The Santa Cruz City Council convened a meeting that began with closed sessions addressing confidential matters, including real property negotiations at 121 SoCal Avenue and ongoing litigation involving James Morrisy and the California Grocers Association. Following these private discussions, the council reconvened for public presentations where SEIU representatives highlighted critical staffing challenges within Department Unit 481, specifically criticizing a high vacancy rate in permanent positions that forces reliance on unbenefited temporary workers who often earn below living wage standards. The union argued that vacancies in essential service roles are being artificially created to fund analyst positions focused on artificial intelligence integration and called for stricter AI job protection measures, better market-aligned salaries, and the elimination of unbudgeted service positions. In a separate presentation, Ecology Action fellows detailed their successful neighborhood resiliency workshops funded by workforce development grants, which equipped nearly 100 residents across seven neighborhoods with emergency preparedness skills like creating go-bags while fostering community connections through targeted outreach to underserved populations such as Spanish-speaking families and unhoused individuals.
The afternoon agenda included several proclamations honoring local achievements and figures, starting with a declaration of August 11, 2026, as Katherine Breed Day in recognition of her historic open-water swimming records and conservation work for Sea Dreamers, who was preparing to attempt a massive coast-to-coast swim while advocating against threats like kelp deforestation. The council also honored the late musician Oliver Tree with a proclamation declaring June 29, 2026, as Oliver Tree Day, acknowledging his global artistic impact and roots in Santa Cruz culture before he passed away earlier that year. During public comment periods, citizens voiced diverse concerns ranging from traffic incidents and artificial intelligence implications to controversial claims about population decline mechanisms and immigration policies, while Council Member Bruner recused herself from specific items involving property interests near project sites or real estate negotiations where she held a conflict of interest.
In the consent agenda and subsequent hearings, the council unanimously approved contracts for playground improvements in Beach Flats, purchases of new refuse vehicles and street sweepers to address sanitation needs during dry summers, and amendments to CalPERS rules allowing certain part-time workers exceeding 900 hours annually to qualify for retirement benefits after legal review. A significant portion of the meeting focused on a complex residential development application requesting modifications due to rising construction costs and difficult hillside terrain; the applicant proposed altering the design from a V-shape extending into the slope to a rectangular footprint that increased height by adding floors, thereby raising bedroom counts while seeking waivers for vinyl windows and reduced setbacks. Intense debate ensued regarding inclusionary housing compliance methods, with Council Member O'Hara expressing concerns about clustering residents in single-bedroom units without supportive services and questioning whether cost-saving concessions like using vinyl windows or waiving tenant selection processes truly maintained affordability goals rather than undermining them by reducing the proportion of low-income units.
After extensive deliberation on environmental risks to West Lake Pond, traffic capacity issues in a food desert area near UC Santa Cruz, and potential litigation over state housing laws that force developers to modify expired permits, the council reached an agreement to approve the revised resolution with specific amendments. The final decision involved removing one incentive concession regarding streamlined tenant selection but allowing public advertising of vacancies through standard city processes to ensure transparency and prevent overwhelming waitlists without a managed intake system. This outcome balanced the state-mandated requirements for affordable housing against community design standards, geotechnical assurances protecting local water resources from karst terrain damage, and commitments to future data-driven processes that would better address socioeconomic displacement concerns raised by residents worried about artificial rental demand strain affecting existing neighborhoods.
Read the full video transcript
Thank you. Thank you.
The hour of 1:00 having come and gone,
the Santa Cruz City Council will come to
order and the clerk will call the role.
Thank you, mayor. Council members
Triggero
>> present.
>> Bruner
>> present.
>> Men
>> present.
>> Boulder. O'Hara
>> here. Vice Mayor Kell Johnson
>> present. Mayor Keely,
>> President Quorum having been
established, let me see if there are any
statements of disqualification.
Council member Bruner,
>> I have a um disqualification for close
session agenda item number two, real
property negotiations
as it relates to my employment.
>> Thank you. Anyone else? On close
session, we'll get to other matters
later. Okay. Thank you. Uh this would be
the opportunity for anyone in council
chambers or online who wishes to comment
on our close session agenda. Uh we have
conference with legal counsel and six
claims we will be considering real
property negotiations at 121 SoCale
Avenue and conference with legal counsel
on existing litigation James Morrisy v
city city of Santa Cruz and California
Grocerers Association v City of Santa
Cruz at all. No one in chambers who
wishes to comment. Do we have anyone
online?
>> No one with their hand up.
>> We have no one online with their hand
up. All right.
What we will do at this point is we are
going to adjourn into close session. We
will take up those items that I
indicated and we will be back
uh no earlier than 200 p.m. or when we
finish our work uh whichever is later.
At this point we stand adjourn into
close session.
The Santa Cruz City Council will come
back into session. Madame clerk, would
you call the role again to establish
quorum?
>> Thank you.
>> Council members Tugaro
>> present.
>> Bruner
>> present.
>> Nome
>> present.
>> Boulder.
>> O'Hara
>> here.
>> Vice Mayor Kellar Johnson
>> present.
>> Mayor Keely
>> present. The quorum having been
established uh we will proceed
uh to a series of presentations. We are
on item four. This is an SEIU assembly
bill 2561 presentation. There are SEIU
representatives here who will be doing
that presentation. Good afternoon.
Welcome.
Good afternoon my friend.
>> Thank you Mr. Keely and council members.
Um, good afternoon. My name is Carrie
Koslac. I'm an administrative assistant
too for the city of Santa Cruz Water
Department and I am the SEIU 521 local
chapter secretary.
Um, I'm here today to present on behalf
of your workers. We're going to discuss
several pressing issues related to the
city's service vacancy rate.
um and present the union's understanding
of where we're at in maintaining proper
staffing levels. We'll be highlighting
specific vacancies and discussing the
underst staffing of service positions
citywide.
Um we really want to thank Sarah Deleó
and the human resources department for
partnering with labor and working with
us to address our concerns. Um we look
forward to continuing these discussions
moving forward with Sarah and HR. Our
goal in this presentation is to share
our understanding
of where things currently are and what
the union perspective is on what's
happening.
Um so again we'll be going through
vacant jobs, specific vacancies,
um highlighting the administrative
assistance series, managerial bloat and
the impact on the community and the
workforce, temporary work, our
lifeguards, our library floaters, um
what the issues are, and then we'll have
some time for questions.
So, we'd like to start out by pointing
out that a permanent unit of 481,
which is a 9.5%
vacancy rate, is actually fairly high,
especially when many of these positions
are historically filled for long periods
of time.
Um, one of the main issues we'll be
addressing in this presentation is the
over reliance on temporary unbenefited
work.
We thought it would be helpful to talk
about a snapshot of the vacancy report
to begin with. Um, as you can see, we
have several positions where there are
many FTEES full-time high vacancies.
When we look at the snapshot, you can
realize a few different things. The
positions that have a high vacancy rate
and a high number of budgeted positions,
you'll see that they tend to be out of
market rate pay.
When you compare the number of temporary
workers in the same classification, you
can see that there are qualified
candidates who can fill these positions
but are not being hired into these
vacancies.
One example is there are five admin
workers hired on as temporary staff and
4.5 vacant positions. So why aren't we
hiring for the administrative assistant
2 and administrative assistant three
vacant positions?
When you look further at positions that
are lower on the vacancy rate, such as
our resource recovery workers, resource
recovery worker one and parking
attendant, you see that the divisions
use temporary work at a much higher rate
than their budgeting for new positions.
The vacancy rate is low, but there are
an additional 16 temp workers to the
nine budgeted for the parking attendant
role.
Despite the need for these positions,
the departments are relying on
unbenefited labor, oftentimes labor
which makes less than the city's living
wage ordinance.
We also want to make sure that it's
clear that while this report focuses on
the 481 positions that are budgeted and
benefited within the city, there's an
often undisussed workforce keeping much
of the operations solvent that aren't
reflected in the report. Those are
temporary unbenefited workers. There's
no vacancy rate for them and a sizable
amount of the city is staffed by these
unbenefited temp workers. Around 309 are
on the city's payroll uh which almost
matches the permanent benefited staff.
So when we look at certain positions
with low vacancy rates but a high
reliance on temporary work, we can see
that there's a need not being addressed
by the number of budgeted positions in
the classification.
What's going on with our administrative
assistant positions?
Um, I want to highlight that our
administrative assistants are the
frontline workers that um, the public
makes first contact with across the
city. Their responsibilities are to
provide face-to-face interaction with
the public, answering calls from
customers and constituents, optimizing
administrative functions, and assisting
directors and other staff. They're the
backbone of many of our operational
functions of the city.
Admin assistants play a really important
role in the city. So why aren't they
being hired for? And more importantly,
why are they being unbudgeted?
So from the union standpoint, the most
recent budget recommended reducing the
number of administrative positions
The vacancies in this role are
manufactured. We believe the city is not
hiring for these public facing roles.
The administrative positions are being
unbudgeted for analyst roles which don't
provide the same public facing and
administrative functions needed to keep
the city running and the public engaged.
This is a worrying trend we've seen with
the integration of artificial
intelligence and false promises of
optimization causing loss of necessary
jobs that deprive the public of
in-person services and contact.
Instead of keeping these positions
funded and brought to market, the city
would rather budget for analysts and
some of those analysts further
integrating AI.
So the reality of where we are with
services
um the number of out the numbers outside
of fire and police in 2025
the city employed 430 service staff 82
supervisors
162 managers.
This means that the city maintains more
than a one to two ratio
of management
to line staff. For every one manager
supervising, there are two workers to
pave roads, work on water lines, or keep
our parks clean and in good shape.
We want to highlight that we think that
there's a mis prioritization of
management over city services.
Even if you add in the temporary
workers, the ratio only rises to one
manager or supervisor to every three
workers. That ratio is drastically
different in the fire and police
departments. In 2025, there was one
manager per nine employees in fire and
one manager per 14 employees in PD.
You'll see throughout the adopted budget
recommendations to delete service
positions for new managerial and
supervisory positions where supervision
and management are already existing.
The outcome is that the city spends
exponentially more money for fewer
services.
How does this impact our workforce?
When you hire new managers, the need for
service doesn't go away. Due to
budgeting for higher salaried,
non-service providing roles, the
siphoning of resources away from
services destroys the city's ability to
retain skilled staff and provide direct
services to the public.
When unbenefited temporary workers are
included in these numbers, it means that
about 35% of the city's workforce does
not receive health benefits of any kind.
Around 100 of these employees also make
below the city's the city's living wage
ordinance,
mainly in our library and parks
departments.
So I know that these a lot of the
numbers are surprising um and we've
included the chart that we used which
was shared with us from human resources
where we got this information the
benefits chart put out by HR showing the
size difference between the service unit
and the supervisor managerial units and
you can see that the number 430
represents the number of hired permanent
staff in 2025.
It does not include our vacancies.
What are the solutions from our
perspective in SEIU?
The solutions include stop the bleeding,
stop unbudgeting service providing
positions,
instruct departments to expand services,
and budget for more positions who keep
the city structurally sound.
Reduce the city's reliance on its
temporary workforce. Build permanent and
stable jobs since the need exists.
Reduce the city's reliance on private
contractors and consultants. And bring
more of the work inhouse.
Bring more temporary workers into
permanent status with the city.
scrutinize the transfer of public money
from services to managerial and
supervisory positions when it's
recommended.
Set standards for AI to ensure that the
city is protecting itself from job loss
and bring more positions
into market alignment and ensure all
workers are making above the living wage
ordinance.
When I did the math for the starting
salary of the administrative assistant
two positions, it is barely barely above
our living wage ordinance.
So, our recommendations overall, we
think funds should be dedicated for a
class and comp increase to help correct
outofmarket vacant positions.
Budget for limited term positions and
bring them into permanency.
Budget for new full-time
classifications.
budget, excuse me, new FTEES for
classifications which have a high
reliancy on temporary work in relation
to our libraries.
With a $4 million temporary budget,
there's room to budget for permanent
library assistant 2 floater positions to
help keep libraries fully staffed and
especially amidst their ongoing issues
with violence at the downtown branch.
Library aids make up most of the
workforce who do not make more than the
living wage ordinance.
And then in relation to parks and fire
having budgeted FTEEs for warf
lifeguards,
beach captains and beach lieutenants
will maintain safe wararf operations
year round. Many of these
classifications risk their lives for
public safety but don't receive the
benefits.
The recreation series also makes up many
of the workers that are below the
ordinance.
That is our full presentation
and are there any questions?
>> Very good. Thank you for the
presentation. Let me see if members have
any questions they would like to direct
to you.
Uh I would like to ask you a question
for a definitional issue between us. Um
my understanding of a number of the
folks who have either a supervisory or
management job in parks in particular.
So let me just go there for a second. I
I thought you characterized
uh
those jobs
as distinguishable from what I'll call
rank and file. Is that fair enough to
use that term? Non-managerial, non
supervisory. I thought you kind of
characterized
those jobs, meaning the supervisory and
managerial as if they don't do any
service work. Meaning, you know, they
don't
That is contrary to my experience with a
number of the managers and supervisors.
They are out there in the parks working
alongside their teams and so on. Did I
misunderstand your characterization or
do we have a difference of opinion? I
think probably a little bit of both, but
um if my understanding so I can only
speak to the department that I work in
and while supervisors and managers do
have some engagement with the public um
and providing services,
>> the majority of that face-to-face
interaction with the public is happening
with our service workers.
>> That's a very different point. So I that
one I think we probably have some
agreement on that. But thank you for
allowing me to clarify. I appreciate it.
Are there other questions or comments?
Uh anyone uh is there any questions,
comments? There we go. We thank you for
being here. We take that very seriously
as you know in the same way we do when
we have our meet and confer work or
contract negotiations or anything else.
And I think I speak on behalf of the
council that we thank you. We understand
that you are the face of this government
to most of the people that we are
accountable to and you're also the face
not only for our constituents but the
100,000 people a day who come in here
seven days seven months of the year
also. So thank you very much. We take
your work seriously. We take these
comments seriously. Best wishes to you.
>> Thank you.
>> Thank you very much.
We are now on item five and we would
invite uh Brandon to come forward and
for Mr. Morgan, the director of our
information technology department to
make a presentation. Sir, good
afternoon. The floor is yours.
>> Good afternoon, mayor, council. Thanks
for having us and thanks for the
opportunity to celebrate Mr. Brandon
Ashby. Uh Brandon has now had 25 cycles
around the sun at the city. uh the first
half of his career he spent at our IT
help desk uh mastering all of the
technology and systems that make a
full-ervice city sing. Uh he has had uh
special assignments to the police
department, the fire department, and for
the last half of his career here, he's
been assigned as a SCADA and network
systems administrator at our wastewater
treatment plant. Uh he manages the
technology solutions there that help to
process three and a half billion gallons
of wastewater per year. Uh he has
responsibility for the SCADA network
systems which is that system that
monitors tanks, pumps, uh sensors,
chemical levels. He manages the
laboratory information systems that help
our great scientists do their work. He
has a data center that has dozens of
servers, switches, routers. He manages
cyber security. He manages physical
access security. And equally as
important, he is the frontline customer
service agent for about 50 employees out
there. So he's essentially a turnkey IT
department uh of one. Um for somebody
that has shown up to work for 25 years
and not sought appreciation or gratitude
or uh any of those accretments, it's an
honor to be here today to to be uh
thankful for Brandon and the great
service that he gives to the community
and the city.
>> Thank you.
>> I say we hold on to this guy.
Brandon, thank you so much for your
decades of service to the city and to
the folks that we all serve out in the
community is just wonderful. The
institutional memory, the continuity so
helpful. Thank you. Would you care to
make some remarks?
>> You're short. I think just having
serving a community helps you have
purpose in your work. Not just a
paycheck, but it's also helping people
out there.
>> Thank you, sir. THANK YOU VERY MUCH.
WE ARE ON ITEM NUMBER SIX. This is an
update of the Mterrey Bay Green Youth
Service Corps fellow projects. We will
have a presentation from our very
capable Dr. Dr. Tiffany Wise West who is
our sustainability and re uh resiliency
officer. Dr. Wise West, good afternoon.
The floor is yours.
>> Good afternoon, mayor and council
members. I am actually just introducing
this presentation, but I'm very pleased
to share with you today the one of the
projects that has come out of our
workforce development grant that funds
three ecology action fellows, two city
fellows, and dozens of other fellows
with other nonprofits in the Monterey
Bay area. The three fellows from Ecology
Action have been working with our fellow
Jennifer Manso on neighborhood
resiliency workshops. their fellowship
is coming to an end and so we wanted to
bring them in to share with you this
really important project they've been
doing out in the community and Jennifer
she's not presenting today but she will
be here later in the year to present her
other project on community resilience
centers. So with that I'm going to allow
the ecology action fellows to introduce
themselves and share with you what
they've been doing.
>> Good afternoon and welcome. Thank you so
much for all of your good work.
>> Thank you, uh, mayor and council. We're
really happy to be here to share our
progress on this cool project we've been
working on. Um, we can go to the next
slide. Thanks, Tiffany, for that intro.
Um, so
where do I point it?
So, as Tiffany mentioned, we've been
working on neighborhood resiliency
workshops across the city. And we're
going to give an overview of how we
approach the design of these workshops,
recognizing the need for them in the
city. and um how we conducted outreach
and continued to develop and iterate on
the workshop design as we received
community feedback. And then we'll um
share the impact that we had through
these workshops on the community towards
building neighborhood resilience.
Thank you. Um, so yeah, the main
>> You're not the only one that has that
trouble. The first time they try to use
it, not problem. Um, so the main purpose
of the workshop series was is to
activate city neighborhoods to work
together in strengthening emergency
preparedness around key local climate
risks. So what this me uh means in
practice is um providing practical steps
and resources to residents to help them
uh prepare for emergencies which we know
are only getting worse with climate
change and also um helping them to have
more conversations around the um
relational side of things and um
building that network of resource
sharing. sharing and skill sharing that
makes a community resilient.
Um so we really emphasized the practical
things like go bags and stay kits and
signing up for cruise but we also really
um made this a community building
initiative as well which was really
wellreceived.
So um this is our map of where we've uh
held the workshops and will continue to
hold the workshops as you can see. Um we
are trying to be as equitable as
possible in the distribution of the
workshops and um for the first phase we
really focused on just getting this
pilot project started. So we started
with a lot of community interest from
neighborhood leaders and that helped us
um gather feedback and continue to
iterate on the design. This next phase
we're really focusing on expanding the
distribution to ensure that we're
reaching more vulnerable populations
such as the low-lying beach flats
community and also um people
experiencing homelessness in our city.
So, um, with that, I will let Angelica
finish continue on.
>> Good afternoon.
>> Hi, good afternoon.
>> Okay, I'll speak briefly to our outreach
and engagement approach. Um, as fellows
at with Ecology Action, we represent a
long-standing commitment to meaningful
community engagement here in Santa Cruz
that we were really excited to bring to
this project. You can see much of our
approach here on the slide. We
participated in a lot of tableabling
opportunities that included uh Midtown
Fridays, local community events, farmers
markets, and uh neighborhood concerts as
well. We also designed and distributed
door hangers for neighborhood specific
workshops and digital outreach also
played a big role in this project um
using social media posts um uh email
newsletters and uh also posts on Next
Door.
And speaking briefly on our workshop
development process uh to start this
project and to address the primary risks
most relevant for city residents. We
referenced geographic climate and
demographic data uh to cater our design
and each workshop focus depending on the
audience we were speaking to to ensure
relevance and impact. We also sought
insight from the Santa Cruz County
Office of Response, Recovery, and
Resilience as well as the Santa Cruz
Community Emergency Response Team to
collaboratively identify possible
engagement gaps based on risks. And
together we identified the gap being um
introductory engagement or instruction
on emergency preparedness with an
emphasis on neighborto neighbor
connections and its relation to climate
action.
Um and following that discussion, we set
out to design uh engaging workshops that
uh incorporated a variety of
facilitation styles um including what
you see on the bottom right of the
screen, which is an interactive
neighborhood mapping exercise that helps
visualize both individual and
neighborhood needs, resources, skills,
and interdependence.
Um and lastly, being a pilot project, we
were really excited to prioritize and
incorporate community feedback. We
facilitated two community feedback
sessions and have since made
opportunities to um regularly address
feedback after each following workshop
in the past few months. Um all of which
has contributed to uh us being able to
incorporate improvements regarding
length, content, and outreach of these
workshops.
