of
pricing or when we close the bonds. And
if there's an event default uh there's
no right of acceleration of bond owners.
The bond owners just continue to get
paid as revenues would come in. If that
answers your question.
>> And well and let me just one quick
followup. In the event interest rates
fall, would that be a situation we where
we'd be able to leverage that at all?
>> So, the the bonds are going to be
structured with a a 10-year optional
redemption provision, which Mrs. Shik
could talk about more in more detail,
but so there will be opportunities in
the future um to refund these bonds for
potential savings if the markets
cooperate. Yes.
>> Great. Thank you.
>> You're welcome.
>> Go ahead.
>> Good morning, Commission. Melissa Schik
with KN&N public finance and I've been
working closely with staff and bond
council on your transaction. Um to
address the question with regard to
declining revenues and the repayment of
debt, uh I just want to draw your
attention back to the graphs that Nisha
showed with you and to remember that
we're pledging all of measure D
revenues, but we're sizing the bonds
only within the highway and active
transportation programs. So, we're not
leveraging
the full extent of the revenue stream.
And that's really important because then
we have something an embedded debt
service coverage, meaning we're not
borrowing all of measure D. We're only
borrowing within the program areas where
the bond proceeds are advancing
projects. Um, and that's really
important. So for the current
transaction we expect that total measure
D revenues will be five times the debt
service due on the bonds. If we take
into account the second borrowing that
Nisha walked you through. We um estimate
that total measure D revenues will be
over two and a half times the total debt
service on the two bond transactions.
Um, so that's a really important feature
with your borrowing and the way your
expenditure plan is set up and the
rating agencies love that, right? Like
they love to see that embedded coverage
and know that actually you can't borrow
all of measure D because you have
obligations to the neighborhood programs
and other programs within your
expenditure plan.
>> Thank you. That's a good answer,
Commissioner Shiffron.
Thank you. Uh thank you for the
presentation. Lots of numbers uh coming
by uh fairly fast. I I do have a few
questions. I want to sort of approach
the questions that Commissioner Keley
raised and responded to slightly
different way. I I think sort of worst
case that if there's really a sharp
reduction in sales tax uh because the
bond uh debt service is such a low
percentage of the current total measure
D money the likelihood that there would
be any
uh default is pretty impossible.
However, if there is a significant the
point I want I I I think is the case if
in fact measure D revenues decline
the debt service will be paid off the
top we're assuming and the whole bond
process is based on the assumption that
there will be sufficient money in the
highway fund and in the active
transportation fund to pay the debt
service and not affect any of the other
categories. Correct.
>> But it's important I think to recognize
if there is a significant decline in
overall sales tax revenue, it is
possible that the amount of revenue
going to highways and act transportation
would not be sufficient and that would
mean at least in the short term um
reduction in the amount of money going
to the other categories. Now, we could
consider that alone, but I think it's
important to recognize in that kind of
worst case situation that it's not
measured because the bond holders are
going to get paid no matter what.
>> It's just whether anybody else is going
to get paid is what is the question. So,
is that kind of the correct
understanding? In case there's a worse
scenario, we'll come back to commission
and we'll give the different uh
opportunities and options to choose from
that either you can take active
transportation for the shorter period of
time like a small loan or you can go
with the rail or any other categories
and uh we'll present those scenarios in
case such a uh situation occurs. But
even if you see with covid which was
like a huge uh uh pandemic and our
revenue didn't significantly go lower.
So if if the whole economy goes down
that then we going to come back again to
the commission.
>> Okay. Thank you. The my real questions
have to do with the you know what we're
talking about here is money and how to
get more money and it's [clears throat]
all based on the fact that we're going
to need the money and I think that that
might be it might be helpful for the
commission and the public to have a
better understanding about why we need
the money. As I understand it, for the
highway project, we really need the
money in the hundred million dollars
overall, the 50 million in the short
term to complete the project that's
under construction now from Bay to State
Park, but more importantly to pay the
local share of the project from state
park from free [snorts]
state park to freedom
>> freedom to state park
>> freedom to state park. So those are
projects that have been through the
process. The ERS have been done. We've
got very very significant
outside grants that are paying for uh a
a huge
>> portion the major portion of that pro
those projects but there's a gap and the
measure D revenues on an annual basis
are not sufficient to close that gap. So
that's why we need to borrow for the
highway fund. Is that correct?
>> Yes, that's absolutely correct. We have
other state and federal revenue coming
in and uh our share because we have to
preund everything from our own u money.
That's the reason that's the local share
that we have. We're going to preund
everything and we're going to submit our
reimbursement to federal and state. So
that's the reason we require all these
funds together with us so we can do
those transactions and get the refund.
So let me the highway fund is pretty
clear to me because we're only talking
about two projects.