Good afternoon. Welcome.
>> Afternoon. Thank you so much. Um, so
over the last six months, we have
conducted eight workshops in seven
neighborhoods and reached nearly 100
Santa Cruz residents. And as stated
previously, we have six additional
workshops planned. So, we only expect
these numbers to grow.
And as stated, community feedback was an
essential component to what made these
workshops so successful. And we um
gathered this feedback using two main
pathways. So the first was with
testimonials with the participants. And
the second was with entry and exit
surveys. And we assessed the success and
impact of the workshops using three main
sentiments. The first being how people
felt more equipped to help their
neighbors in the event of a disaster
after after the workshop, their
confidence in their personal ability to
be prepared for a natural disaster, and
their comfortability asking neighbors
for help in a time of need. And uh these
were assessed on a scale of one through
five. Uh so on average across all three
of these benchmarks, we had our
participants coming in at around a low
three and leaving at a high four or a
five, which another way of looking at
that is people came in with about a C or
a C+ in their understanding and left
with an A minus or an A. So we're pretty
happy about that. Um and there's two
main takeaways from this data. One is
that most of our participants came in
with a pretty good understanding of
emergency preparedness and what they
need to do to be prepared. Um, and the
main reason um that we had participants
coming to our workshop and this is
coming through testimonials and just
conversations um is that they wanted an
opportunity to connect more deeply with
their neighbors specifically around this
topic. that is typically not something
you just casually bring up to your
neighbor. Um and so they were excited
about the opportunity to uh talk
individually with their neighbors about
this. Secondly um is that we need to do
a better job of reaching the communities
that do not have this um previous
understanding of the resources um and
knowledge around emergency preparedness
and we hope to address this in a few key
ways.
So, as we look ahead and hope to expand
upon these workshops, we're hoping to do
additional outreach in key communities
um such as Spanish-sp speakaking
neighborhoods, families or young
parents, students, and our unhoused
community which um overall were not
equitably represented um in the
participation of our workshops. Um, and
we hope to do that through properly
incentivizing attendance of our
workshops, through things like meals and
child care. A lot of these workshops
happen during dinner time and we do not
want that to be a barrier to people
attending as well as a need to attend to
their young children. Along with that,
we also hope to offer more engaging
opportunities such as hosting block
parties or even um like micro uh 30
minute workshops with communities that
offer more targeted relevant information
to their specific needs. Um and we are
actually uh executing this this week by
offering a 30inut workshop tomorrow in
the Beach Flats community um entirely in
Spanish. And we are also having a
workshop at homeless garden project with
their unhoused community to speak with
them about their concerns.
And um that's all we have for you today.
We thank you so much for your time and
we open the floor to questions and
comments.
>> Well, thank you all three of you. And
you have one other colleague who's not
here. Is that it today?
>> Jennifer's here. She's waving to us.
>> Oh, hi. There we go. Yeah, I thought I
saw you around here. Good. Well, thank
you so very much. I will open it to
questions. Let me see if members have
questions they would like to ask you.
And we're going to start with Council
Member Golder.
>> Thank you. I like the format of this. I
think the idea of having it with your
neighbors is a great idea. This is
something that council member O'Hara and
council member Bruner and I have been
>> working with with fire with Meredith
Albert and I know Santa Cruz neighbors
and other type types of groups have been
together um and the firewise groups also
do stuff like this and so I was just
wondering how much were you
collaborating with all the efforts that
are already kind of happening out there
or is this something separate?
Meredith Albert was an essential um
individual that assisted us in offer in
in the how we developed the content for
this workshop. And we're also working
with other community groups such as the
VOAD to ensure that all of this
information isn't just something that's
uh yeah just we don't want to yeah
duplicative of what is currently exists.
>> I actually I like this one this format
better than the ones I've seen before.
And I'm wondering, and this may be a
question to staff, when we talk about
getting the word out, we talked about
different seasons or different campaigns
or different things, but I know
sometimes the city does mailers to all
the residents. Like to me, if this came
in the mail with
and then some kind of blitz media thing
to help people remember to prepare, it
could be really effective in
communicating because 93 participants
that came, you know, it's hard to get
people to, but if it came in the mail to
everybody, they might take the time to
make plans to prepare.
>> Yeah. And we can look at um that model
when we're looking at our seasonal
outreach that we're doing. We're looking
at all the different platforms for
reaching people and we're also pairing
it with the audience that we know is
missing most. So we're looking at
mailers, bill inserts, social media, um
our newsletters, our list serves. So all
of that and we can look at, you know,
this as well.
>> Thank you, Madam Vice Mayor.
>> Thank you so much for the work and the
presentation. Um, Council Member
Golders's comment just made me think
that there might be an opportunity as we
look at neighborhood activation and the
neighborhood activation microrant
program. Um, integrating something like
this or even just having uh a list of
neighborhood um doesn't have to be resil
resiliency, but neighborhood projects
and this would be a great one. So, thank
you for giving us something concrete.
See if there Council Member Bruner,
>> thank you for the wonderful presentation
and the work. It's very interesting to
hear what you've been working on and
focusing on. And uh my question is
somewhat similar to Council Member
Golders. Our fire department has sheets
that have these checklists and uh the
sign up. Uh so I
I would like to uh see maybe not so many
different ones but working more of
having one recommended readiness
checklist. I think um that might be
helpful and not duplicative. Um, this is
very well done and I really appreciate
the the sheet of identifying
neighborhood resources, whether someone
has a chainsaw, a fire extinguisher,
um, solar batteries, etc. Those are
things people don't think about. And as
we get into more natural disasters, I
think it's really important to have that
front and center in everybody's mind.
And another thing um I think is really
important that I bring up in our public
safety committee meetings is
neighborhoods include business
communities, business neighborhoods. And
it's really important to um for
businesses to keep in mind having a go
bag emergency kits getting to know the
neighbors. um because
emergencies strike anytime, anywhere.
You may not be at home where all of your
preparedness is and so um just keeping
that in mind for you as you move forward
in your work. Thank you.
>> Thank you for the questions and comments
by members. Anyone with us wish comment
on this? We thank you very very much.
Excellent work. Thanks to all of you. We
love Ecology Action, too. They're a
great partner in the community. So,
thank you and uh we look forward to more
good work together.
>> Thank you, our friends.
>> Thank you.
>> We are on item number seven.
This is a mayoral proclamation declaring
August the 11th, 2026
as Katherine Breed Day. Um Mr. Hajes and
Miss Ro from Save the Waves are here and
uh the vice mayor will be leading on
this item.
>> Thank you, mayor. I have a proclamation
before me and I'm going to read this
proclamation. Um
just bear with me. There's a lot of
amazing things here. Whereas on March
22nd, 1993, Katherine Breed was born to
Robin and Charles Breed in Pleasanton,
California. And Katherine Breed was
drawn to the water from an early age and
began swimming at the age of four when
she joined a summer league team. And
whereas from 2007 to 2011, Katherine
Breed competed on the Amador Valley High
School swim team in Pleasanton, earning
21 All-American honors over four years.
From 2008 to 2010, Katherine Breed was a
member of the US National Youth Team and
stepped up to the national team after a
great performance at the 2011 Summer
Nationals. And in 2008 and 2012, she
qualified for the United States Olympics
trial Olympic trials. And whereas
Katherine Breed went on to attend the
University of California, Berkeley,
studying integrative biology in
competing as a collegiate swimmer
specializing primarily in freestyle
while remaining actively involved in her
community. After graduation, she planned
to attend medical school before
switching to f to focus on open water
swimming. And in two 2016, Katherine
Breed joined San Francisco's historic
openwater swimming community at the
Dolphin Club, transitioning from pool
competition to open water endurance
swimming where cold water powerful ties
and a culture of bold exploration
challenged her to redefine her limits.
Surrounded by legendary swimmers and
lifelong adventurers, she began pursuing
ambitious endurance swims that transform
swimming from competition into
exploration and on ultimately into a
platform for storytelling and impact.
And whereas from this transition emerged
a guide guiding philosophy beyond the
backline, a mindset rooted in stepping
beyond certainty, embracing discomfort
and forging new paths without predefined
boundaries. And in 2017,
Kathern Reed swam the length of Lake
Tahoe in 8 hours and 56 minutes. Yeah.
Breaking a record that stood since 1987.
In two in 2022, she became the first
person to swim from the Golden Gate
Bridge to Half Moon Bay, covering 27
miles. And in 2025, she broke the
Fereralon Islands to San Francisco open
water swimming record. In addition to
these accomplishments, she's completed
marathon swims of the English Channel,
the North Channel, and the 20 Bridges
Swim.
Keeps going. In 2024, Kathern Breed
founded Sea Dreamers, a nonprofit
organization dedicated to protecting the
ocean through conservation and
education. In 2026, Kathern Breed
announced a plan to become the first
person to swim the entire length of
California, covering 900 miles of the
Pacific coast from north to south. And
today, Katherine Breed's work extends
far beyond individual achievement
achievement. She is the founder of
purpose-driven initiatives that combine
endurance sport storytelling and ocean
advocacy to inspire meaningful
engagement with the natural world. And
whereas Katherine Breeda advocates
advocates for greater equity and
representation in ocean spaces,
particularly for women and
underrepresented communities while
championing the protection of marine
ecosystems through experiential
storytelling and community engagement.
Now therefore, I, Sheper Kalentaria
Johnson, vice mayor of the city of Santa
Cruz, on beha behalf of our mayor and
our city council, do hereby proclaim
August 11th, 2026 as Katherine Breed Day
and the city of Santa Cruz and encourage
all citizens to join me in
congratulating her on her extraordinary
achievements and her commitment to
ongoing ongoing beyond the black line by
choosing a lifeguided by curiosity,
courage, and connection and creating
pathways for others to do the name. So,
let's hear a round of applause for
Captain Green.
>> But I had to I had to read it all
because that was quite impressive.
>> Seriously, good afternoon.
>> Good afternoon.
>> Thank you, council. TR, clearly I'm not
worthy of accepting this award on behalf
of Katherine Breed. U it's just
exhausting hearing all of her incredible
achievements. Um but my name is Tren
Hodes. represent Save the Waves
Coalition and uh we are honored to
receive this proclamation on behalf of
Katherine Breed uh who is somewhere off
the coast of Bolinus right now I believe
if you check on the on the live stream.
Um personally as a longtime swimmer
myself I can't cannot even fathom the
physical and mental endurance that it
takes to accomplish such an incredible
feat. It's truly something that has um
inspired many many people across the
world, not just in California. Um, as
many people might already know,
Katherine is making this 900 mile swim
not only to do something that has never
been done before in swimming the entire
length of California, but also to bring
awareness to the beauty as well as the
fragility of California's coastal
ecosystems.
As Katherine puts it, this swim is her
love letter to California. And she is
using this incredible feat to bring
awareness to the most critical and
pressing issues facing our coasts right
now, uh, including kelp deforestation,
ship strikes on whales, the reemerging
threat of offshore oil, and so much
more.
Uh Katherine is highlighting the great
work of many coastal conservation
organizations including Save the Waves
um that are providing solutions to these
threats including the Surf Rider
Foundation, Monterey Bay Aquarium, Wild
Coast uh and many others. And we are
just humbled uh that Katherine invited
us and our organization to celebrate her
stop in Santa Cruz, which we are
expecting will be around August 22nd. So
stay tuned for some details. Obviously,
uh the timing has to be a little bit
flexible with the fee that she's
attempting. Um but we would love to
share details with that with um the city
obviously and and the community so they
can attend and and meet Katherine in
person. Um so thank you to council for
recognizing this incredible person and
this achievement and what this signifies
for our precious California coastline.
So thank you so much.
>> Well, thank you and obviously thanks
Mr. Hodgees, while you're here, let me
just also extend our thanks and
appreciation to Save Our Waves. Uh, Save
the Waves. That coalition is very, very
helpful working with all the other ocean
related entities around the Monterey Bay
area. I know that you do that on an
international basis. We really
appreciate that work. It's very very
good and serious and scientifically
based and thank you for all that good
work sir.
>> Thank you. Appreciate it. Mr. Mayor and
I'm actually stepping in for Sean Burns
who is our our local coordinator here in
Santa Cruz and I do a lot of
international work. So I'm uh humbled
and I'll tell Sean uh that you uh
recognize all his great work. So thank
you so much.
>> Thank you sir. All right.
>> Indeed. Indeed. Uh we are on item 10.
This is a mayoral proclamation declaring
June 29th, 2026 as Oliver Tree Day. And
uh we are going to have presentation by
Council Member Bruner.
>> Thank you. I'd like to invite Oliver
Tre's family to come. Please step
forward to the podium who have waited
patiently here today. Thank you so much.
And um we will be presenting a mayoral
proclamation. Oliver Tree Nickel passed
away earlier this year uh unexpectedly
and had great musical and cultural
impact here locally and internationally
and I am honored to present this
proclamation.
Whereas Oliver Tree was born and raised
in Santa Cruz and has often credited the
city's culture, extreme sport, community
and culture and creative spirit as
influences on his work. And whereas
Oliver Tree has achieved international
recognition as a musician, songwriter,
actor, filmmaker, visual artist,
reaching audiences around the world
through his creative projects.
And whereas Oliver Tree's success has
brought positive attention to Santa Cruz
and serves as an inspiration to upcoming
artists and creators. And whereas Oliver
Tree's message to his fans and the world
was, "No matter how strange you look, no
matter how ugly you feel, you are
beautiful."
And whereas Oliver Tre's foundation, Dr.
Oliver Tre's extremely epic art grant
for baby geniuses
will support and foster emerging artists
in music, installation, and performing
arts in perpetuity.
And whereas words that Oliver Tree lived
by, you know, people are coming to judge
you in life. And I find it's much easier
to just be able to take a deep breath,
remind yourself who you are, what you
do, what you stand for, what you live
for. We're constantly changing and
evolving and growing. And if people
don't resonate with you at that moment,
forget them.
And whereas many residents and fans wish
to celebrate Oliver Tre's artistic
contributions and lasting connection to
the Santa Cruz community.
Now therefore, I, Sonia Berner, council
member, city of Santa Cruz, on behalf of
Fred Keelley, mayor of the city of Santa
Cruz and the rest of the city council,
do hereby proclaim June 29th, 2026 as
Oliver Tree Day in the city of Santa
Cruz in recognition of his achievements
and contributions to the arts. Thank
you.
>> Yes. Thank you for putting this award
for Oliver.
>> Yes, sir. Welcome.
>> Yeah. Yeah. So, thank you for um doing
this for Oliver. He's a true local. He
was born in Dominican, went to um with
the Gald Elementary, B40 middle school
and and Harbor for high school. So,
yeah, true creative place to grow up in
Santa Cruz, you know. So, Oliver took
his creativity and you know, traveled
the world. So he got to do a lot of
traveling the last two years. He did 82
countries and he had encroached about
134 countries total in his his travel.
So he was out, you know, checking out
the world and playing music and writing
music the whole time. So very strong
creative. I'm also thankful for the for
Ma to actually get him in Evergreen
Cemetery. So that's really good. We have
a we haven't buried him there. So it's
exciting to have another musician in
that cemetery. So, thank you for
honoring Oliver and he's up there, you
know, really appreciating. He's got a
smile and he's got a joke somewhere for
you.
>> Thank you, sir.
>> Also, he spent much of his youth on his
birthday, June 29th, at the Saturn Cafe.
He loved that place.
We are on oral communication. This would
be the opportunity for anyone who is
with us to address us on a matter under
our jurisdiction. but not on today's
agenda for a period of time of up to two
minutes. In the event that we have folks
here and folks online who want to make
uh comments under all communication,
we'll toggle back and forth uh between
the Mr. Euing. Good afternoon. Welcome.
>> Can I call a port of order before I
start, please?
>> I'm sorry.
>> May I call a point of order before I
start?
>> Please do.
>> Okay. I listened patiently to the five
proclamations, took some notes on them.
Only number six. Did you ask if the
public were to make comments? I would
have loved to have made comments on
number four. That completes my point of
order.
>> Thank you.
>> Yeah. Hello. My name is James Ying
Whitman. It was quite fascinating to you
guys were on vacation. The supervisors
were on vacation. Hopefully you guys are
on vacation.
Um I know when to stand up first.
Apparently there were a lot of people
behind me when I turned around. There
were like 20 people behind me and I said
what I said. I going to probably try to
deliver my shortest corporate feces
sandwich and I started with the yummy
bread and then the other end of the
yummy bread. But I had to leave the
meeting when the second woman brought up
chest feeding.
What are people being taught? It is so
challenging. Having almost completed
four semesters at um Cabrio in 13
different subject areas, I can say that
it's quite confusing. I really could
talk at great length about all of my
professors, but are they captured and
narrow-minded? Oh, it is unfortunate.
Um I don't think I can endure going back
there. It was just too mentally
challenging. Although I really enjoyed
it.
Uh,
so besides that, I started my, it says I
have 2 minutes, but that's impossible.
It'd be nice, though. I started my
corporate feces sandwich with, um, the
only thing that, uh, second grade girls
need to know about boys is that boys
have cooties.
and then um kind of talked about
artificial intelligence is no match for
natural stupidity because I personally
wasn't paying attention to some stuff
and um had traffic begin moving it might
have been a lot different when I was
half my body was underneath a truck on
soel very thankful for that artificial
intelligence is not designed to kill
itself just dumb down the people and
kill people
14 seconds. Besides that, I kind of went
around about the metrocrats. I really
wanted to talk about the World Homicide
Organization. I'll do that later.
Thanks.
>> Thank you, sir. Do we have anyone else
who's with us in chambers wishing to
provide comment under oral
communication? Miss Bush, do we have
anyone online? We'll take the person
online. Good afternoon and welcome to
the city council meeting.
>> Hello. Uh, hey Fred, it's Bradley
Snyder. Hello, council. Welcome back. uh
with the Zoom uh uh image. It's half the
screen. You can kind of see that Scott's
wearing a tie. Um
so I hope everybody had a lot of fun uh
sleepovers and pizza parties and
everything. Summer's great. Exciting
time of the year. Um, this is something
I talked to Corey Aldrich, uh, the new
CEO of the Metro about, and I I I want
to put this past, you know, on this
level at this meeting because I think
it's a really interesting, um,
phenomenon that,
uh, the the the 17 Express bus, which,
um, you know, has a driver pool out of
SCMTD
and, um, you know, is an Amtrak, a VTA,
SCMTD, and Calra uh, coordinated um, uh,
uh route. Uh the one thing that they did
was they designed it about 5 years
before they put in the green line to
South San Jose. And so every time you
take that bus going to San Jose and well
vice versa coming back and you're going
underneath the green line um the so
undoubtedly had um had things happened
in the reverse order uh the line would
have stopped at Hamilton and uh at 880
Hamilton and and there is a light rail
station right there that it passes every
single route and uh so uh that's just
that's just an oversight. Now uh Mr.
Aldrich is new to SEMTD.
Uh, you know, he's he's from, I think,
from the Dakotas is where the originally
where he did his work with a transit
system in in that area of the country.
Uh, but for me, it'd be very exciting uh
if they would uh you know, they could
there's so many uh so many different
organizations involved. Now, uh uh Ryan
Kuny worked under Matt Mayan in San
Jose, and I'm sure he's familiar with uh
Mr. Mayan's interest in bringing BART
into downtown San Jose. I only have four
more seconds. So anyways, thanks for
letting me speak and uh welcome back.
>> Thank you.
It's online. We'll take the next person
online. Good afternoon and welcome.
>> Yes. Thank you. I pledge allegiance to
the flag of the United States of America
and to the republic for which it stands,
one nation under God, indivisible, with
liberty and justice for all. I
especially like the liberty part, the
essence of what America is. With all the
democratic communists trashing American
principles the last 10 years or so, I
think we all need to reaffirm our
American roots and values. You must be
aware of what they, the so-called DSA,
stand for things like abolishing the
Senate presidency, their Supreme Court,
abolishing ICE, borders and prisons,
defunding the Pentagon, mass amnesty for
illegals, and very pro- Hamas. DSA
influencers like Hassan have been
reported to be calling for killing all
capitalists, raping their daughters, or
impoverishing the white middle class,
and endorsing racist DEI principles to
mention a few. Refusing to say the
pledge gives me the idea you don't all
believe in Western American principles.