>> Sure.
>> But so let's talk about the active
transportation and why we need the
bonding for the active transportation.
>> Okay. It's is some of it going to be
potentially needed for 8 through 12 or
and to what extent is it really are we
really building uh the capacity to do 13
through 20 because my understanding was
uh if we're fortunate the cost of doing
8 through 12 will be in the grants but
what we were really going to need money
for the in the future and what's not
sufficient in the act transportation
fund is for the South County Trail. Is
that a correct understanding about why
we're going to need the to do bonding
for active transportation?
>> I can call upon Grace to answer that
question, but I do have some slides
which can uh reflect as to how much we
are borrowing and how much grants do we
have for active.
>> Morning commissioners. Grace, please
leave your step. Sarah, it looked like
you might want to respond. So, I wanted
to give you a chance first. I was going
to give a 10,000 foot view of just a
history. I know that you're aware of the
history of the decision to to bond um
and the decision to borrow was uh was
made before we applied for these large
grants that we've since received
luckily. Um but I want to just point and
give perspective to um you know in 20
2020 we prepared a strategic
implementation plan for measure D that
outlined kind of our strategy around
this and the commission at that time um
you know shortly after the strategic
implementation plan was prepared um they
accepted this approach to borrow because
it is it is a smart thing to do to bring
money forward so that our community can
experience the transportation
improvements sooner, right? Um if we
just go off of pay as you go revenue,
it's um you know those projects are
going to we're going to get less
project, right? So part of this is about
stretching our dollar. Uh but uh as part
of the strategic implementation plan, we
have our um cash flow model that is
based on expenditures programwide. So
every dollar that we have programmed,
this commission has programmed is
year-over-year. Like those are the
amounts that we're assuming we need to
fund, right? So if we've uh program
funds to uh North Coast segment 5, yes,
that's included in it's like an overall
program expenditure
uh need. So basically we're running out
of cash in the program based on the
programming that this commission has
already approved. Um but with that if
you want to add more detail that
>> I think that was a great overview but to
answer part of your question is yes we
expect that the existing program
fundings when you combine the state
potential federal funding and the local
measure D funding will cover the the
interim trail cost as currently
estimated. you brought up an item um a
question in the earlier item about cost
estimates at early um kind of design
when you were speaking with Riley. So
right now the interim trail design is
around 30%. So we still have a lot to
learn. We've tried to keep up with
escalation rate costs and estimates as
well as unit cost estimates but we will
we'll have updated cost estimates going
forward. So the cash flow model that you
saw presented by Nisha does assume that
the um interim trail can be constructed
within segments 9 through 12 with the
existing um nine sorry 9 through 11 with
the existing programmed funding.
>> Let me follow up on that because I think
I tend to not like bonding uh because it
has interest payments and it means we
you know we're paying now but we're
paying for a long time. I I can support
it when we really need the money and I
can see for the highway project that we
really need the money as projected. It
isn't quite as clear to me why we need
the money for the trail. Um my
understanding was and and I think it's
important to let people know we're
borrowing because we we want to do the
projects and we can't do the projects if
we don't borrow. Uh, and I think that's
true for the highway projects and I
think it's it's probably true for the
trail project once we go beyond um
segment segments 8 through 12. At least
that's my understanding of it. So, as we
move forward with uh 13 through 20, um I
as I've been thinking about it, it's
less clear to me why we need a bond for
$10 million in 2627
when there isn't really a need for it uh
in terms of funding any project or at
least it doesn't appear to be a need for
it. And so, sort of correct me on that.
Um, I want to bond when we need to bond,
but I don't think we should bond unless
we need to bond. And things tend tend to
take longer than you think they're going
to take, as we well know. So, you know,
not having a bunch of money sitting in
the bank that we're paying interest on,
uh, that we're not using is, you know,
not necessarily the best way forward. So
help me with understanding why we need
the um active transportation bond in
2627.
>> Okay. Um I think it really alludes to
what Sarah was saying is that we can't
we don't have the pay as you go funds to
advance the projects right now and and
we want to stick to the schedule that we
have for delivery of segments 9 through
11 or 8 through 11 and we do not have
sufficient funds on a pay as you go
basis to do that. So really the earlier
bonding is to be able to to construct
those projects. Um for future projects
in South County, we don't have cost
estimates for the construction of those
projects. So we would need to return to
the commission once we do get to that
phase. You know, Riley presented on
developing the um pre-construction
phase, the environmental phase, and that
will inform the cost of the construction
of those projects in the future. So the
to try to answer your question most
simply, we do not have the pay as you go
capacity in these early years to advance
the projects 9 through 11 and that's why
we're pursuing bonding.
>> So
that seems to contradict the notion that
um the grants are going to cover the
cost. Is it a is it a re reimbursement
problem that we're having that what we
need to do is spend the money upfront
and then they'll be reimbursed out of
the bonds? Is that why we need I mean if
the bonds are going to I mean if the
grants are going to cover the cost of
the project then theoretically we
shouldn't need to bond but if we're not
going to get the grants until we've paid
for essentially paid for much of the
project then I can understand why we
would need to bond. So, we will be
reimbursed for it, which will help us
down the road, but we need a bond
because we don't have enough money in
the account to pay for the construction
as it has happens until we get
reimbursed. Is that really what's going
on?
>> Um, no. So, I think a key piece of that
I maybe didn't make clear is that the
funding, the complete the funding for
the trail projects is a combination. It
is the state funding, the grants that we
received as well as the previously
programmed measure D funding that we are
advancing into earlier years to complete
the construction. So, it's a combination
of that funding.
>> So, we're
our commitment to the local share of A
through 12 is um
based on the funds we don't have
essentially funds that we're expecting
to get,
>> not on a pay as you go basis,
>> right? So they're not available now. The
our expectation is they will be
available over the next several years
and the bond will cover it during that
period. So it's essentially uh paying
for the local share uh until we get the
local until we get the measure D funding
that will cover the local share. And I
know Sarah had alluded to this and and
we talked about this earlier, but it is
very real the escalation rates that
we're facing and bonding can be an
uncomfortable conversation and debt
service can be an uncomfortable
conversation when you're talking about
public funds, but really the strategy is
to try to get ahead of that escalation.
We're facing serious cost increases
every month, not just yearly on the
escalation rates. So, we can't predict
the future, but that's a serious part of
our conversation we have as staff and
coming to you with this recommendation.
>> Okay. Um, thank you very much. I I just
wanted to make clear what the why they
were needed, how the public is going to
benefit, how these projects are going to
benefit by having the bonding, and I
think you've made that clear. So, thank
you.
>> Thank you. Um, Commissioner Downey.
>> Yes. Thank you for the presentation. It
was very thorough and easy to
understand. Um, I think back to 2016
when we passed Measure D, uh, especially
that component of the trail. And I'd
like to know since we've been talking
like up through segment 12 for these
projects, where does that leave 13
through 20
um, in this scenario with bonding?
I could take a stab at that. So um as
Nisha's presentation showed, we're kind
of tapping out the highway program, but
we may have some capacity in future
years um in the active transportation
program. So we uh as staff were aware uh
you know thinking about the future and
the um delivery strategy of the South
County Trail projects. it's going to be
really important to um try to preserve
some additional you know revenues so we
have some leftover so that we could then
use um measure D funds maybe future you
know when we're going for grants we're
going to need to commit Measure D as our
local match and hopefully among other
funds that you know maybe other agencies
want to also chip in on these important
projects but um but really we want to
replicate the success that we've had for
the north county in the south county.
And so that's really our intent looking,
you know, five years down the road. But
the first things first is get the
project started, which is Riley's
presentation, which was fantastic. And
then secondly, we have to manage our
funds very uh diligently so that we have
enough money left to pledge a local
match for future um very large grants
that we hope to obtain to build these uh
amazing improvements for South County.
And I just wanted to clarify, does this
measure do you send sun down in 2047?
Does it?
>> Yes, it's a 30-year measure and uh 2047
is uh when it sunsets
>> and the current projects that we were
just describing. When do when do we hope
for uh their completion if this bonding
is uh successful
>> for the highway program? It's a probably
around 2031 would be the completion of
the improvements to the phase 3 project.
And then for the coastal rail trail
projects, there's several of them. So
I'll defer to Grace on that.
>> Um for the segments we've been talking
about today related to the bonding
segments 8 through 11, we're looking at
a completion date of around 2030. Okay.
>> Start construction in 2027 is our
current schedule.
>> Thank you. Any other questions?
Seeing none, I'll go out to the public
to end this item at the agenda.
[clears throat] Anybody in chambers?
Hi, I'm Brett Garrett. I want to make
sure you have read the comments from
Linda Wilshen, former executive director
of RTC from 1985 to 2005. This is the
attachment for item 18 on the website.
I'll just try to read her number 14 to
summarize. I'll read as much as I can.
The RTC staff report is proposing to
mortgage future measure D revenues so
that CALR can initiate construction of a
highway 1 widening project that was not
included in the 2016 measure D approved
by voters and for which a current
estimated total project cost and
sequencing has not been made public.
that after years of construction will
offer no traffic relief to Highway One
drivers in the short term or long term
and that will severely limit local
measure D funds for other possible
Highway 1 corridor operational
improvements, interchange projects,
traffic management, and related
projects. Please make sure you read
this. It's it's a longer it's longer
than what I read, but it's from a former
executive director of the RTC, and it's
very important. Please read it.