Uh, Proposition C also leads me to
believe that it's very anti-private
property. The real estate transfer tax
is pure wealth confiscation, offering
nothing in return to those who have
their wealth stolen. Its effect is
people become poorer. You must realize
property taxes normally and should fund
necessary services that everyone can
access. Sales taxes as well as income
taxes tax new wealth creation. They do
not confiscate already taxed wealth uh
which is just an abuse of the democratic
process. Hopefully, Proposition 43 in
November will forever eliminate tax
abuses by city outsider self-interested
nonprofits like Measure C was. I'll bet
when Eden calls, you pick up the phone.
As a sanctuary city status, I would
think you've seen the effects of open
borders in Spain where 50,000 illegals
invaded a small Spanish city in a day.
Now, there's reports of 13 year olds
being raped, various acts of violence.
That's the result. I I sure would like
to see in your uh uh your budget, annual
budget, you have state of the city
stats, and I'd love to know how many
illegals there are and how what the
crime statistics are uh each year as
well as gang activity. Thanks.
>> Thank you. Anyone else on the line?
Okay, anyone else? Last call on oral
communication. We're on presiding
officer announcements. I have none at
this point. statements of
disqualification on these agenda items.
Council member,
>> thank you, mayor. I have to recuse
myself from item number 28. I own
property within 500 ft of the project.
>> Thank you. Any other statements of
disqualification?
Seeing near none, let me ask the city
clerk, do we have any additions or
deletions on our agenda?
>> We do not. No.
>> Okay. Let me see. Uh we are going to now
receive a city attorney's report on our
closed session. Good afternoon, madame
council.
>> Good afternoon, mayor. Uh the council
met in close session today at 1:00 uh to
discuss liability claims. Uh those are
the claims listed on your agenda. Also
to discuss real property negotiations
with its real property negotiator
involving the property at 121 SoCal
Avenue. Council also met with legal
counsel to discuss the existing
litigation. Uh the two matters were the
case James Morrisy versus City of Santa
Cruz and the second one was California
Grocerers Association versus City of
Santa Cruz. And I forgot to mention that
council member Bruner recused herself
from item number two, the real property
item. Thank you.
>> Well, thank you.
Council meeting calendar. Miss Bush,
anything you would like to draw to our
attention?
>> No changes.
>> Very good. Thank you.
We are on the consent agenda. For those
of you that might not be familiar with
it, we will be taking up items 10
through 23 inclusive on one motion. What
I will do is give an opportunity for
council members to pull or comment or
ask a question on them item. I will then
go out to the public uh for a similar uh
opportunity. Let me start on my right
with Council Member Taggero on the
consent agenda.
>> No, thank you, sir.
>> Very good. Council member Bruner,
>> I have a comment question on 17.
Uh, and that is the award
contract for Poets Park playground
improvement project and it looks like
parks and wreck. Um,
>> Mr. Elliot, good afternoon.
>> So, uh, thank you. My my question and
comment uh comment reading through this
park improvement project item and seeing
the attached park playground plans,
reading about the community input and
the colorful um options that are
presented. It looks great. It's ADA
accessible. It's being upgraded in such
a wonderful way. And through all of the
attachments and the agenda report, I
don't know where Poets Park playground
is. And there's no address listed
anywhere. And it says district 4. And
the only thing I could find was
something about Grant Park. And Grant
Park is no. So why is Grant Park listed
in the draft cooperative purchasing
agreement? And where is Poets Park
playground?
Great questions. Thank you very much for
that, Sure.
>> We will be sure to include those details
in future staff reports, but thank you
very much for calling that out. Poets
Park is in Beach Flats, so very close to
Beach Flats Park. It's a small pocket
park, but a a wellused uh beloved uh
pocket park there in Beach Flats. So, we
did community outreach on June 20th and
July 1st, and the community really
shaped uh the vision and chose the uh
the the playground design and park
amenities for that uh park renovation.
So, really good feedback from the
community. Grant Park may have been
mentioned. That was another uh
playground project that we implemented
last year. Uh we cut the ribbon at Grant
Park on that new playground. That was
another example uh of a cooperative
purchase uh agreement uh playground that
we um undertook that project that we
undertook with Ross Recreation on that
one. So there may have been a comparison
in the staff report uh to the
methodology that we used for Grant Park
to fund that capital investment project
uh at that park but different areas uh
Poets Park again being in the Beach
Flats neighborhood.
Thank you,
>> Council Member Nuome. On the consent
agenda,
>> uh thank you, Mayor. I just have a very
quick comment on 16, 17, and 20. Uh all
three of those items deal with
infrastructure investment uh in my
district. Uh one being new playground
equipment at Poets Park and Beach Flats
and enhanced uh roundabout at Pacific
and Beach Street roundabout that will
make it uh more accessible for uh and
safer for the bike community and new
handrails at the civic auditorium. Uh so
just really happy that all three of
these are on our agenda. Want to thank
Director Elliots and Nwen for bringing
them forward and for all their work and
look forward to continue investment in
in my district. Thank you.
>> Thank you sir. Madame vice mayor.
>> None for me. Thank you mayor.
>> Thank you council member.
>> None for me. Thank you.
>> And council member Golder. Very good.
Anyone with us wish to uh comment on the
consent agenda? This would be your
opportunity to do so.
Good afternoon, sir.
>> Hello. This is still James Yuing
Whitman.
>> Want to comment on number 10, the
minutes of the June 23rd meeting. And
then on item number 21, the three trucks
that are being purchased, one for
$550,000.
It's a front loading refuge vehicle, I
believe. And the other two, $700,000 are
street sweepers. Well, I sure hope those
are quality equipment because usually
the city buys really quality equipment
except for the electric stuff. So,
enough on I wish the electric was better
than it seems to be. Uh then on the
minutes, seems like I've got quite a bit
of leeway. I kind of looked through what
was on that previous agenda. than I
listened to several of the six times I
spoke that day. So I could probably talk
about anything.
Um
the making a reference to the violence
against women which I think is really
important to u protect and covet. I
attended a meeting last Wednesday in
this room. There were five women on this
side, one in the audience and then the
police person.
I spoke three times. I was great. I only
spoke briefly. I just was rather nice.
Didn't have to be, but I was. Um, lo and
behold, they had another meeting at 6:30
and they had some of the same
information on there. It's just
interesting how these strategies worked.
Um,
once again, I'm This is a very
interesting shirt. The World Homicide
Organization, I mean, started in 1913
with the Clayton Act.
um it's not what people think it is. You
know, it has a lot to do with the city
and county management system and that
it's controlling and directing the
populations in a certain way, which is
population decline. Now, I could be much
more specific. I took several pages of
notes from a presentation that Dr. David
Martin provided.
I suppose I could read some stuff, but I
meant what I said about population
control.
Um, one of the interesting things about
the Masons, and he definitely is a
Mason, is they like to tell you what
they're doing to see if regular
individuals are actually going to do
something about it. Um,
fascinating how the WH is really run by,
what was it, Renee Sand, who ran Dhaka
concentration camp.
Um, then the first inspector general of
the UN, 1948, 1953, Brock Chisum. You
know, you basically can do anything you
want as as long as it's what we want you
to do. Otherwise, we're going to take
you out or drug you or whatever. So,
we're all kind of in this together. And
it's just fascinating to make
observations of stuff here. That's
enough. Except I found this New Yorker
with Mr. probably Trump drinking.
Hopefully, that's oil and not
adrenochrome. Thanks.
>> Thank you, sir. Anyone else on the
consent agenda?
We have someone online. We'll take the
person online. Good afternoon and
welcome.
>> Hello again. Um it's Bradley Snider. Um
I'm looking at the um
looking at the agenda
and um
one thing that I'm interested
uh on uh it's the sweet uh the street
sweeper uh vehicles uh 21 I want to
mention something about I'm 21 you so
you're buying these uh street sweepers I
just want to recommend I'm kind of
familiar with heavy equipment um in my
family uh growing up they owned a
tractor dealership in the Midwest. So,
uh, one thing I, you know, you notice
about, uh, the climate, and you know,
there's a lot of talk about climate at
this meeting, but you just the
pragmatic, uh, concerns of, uh, central
coastal California is that it doesn't
rain over the summer. And, um, at this
restaurant where I I do a little bit of
helping out, um, uh, you know, they have
an indoor sort of enclosed courtyard and
just washing it with, uh, some, you
know, a little pine salt, just basically
mopping the cement. uh it does wonders
and uh you know I really think the city
of Santa Cruz should consider uh like
pressure washing's great but seems a
little resource intensive but just
simply rinsing the sidewalk during the
summer once a month or twice a month
would do wonders I think for the down
the environment downtown um and so you
know you've got street sweepers but
nothing you know considering that
particular uh you know particular effect
in the summertime where you get all
these stains that just dwell for a long
long time and it's basically just
someone spilled their coffee or
something uh like that. Um
you know the liability claims against
the city I I have to imagine the well
the the the lawsuit you dealt with in
close session about the the grocerers
was about um taxing soda pop and I've
expressed my opinions uh in the past
about that. I don't think it's a fair um
you know uh I don't know you know it
unfairly you know targets people who
just prefer a certain consumer product
that doesn't seem fair to anybody. Um I
wanted to shout out to um Ryder Williams
the the lifeguard who um uh sorry I
forgot during public comment but you
know uh you know congratulations to that
kid for saving a life. You know that's
just uh an amazing example. you know,
anybody should u try to try to do what
he did, you know, if they see someone um
you know, suffering from, you know,
climate the climate effects of the
waves. Uh just kidding. Anyway, thanks
very much. Have a good one.
>> Thank you, Mr. Schneider. Anyone else
online? Matters back before the body,
pleasure of the body. Council member
Trigger moves the consent agenda.
Council member uh we got a second. We
got a second from Council Member Nuome.
Debate or discussion? Seeing and hearing
none, the clerk will call the role.
>> Council members Triggero
>> I.
>> Grer
>> I.
>> Nome
>> I.
>> Holder
>> I.
>> O'Hara
>> I.
>> Vice Mayor Kalentary Johnson
>> I.
>> Mayor Kuy
>> I. Motion passes is awarded. We are on
consent agenda public hearing. There are
two items. We'll be opening the public
hearing on both items 24 and 25.
Let me see if uh members have any
questions or comments on these items.
Let me just ask generally. Any
questions, comments? Members of the
public, this will be your opportunity to
comment. I open the public hearing on
items 24 and 25.
Last call. Do we have anyone online on
items 24 and 25? Seeing none, we will
close the public hearing. The matter is
back before the body. The pleasure of
the body.
>> I'd like to move items 24 and 25.
Council member O'Hara moves and council
member Bruner seconds. Moving items 24
and 25 as recommended after the public
hearing.
Further debate or discussion. Seeing
hearing none, the clerk will call the
role.
>> Council members Tgerero
>> I.
>> Rder
>> I.
>> Newsome
>> I.
>> Holder
>> I.
>> O'Hara
>> I.
>> Vice Mayor Kellory Johnson
>> I.
>> Mayor Keely
>> I. Motion passes and so awarded. We are
on item number 26. This is a California
public employees retirement system
contract amendment. We have materials in
our packet. Miss our very competent
chief people officer, Miss Deleó is
here. Miss Deleó. Good afternoon and
welcome.
>> Thank you, mayor. Good afternoon, mayor
and city council. I'm hoping this is a
quick, easy item, but maybe I should
never start with that. Um, this is a
cleanup to our um Kalpers contract that
entire impacts our entire workforce. Um
since 75 we were not able to exclude
certain temporary conditions of
employment. Um and so we are making sure
that our contract aligns with that state
law. That is the only thing we are
removing. Um the hope with this removal
is to clean us up, get us in alignment,
and make sure that employees who may
have worked um in any of these temporary
positions that are listed, which include
county branch library aids, library
pages, school crossing guards, and
recreation department employees. um in a
temporary nature can now qualify that
time once they retire. Um so um that
would impact our staff once this
ordinance passes. I believe at the
second reading anyone who retired after
that would be able to collect that time
if they had it. And that's all.
>> Thank you, Miss Deleon. Let me see if
there are questions by members. Council
member O'Hara.
>> Thank you, Miss Deleon. I do have a
couple questions and this might be a
reading of the staff report around um
the characterization of kind of cleaning
up that has been kind of confusing to
me. So the staff report clearly explains
the need to remove the existing
contractual exclusions for certain
hourly temporary seasonal part-time
employees. So I get that. But what also
caught my attention is that the actual
motion resolution and ordinance go
further. They also removed the
contractual exclusion for all appointed
members of the boards and commissions.
And there's no data or information in
the staff report that talks about that
being a separate category of exclusion.
And I need to understand that because
that actually caused me to question
that particular aspect of the motion and
what we're trying to achieve with that.
So anyone who had a temporary nature as
an appointed member should still count
and so we don't want that language there
disallowing that service.
>> Are you is that the is that your concern
that it's doing the opposite?
>> Um
what the way I read it is that we're
basically offering potentially CalPER's
retirement to appointed members of the
boards and commissions. No, they would
have to be hired as temps and go over
there's other eligibility requirements.
You have to hit over the 999 hours,
basically a thousand to qualify to be
enrolled into Kalpers. So just because
you're a temp doesn't always mean that
you're going to earn time in Kalpers.
It's usually if you've exceeded that 999
hour limitation.
So we are not giving Kalpers's
retirement straight away to any temps.
There's other eligibility requirements
to meet that.
So, if I'm understanding this correctly,
if there happens to be a temp employee
that moves from temp employee to board
or commission and then is continuing to
acrue hours, those hours would be
potentially
correct because as a temp, all your
hours together count in totality
regardless of the classification itself.
It's a 999 limitation as that
appointment type of temporary. So, you
could be a temp recreation aid for 600
hours, a temp maintenance aid. If you
are paid as a temp doing some sort of I
don't know that we do that with our
boards and commissions. We don't usually
hire them as temporary employees, but if
we did, those collective hours would
count towards that 999. And if they went
over, then we would be enrolling them in
CalPERS.
So sorry, hypothetically, if a temp
employee that was a school crossing
guard or a parks employee become during
that same fiscal year becomes a downtown
commissioner,
>> that time as a downtown commissioner
would be subject to her retirement,
the hours counted towards it would count
towards their 999.
But we don't often there is a council
policy not allowing us to go over the
999 hours. It's extremely limited.
So,
>> okay. Um
I'm This is nebulous for me actually. Um
I think it's very possible that there
could be temp employees that go over 999
by virtue of transitioning from a temp
position to an appointed position. And I
I'm calling into question whether that
isn't our our intention because I don't
feel like we are compensating andor even
tracking hours associated with
commission and board appointments.
Why don't I take this back with my staff
and I know we have if we can still do
the reading today open it up. I know I
have to do a second reading with you all
and I can come back with that perhaps at
our it has to be 20 days apart. So, I
believe it's not the next meeting, but
the following that the second reading
would take place. Would that be
acceptable?
>> I'm happy to get some advice from the
city attorney. And
>> sure, we're kind of back and forth here.
>> My understanding is that uh people on
city boards and commissions are not
paid. They receive an optional stipen.
Is that correct?
>> Correct. Um how exactly that the number
of hours they use factors into the
Kalpers, you know? Maybe you can comment
on that, Miss Deleó.
>> I I understand um council member
O'Hara's concern because it does read
all appointed members of the boards and
commissions semicolon and that doesn't
speak to
>> total hours and so I see why she does
have the question and concern and I
think it's appropriate to for me to get
some final staff check-ins before
approvals the next meeting.
>> That's helpful.
Thank you,
>> Council Member Bruner on this item.
>> That was uh my similar question
regarding all appointed members of
boards and commissions and clarity
around that. So, thank you.
>> Thank you. This will be the opportunity
for anyone who's with us who wishes to
make comment on this item. This will be
your opportunity to do so. In the event
we have folks online, we'll toggle back
and forth. Anyone on this item? We have
anyone online? Matters back before the
body. Pleasure of the body.
>> Thank you, mayor. Um, I am seeking some
advice from the city attorney, Miss Dele
Leon, as to whether we are s whether I
should be suggesting a continuation
or denying the
resolution
and the publication of the first reading
of the ordinance.
I think what Miss Deleon presented, the
option she presented was to go ahead and
pass uh this motion language today and
that if there is a problem um with the
um uh the city commissioners, that sort
of thing, that uh there would be
potentially an another first reading at
the next uh council meeting, but if
everything checks out, then we could do
a second reading uh as appropriate.
Thank you, the mayor. I I'm happy to
move uh staff's recommendation with a
express understanding that we might have
to return with a second first reading.
>> There's a motion second by council
member Bruner. Further debate or
discussion. Seeing hearing none, the
clerk will call the role.
>> Council member Triggera
>> I.
>> Bruner.
>> I.
>> Holder.
>> I. Vice Mayor Keller Johnson
>> I.
>> Mayor Keely
>> I. Motion passes and awarded. We're on
item 27. This is the 2025
2030 city of Santa Cruz local hazard
mitigation plan and climate adaptation
plan and implementation progress report.
We have material in our packet and we
are going to receive a presentation from
Dr. Tiffany Wise West. Good afternoon
and welcome and welcome to you.
>> Good afternoon, mayor and council
members. Uh we're here today to present
to you the uh one-year implementation of
the 2025 to 2030 local hazard mitigation
and climate adaptation plan. I'd like to
introduce Michael Dyer who is our
sustainability and resiliency project
manager too and had substantial work on
this report that you see today in terms
of data collection analysis and um the
report itself. So thank you Michael.
He's here to answer any questions that
um I cannot. So, just to remind you, um
this plan was developed between 2023 and
2025.
It was adopted by city council early
last year, approved by FEMA in spring of
last year, and is the first combined
local hazard mitigation and climate
adaptation plan in the United States to
be approved. So, today um we're going to
give you
>> Say that one more time. slow it down.
>> It's the first combined local hazard
mitigation and climate adaptation plan
to be approved by FEMA in the country.
>> Um so kudos to you all for that. Um
we're going to review uh the plan and
how or not the plan, I'm sorry, the the
governance for how we are ensuring that
this plan is implemented over the next
five years. We're going to share with
you some highlights that are, you know,
very detailed in the report. You have
the community engagement that's uh been
conducted related to the projects in the
plan, some adjacent efforts, some
challenges that we have mostly related
to funding and year 2 implementation
priorities. So, we have a lot here. I'm
not going to read all of it, but um
here's kind of some of the things that I
mentioned already in terms of timing.
This covers 10 different hazards. You
can see everything from erosion, dam
failure. For the first time, extreme
heat is brought into the plan. Um, we
have 27 adopted projects that are in the
plan. And again, the governance was
approved by our department directors in
August of last year. So, thus the one
year. And we had some new annexes to the
plan that were developed since its
adoption, including the multi-hazards
and compound events annex, which really,
you know, acknowledges that these
hazards often don't happen by on their
own. You could have a drought that
exacerbates the need the uh potential
for fire, which then can exacerbate
landfills when you or landfills
landslides when you have a big storm.
Right? So interconnectedness that we
hadn't really explored before as well as
adaptation pathways for non-coastal
hazards. We had already kind of started
our adaptation pathways journey for
coastal hazards where adaptation
pathways is really looking for a signal
to uh implement projects versus kind of
sequencing them on a time frame with
respect to the uncertainty with climate
change doesn't necessarily make sense.
So our first pass at putting adaptation
pathways together uh as well and
importantly having this document makes
us eligible for certain categories of
pre and post hazard mitigation funding
from FEMA of which we take a huge
advantage of. So this keeps us in uh
eligibility for that.
So uh we have completed two projects. Um
we have 22 of the 27 that are in
progress. So, we've started almost all
of them. There are eight new public
works projects and one parks and wreck
project that's not reflected here or in
your report that we are considering
annexing into the plan that are some
high priorities. So, that would be
coming later. It doesn't require going
back to FEMA, but it acknowledges and
brings them in and makes them eligible
for that funding. Um the total portfolio
and this is a working number in nature
because we're still getting our arms
around uh the cost of these projects is
about $654 million for uh the 27
projects. Already we've secured 152
million of that. Um and since uh the
plan has been put in place, we have a
67% grant success rate with the nine
grant apps submitted, which we've really
ramped up over the past couple years.
So, a lot of success there. Um,
including the FEMA brick grant. Uh, so
some highlights. Uh, just to recap the
hazards. Um, and we didn't even include
the June 2026 Lighthouse Point um,
erosion event in our uh, report because
we were drafting it prior to that. But
we are including uh the major storm
damage at the wararf uh the bluff
erosion uh at GCH's which currently uh
relocation of that path is is happening
and funded and then of course the
lighthouse point uh uh erosion event
that happened just in June of this
summer. These are the two projects that
are complete. The water department has
installed a backup generator at their
admin building as well as completed
their utility customer assistance
program um for both single family and
multi- uh family programs as well as a
lot of community engagement conducted
there. Um we have some major projects
that are under construction of which you
are already aware. Murray Street Bridge,
the New Creek Pipeline, aquafer storage
and recovery and of course the warf
resilience improvements.
We also have in addition to construction
some design milestones and funding
milestones uh that have um been
completed for the downtown San Lorenzo
River drainage and pump station number
one project. Um we are in the process of
developing developing a basis of design
report that's what BOD stands for and
design of that pump station. That is the
phase one of a FEMA brick grant which is
building resilience resilient
infrastructure for communities. That was
a grant that had been put on pause by
the Trump administration and has since
started flowing. The second phase of
that project is construction. Um it's
about 10 a little over 10 million. We
early indications are we're we're likely
going to get that funding flowing again.
Also, this is all pending uh some final
confirmation with Caloes, but that is
really good news for us because we
thought all that funding was gone. Uh
Graham Hill Water Treatment Plant uh is
under construction starting in January
of 2027.
Um and then the Lighthouse Field
Westcliff Road relocation that's in
design right now um and uh is expected
to uh be complete by May of 2027.
On the right, you can see of our secured
funding. We have a whole lot of
different uh grants and uh revolving
loan fund uh uh sources that we're
pulling from, including our local
measure Q for the San Lorenzo River
Culvert project that's helping to pay
for the debris broom to get that
performance a little more um maximized
or optimized. Um so again, really
diverse funding uh for these different
projects.
In terms of community engagement, I
think one of our really proud moments
was the uh race the wave tsunami
preparedness run and of course uh race
the flame is being pl uh planned for
this fall. Uh the beach flat Spanish
language focus group we conducted uh in
December of this past year. Big success
continued focus on emergency
preparedness. You heard earlier today
about the neighborhood resilience
workshops and again the one that's being
conducted in the beach flats tomorrow.
And as I mentioned, our fellow will be
sharing with you a little bit later in
the year our work on developing both
municipal and nonprofit community
resilience centers. So those are uh
places that people can go to to say pick
up air purifiers to get into clean air
when there's smoke. Um cooling centers,
but they can also serve as long-term
education hubs or workshops, things like
that. So more to come on community
resilience centers.
Some adjacent efforts that aren't in the
plan itself, but really support um local
hazard mitigation includes uh recently
uh obtaining the tsunami ready
designation. Um the coastal incident
response planning framework update uh
that our emergency operations manager uh
has developed. The wildfire early
warning system. There are contracts for
critical facility fuel, very important.
Um our communications team has launched
an emergency preparedness portal and
we've developed a critical facility
infrastructure list. So very
complimentary to the projects in the
plan itself.
Challenges to implementation. I already
mentioned the brick phase 2 fundings
uncertainty. We're starting to get a
little more certain on that but we'll
we'll know more in a couple months. Um,
we also have had some internal capacity
limitations to undertake some of our
projects. For example, the critical
facility seismic retrofit. With that
said, we're only on year one. Um, we
have the additional projects that we
mentioned that we need to annex in and
find funding for. And for the Brans of
40 flood control project, the, you know,
additional challenge of sequencing that
project with private development that's
occurring in the area. nothing that
can't be um overcome but definite
challenges.
Um I'm not going to read all this but
implement uh year 2 implementation
priorities. We want to advance at least
two major grant applications. We're
working on that right now uh with a
multi-depal team um try to get some of
these other projects started. Um, we
also have the coastal funding and
financing study which is associated with
the shoreline adaptation and management
plan project that council directed um
staff to complete as part of the
Westcliff 5-year roadmap. Um, we have
the um some other coastal projects going
on. Um we also have launching a GIS
hazard and project database and web
portal that we're hoping to have a
public facing uh portion of that in
addition to using it as a tool for
tracking for efficient tracking and then
a lot more with community engagement. Um
you can see I've already mentioned many
things um added capacity workshops and
events.
With that that's my uh presentation for
you. I'm happy to answer any questions
and the staff recommendation is shown um
if you if you are able to uh accept the
report.
>> Dr. Wise West, thank you. Many thanks to
you and your staff uh for this fine
work. Let me see if there are questions
and comments by members. Council member
Bruner,
>> thank you so much. I I really
appreciated reading through the staff
report and the attachments and I just
wanted to say I appreciate the tracker.
Um I love that kind of data and seeing
it in color differentiated columns and
um that was really helpful for me to see
and the prioritization from highest to
high to and so on down the list. So,
thank you so much for all the great work
to everybody involved. Um, thank you.
>> You're welcome. And yes, I should
acknowledge that there is a team of city
staff that meets twice a year on this
and were key to us gathering all this
information citywide.
>> Thank you, Council Member O'Hara.
>> Thank you. And I had an opportunity to
express this directly to Dr. Weise West
um in the hallway earlier. I just want
my colleagues, and I'm sure you know
this, to understand that we are so
normalized to the exemplary work that
this office does, that we can sit and
listen to a presentation like this where
we can see that we are nearly 70% of
awarded grants, hundreds of millions of
dollars of investment, and think that's
business as usual, but it's simply is
not. It is extraordinary.
>> It's extraordinary. It's generational.
It is the most critical work, you know,
that we are doing to ensure that the
infrastructure in our community is here
for the next generation and the many
generations after that. So, I just want
to express my appreciation
um and then just say out loud how
unusual this is. Um, I was just in
Wisconsin last week working with seven
water utilities that have formed in the
90s a water authority. It's the only in
Wisconsin and they have gone through
this process of building a 65 mile 48
inch pipeline to bring Lake Michigan
water to these small communities. And
when I got out there, they sit on top of
the Fox River. And I thought, I asked,
why aren't you using this water source?
It's because the Fox River is completely
polluted. And they are living in a
completely different
world than we are here.
>> And some of that is because of
California legislation. Some of that is
because the city of Santa Cruz has been
at the forefront for years doing this
work. So, thank you, Tiffany. I really
appreciate it. Thanks to staff as well.
Um I'm so proud to be a part of this
work that you are doing and have a
little piece of it.
>> Thank you. Again, just want to mention
this is a testament to all our staff.
I'm just here reporting today
>> for the questions and comments. Let me
see if there's anyone who's with us who
wish to make comment on this item. This
will be your opportunity to do so. Miss
Bush, do we have anyone online?
We will take the person online. Good
afternoon and welcome.
Hello. I I just have a quick question. I
I didn't see any reference to the cost
to the local taxpayers in any of these
projects and I know there is some and
maybe somebody there could ask that
question. Thanks.
>> Thank you, Dr. Wiseworth. On behalf of
Mr. Phillip, I'll be glad to ask the
question.
>> Sure. Absolutely. We don't have that
totaled but what you saw that 152
million is grants. Now in some cases we
have matches that we have to bring with
that which vary in percentage. That's
not something we have totaled. We could
and then the rest is our staff time.
>> I want to say with regard to grants um I
think it's one of those cases where we
think it's somebody else's money. Now,
this is grant that we have paid somehow
in taxes, fees, and exercises of various
kinds and we're getting those back into
the city of Santa Cruz, not like it's
somebody else's money. So, when Mr.
Phillip asks, you know, the taxpayers,
this is getting clawing back some of our
taxpayer money that we paid here back
into our community for these very
beneficial purposes. Let me see if there
are other questions, comments. Anyone
else online, Miss Bush?
No. Last call.
Yes, please. Mr. Yuing, good afternoon,
sir.
>> No, thank you very much. I like being
called Mr. Euing, actually.
>> Uh,
I thought this list of 10 was about the,
you know, the 17 sustainability goals.
I'll just list them. Number seven,
coastal erosion. Two, dam failure. Five,
drought.
Uh, I didn't write clearly. Number nine,
two, extreme heat. 13, flood. Three,
landslide. Nine, sea level. Sea level
rise. Two, tsunami, 10, wildfire.
I guess what I got to say is we are all
in this together. We are all breathing
the same air. And when we have any kind
of disaster,
you know, who's actually looking out and
helping each other? That's a big
question. I uh
it's it's actually a big question. I I
question a lot of things going on in
these rooms and I wish that uh there was
a juror's prudence that was really
helping each and every individual.
I can observe a similarity to my 13
different subject areas at Cabrio.
Fascinating. I loved my professors, but
uh I love all you guys too, but I
disagree with you guys a lot. Um,
so
I just kind of have to wonder about all
this stuff. I'm pretty sure FEMA was
mentioned. I looked in the stuff. I
didn't see it in particular.
Uh, who's in charge of FEMA in this
county now that Carlos Palasios is gone?
You know, my understanding is we've been
in a state of emergency since March 23rd
or March 13, 2020. FEMA's been in
control.
So, back to when any of these
natural processes
happen on planet Earth, Santa Cruz is
not an island unto itself. California
was an island 300 years ago, but that's
was then. Um,
I'm amazed just to be an observation of
this stuff. I was gone for, I thought,
five minutes. You went through three
other items. It's happened before. It's
just okay. Um, so it's just a pleasure
to be here. I'm glad nobody resigned
in any of the office while you guys were
on vacation.
Um, I'll bring stuff up next time. Thank
you so much.
>> Oh, well, thank you so much. All right,
matters back for the body pleasure of
the body. The vice mayor is recognized.
>> Thank you. I'd like to move uh to accept
the local hazard mitigation and climate
adaptation plan year one implementation
progress report. There's a motion. Is
there a second? Council member Newsome.
Debate or discussion? Seeing and hearing
none, the clerk will call the role.
>> Council member Tgera
>> I.
>> Grer
>> I.
>> Newsome
>> I.
>> Holder
>> O'Hara
>> I.
>> Vice Mayor Kalentary Johnson
>> I.
>> And Mayor Keely
>> I. Motion passes and so ordered.
For those of you who've been sitting
waiting patiently, we have arrived. We
are on item number 28. This is 900 High
Street major modification and density
bonus request proposing modifications to
application number CP22-0164.
We have a fair amount of material in our
packet and we have Mr. Bane here to uh
help us move through this.
The record will reflect that council
member Nuome is has recused himself
because he has a conflict in so far as
his residence is within a legally
required limit uh which prohibits him
from being able to participate in this.
Mr. Bane, good afternoon, sir.
>> Good afternoon.
Um what we have before you is a uh major
modification to a previously approved um
application CP220164.
Um that this application included a
minor land division design permit, slope
development permit, density bonus
request, and heritage tree removal
permit. Um the original project site was
a 5.9 acre lot located on the north side
of High Street Mey to the northeast of
its intersection with Moore Street shown
here. Um developed with a church that
was constructed in 1957. So the approved
project scope uh included subdividing
the parcel into two lots. Um the lower
3.7 acre lot retaining the existing
church uh campus and the upper lot to be
approximately 2.23 23 acres for
construction of a 40 unit uh fourstory
residential apartment building. So this
this project was originally approved by
our zoning administrator um and then it
was appealed to planning commission
where the appeal was denied and the
project approved and then it was
appealed to city council um where the
appeal was denied and this uh back in uh
February of 24.
So since that approval, the subject
property has been subdivided as as
approved. Um but no construction has
occurred at the site. Uh the site slopes
upward to the north as you can see here.
Uh it's comprised of mainly open
grasslands and and trees.
So following approval of the original
application, it was determined that the
project was not financially feasible.
Um, in order to make the project
feasible, the applicant has redesigned
the building to be a more efficient
rectangular shape and footprint, uh,
eliminating the wings of the building
that had stepped up the slope, uh,
increased the unit count from 40 to 47,
including a change to the unit mix to
include more co-living units and
studios, and requested additional
concessions and waiverss to decrease
project costs.
So the building shape modified from um a
Vshape with a which is shown on the left
extending up the hillside to a more
basic rectangular shape that is
generally in the same footprint as the
as the previously approved. In essence
they took kind of that wing that
V-shaped wing and placed it on top. Um
basically kind of reducing that
footprint and not stepping up the hill.
Um, with the overall footprint of the
building generally being reduced, the
building's rectangular dimension has
been increased as was the height. Um,
adding an additional floor.
Um, this is the view from from the
north, the uphill side, which can
generally only be seen from the UCSC
residential units that are above. So,
while this new design is a bit more
basic from this vantage point, it
reduces the overall building footprint.
um the general scale of the structure is
reduced as well as the amount of grading
that would be needed um as the building
is not being constructed further into
that hillside.
Um also um being modified is the bedroom
or the unit mix and bedroom count. So um
as is demonstrated in this table here um
the bedroom count has increased from 85
to 107 bedrooms.
Um also u minor change and modification
is um the original project proposed two
ent two entrances to the project. Um so
the proposed project modifies what was
the newly proposed entrance to strictly
just an emergency um uh vehicle access
leaving only the one existing eress
point that's currently there. Also um I
should mention that the previous uh
approval included a condition of
approval that required the transformer
box be placed underground. Um it has
since been determined that the city
cannot require this undergrounding and
therefore that condition has been
stricken.
Um under state density bonus law, the
project qualifies for four incentive
concessions and an unlimited number of
waivers. Um the density bonus request
proposes three concessions and three
waivers um from the development
standards and those are listed here. Uh,
additionally, it should be mentioned
that a new SP330 pre-application
associated with the project was deemed
complete prior to that, prior to this
modification application. Therefore, the
objective design standards for multif
family housing are applicable to this
modification. Um, the project meets 28
of the 31 objective design standards. So
except for those three that were as
modified um by incentives and
concessions and waiverss pursuant to uh
density bonus law.
Um the zoning code zoning code states
that rental residential developments
that create five or more dwellings shall
be provide uh 20% of the dwelling units
as inclusionary units um which shall be
made available for rent to low-income
households at an affordable rent. Um
this calculation is specific to the base
density of the project which in this
case is 23 units. Um so that's requiring
four units. The project is meeting the
minimum number of inclusion units by
providing the four very low-income units
that also qualify the project for the
50% density bonus. Um the zoning code
also states that for developments with
multiple market rate unit types
containing different numbers of bedrooms
uh inclusion inclusionary units shall be
representative of the market rate unit
mix. So the zoning code does allow um
states that for developments with
multiple market rate units um sorry for
compliance with the above mentioned
criteria the applicant is proposing to
use an alternative compliance uh method
available through our zoning code. So
rather than providing uh the affordable
housing in units that are representative
of the unit breakdown, the applicant has
proposed to provide the required four
inclusionary affordable units as all
studio units while providing 10 um
additional affordable bedrooms in the
co-living units.
So in summary, basically the original
approval um project provided four very
lowincome units and five low-income
units for a total of nine. So the
proposed modification uh proposed
project would provide four very
low-income units, four moderate income
units in addition to 10 additional
bedrooms within the co-living units also
being made available to income
qualifying tenants as affordable rates.
And I should mention that inclusion area
is definitely not more forte for forte,
but we do have luckily some very
knowledgeable, smart um folks from our
housing department here that can answer
any questions that may come up regarding
regarding how these were calculated.
So, uh, in conclusion that, um, the
recommendation is that the council make
a motion to adopt a resolution
acknowledging the environmental
determination and approval of the major
modification and density bonus request
proposing modifications to application
CP220164
based on the findings listed in the
draft resolution and the conditions of
approval attached as exhibit A. And I'm
available for any questions.
>> Mr. Bane, thank you very much for the
presentation. Let me see if there are
questions or comments. Council member
O'Hara is recognized.
>> Thank you, Mayor. Um and if um you are
comfortable, mayor, I'd like to have the
floor for several minutes to walk
through several questions.
>> You take such time as you need.
>> Thank you. Um this particular project
was approved um by this council by
denying the appeal during um my election
campaign. And so this is the first time
even though this is in my district I've
had a chance to weigh in on this
project. Um, and as I was considering
how to engage on this project, I wanted
to start with a premise that staff does
an exceptional job in receiving these
development requests,
going through line by line those permits
and the, you know, all of the different
requirements that state density bonus
and all of the other California law
requires. But it is the role of staff to
analyze those conditions and make a
recommendation to this hearing body and
it is our responsibility to work with
the applicant on those findings. And so
I'm going to be walking through a number
of questions of the applicant. So
whomever is responsible for answering
technical questions, thank you for um
coming up to oblige me with that. So,
I'm going to because of that premise
that I'm working off of, I want to
organize my questions a little bit
differently this afternoon and restate a
couple, you know, facts first. Um, we
already Thank you, Mr. Simon. You can
sit for a second. I'm going to go for a
little bit and then I I'll call you up.
Thank you. We already approved for a
40unit project on this site. The propo
the prop proposal before us is now a
material different 47 unit project with
a different building configuration a
different unit mix and an increase from
85 to 107 bedrooms three additional
concessions three waiverss and a
different approach to sat satisfying our
inclusionary housing requirements
and while I understand that state law
significantly constrains some of our
decisions available to us I believe that
as I mentioned staff's role is to
analyze the application and make a
recommend commendation. It is our
responsibility as the decision-making
body um to make the findings that are in
front of us today. So I want I want to
walk through this in a very deliberate
way. First I want to understand directly
from the applicant why the project we
previously approved cannot be built.
Then I want to take each concession and
waiver individually.
what the applicant is asking for and
why, what staff concluded, and what
legal determination council is actually
being asked to make. Finally, I want to
make I want to discuss the proposed
alternative approach to inclusionary
housing separately, and I appreciate
appreciate that we have staff here that
can help with that. All right. So, the
first question to the applicant. The
staff report states that the original
project was approved.
I'm sorry. After the original project
was approved, it was determined that the
project was not financially feasible and
that this redesign was undertaken in
order to make the project feasible. Can
you explain to council directly what
made the project we approved in 2024
financially infeasible?
>> Yeah. and just cut me off or interrupt
here, but I try to be thorough without
being too long. Um, we started and the
the bulk of the design work of that
original project was done in uh mid to
early 2022
and we submitted it as a full
application at the end of 2022.
And
so there's really two categories of
things that that led to the problem. And
also, I just want to say upfront, we
would much I'd much rather be visiting a
construction site right now of the
previously approved project than back
here with you all, although I appreciate
you having me. So, uh, so we just really
wish we could be building that, but the
the, uh, so two categories of things.
First of all, since that, you know, mid
2022 when we're um making that
determination, costs of construction and
development are just way up. And it's
nobody here's fault, but um you know,
tariffs have come on since then.
Interest rates are a couple still two to
three points higher than which has a
massive effect. Um you know, insurance,
etc., etc. And you you expect costs to
go up, but they've gone up. We thought
they'd gone up a ton during the pandemic
and that would probably be it and there
was a lot of predictions interest rates
would actually come down eventually and
here we are. So that's one whole
category of things. The other is um that
we really wanted to go for that design
of stepping up the hill giving
accessible access to the open space up
above and other features that that could
um provide. And
this is a fairly um it's being this
project's really being run on a budget
because our goal and the funding from
nonprofit sources we have for this and
the church's goal is to maximize
affordability in the project and not
just upfront with the numbers you're
seeing, but a lot more than that and on
the long term have more affordability in
the project. And so we do things step by
step and carefully, but it costs a lot
to do all the investigations to know
exactly what it's going to cost to
build. And we still don't know exactly
what it cost to build because you have
to get to building permit really to know
all the details. But you continually
hone in on that. And in this particular
case, a challenging site stepping up
what you don't know. I we don't want to
spend tens of thousands of dollars
really getting a firm estimate on all of
that. uh the construction costs
including the foundation and what's in
the soil going up the hill until we know
what's going to get approved. So, it's a
balancing act where we had a sense of
it, we thought we could pull it off,
then we go through a couple years of
work to get it approved. Meanwhile,
costs are going up, then we go out and
we did more borings in the soil, um and
got contractors to say, "This is how
much concrete you're going to need. This
is what it's going to cost." And both
were problems. the overall cost of the
whole project went up and that came back
more than we had hoped despite having
experience with it. So, um we could have
absorbed potentially one of those things
but not both of them. And so we said,
okay, we got a step back. Um meanwhile,
we did the lot split. You know, getting
it approved was still really important
because you get it approved, we unlocked
additional funding which helped us
figure all this out and advance the
project further. So, that was really
key. And then we're back here.