>> Thank you.
>> [laughter and clears throat]
>> Hello again. Well, um I'm sure you've
all memorized the 2019
EIR. In case you haven't, let me remind
you uh a couple of [snorts] statistics
there. They're predicting a traffic
speed increase of four miles an hour
from 24 26 to 30 miles an hour. Uh
there's a uh no guarantee how long
that's going to last. We all know about
induced demand. Uh the question is uh
you know is this a permanent
construction project because as soon as
we get the three lanes done it's it's a
mess up at the fish hook $127 million uh
worse than it's ever been. So then
there's the next move say okay let's
start building four lanes. Uh I came
from Los Angeles when they built the 14
lane Santa Monica freeway within 10
years it was a parking lot at rush hour.
I mean, I think folks are earnest in
trying to do something here that'll
help, but this is proven not to be the
way to go. Uh, you know, this this phase
is obviously on its way, although I
think borrowing is sort of irresponsible
when it's not really necessary. Thank
you. So, I think take a better look,
please.
>> Hi, Mark Lee from Santa Cruz County. I'd
like to uh encourage you to look at the
economics of what you're about to pass.
You're putting the county into extreme
debt service here. In 2024, the project
environmental review included that this
segment 12 would only increase traffic
by four miles per hour.
Think about that. You're spending 70 to
90 million.
only out of the 260,000 people that are
living here in the county, 50% of the
people only work full-time. The rest of
us are working part-time or on
lowinccome salaries. Think about the
debt service that you're putting the the
future generations into. Furthermore,
this in the EIR section that you paid
for your consultant under the EIR in n
2019 2.51.16
the pre the the EIR indicated that there
was discernable negligible improvement.
You're spending $90 million to gain four
miles per hour gain from park segment 9.
Please do not pass this authorization.
It's a waste of taxpayers money.
>> Thank you, sir.
>> Debbie Bulier,
I urge you not to issue millions in
bonds with the lion's share going
towards widening Highway One from State
Park to Freedom. Measure D did not
address this section of Highway One.
widening state park drive to freedom was
not approved by the voters. The EIR as
has been said predicts insignificant
congestion relief. Taxpayers cannot
afford this enormous expenditure.
Anyone paying attention to the national
news of extreme weather exacerbated by
climate change knows we must invest in
reducing carbon emissions. Measure D
money should be used for road repair,
neighborhood safety projects, transit,
and active transportation,
not for widening the highway that we did
not vote for.
>> Thank you. See no one else in chambers.
Anybody oversee?
>> You do not have any speakers.
>> All right, I'll bring it back to the
commissioner for um direction.
as
>> so it's been moved and second
and other questions. All those in favor
say I.
>> I.
>> Any nos? No.
So the motion passes. So thank you. Uh
with that we're going to go on to um
I get back in my place.
[laughter]
Uh
review of the items uh to be discussed
in close session.
>> Uh thank you Mr. Chair. We have four
items for close session today. The first
two items are public employee uh
performance evaluation and labor
negotiations related to the executive
director. And then the remaining two
items are conference with legal counsel
both under anticipated litigation. And
with that um we are ready for close
session.
>> Do we expect any report report?
>> I do not anticipate any reportable
action today. Right.
>> Well, thank you. With that, um, any
public comment?
>> Good morning, Commissioners Grace. I'm
now speaking as a member of public on my
own time. Um, I'm item on the close
session. Um, the RTC has proposed key
decisions to maintain significant grants
during the almost two-year period that
director Christensen has been the
director. It's also made careful
decisions about cost increases on
highway projects, all focused on
multimmoal limit mobility. Sarah has
provided clarity to the RTC on the
landscape for the project delivery and
how that works for Highway One and
Coastal Rail Trail and State grants.
We've observed that as the director and
with the support by RTC, we have become
a more transparent agency. And we've
also been able to receive the feedback
of the public and advance equity goals.
Where staff need support is to create a
positive work environment that
encourages multi-d disciplinary
decision-making and support for an
environment that retains staff and is
fiscally responsible with staff
resources. We've been known as an agency
that's lean and um very effective and we
want to continue to serve in that
capacity.
This will any kind of um work conditions
that are difficult create distractions,
reduces staff's energy, and takes away
from the focus of our goals. I hope you
can ask important questions to help RTC
get there. Core staff are the folks who
are putting their names on their staff
reports and developing the work to you,
providing the analysis and making
recommendations that receive review by
your director.
We appreciate your attention to
supporting our staff and committ
continuing to be committed to the public
through the RTC.
>> Thank you. Um with that, any other uh
comments? Any public comment? You see
anybody?
>> No. Over Zoom.
>> You have no speakers.
>> All right. With that, I'm closing up.
So, until the next meeting. Thank you.