>> Okay. Um, can you share an order of
magnitude um of this financial gap? Is
it hundreds of thousands of dollars?
>> It's tens of millions of dollars.
>> No, millions of dollars. Not tens of
millions of dollars, you know. Uh, and
so, um, so we just really had to figure
out what's going to fill that gap. And
to some extent then, not going up the
hill is a really big factor and having
some additional units is a really big
factor. and a combination of those
things and a balance in everything we
could come up with is is what we came
to.
>> Okay. Thank you. And um this is a Thank
you. Um this is a question for staff.
Did staff receive or review a financial
proforma or other financial analysis
comparing the approved project with the
project before us today?
>> No.
Um, so,
so if that's the case, when staff
reports, when the staff report states
that the approved project was not
financially feasible, should council
understand that as a representation made
by the applicant rather than an
independent financial determination made
by the city?
That was something that as part of their
modification application, that was a
statement that was made as as part of
the submitt
to us saying that that is the reason for
the modification. And I don't believe
that we're required to uh
have them provide financial um
statements like that. Okay. Maybe for
the city attorney. Am I correct that the
overall financial feasibility is the
applicant's explanation of why this
major modification is being requested,
but proving that the original project is
financially infeasible is not itself the
legal test for granting an individual
density bonus concession.
the applicant does not
um it the analysis is more along the
lines of does the city have grounds to
deny an incentive concession or does the
city have grounds to deny a waiver? And
there are specific
um points in the code about that
specifically to the
assertion that it's financially
infeasible.
We cannot deny a an approval of a
project based on us not having any data
around that that infeasibility.
Correct. So if you if for example if you
were inclined to attempt to deny a
concession for example, you would need
to have a written finding based on
substantial evidence that the concession
or or incentive does not result in
identifiable and actual cost reductions.
>> Okay. Okay. Um I'm going to walk through
each of the concessions. So the first
one is the floatable floating affordable
units. Um, the applicant asked to remove
the requirement that the affordable
housing agreement identify the location
of the inclusionary units and proposes
allowing the affordable designation to
move among units.
>> So, Mr. Simon, let's take that
concession first. What specific problem
are you trying to solve with this
concession? Yeah, I'm trying to um make
things flexible and make it easy for us
to change which units are the affordable
units, which does uh multiple things.
One is it can minimize our vacancy time
and turnover if we know, you know, a lot
of times you get a 30-day notice or even
longer for someone who's going to move
out. If we have another unit, it takes a
little bit longer. there's more process
with
um getting a process to get a new tenant
who qualifies for an affordable unit
um and income validating that and going
through the housing authority and other
things. And so there will be situations
where we can get a head start and have a
different unit uh and get that person
in. And when the first unit that was
affordable comes up, you'd have a little
overlap first, then that one can be open
market and we can lease it up faster.
One of the things we're really trying to
do here is you usually get subsidized
all affordable projects or you get
forprofit profit maximizing projects and
we're neither and we're trying to have
more affordability without having any
public subsidy. there's not a public
dollar in this in the subsidy sense. And
so we're trying to make the most
flexibility and the minimum overhead
while complying with everything. And the
other the other thing I want to say is
that the church has strong interest in
this project being more affordable over
time as it can afford to do so. So we
got to pay back everybody who's putting
money in to build this. But as that
financial situation of the project
approves, more affordability is one of
the key goals and in contracts we have
with the church. And so we would really
like to have a two or threebedroom unit
eventually that's an affordable unit,
for example. And we're just trying to
not have a whole bunch of recorded
agreements with the city. We got to go
and change and get the city manager to
sign and notoriize and go to the county
and get them to file it before we can
just say, "Oh, now instead of a studio,
we're ready to have a two-bedroom as an
affordable unit.
Okay. Um,
did you quantify an expected cost
savings associated with this concession?
>> No, we just know that there is cost
savings with it. Obviously, it's
something we could take time to do, but
with everything, we didn't run and try
to estimate a number on it.
>> So, let me make sure I understand this.
So, the concession doesn't necessarily
isn't necessarily d been driven by cost
savings. It's uh allowing flexibility on
behalf of the
>> it's it's both and I was trying to
emphasize both things both aspects.
We're really trying to find every way
because this you hear a lot about
projects penciling. This project doesn't
pencil in the usual sense and was never
designed to. We're getting funding
sources that won't get a market rate
investment return to fund this project.
So we're trying to make it as absolutely
efficient and yes efficient to do what
partly what the project's designed to do
which is also about maximize
affordability. Yeah, I get that. I guess
I'm drawing back to the financial
infeasibility and if there isn't any
specific cost savings associated with
this concession,
>> there is cost savings. We didn't run the
number. We look at how do we use some
concessions to improve cost? And on this
particular one, I don't have a number.
Yeah.
>> Okay. Um for staff, if a council
approves this concession, what prevents
an affordable unit from being replaced
by a materially smaller unit or a unit
with fewer bedrooms?
Good afternoon, Mr. Butler.
>> Thank you, Mayor, and thanks for that
question, Council Member O'Hara. The
affordable housing development agreement
will specify the minimum number of uh
bedrooms. And so we would have for
example um that while those units aren't
identified specifically, we would say at
a minimum four studios at very low
income and at a minimum four studios at
moderate and at a minimum as the
applicant has agreed to 10 bedrooms in
the co-living spaces as moderate with
the other stipulations associated with
those um those bedrooms.
Okay,
>> excuse me. That that uh the bedrooms are
low income, not moderate. Sorry about
that.
>> Thank you. Okay, I'm going to move on to
uh concession two, the streamlined
tenant selection. The applicant asked to
make city marketing of a vacant
affordable unit optional at the property
manager's discretion based on the
assertion reduced reduction in property
management time and expense.
Um, on concession two, are you asking
the city to make city marketing of
available afford affordable units
optional? What specifically is the cost
associated with the city's posting or
marketing of an available affordable
unit?
>> It's the management time. And here
again, you know, you know that
affordable unit projects are much more
expensive than open market projects. And
we're trying to hit the sweet spot here.
And so we have to convince lenders that
we've got a management model that can
work with similar to there's no question
there's more management time on co-l
livingiving yes but on the deed
restricted affordable units that we can
manage them you know in a way that our
cost models make sense and that affects
how much we can borrow you know for the
project. So in this case, if we we
anticipate we are always going to have a
lot of folks interested in these
affordable units and if somebody
contacts us, we'll put them on our list
and we'll get back out to them, you
know, etc. But having uh and we want to
be right on top of like I kind of said
pre loading if we know a unit's coming
available we want to get going on income
qualifying someone getting them in there
and by the time we send the form to the
city the city gets it up on things and
people then people see it and then they
contact us. I think we're just going to
get hundreds and I mean we know we do.
Affordable projects get a thousand
people applying for every unit and then
we got to tell all those people we
already got somebody and I just want to
make it more efficient than that. If we
need to market it, we're coming to the
city to help do that. I just don't I
think that just takes a lot of extra
time for the modest number of units
here.
>> Thank you. Um this is for staff. What
public purpose does the city's existing
marketing requirements serve? And is the
intention to provide broader and more
equitable public access to scarce,
affordable units?
I look to our
yeah,
our housing department to maybe answer
that since they're the ones who
implement this mostly.
>> Thanks, Jessica.
>> Good afternoon.
Good afternoon. Jessica Duet, housing
manager at the city. Um, it would
provide another option for uh folks to
be able to see that unit online is
available or coming coming up for lease.
If the developer owner already has a
wait list of a thousand that they're
going through, um,
the chances of, you know what I mean?
It's a long process. So, it's one other
option. Is it
the only option, no. Um, we do have 100%
affordable projects in the city where
they have this long waiting list and
some of them are are are going years
before they want to come back and post
with the city. So, I I I don't think
it's going to be a if the operator is
saying it's a big issue, then we can we
we can work with it. But typically, yes,
we would like to post on our city
website.
>> Thank you. Okay. I uh Yes,
>> Mr. Bmore.
>> Thank you. Um I was just going to add as
it relates to this that um we um we can
um post those online, but the the costs
associated with it that the developer
has indicated um would qualify for that
incentive concession. Um and um
I think uh one of the things that we
want to um convey here is that um to the
points and the questions that you've
been asking the the burden of proof
falls on the city for establishing that
these things do not um do not create uh
a cost savings for the applicant. So, I
just wanted to to point that out in
terms of like where the law falls um on
the the burden of proof.
>> Thank you. Thank you, Mr. Butler. Okay.
I'd like to move on to concession three,
the vinyl windows. The third concession
is permission to use vinyl windows
rather than the materials otherwise
required by our objective design
standards. Do you can you share the
approximate cost difference between the
compliant windows and the vinyl windows
if you want to use if that's the option
you would like to use?
Yeah, certainly at least tens of
thousands of dollars, but I don't have a
quote yet on the window package for
this. We'll do that during the building
uh permit phase. But, you know, it's
something we consider carefully and
honestly, if we can come through uh
the detailed design process and come pay
for other types of windows, we may do
that. but would really like the option.
Um, and particularly thought about that
because this isn't a street facing
facade. I just add the church cares a
lot about the aesthetics of this project
because that's what it's facing is
really the church rather than a street.
And so, you know, we will have to work
together to find um a great look that
we're all happy with there.
>> Just to make sure I understand Stan, for
the entire project, it's in the tens of
thousands of dollars potentially
>> at least. Yeah. Yeah. Okay. Um I think
I'll move on to waiver
um am I already on waiver five? Hold on.
Uh nope. Sorry I went too far forward.
Sorry, my apologies. Now I'm all over
the place here. Okay. All right. Waiver
five is the heights. The project seek
seeks a waiver from R1 height standard
of two and a half stories 30 feet to
construct to a proposed fivetory
building. Um
for the height waiver, what specifically
happens to the project if the 30 foot
height standard is applied? How many res
residential units will actually be lost?
Have you modeled a development that
complies with the 30-oot height limit?
If so, how many units can the building
accommodate? I'd like to have a better
understanding of how we ended up with
the additional height in terms of
objective changes in units etc.
>> Yeah, I mean it's a little under 60% of
the units because you got lobby and like
and it's yeah it might it's probably
about half of the units are in the
bottom three out of five floors
and um because of all the other spaces
that need to be in the first floor. And
we
um yeah, we we've been working on this
project for 10 years and we originally
and had community meetings around
projects with town houses and projects
with forplexes up on the top level all
kind just looked at everything and and
every way we were getting getting
blocked by the expense of trying to do
different things. So, a compact building
where you have enough scale you can pay
for all the improvements needed to be
made on the property and pay for the
construction and the foundation. Um,
that's what we've come to is what we
believe we can accomplish. Like I said,
it didn't meet all the financial
feasibility metrics that a normal
for-profit project would, but we believe
we can get there. I would like to say, I
don't think it was entirely clear
before, that while the tallest part of
the building that's occupied before was
four stories, there were six levels
because of the way it stepped up the
hill. So, we've taken two levels off of
the step up and put them on one level
down below
for what that's worth.
>> Okay. Thank you. Um for staff, did staff
perform indep uh independent evaluation
uh with regard to applying the height st
with regard regard to whether applying
the height standard would physically
preclude construction of the density
permitted under I'm sorry construction
of the density permitted under state
density bonus law.
>> Yes. Um we looked at that and obviously
they wouldn't be able to add those
additional density bonus units without
allowing for going over the height.
that's um currently there on a for the
R110 zone district.
>> Okay, thank you. Um on to the next
waiver, front setback. The pro project
seeks to reduce the required 25 foot
front setback to approximately 7 ft
for the setback waiver. What
specifically happens if you comply with
a 25 foot setback?
>> Yeah, there's Well, first of all, I want
to say really,
yeah, there's only enough room just for
the building right there as it is. So if
you move the building back, you're
moving it into the steep hillside and
then we've got, you know, could be a
million dollars of retaining wall, you
know, that you've got behind the
building if you really scoot it back a
lot. But that's kind of an artificial
point because really we drew the new
property line that we're setting back
from that's not down at the street. It's
way up behind the church. And we could
have drawn that property line 25 ft in
front of the building. just would have
been in the middle of a parking lot
which just wasn't really a sensible
place as we're having easement
agreements with the church. It just made
a for ingress and egress and parking
sharing and all those things. It made a
lot more sense to draw the property line
mostly straight across the property
keeping in mind where the road is and
the buildings are and have it be kind of
at the edge of the parking lot between
that and the building. So, it's this
invisible property line that no one up
there will kind of know where it is
because parking is is shared on the
church property and stuff. That's what's
within much, you know, 7 ft of the
building
>> rather than a street or anything like
that.
>> Okay. So, if if I'm hearing this
correctly, we're not talking about a
trade-off between building footprint and
residential unit units not being
feasible. more of you established a
property line and the construction of
the building that is feasibly a
financially feasible has to be or it's
preferred for it to be within 77 foot
setback rather than a 25 foot.
>> Yeah. I mean the property line now
already exists. So that was approved
before by city council. We did it. We
separated the two lots and that's been
recorded. So that that is done. So now
in this situation with the property line
where it was approved to be
with this building, yeah, we can't
feasibly
fit it
more than 7 ft back from where that
property line now is. I was just kind of
explaining more how we
>> without carving into the
>> carving into the very steep hillside.
Yeah.
>> Okay. All right. Let's move on to waiver
three, building modulation. The staff
report says additional modulation on the
north elevation would potentially reduce
or eliminate residential units. Key word
potentially. To the applicant, I want to
spend a little bit more time on the
building modulation waiver
and this question of potentially. Can
you explain exactly how compliance with
the standard physically precludes the
construction of the permitted density?
Yeah, it would
reduce the number of units because we
have kind were just talking about a very
narrow corridor between the slope and
then the parking lot which is also down
a slight level from the bench on which
we're building this hope to build this
building or trying to permit this
building. So there's a narrow corridor.
So, um, you can't modulate the building
out more. You'd have to modulate it in
and cut into the square footage. And
these are modest size units meant to not
be too expensive. And so, you would have
to cut out at least some units
to make, you know, what was a whole
studio could only be a bedroom on
another unit now if you've cut into it,
right? So, and we felt that okay, we
want to make um architectural
um architecturally interesting thing and
landscaping etc. on the front of the
building because that's facing the
church, facing where people circulate
through, go to preschool, all that
stuff. Um the back is really facing the
the vast majority of the back is facing
the
uh slope and there is there are houses
up above set back quite a ways much
further now that we've consolidated the
building to the lower point. They're
really looking downhill. Even that open
space above is is sloped. They're
looking downhill at the top part of this
building. So, we just didn't feel like
this is very different than
the buildings um you know on streets
that everybody's going by. And I felt
like I feel like it's a good example of
like the objective design standards make
sense. Our original plan wasn't subject
to the objective design standards, but
when we're going back for a
modification, we tried to incorporate uh
as many as we could. And here figuring
out some really expensive way in the
back to do it where hardly anyone sees
much of it at all didn't seem like the
place to invest our dollars in trying to
comply with objective standards that we
weren't originally and figure everything
else out.
>> Okay. Um do you have a sense of how how
much floor area would be removed if you
met the objective design standards on
the back for module? You'd have to look
back at the new at yeah it's a
calculation with the length of the
building and I you know how many feet
you set in and all that but it'd be a
few units I think probably
like you could take a couple studios at
least out of each floor maybe something
like that so it's a substantial amount
>> okay thank you and for staff the
statutory standard before us is physical
proclusion but the staff report uses the
word potentially reduce or eliminate
residential units what Evans evidence
allows council to move from potentially
to a finding that the standard actually
physically precludes the permitted
project.
Uh I think the applicant explained it
fairly well and my understanding of
density bonus law is that you know
there's a pretty fine line where if
there's anything any any standard
objective standard or requirement that
reduces the size of a unit or of the
project that a waiver would need to be
um granted is my understanding of it. So
>> good afternoon council members. Alex Gis
with the city attorney's office and to
kind of expound on what Ryan was Ryan
was saying, courts have interpreted the
language related to waiverss under the
density bonus law to mean that the
objective standard can't physically
preclude the project as designed. So it
doesn't necessarily mean that they
couldn't redesign a project that meets
the objective standards. We have to
evaluate what the project as proposed is
and whether any objective standards
would physically preclude that project.
>> Okay. And maybe this is for you as well.
Um is a conclusion that compliant
compliance would potentially reduce
units sufficient for council to find
physical proclusion or does the record
need to establish more specifically that
compliance would actually prevent
construction of the permitted density?
The council doesn't need more than what
the applicant has stated. The only time
the the burden is on us if if we were to
deny a waiver, but as far as accepting a
waiver goes, there's no evidentiary
minimum.
>> Okay, that's helpful. Okay, let's move
on to the inclusionary housing um and
exactly what we're approving. The
proposed conditions require for very
lowincome studios in perpetuity, four
moderate income studios for 55 years and
10 lowincome co-living bedrooms in
perpetuity. I want to uh treat this
question of inclusionary housing
proposal separately. And I want to
acknowledge that the proposal before us
includes more than the four very
lowincome studios. Condition 35 also
includes four moderate income studios
and 10 low-income bedroom uh bedrooms
with within the co-living units. But
those 10 bedrooms are a part of an
alternative compliance method and
council is being asked to affirmatively
propose that I'm sorry affirmatively
approve that alternative. So I want to
understand precisely how that will work.
First, for the applicant, will each of
the 50 co-living bedrooms be rented
individually or to to an individual
tenant?
>> Yes, rented individually to an
individual tenant.
>> Will each tenant have an individual
lease for a specific bedroom?
>> Will a tenant be financially responsible
only for the tenants's bedroom teny or
could that tenant have financial
responsibility for other residents of a
larger five or sixbedroom unit?
>> No.
For the 10 affordable bedrooms, are 10
specific physical bedrooms permanently
uh designated as affordable or will the
affordable designation float among the
50 co-living bedrooms?
>> Yes, it'll float.
>> If they float, what is the mechanism
that guarantees there is always 10
affordable bedrooms available or
occupied by qualifying low-income
tenants? It's same exact mechanisms as
any of the other apartments that are
designated affordable. It's in a
contract with the city that has
compliance requirements, reporting
requirements, uh, you know, turning in
or third party verification of income
qualification of the tenant. The leases
are available, you know, for the city or
housing authority. All of those
requirements are in the agreement that
is recorded agreement on the property,
you know, recorded at the county. So, in
that respect, as I understand your
question, there's no difference at all
between how one of these bedrooms is um
handled for compliance as a studio
apartment or someday some other
apartment.
>> Okay. As a followup to that, um,
understanding that's kind of the inverse
of what you just described, could an
affordable bedroom become market rate
before a replacement affordable bedroom
is identified and a available?
>> No.
>> Okay. Who monitors that and how often?
I don't have that in front of me far as
far as the city is concerned, but I
suspect we'll have um in the affordable
housing agreements
if a bedroom that is affordable. That's
where we went back and forth with the
city where I was trying to
lower the administrative burden but
still have all the compliance. And what
we came to is that we're still required
to submit a form to the city every time
there's a vacancy
with an affordable unit which would
include one of these affordable
bedrooms. So we're not skipping that
step. It's just the marketing of it that
is optional. But we have to do that
whenever there's a a vacancy and so then
the city's aware of that and we're
reporting on everything.
>> Thank you and thank you for the um
answering these questions. This is this
is a new frontier for us. We have not
considered this type of mix of
inclusionary. So I want to get through
the rest of this. So this questions
these questions are about what
affordable rent means for these
co-living bedrooms. You propose that
these bedrooms to be rented at no more
than 30% of 80% AMI for a single
individual. Is that the tenants's total
housing costs or just the base bedroom
rent?
>> That's total housing costs and it
includes in all these affordable units
you include utility allowance. So if the
owner of the property management isn't
paying for all utilities, if tenants are
responsible for some utilities, then
that amount the rent amount is reduced
by an amount to make sure that the rent
plus utilities is affordable. That's
housing authority has schedules for all
of that etc.
>> Okay. Are there any required amenity,
common area, cleaning, furnishing,
service or administrative fees in
addition to the bedroom rent?
>> No. Now that all this said, we don't
have a full management plan yet. We
don't have the property management, but
no, there's not intended to be the one
thing to make sure I don't misspe here
is that parking will be charged for
we're trying to create a lowcar
uh footprint project here, not no cars,
but low cars. And both parking spaces
will be an additional charge and use of
shared vehicles which we will have some
shared vehicles so people can live
without their own vehicle um and just
occasionally use a shared vehicle that
would be that could be separate amount
as well.
>> Okay. And maybe this is to staff and I
think this is a followup if I'm tracking
this right. If a tenant is required to
pay additional feels fees for parking,
for instance, um could that cause the
tenants's total mandatory housing
expense to exceed the affordability cap?
>> It it could exceed the amount I
proposing because that would be the
parking would be on top, but the amount
I'm proposing is well under the amount
that the Santa Cruz inclusionary
ordinance um actually calculates. So,
we're we're proposing 30% of the
low-inccome limit rather than 35% which
is the city's rent cap and for studios
for a single individual. And so, um but
parking also is an optional amenity. So,
it's not required to rent a parking
spot.
>> Get that. Um thank you. Um and this is
I'm try I'm trying to track here. So to
staff, I believe, can we make it
explicit in the agreement so that an
affordable bedroom cannot have a
compliantbased rent but additional
mandatory charges or even not mandatory
charges but charges associated with fees
with parking etc that effectively exceed
the affordability limit. Should we be
considering having an agreement where
that is explicit to not be a burden on
the tenants?
might ask for some assistance from our
housing folks since those are the ones
that uh write and implement the uh
housing agreement.
I'm looking through the um the code here
and looking for the specific um
provision here, but my understanding is
that um the items that the applicant
Sibly Simon referenced in terms of
utility costs and any um mandatory fees
as you alluded to for cleaning fees and
so forth, those would all need to be
deducted in order to make deducted from
the rent in order to um not exceed that
cap. But I am not aware of anything in
our code as it relates to parking. And
so our code does not require that
parking fees as far as I'm aware. I'm
looking to Jessica for confirmation
because I haven't found the exact code
section.
>> Yeah, the we follow the housing
authorities utility allowance schedule
and that does not include parking as a
necessary
housing cost.
>> Okay. Thank you.
Um, I have other questions with regard
to this inclusionary
mix based on these five and sixbedroom
units and the and the bedrooms being the
inclusionary units that we are using to
calculate that meeting that threshold.
Um, and I'm going to go through a couple
of these quietly and then I'm going to
decide whether I'm going to ask them
because I think some of these are maybe
not necessarily helpful. Um,
I guess what I want to say before I get
to the my some of my closing questions
is that I asked staff yesterday whether
there was any local precedent for using
this inclusionary mix, specifically
these bedroom u the bedroom
calculations.
Um, and staff did share that and I think
it's a project that was considered maybe
even approved but not didn't move
forward. an assisted living facility
that used a similar methodology.
And I kind of came back with that
yesterday and did a Google search to see
in California if this is happening at
all. And it is, but it's happening
predominantly or maybe even exclusively
with permanent supportive housing or
programs that have supportive care
associated with the housing development.
not just a five or sixbedroom unit of
which five or six people are going to be
renting individual rooms and clustering
in in that housing
plan um without any supportive services
associated with it. I'm not suggesting
that I understand whether that's the
plan or not the plan. I actually don't
know. It just is occurring to me and
maybe Mr. Simon, you have an answer to
that that we need to be thinking very
carefully about whether this is the
right way for us to manage this
inclusionary request if we are setting
precedent for this type of model without
supportive services associated.
>> Yeah. the um this is not a project whose
goal is to house
folks who really need supportive
services in general. Not that someone in
here couldn't be tied to some services
separately, but this is not a supportive
housing um project. And there are
housing projects have certainly been a
number around the Bay Area. um years ago
a number of us from the church went and
visited uh multiple of them uh Oakland,
Berkeley etc. where uh really where this
where we got this model um where you can
get a sense of cultivate a sense of
community
um with a certain number of bedrooms and
large amounts of uh shared space with
those. And it is meant to be a um you
know the place this is happening all the
time ad hawk is in houses in the west
side of Santa Cruz right with university
students or young professionals or I
know teachers who are in group houses
like that right and we'd like to see
more of those houses with families and
have great housing options that are like
that for you know folks at that stage of
life and so um so we're trying to
purpose build that and it is true like
not all the rules were set up with that
in mind. And so we're trying to respect
the rules and the spirit of the rules
and figure out, you know, how to do
this, but it's not a supportive housing
project in that sense in the way some
congregate housing uh projects have been
in the past. So then once we're doing
that and we're say look, there's huge
demand in Santa Cruz for this kind of
housing and it's taken up a lot of our
houses like can we have some of it here
and some of these will be students and
some of them won't be students and you
know, etc. and can we manage that? And
it does take more management time. So
when you say there's not I I take your
supportive services to mean the kind of
things with permanent supportive
housing, but there is extra management
time that goes into this and um to
managing co-housing. But in any case, um
then okay, we've got a different type of
unit than we're typically contemplating
in projects and we'd like to prove this
can work really well. And so then we're
trying to figure out how do we do the
inclusionary ordinance and we looked at
it not well you know I think you
probably read the materials so there's
the inclusionary and spec number of
units then there's we looked at number
of bedrooms and that got us to seven
bedrooms need to in the co- livingiving
need to be affordable to comply with the
total number in there but then you know
talking to staff we thought we should
also look at it in terms of number of
people who are being served in
affordable housing. And when we did that
calculation, it came up with 10
bedrooms. So, we took the most um you
know, we wanted to look at it different
ways since it's a non-conventional
situation for the inclusionary ordinance
and we took the biggest number that came
out of each of those ways.
>> Okay. Thank you. Thank you. Um this is
these questions are for the city
attorney's office. So, I want to end by
making the legal distinctions very clear
for council and the public. For the
three density bonus concessions, what
exactly is council's legal test for
approval or denial?
>> Yes. To deny a concession, the council
would need need to make a written
finding based on substantial evidence
that the concession or incentive does
not result in identifiable cost
reductions.
>> Okay. And for the three waivers, what
exactly is council's legal standard?
>> Uh at that point, uh the council would
need to show that um the waiver does not
have the effect of physically precluding
construction. Um and there's also
another option to show that it and again
it would be the city's burden to show a
specific adverse impact upon health or
safety related to the waiver.
>> Okay. And then for the inclusionary
alternative compliance proposal, what
exactly is council's legal standard?
>> It's a good question. Alex, do you want
to step in on that one?
>> Yes. So, in order to approve the
alternate alternative compliance method,
council essentially has to make four
findings based on substantial evidence.
One, that the proposed alternative
method of compliance is consistent with
the city's general plan and all of its
elements. Two, that the proposal
conforms to the standards established by
for inclusionary units unless the
alternative method does not require
compliance with that section, which is a
little circular.
And then the final two
are that the alternative compliance
meant compliance option will provide as
many or more affordable units at the
same or lower income levels and two that
financing has been committed to ensure
that the affordable units will be
constructed.
>> Okay. Um and for Mr. Butler, I think,
um, do we have the discretion and
authority as council to deny the
proposed alternative path for compliance
with our inclusionary housing ordinance?
>> So, thanks for that question, Council
Member O'Hara. We have articulated in
the staff report why we believe those
findings can be made, the findings that
um were just alluded to by our city
attorney, Alex. And um the council would
have discretion to uh deny that
component of the the project, the
alternative inclusionary request, if you
could um uh identify one of those
findings that um is inconsider or can't
be met. Um and so um if that is the will
of the council, we could advise related
to that.
>> Okay. Thank you. Um thank you, Mr.
Simon, for taking the time to walk
through this. As I mentioned at the
beginning of my comments, and thank you
to council for for taking the the time
to allow for me to walk through this. Um
I really want these conversations to
change with regard to these development
projects. Um, I've been in a few of
these conversations during my tenure on
council. We are so limited in terms of
our discretion to um help shepherd the
look and feel of these development
projects. We lean so heavily on the
ethics and the intentions and the
principles of these developers. Um I
think it's important for us to have this
conversation directly with the
developers in terms of what they are
trying to achieve
what each and every concession and
waiver is yielding in terms of benefit
not only for the development and their
bottom line but for this community. Um,
I think I lean to much more on the side
of the scale in terms of the benefit for
the community and obviously having
additional beds, sorry, additional
units, maybe that's a whole unit, maybe
that's a bedroom is very important. But
I also want to ensure that my role in
this body that is making these findings
and I I heard the four findings that
we're supposed to be making for the
inclusionary
um provision. I have no idea if we've
met the threshold of those four
findings. There's no evidence in the
staff report. Hold on, Mr. Butler. Thank
you. There's no evidence in the staff
report that suggests that we have met
all of those findings. Um, and so for
me, it's I'm I'm very tenuous in in
allowing any in in letting go of any
discretion that we have as a council.
Well, I think we should be up here
working hard to have these projects
built in our community. We need the
housing. If we are
essentially rubber stamping
um
a an interpretation and albeit a fine,
valuable, important interpretation of
staff that this meets the threshold. we
are not doing a service to this
community, period. And so it's important
to have this conversation. It's
important to take the time to have this
conversation. I think it's going to be
very important moving forward as we
manage these incredibly challenging
dynamics of building more housing in a
community that is feeling so much
complicated feelings about what these
development projects look like to take
some time to do this. It's very
important to do this. Um, and so I do
have a motion once we finish with the
rest of council's considerations and the
public. Um, and I appreciate mayor the
the grace for allowing me to walk
through this.
>> Of course. Of course. Let make sure that
Mr. Butler, did you have something you
would like to say?
>> I I do. Thank you for for that
opportunity, mayor. Um, I just wanted to
convey to council member O'Hara, uh, the
the descriptions of how the project
meets those inclusionary standards are
found in the resolution. So, they're not
articulated in the staff report, but the
resolution has each of those findings.
And we believe that that um actually
provides more affordable housing because
it it does provide more affordable
housing in terms of the number of
bedrooms than we would get if we
strictly applied the inclusionary
ordinance. and that's why we were
supportive of that uh negotiation and
the approach that we ultimately landed
on with the applicant there.
>> Thank you, Mr. P. Let me reset for folks
where we are right now. Where we are is
we are still asking questions and making
comments as members. What we will do
next is go out to the public. Uh we will
get your responses, your testimony,
whatever you wish to do. Matter will be
back before the body. There will be a
motion. We'll debate and discuss and
vote on one or more motions that may
come along. The vice mayor is
recognized.
>> Thank you. Um, thank you for the
questions, Council Member O'Hara. You
touched on I think all the ones I had,
but a few I I Well, it's questions and
comments. Um, I want to ask about the
geological feasibility study that was
done in the first iteration of the
project. Um, we have not completed a
second one in this new iteration. That
correct? I don't know who would answer
that.
>> Yeah, the study was about the geology of
the whole property. So, there's not
that from a geology study as opposed to
geotechnical, but geology study um
there's nothing about the project making
this adjustment that changes that. So
then then perhaps it's the geotechnical
that that I'm that I want to ask about
because the footprint of the the project
has changed. There's more height.
There's more massing. So more impact on
on the land. So has there been another
study? Is there plans to do another
study? And then legally where um where
is the city in terms of what's required?
>> We had really studied quite a lot before
on this whole area. So this this was a
where the building is currently proposed
a subset of that but pretty much the
whole length of that you know just a
little bit less width was a part of the
previous proposed building. And so in
this whole shelf including everywhere
we're proposing to build now we had
investigated and
had um so determined the soil types and
therefore the information needed um to
very approximately design a foundation.
But then when we get this entitlement
approval, if this is moving forward,
then we need to unlock the next stage of
funding and we have to have a structural
engineer
>> and our geotechnical engineer do more
work and then that's when at a building
permit we come back. So, and they'll
say, "Oh, you know, everything involved
with earthquakes and soil types, you
know, you need to build a mat slab or
you can have a conventional, well, we
anticipate we probably can have a
conventional foundation, but we have to
over excavate and put new engineered
soil in. But that determination is not
made yet." And that h a lot more that
happens at the uh building permit stage
with more work. I think what this study
tells us is that it's feasible to build
a building there. Not perfectly. what
kind of foundation yet?
>> Thank you. Um, and then this is
this is maybe a comment for our city
attorney in terms of the incentive
concession too. Um, you option for
streamline tenant selection. Um,
could we be risking the unintended
consequence of having
by taking ourselves out of the equation,
having the outreach be inequitable and
prot and possibly discriminatory towards
um the community at large? I mean, when
we do our outreach, we do wide outreach.
This may narrow our outreach. So, what
are the unintended consequences or risks
associated? I don't know if that's
question for you or for city staff.
>> I mean, I suppose that's it's possible
that it would limit the outreach, but uh
not in a way that's legally um
meaningful or subjects the city to legal
risk.
>> The other thing I would add there is
that the project is still going to be
required to adhere to the city's local
preference standards. And so um they
would have to adhere to um all fair
housing standards. And if if they found
for example that the outreach that they
are doing was not um meeting any fair
housing standards they they would need
to adjust accordingly.
>> We do have a different reach than
perhaps the partners of this project.
And I would I would guess a pretty broad
reach for when we do our outreach for um
affordable housing.
>> That's correct. I mean when we if we
post it on the website there there may
be um more people different people
certainly that see it um as compared to
um whatever marketing approaches that uh
applicant group assumes. Um, I will say,
you know, that isn't the the test for a
concession. The test is whether or not
it's providing um a cost
savings for them.
>> Sure. And what I heard was um more
efficiency and management that could
produce cost savings, but I'm not
convinced that that would produce cost
savings. And and that gets maybe to my
last um
point question is if if the burden of
proof falls on the city to um
demonstrate that there wouldn't be cost
savings. I haven't seen the numbers. I
mean, council member O'Hara um asked
those questions and so as a council
member, I want to make informed
decisions and I'd like to see some of
those numbers. What is the difference
between um vinyl windows and non vinyl
windows? what is the difference in in
cost savings with if we um opt out of
the outreach uh to for um the units. So
those I think I think it's important to
have something concrete in front of us
if we're um asked to make these
decisions.
>> Council member, I just wanted to give a
little context because I understand your
frustration. And in 2021, the uh court
of appeal in a case called Shriber
versus City of Los Angeles, Los Angeles
used to require pro-forma for every
project to ensure that there were actual
cost reductions associated with the
concession because without that, to your
point, how is the city supposed to have
the evidence to show it doesn't? And the
court explicitly found that a
requirement that the project is
economically feasible conflicts with the
statute and is prohibited under state
law. The court further went on to say
the applicant is not required to
establish that cost reductions will
result. Instead, the city shall bear the
burden of proof for the denial of a
requested concession or incentive.
>> So then how do we bear how do we create
that proof?
>> I that's a question for the state
legislature. I would or
>> Well, it's a question for us. if if the
burden of proof falls on the city, it's
a question that we need to answer. And I
don't I don't see the proof in front of
me. I mean, we we are asked these
questions by the community. And and let
me just back up and say um I want
housing in our community and I support
density and I support housing density in
certain corridors. So, I just want to
make that clear for everyone here, for
anyone listening. Um,
and I think there's a way to do this
where we are dancing well together and
we're responsive to the community. I
mean, the community says, "Why are we
rubber stamping?" And we say, "Well,
we've got we've got no discretion and
we've got to have the burden of proof,
but where is the proof?" I mean, it's
it's it's a very frustrating position to
be in. So, I don't see the proof. I
don't see the proof in front of us in
dollars in terms of cost savings. Some
of it is much more intuitive in terms of
what's what's being proposed as
modifications, but some of it might
vinyl windows and streamlining of
outreach and I mean these may be minor
things, but these are things that impact
how the building is built, how the
community um receives and accepts it.
So, um, so I'm having a really hard time
with that piece of it is the burden of
proof falls on the city, yet we don't
see anything in front of us. And I
understand, Mr. Guys, what you're saying
about the state laws. Um, yet it's still
the decision still falls on us. Um, did
you have a comment or
>> Yeah, I thank you and I understand and
hear that frustration. Um I what I would
say there is if it's the pleasure of the
council you know we can do a set of
analyses that you know shows here's the
cost of windows x y and z. Here's the
cost of vinyl windows. You know we heard
the applicant say it's in the tens of
thousands of dollars. I I um and and as
you alluded to some of these are more
intuitive that yes if you're spending
less time then it's going to be less
money. um happy to provide that
information if that's the will of the
council. Also want to set expectations
that um you know as you indicated some
of this is intuitively less and as we
generally understand vinyl windows are
cheaper and so I don't want to set an
expectation for the council or the
community that if you asked us to go
provide that information that we would
come to a different result.
>> It would still be helpful to have some
concrete numbers in front of us.
>> Yeah. Thank you. Those are my questions
and comments for now. Thank you, Mayor.
>> Council member Briner.
>> Thank you. Um I had a couple questions
and um I think they kind of touch on
maybe some of the questions that have
been asked. Um and so I'll I'll start
with the vinyl windows. Um, in reading
all of this information,
um, the question that came to my mind
was,
why are vinyl windows not allowed in the
first place? What are the pros and cons
about vinyl windows? And doing a quick
uh, research and down the rabbit hole on
vinyl windows, I learned about aluminum
windows and um, composite windows, wood
windows, all the different options out
there. And yes, vinyl is the cheapest.
And um I think um trying to understand
why the city has that in place in the
first place. And there were many pros
and cons about vinyl windows. Um they're
energy efficient. Um con, they may not
meet fire rating requirements. They may
warp warp over time. there were just
like all these things that came up about
these vinyl windows. So from a cost
perspective, from the research I did, I
did find um from many different sites um
the material is less expensive.
And my question is
why does the city not allow vinyl
windows? And is there a fire um risk? Is
there a safety risk with vinyl windows?
Does anybody have the answer to that
question?
>> Well, I wasn't involved in the adoption
of the objective standards. I I my
understanding likely that vinyl windows
generally are not as attractive on a
larger building. And so that was one of
the reasons why that was incorporated
into the objective standards.
I think important context is the city
does allow vinyl windows just not on
buildings of certain heights.
>> Okay. Let me just say excuse me. Let me
just say we're really clear. If you
would like to speak I'll be glad to
recognize you. Get my attention. Allow
me to recognize you. I'd be glad to do
it. So please get up if you would like
to continue that line. Thank you sir.
>> Yeah. I just had to look at the city
rules when we were figuring this out and
there are quite a number of
circumstances with a lot of buildings
where vinyl windows are allowed in the
city. So, it's not that there's a
blanket prohibition.
>> Thank you. That's the fact.
>> The objective standards that exist are
for a certain type of buildings. And um
in in looking it up, I saw there was a
lot of um other places that had that due
to historical buildings and and um I was
just curious if there was a known
history with here in the city other
other than aesthetics.
>> Uh there is there a safety issue? Is
there
other reasons besides aesthetics? My
understanding is aesthetics I don't
there may be more involved that I'm not
not aware of but you are correct with
historic there are secretary of interior
standards where they have to be
replacement windows and kind usually for
older buildings it's wood and there are
some mid-century that are metal those
type of things but um in this case it's
for multifamily buildings over three
stories so usually it's going to be a
larger building larger project and so um
I guess that was part of the objective
standards is is to have a higher quality
window for a larger project like that.
>> Thank you. Um, okay, that that answers
that. And then the other question I had
actually came from
uh a resident who has property on Laurel
Creek and it came post packet
production. And they had two questions
that I think I know the answer to. um
they were concerned um about the impact
of subsurface flow of groundwater
through springs to surface water. So the
hydrarology which I think vice mayor
Kalantari Johnson may have been also
getting at. Um, so that was part one of
their concern and part two was the
requirement of storm water and the storm
drains which they're concerned would
reduce water reaching Westlake Pond and
Laurel Creek. Um, so at what point are
those uh questions around the hydraology
they're addressed? Is that in the
building permit stage?
Yeah, I mean we so as mentioned there's
been a you know um extensive geological
and geotechnical studies that have been
um been done by professionals and been
reviewed by the city. Um and then also
there's conditions of approval that
basically require that those studies be
updated and reviewed as part of the the
construction documents.
Um, so those will all be in place. In
terms of
your question regarding storm water, I
mean, we did our public works department
um did review the storm water um as a
storm water plan. Um, and so I'm not
aware of any issues that came up
regarding
um
having to have um I think the concerns
had to do with storm water that would
reduce water reaching Westlake Pond and
Laurel Creek if they go if water goes to
the storm drains.
>> Okay.
>> So maybe those would be
at some point
answered. My understanding was at the
building permit stage. I just wanted to
get clarity of when those questions
could be addressed.
>> Yeah, I would just note that um the
regional water quality control board um
has uh specific storm water control
standards and um they require that um
post uh project runoff is um not
exceeding the pre-ro runoff. And so the
uh the amount of groundwater that's you
know percolating down is going to be
comparable to what it is now in an
undeveloped state. Um and they've got
those specific standards for a 10-year
storm. And so those would be applied.
There are some pre preliminary drawings
for storm water control measures that
are included in all the planning
documents. And then at the building
permit stage, those are reviewed and
finalized um through our team in public
works. Um, and that's for consistency
with those statewide standards that come
down and are uh provided through the
regional water quality control board.
>> Okay. Thank you.
>> Thank you. Further questions this stage.
>> One last question for the applicant.
>> Thank you, mayor. Um, Mr. Simon, would
the applicant be willing to forego
concession number two, streamline tenant
selection?
Let me do this or I want to I want to
inquire. I wonder if that question might
be more appropriate after we take and
the matter is back before the body and
folks are trying to fashion. I'll do it
either way you prefer.
>> Um if you don't mind, I would like to
hear the get a litmus test of that as
I'm considering what the motion is.
>> Such will be the order. Thank you,
>> Mr. Simon.
I just really feel it serves people so
poorly that if we have to be constantly
turning away hundreds of people for
every unit and for some reason that's
just our job to do that. So we don't
want to make that
change.
So if the interest of this council is to
ensure that from our perspective,
whatever our city's obligation is to
make public information of these units
as part of our affordable housing
program. You're suggesting that you will
not remove that concession because
you're worried about people being on a
wait list and getting frustrated. not
just on a weight list, but how much time
we have to spend on something that
doesn't help anyone. I just want to
spend time helping people get housing.
If the city has an obligation to do this
for units that don't have any public
dollars in them that are affordable, of
course, we'll comply with that. But in
talking through it with staff, we didn't
identify any such obligation that the
city has. So, just make making sure I'm
clear. You're not willing to forego
concession number two, streamline t
>> unless there's a requirement that we do
that, right?
>> Good.
>> Council member Brener.
>> Um, can I ask a question? Maybe uh the
housing program manager, I'm not sure.
Um
it concerns me that there is a request
to avoid this process. So is what is
this process? Is it that cumbersome and
time
consuming? Like is there something city
internally that we can improve so that
that's not the experience for
inclusionary and affordable and
lowincome housing uh properties to not
want to
work with the city in this aspect?
>> Yeah, thank you for the question.
>> Thank you for the question. Jessica Dit,
city housing manager. So I think there
may be some misunderstanding
of of
between the owner operator and what they
think is happening at the city side. And
maybe that's maybe that's what's
happening is
we're merely asking for the developer
owner operator to let us know when there
is a unit available for lease and we
post that onto our website. We don't
manage a process from from as far as
like intaking an applicant. The
applicant is directed to go to the owner
operators property management service.
There is a process with the city as far
as income eligibility and working
through the housing authority um and
doing that process, but that is the my
understanding that we're not giving that
up. So, the only piece of the process is
the marketing outreach of the fact that
the unit is available. Um, so I'm
wondering if there may be some kind of
misunderstanding with the owner operator
feeling like there may be more to the
process than
>> Thank you. So, yeah. Yeah. And it could
I ask Mr. Simon
um to clarify? Am I misunderstanding?
No, I don't think there's any.
>> You just are trying to avoid more
applicants coming your way.
>> Yeah. In Santa Cruz, when affordable
housing project stands up, it's not
uncommon there's a thousand households
that apply for every affordable unit.
So, we're not subsidized uh you know, in
this uh and how we can show how we're
going to manage it and what that is
going to cost. and com you know I'm
answering questions every day right now
from lenders who will fund the next
phase of work on this project trying to
explain what the project is and what it
isn't what our model is and in all that
yeah I don't I don't want to have the
reputation of thousands of people in
Santa Cruz calling us and we never
called them back and they don't know if
they can get the housing or whatever and
and it's and look yeah we could try to
make the best possible progress process
But I just am looking for ways to manage
this in a really streamlined way like we
would manage any other housing unit, but
put that time and effort into how do we
get more affordable housing for
everybody.
>> I understand. I've seen that. and to
manage a a huge list. And I know I sat
on the housing authority board for a
decade and to have waiting lists closed
and to h you need staff people to just
manage a waiting list and reach out and
I understand that time component uh of
managing applicants. Um so answer me
this. How will you equitably reach
because that is our goal and that was
brought up uh reach
uh for applicants to have access to this
housing if it's not through the city as
as requested.
>> Yeah, we haven't come up with our
marketing plan yet, but certainly um one
of some of our priorities are also you
know there's a whole bunch of
priorities, right? and absolutely
committed to um following fair housing
law. So, anybody that contacts us will
put them on a list 100%. Um we are also
another of our priorities is to have low
vehicle miles traveled. So, we're
certainly going to proactively market to
the elementary school next door, the
university, folks who are employed right
by this project that you know or and
that's and we've already you know had
meetings voluntarily with the school
district you know on that. nothing's set
aside for teachers or anything, but we
want to actively, you know, market in
that ways. And we're going to have a
priority to some extent, not yet fully
determined how many units, but some for
folks who don't own cars at the time
they move in. Um, again, about
minimizing impact on traffic there. So,
all those things are going to be
components. But, you know, I know
whenever I've put something up on
Craigslist or Facebook or whatever, I
mean, you get a lot of applicants,
right? So, um, honestly, that hasn't,
you know, how do we get enough
applicants hasn't been a concern. We
also, you know, a bunch of the funding
for this project came from New Way Homes
and New Way Homes has relationships with
some employers in Santa Cruz who have
contributed towards affordable housing
and we will be notifying them in case
there they have employees who want to
apply. So, we have a lot of ways just to
do different kinds of outreach.
I appreciate hearing that and I
appreciate knowing that and I think the
community for the community to know that
our local preference policy will still
apply and that we still plan on the fair
housing standards to be applicable
>> and that applies to the non-reg the
units that are non-inclusionary units
too. I mean we just kind of thought we
want to do them all in a fairly similar
fashion again to streamline management
while complying with everything we need
to. Okay, thank you.
>> Thank you
for the questions. This will be the
opportunity for anyone who wishes to
address us on this matter to do so.
Seating and hearing. Okay, here we go.
This is not your time to hesitate.
Here we go. And if those of you who do
want to speak would line up to my left,
your right under this beautiful picture
over here, that's the way to do it.
We'll take people as you uh as you line
up. Good afternoon, sir. Thank you for
all your good works in the community.
>> Good afternoon. My name is David Pati.
Um we just organized to buy a home in
district 4. Most every day I am riding
my bicycle up High Street to uh District
5 where I am still the pastor of Peace
United Church of Christ.
Uh which I offer in good human uh good
humored acknowledgement that we have
been nudging this project along for a
very long time.
Uh we're grateful for the encouragement
of neighbors through the years and city
staff and for the patience and goodwill
uh of this council as they consider the
approval we seek for adjustments to the
project
which is the way of things that take a
long time.
uh they have to change over time because
it takes such a long time.
Uh we have stuck with it through the
years because Peace Village is not just
a housing project to us.
It is a part of our vision for our
ministry and our future and the kind of
community that we want to build. um uh a
diverse community with an increase of
affordable and workforce accessible
housing
in our neighborhood.
So, uh I hope you will be with us in
this very long endeavor because we'd
like to get to the building phase after
10 years. Thank you for your
consideration.
Thank you, sir. Mr. Hall, good
afternoon. Welcome to the council
meeting.
>> Thank you, uh, Mayor Keely, and, uh,
thank you, council members. My name is
John Hall. I'm a member of, uh, Peace
Church, and, uh, I, uh, want to
encourage you to approve this project
without further conditions of approval
that will result in yet another cycle of
which we've been through.
uh for many many years. Um and I think
it's worth looking at the church, Peace
Church, formerly the United First United
Church of Christ over the long
historical run. Uh this church uh began
before the city of Santa Cruz was
incorporated. We have been here longer
than the city has. And every 60 years or
so, uh, we do something really
important, something big. The first was
in the 1850s,
um, starting the church. I wasn't here.
Uh, secondly, in the early 1900s,
uh, building the church, the first
congregational church downtown. Uh,
third, in the 1950s, 1957, building our
facility and our campus on High Street.
And now we come to this point uh where
um pastor Dave Bati has already
emphasized uh this is part of a a
religious vision I would say but it's
also part of a community vision uh to
make peace village a place that is a
center of social life beyond just uh
Sunday go to meeting uh it is a place
where people live is a place where
there's It's already a daycare center
and with housing it will be integral uh
to the community. So, I think it is a
win for the city and I very much
appreciate the thoroughess of the
discussion that we've had here this
afternoon and I would encourage you to
apply that same
focus to other development projects
which as uh has been observed this has
not been the case before and uh it is I
think a good model to follow. uh because
obviously I am like many other people in
the community concerned about the kind
of community that we build, the kind of
physical structure and streetscape and
cityscape that we create and I do want
to say personally and as a member of the
congregation that I think the members of
the congregation are very happy with the
design. We have worked with Sibly Simon
and his group for a number of years and
I appreciate uh the integrity with which
he has engaged with the congregation to
provide something that integrates with
the campus aesthetically and socially.
One final thing, my daughter uh lived in
co-ousing in Oakland and I think it's a
model that has a lot of appeal and one
that includes people of diverse ages.
This will be a diverse housing
development and people who call it home.
Thank you very much.
>> Thank you, sir. Let me tell you what
we're going to do, sir. Ju just one
second. We have, I think, three people
online. So, what I'll do is I'm going to
take the first one of them, then you,
then them, then the next person in line.
So, just be patient for one second. Here
we go. We're going to take the first
person online. Good afternoon and
welcome.
>> Good afternoon, everyone. Um, I live in
the neighborhood near 900 High Street,
and I'm asking you to deny the proposed
modifications and hold this project to
the design that was approved in 2024.
I'm not here to oppose housing. This
community accepted a 40 40unit project
after years of dialogue. The V-shaped
building stepped into the hillside was
the compromise. The design responded to
neighborhood concerns raised as far back
as 2019 and it persuaded the neighbors
who formally appealed the project to
stand down. The proposed modification
abandons that compromise. The approved
design was shaped to disappear into the
hillside from the street and the field.
It would have read as a low building
tucked into the slope. The new design
stands up against the skyline instead.
Nothing in the surrounding neighborhood
comes close to that scale. This is an
area of one and twotory homes, and this
building would tower over all of them.
That's not a small revision to an
approved project. It's a totally
different building. This matters
tremendously for the community, and it
has permanent consequences for the open
field behind the parcel. Every day,
people from across the west side come to
that open ground for one of the few
freely accessible views of the bay left
in this city. It's a public good that
will be permanently destroyed. And I
hope the council thinks clearly and uh
and about this change. It's not clear to
me listening to the Q&A today that the
proposed project would even work in
terms of building more affordable, safe,
quality, and feasible housing for Santa
Cruz. I really appreciate all of the
council members questions standing up
for the community and asking for
evidence of the feasibility of this
project. I especially appreciate council
member O'Hara's questions about changes
in proportion of affordable house
housing with the new proposal. From my
read of the Q&A today, the new proposal
seems to reduce the amount of low-income
housing baked into the original
proposal. If the developer needs to
reshape this project to make the money
work, the affordable homes for
low-income people shouldn't be the part
that shrinks proportionately to the
overall number of bedrooms. Finally,
there's been very little discussion of
traffic. High street is a narrow
corridor already strained by daily UCSC
commute traffic, local school and
neighborhood traffic, and there's no
plan for absorbing that added density um
in the new proposal. Please hold this
project to what was approved and
compromised with the community 40 units
in this uh the design that was the
community helped to shape together.
Thank you very much.
>> Thank you very much sir. Thank you for
your forbearance.
>> Mayor Council members Clayton Markle
neighbor
and I echo many of the concerns of the
previous uh previous speaker.
you are approving a major change
and but aside from the sidelines and
everything else the traffic problems
we've seen it traffic is only getting
worse
I know I understand the vision
of the church I understand the vision of
the developer
it's already run up against economic
reality everyone has to make it work
financially it doesn't sound like it's
going to the reduction You're inc you're
increasing with by seven units, but
you're going to 33 bedrooms.
That's
10 I think it's 108 bedrooms now
or as much as you would like to have no
cars in that neighborhood or minimal
cars in that development.
There's no there's no stores up there.
I've lived up there for a while. I've
lived in lived in Santa Cruz for 50
years. I grew up on the west side. My
best friend lived up there. I was up
there all the time. I've seen it change.
It's still changing.
And in order to get food,
they're not going to shop at 7-Eleven.
They're either riding a bus down. There
is no bus to get to any any of the
stores on the on the far west side. It's
just not practical.
Someone's going to have cars. Where are
those cars going to go?
I don't know that that the church has
that many parking spaces. I know that
when they have events there, our
neighborhood fills up.
If you have to pay for parking, I'm
going to park on the street.
This this development cannot be allowed
to participate for one thing in the
Westside residential parking program.
The property has parking spaces.
I believe in high density housing. I do.
But he's got to be in places that have
adequate transit,
adequate support. You know, it's not a
food desert. Be able to get the food, be
able to get to the library store, the
entertainment, it's got to be there.
This, I'm sorry to say, I don't think is
the right place for your vision.
In addition, there are many questions
about in the geotechnical survey
regarding the storm water runoff. We've
had issues with water running through
our through our yard already
just from other neighbors. You pave that
much more, that much more runs off into
the street, overwhelms. Climate change
is increasing. The intensity of
raintorms is increasing. We've already
seen it. This doesn't allow for that.
You can't have any water penetration
into the ground. You're going to get
sink holes because the geology the
report says. Thank you for your time.
>> We're going to take the next person
online. We'll be right with you. Person
online. Good afternoon. Welcome to the
city council meeting.
Three, two,
one, you're up.
Hello, my name is um Deb Dela Debrien. I
just for to start off, I did grow up in
um I guess public housing here in Santa
Cruz. So, I understand the need for
public housing, but I do not I we should
not go through with this at all. I don't
believe that this is the right space
because of some of the things that both
the person that called in initially, I
felt like we could just I pretty much
have to say what she said already. And
then in addition to what Clayton just
said, it's a food desert up there.
Parking is terrible. The traffic jams
are crazy. You can't get in and out of
there, even with the school traffic. So
to add more to that doesn't make sense.
The idea that people are going to move
up into this area where there's nothing
up there. Everybody who lives there, we
have cars. There's no way to get in and
out of there other than have a car. Um,
and the idea that most people are going
to ride their bikes or walk is is just
it's one of the lowest walkability
scores in Santa Cruz because there's
just nothing up there. Um,
I the other thing I wanted to point out
is the mockup that they just that they
have of the new rendition. They don't
have it from the approach. They only
have it looking down from the hill. It
is going to be a huge eyesore. This
absolutely should not be approved. Um,
part of what makes Santa Cruz so
wonderful to live in is how beautiful it
is to look at and it would be an awful
eyesore to have up there as you're
coming up the hill to look at. So, um,
that's another thing. Um,
I think that's that's all I have because
everything else was already talked
about. So, thank you for your time and
please do not approve this um, project.
And as far as the windows go, vinyl
windows are really bad environmentally.
Um, and so metal windows are much more
environmentally friendly and not to
mention the um the high VOCC's that come
with them. And then I think the fire
danger that was um mentioned. So, thank
you.
>> Thank you. We're going to take the next
person online. We'll be right with you,
sir. Person online. Good afternoon.
Welcome to the city council meeting.
>> Hello, uh, Fred. Thank you, uh, council
beer. Uh it's a very teachable moment.
It's a very odd spot where you've uh
decided to try to push the envelope. I
know you know uh that I feel that way
about all the development going on. uh
the the Mission Street uh development
that didn't go through uh encountered a
lot of resistance and I feel like uh you
know uh the the the statements by
Adriana Monago um are very very spot-on
uh regarding uh you know changes being
uh you know very imposing and uh you
know the community being very
comfortable with the changes that or the
original original design. Um, you know,
this is a very odd spot because it's in
that very strange part of Monica's
district in the in the on the county
board of supervisors that's part of uh
the San Lorenzo Valley that reaches down
and it and then there's um the faculty
housing at UCSC that also falls in that
small area that's uh well gerrymandering
you know that's a socioeconomic class
where you're trying to uh you know take
an area and in some for some political
advantage I don't think it's
gerrymandering, but I do think it's an
odd thing that you're taking a stand on
increasing the density in this really uh
small part of uh you know your campus.
Um that was a very odd t-shirt the
gentleman who uh you know who's uh who's
uh in in favor of this is wearing it
says density and it shows a big city.
Well um you know uh college students
affect areas next to them um in a lot of
ways. Uh one of the things they do is
because they are socioeconomically uh
disadvantaged um you know it looks like
the areas they live in are as well. But
um when they leave uh their earning
potential and um their socioeconomic
uh their financial mobility skyrockets
and then the people left in the
community uh have very very um
entrenched uh economic issues. uh you
know they compete for things like jobs,
they compete for uh things like the you
know standing in line at the McDonald's
uh they they compete for a seat on the
bus and um you I don't think you should
increase the density of this. Um
you know it's uh it's housing strain you
know that's created by doing all this
high density uh development you know
artificially inflated rental demand. We
look at the student population, it's
about 25% of the overall population of
the city, but they're only here 9 months
of the year. Um, does that mean that
they're 25% less than 25%. I don't know.
It's very confusing. What I do know is
Santa Cruz High students uh get half as
likely to get get admitted to UCSC
um compared to students from um the East
Bay who are applying. And I just don't
find it very fair. Okay. Um thanks very
much. I only have a few more seconds to
waste. Thanks.
>> Thank you. Good afternoon, sir. Thank
you for your forbearance.
>> Hi, friends. My name is Andrew Mariam
and I agree with uh most of the comments
from the uh previous speakers. Um once
again, the the Westside uh neighbors are
rallying in opposition to the proposed
development. A few years ago, we were
unable to prevent the the approval of
the uh the permit, the previous permit
application, uh which was approved.
We went home. We uh we licked our wounds
and we waited for the other shoe to drop
and waited
and
developer took their sweet time and they
have now come back with what they call a
major modification
which to me looks like an entirely new
um development.
One thing that uh I was struck by as I
read the application, the new
application, I uh was progressively more
frustrated and insensed at the way that
the developer has used uh manipulated
the the state's housing laws,
well-intentioned housing laws, uh
leveraged them in order to basically ram
this decidedly nonconforming
uh development
with its
its concessions, its sweeteners, its
incentives
uh down our collective throats.
But uh permits are not uh granted in
perpetuity. the previous permit. One of
the conditions of approval was that it
had 24 months before uh under which time
the developer had to exercise the permit
otherwise the permit would become null
and void. And
I ask I put it to you council members
that um the developer has not exercised
that uh that permit.
The time has run out. It is null and
void. And the important part of that is
that the developer cannot now claim uh
any kind of priority or preference or
precedence based on that previous
previous permit uh approval.
what they are uh what the developer is
now presenting is a entirely new kind of
of of beast which looks very different
and it should be treated as a as a new
application. I I hear all the uh the
uncertainty and there is a lot of new uh
material in this application. It should
not be uh it should not have that
precedence as simply a modification of
the previous permit application.
>> Go to the back of the line and uh do not
pass go do not collect $200. Thank you
for your attention.
>> Thank you, sir. We have someone else
online at this point. We're going to
take that person. We'll be right with
you. First online, good afternoon.
Welcome to the city council. Maybe
Three,
>> two,
>> good afternoon. Um,
>> good afternoon.
>> It's Judy Grunstra and I just wanted to
echo what the other woman said about
vinyl. Um, council members seem to not
really understand why vinyl windows are
discouraged. Um, so I just wanted to say
that I had seen a film called Blue Vinyl
which was made in 2002 and it really
enlightened me about the toxic
byproducts of vinyl as a building
material uh the production of it and the
disposal of it. So since the city does
have a climate action plan, we should uh
you know realize that cheapest isn't
always the best choice. Thank you.
>> Thank you. Good afternoon sir. and thank
you for your forbearance.
>> Good afternoon, council. Mr. Mayor, Mr.
Mayor, could I have uh the plot view of
the ingress egress points brought up on
display, please?
>> Sure. And we won't take this out of your
time. Okay.
>> Let me ask Mr. Bane if he someone here
who can pull that up for us. Give us a
second on that. We'll start the clock
over in a minute.
Okay. I I don't know if uh people had a
really good opportunity to take a look
at this.
>> What you're looking for?
>> Yes. Yes, it is.
>> Very good. We'll start the clock now.
>> Okay. So, my my question is the um this
is an in increase to 107 bedrooms.
Correct.
>> All right. How how many how many people
again
>> are you estimating? Let's do this. We're
We're not going to do questions and
answers. You just go ahead and provide
your test. You're doing great. Thank
you.
>> Okay.
>> Um
I get the overall impression as I've had
for the last six years that this is very
under capitalized.
And my question is with all the fires
which are going on when we see that
there's an increase in construction
materials cost. We've seen this happen
over the last five years. You know,
looking at the LA thing that happened,
looking at what's going on in Spokane.
Are you going to keep asking for an
increase in number of units just because
every time the price of construction
materials go up, you have to come up
with some feasible way of building? Um,
I'm I'm just kind of curious about that.
The the other thing is is the looking at
the uh the picture up here uh it shows
an increase of parking spaces. Uh I
don't know how many parking spaces that
is, but I'm guessing what
>> what 20 some odd up there? 25.
>> Okay. Remember, excuse me, Mr. Payne,
this is your testimony. We're not doing
questions and answers. Second time I've
asked you that. Okay.
>> Thank you. Um anyway, um
I just have concerns. I don't agree with
the increase in the number of units. Uh
I look at more people. I look at the
issue with cars, but that's already been
discussed.
Um
I look at a removal of one driveway.
That means that it's going to double the
traffic going up and down that hill.
And my concern is is that, you know,
we're talking about water as well. Uh I
can tell you that I grew up
uh in that house. It's that's located on
High Street and uh my dad built it in
1957 and I acquired it from him not too
much longer than that. And I remember
water coming down my driveway into the
garage. I remember the city of Santa
Cruz sandbagging my driveway
>> just to keep the water out of the
driveway and this happened several times
a year during the more wet years. Um
so I can testify to the groundwater
issues as far as that goes. Uh the other
thing is is that uh I attended First
Congregational Church from the time I
was four years old and all the way
through high school and uh it was part
of their youth body. Uh, I knew uh
Bernie Cornelius very well. He was the
pastor at that time and I could tell you
he'd be rolling over in his grave if he
saw this proposition to what's going on
right now. That is not part of what the
original church's mission was.
>> Thank you.
>> Thank you. Thank you, sir. Anyone else
online?
>> Good afternoon.
>> There you go.
>> You won the lottery on that one.
I was ready for my forbearance. Um, hi,
my name is Ron Goodman. Um, this
project, as you know, sits on complex,
environmentally sensitive cars terrain.
And as you know, a project like this can
cause cars damage that can negatively
alter the quality and quantity of water
emanating from downstream springs. So I
reached out to Eric Zinn who is the
geologist for this project to learn more
about the hydrogeeological studies that
have been done for this project. He
stated, "Hi Ron, I did an engineering
geology report that focused on the
hazards and risks to the foundations of
the proposed development. I did not
conduct a hydrogeeological
investigation.
I looked on the city information page
which lists three geology related
studies. None of them mention the
springs or potential carsted impacts.
You may be wondering if these issues are
a serious concern that need to be
addressed. Well, these issues were
raised during the recent student housing
west project at UC Santa Cruz, which
shares the same car system as this
project. The university committed to
best practice construction to minimize
aquafer risks. I believe Pacific Crest
Engineering who's working on this
project is also responsible for the UCSC
engineering work.
Unfortunately, I manage the KCAR pond,
which is the pond directly below the
UCSC project, and we now have evidence
that that project damaged our springs.
Although we're still working with the
university to get all the required data
through a California Public Records Act
request to document this definitively,
at least one of our four primary
springs, the largest producing spring,
no longer produces any water. It's
completely dry. Furthermore, mitigation
is almost impossible. A collapse or
infilling of a car pool or a damaged
conduit is essentially a permanent
change to the land. It cannot be undone.
Um
I'm currently working um with parks and
wreck starting in the beginning of
August um in helping to manage West Lake
Pond. Um
and
in that in that capacity I would
basically say it's really important you
do a hydrogeeological study.
Unfortunately I already know what the
result is going to say because I know a
lot about this topic. they're going to
say there's no way of knowing. Um,
and so you're sort of making that
decision. One comment I also want to
make is that you uh mentioned that one
of the things you have to accept to
approve this would be that it's
compliant with the general plan. Um, you
have a goal NRC 1.1, the wetland and
surface water protection policy in the
general plan, which I don't believe this
would be compliant with if it were to
damage the Kurs. NRC 2.1, the biological
resources and sensitive habitats would
also be violated if this were to impact
West Lake Pond, which is a natural pond.
Um, and the community facilities and
water resource element. Thank you.
There's so much more on this topic, but
I will leave it at that.
>> Mr. Goodman, thank you. And I don't want
you to go away feeling slighted. Thank
you for your forbearance. All right.
>> Thank you.
>> Here we go. Good afternoon and welcome.
Good afternoon, Mr. Mayor. Uh, city
council members. My name is Andrea Toleo
and I live up on the west side and I
don't think it's unreasonable to ask for
additional financial information
to look at their ROI over time. You
know, it it's a million million million
dollar project and I appreciate, you
know, wanting to provide affordable
housing, but these are major
concessions. It's a new project
and just to say we can't afford it. It's
going to cost us too much money. And the
other thing I think we need information.
I don't think there's anything wrong
with asking for it or we do it
somehow. We have to have the
information. It's a huge project. Um and
the other thing is really the the 10
dorms or the bedrooms.
I think that's an interesting approach,
but really
people come up on the list and you have
an 18-year-old and you have a 65y old,
you have ch and I guess those aren't for
children, right? They're just bedrooms.
So families are out of that list
already. That's not addressing the
affordable housing issues in this
county. It's being creative, which I
appreciate, but I don't think that's the
path. So I would ask you to deny this
current project and even go back to the
old project with the geotechnical
um surveys that they've done in terms of
the sink holes up there and are they
being addressed with geo with the with
the surveys that they're doing. So thank
you very much. But I want you to please
not accept this new proposal. Thank you.
>> Thank you.
Good afternoon and welcome as
unaccustomed as you are. Welcome
>> council members. I'm Deborah Ston. Um
Westlake neighbors. Can't thank Ron
Goodman enough um to dig into that type
of um process as well to protect our
Westlake pond which is very cherished.
Um in some ways, and I've said this
before, the process seems backwards. Um,
this does seem to be a completely new
project, way different than town homes
on the top of the bluff the way it was
originally planned. Um, the drillings
were done in 2018 and I would like to
point out number 41 and 42 on the
conditions of approval.
This study into the carst system is
really a safety issue. It's a safety
issue for the developer. It's a safety
issue for your approval. It's a safety
issue for the people who are going to
live there. So the DR adding one to two
stories to this project leads to has to
lead to further testing, further
drilling. They only did 30 ft down.
They're going another story up. They
have to go another 10t down. They have
to know what's their building underneath
them before. And I and I get it. It's
all back. you approve the project and
then we do the building permit and then
they do the drilling. Kind of seems
backwards because this is an expense
that has to be followed through on um
seismic activity. This was also in um
the DE's and associates recommendations
on page nine and 10. So even the seismic
activity has changed. We had um it needs
updating. Let's just put it that way. We
had a 4.6 little shakeup and that fault
line goes right through our neighborhood
and it's less than a mile away. And the
old um
the old report, you know, they were
saying the closest fault line was 5.8.
Well, this fault line just woke up. It
was considered dormant. it's not dormant
anymore. So, um it just seems like you
do need more data in order to go forward
on this project. And I think approving a
building permit and then going backwards
after that you give the B building
permit and then they have to do all this
and then you they find out it's not even
feasible. So, that's my point. Thank
you.
>> Thank you, Miss Ellson. Do we have
anyone else online?
>> No, we don't. Last call for anyone who
would like to testify on the matter.
Matter of fact, before the Excuse me,
I'm sorry.
>> We now have someone.
>> We got one just right there under the
wire. All right, we'll take the person
online. Good afternoon. Welcome to the
city council meeting.
Good afternoon.
Three, two, one. Matters back before the
body. Pleasure of the body. Council
member O'Hara.
>> Thank you, Mayor. Um, I have a motion
that I sent to the clerk that I was
hoping you could put up on the screen.
And as we see this coming up, I want to
suggest to my colleagues that I'm open
to friendly amendments.
Motion to adopt
um the resolution approving the project
as recommended by staff with one
substantive amendment that findings 22
through 25. The inclusionary alternative
approach findings under section 2416302
and 2416311
03011
be revised to deny the applicant's
proposed alternative inclusionary
compliance method because council cannot
make all of the findings required for
its approval, including the findings of
conformance with section 246025.
Condition 35 shall therefore be resi
revised to require compliance with the
city's otherwise applicable inclusionary
housing requirements including the
represented unit mix requirement while
preserving the affordability required
for the project state density bonus.
Motion authorizes the city attorney and
community development director to make
the conforming revisions necessary to
effectuate this direction with all other
project approvals, findings, and
conditions remaining as recommended.
There's a motion. Is there a second?
>> I'll second with a friendly amendment.
>> There is a second. What does state your
friendly amendment?
>> Um, and I just sent it to you, Miss
Bush.
Whoa. Try to keep noise down. Seniors
are sleeping.
>> Yeah, my my purse decided to
>> All right.
Uh finally, amendment to strike
incentive concession number two, which
is the option for streamline tenant
selection from the resolution, which is
on page 10, and direct staff for future
projects to include quantifiable data
that demonstrates cost savings when
incentives, concessions, or wavens,
waiverss are requested by applicants.
>> Is that agreeable to the maker of the
motion?
>> Yes.
>> Okay. accepted as a uh as a friendly
amendment that is now included in the uh
motion in chief. Let me see if there are
questions, comments, debate and
discussion. Council member Bruner,
>> I just have a quick question about the
friendly amendment and I wonder if maybe
the city attorney's office can speak to
that.
Yeah, I do believe that the friendly
amendment language about striking
incentive concession number two uh does
subject the city to potential for
litigation and attorneys fees exposure.
There's a you know a significant uh
chance of litigation and attorney's fees
exposure with that change.
>> I understand.
>> Council member,
>> um can I open on the motion?
>> Say it again. I'm sorry.
>> With Can I open on my motion?
>> Oh, I'd like for you. Thank you. Thank
you.
>> Okay. Thank you. Um, with that in mind,
I also understand the risk associated
with the language that the vice mayor
has added and I would like to request
again the consideration of the applicant
as to whether you would allow for that
concession to be stricken from
your application.
>> The uh
>> Okay. I Excuse me for just doing fine. I
just want to be clear. I'm going to
allow you to answer this question. The
matter is back before the body. So, uh,
this question will be allowed.
Matters back before the body, though.
So, the
>> Thank you, mayor.
>> Council members asked you a question. Go
ahead.
>> Go ahead.
>> You're the referring to concession
number two, the streamline tenant
selection.
if I would voluntarily remove it.
>> Yes. And the context being when Mr. Dit
came up and suggested that there might
be some misunderstanding in terms of the
um magnitude and complicating factors
associated with us simply advertising
the vacancy.
Um, I'm asking whether you would be
willing as the applicant to voluntarily
remove this concession from your
application.
>> Um,
I would consider there wasn't a
misunderstanding because there wasn't a
big city process. It's just the volume
of inquiries we'll have to deal with
with that. But I would consider it
in the context of our
uh inclusionary housing
alternative method requests getting
approved. But without that, you know,
we're going to have to go back and
modify the project again and figure out
what project can go forward. So, I'm not
going to it wouldn't be meaningful. I'm
not going to withdraw it as it stands on
this motion.
>> Thank you, sir.
>> Council member,
>> thank you, Mayor. I'm I'm willing to
engage in this negotiation and I'm going
to provide some context for that. The
way that this motion is currently stated
is um the city does have discretion in
the pathway that was identified by staff
and the applicant to either accept or
deny this alternative inclusionary
compliance method. However, the applica
applicant has an additional concession
that you may apply and it was as my
understanding a decision between staff
and the applicant to take this method
versus a concession to get to the number
of units that you are proposing with
regard to the bedrooms.
I am very comfortable
foregoing because I believe you are
going to be coming back anyway with an
additional concession
to meet the same exact standard. I think
we can not have another hearing if we
are comfortable switching ah my computer
this to a concession which I believe you
were going to do anyway. And what I'm
asking for is the forbearance on um
allowing the city to to advertise
for this project. I personally don't
think that is at all out of scale for
what we are trying to do as a community.
And even the example of you're going to
talk to Westlake families and teachers
and people in the neighborhood is quite
frankly the exact opposite of what I
would hope to be advertising this
project for. Maybe there are students
that currently go to G that would be
better served up at Westlake. Maybe
there are students on the far west side
that would be better served being
because their parents are academics
living up there. So what is the problem
with allowing the city our discretion to
ensure that this is publicly available
associated with our current practices. I
feel very strongly about this. I
understand we're in a position of
negotiation. I think we can I can lean
on staff because I understand that there
is potential for meeting the
inclusionary requirements
via a concession. I understand that that
option is available. I feel very
strongly that this is an unnecessary
concession. I understand that you have
you're worried about the burden of of of
managing this. However, our position as
a city is to ensure that we are at
whatever capacity we have reaching our
entire community. And that is not
something I'm willing to just place um
comfortably in your hands. I want to
have that option and I want to exercise
that option.
>> Council member Golders is recognized.
>> I hear you. I I I think a lot of us
share the same values. My question about
this particular project and I don't know
who can answer it is my understanding
with this project when it first came
before us is it was part of the church
and I maybe I naively assumed that it
was a way to help like increase
membership or help current members of
the church maybe find housing. I didn't
think it was something that was meant to
be opened up to the wider community. But
maybe I'm wrong. I don't know if staff
or someone can help me answer that.
>> That question
>> that kind of helps me think about
asking.
>> Do you have an answer to that?
>> I think the applicant actually might be
the best person to answer that question
what their intent is in terms of
>> I'm sorry I didn't hear you.
>> I think maybe the applicant might be
able to answer their their intent of who
they plan to rent to or their intention
was.
>> This is not meant primarily for church
members and in fact that is a fair
housing law uh potential issue. You
can't discriminate based on religion for
example or membership in a certain
organization or type of employment
variety of things right so no uh we do
envision there will be members of the
church who live there but like everyone
else you know um uh so it's not it's not
over um you know bent in that direction
and if I can while I'm here I just want
to say thank you for expressing that
that is a really important point to you
and I think we can uh meet it. I just,
you know, we do need an afford
affordability plan that works. I hope we
can come to that. Thank you,
>> Council Member Golder. Completed with
that. Okay. Other debate or discussion
on this item?
Well, I've got a few, but go ahead.
>> Um, thank you. Um,
I have a question for staff. Um, if we
were to revise
this motion or even go back to the
original motion with the voluntary
removal of concession 2 and changing the
methodology for reaching the
inclusionary numbers, what would that
motion look like?
>> Mr. Butler,
>> thanks for that question, Council Member
O'Hara. Um so that question would be um
or that that motion would include um as
you suggested to um reference that
the applicant has voluntarily um
switched their incentive concession
requests going from the uh removal of
the notification current incentive
concession number two and switching it
to the inclusionary
um uh alternative means um that we
initially had proposed. Um and you could
um include in that something similar to
what you had in your motion, which is
providing direction to staff and the
city attorney's office to modify the u
the resolution findings accordingly.
>> Point of order or maybe parliamentary
question.
>> Certainly. Um I I know there's motion
and a second on the floor. I'm not quite
certain how to proceed. Um and I'm
leaning on you in terms of if there is
interest in modifying this motion. How
would you like me to proceed?
>> Well, you are the maker of the motion.
If you would like to modify your motion
and it's agreeable to the second, then
those will be accepted. So feel free to
to amend your own motion.
>> Okay. Thank you. Um,
holy smoke smokes.
>> I let me ask a question procedurally.
I'm going to go back. Yes. With the we
have been sitting here for 3 hours and
you know 40 minutes uh on this item and
I am wondering if what we could do is
just take a 10-minute break uh and then
we will come back and you will have the
floor.
>> Thank you.
>> Without objection, we are standing
recess for 10 minutes.
Santa Cruz City Council is back in
session and I will recognize that a
quorum continues to be present. Uh when
we took our break, uh Council Member
O'Hara had the floor. So, Council
Member, it is back to you. Thank you,
mayor. Um, I would like to request to
uh remove the motion on the floor. The
current motion on the floor.
>> Motion on the floor is withdrawn by the
maker of the motion.
>> Member, you have the floor.
>> Thank you. And I would like to move a
new motion to adopt the resolution to
adopt the resolution approving the
project as recommended by staff with one
substantive amendment as agreed to by
the applicant. that the applicants
requested incentive number two related
to option for streamline tenant
selection be removed and replace it with
an alternative concession request to
allow for the inclusionary alternative
approach per section 246030
proposed by the applicant as articulated
in their proposal and the city staff's
report. Motion authorizes the city
attorney and community development
director to make the conforming
revisions necessary to the resolution to
effectuate this direction with all other
project approvals, findings, and
conditions remaining as recommended with
you can remove you can strike friendly
amendment. Miss Bush direct staff for
future projects to include quantifiable
data that demonstrates cost savings when
incentives concessions are requested by
applicants.
>> There's a motion. Is there a second?
>> I'll second. Second by the vice mayor.
Council member O'Hara, you may open on
your motion.
>> Thank you. And I have a question to the
applicant. I need to have you guys on
record that you are in comfortable with
this direction of um the proposed motion
in relation to concession number two.
>> Yes. Thank you.
>> We'll never forget a word you had to
say.
>> Yes.
>> All right.
>> Okay. Thank you. Matter fact, followed
by further debate or discussion on
>> No, I just I I appreciate the time
energy that went into this. I do have
one additional thing that I want to add
to this conversation. Um, a few of us,
Vice May, Mayor Colintari Johnson and
Council Member Nuome and I are currently
on an ad hoc committee focused on design
guidelines. We have been going through a
very regimented process with staff um to
engage with the community on what does
good design look like? What should it
look like in Santa Cruz? Um have been
through a design professionals roundt
um that came up with design themes for
the consideration of the community. had
a planning commission meeting of which
um we had the entire um courtyard out
here filled with folks um looking
through different design characteristics
and making recommendations based on what
we think is Santa Cruz character and
what are we looking for for design. So,
in addition to this motion, I just want
to put up on the screen. Um, Madame
Clerk,
we have a community survey going on
right now that is really looking for
community feedback on what kind of
design are we looking for in this
community. I'm going to put these QR
codes up quickly for the community that
is here and anybody who might be
watching from home. Please take the
survey. It's really important that we,
and if you can scroll up slightly, left
is English, right is Spanish. Um, it's
important that we get as much feedback
on this as we possibly can. This
conversation today really does get to um
we are trying to strike a very
complicated balance with current
California legislation and laws limiting
our local control because we need to add
housing stock in the state and
particularly in our coastal communities
where our cost of living, you know, we
have the highest rent burden in the
entire nation here in Santa Cruz. um we
need to build housing, but how do we do
that in such a way where we're trying to
thread the needle around? What are we
looking for um with these new
developments? Um that will make us feel
better about the direction that we're
going. So, please do take these surveys.
I don't know how long they're open, but
hopefully for another
>> through August.
>> Through August. Thank you. Um please
take these surveys. Take the time to do
do so. Um I took it a couple days ago.
It takes maybe 10 minutes and it's
actually really um an informative
process. So I appreciate everybody's
forbearance on that um and really
appreciate the conversation and the
regimented process that we tried to walk
through with regard to this particular
project. it is the responsibility of the
applicant to meet our needs and address
the findings that we are trying to
address um during these deliberations.
So I appreciate the time that you guys
took in answering questions um and then
some of the concessions that we were
able to negotiate and I appreciate the
the patience of my colleagues as we walk
through this discussion. Thank you.
>> Thank you. Vice Mayor is recognized.
>> Thank you. Um just a couple of things.
Um the geotechnical
study was brought up and uh Mr. Sibi uh
mentioned that this will be done before
permit is issued and um staff also
confirmed that. So that was brought up
by some of the speakers here. So rest
assured that a thorough geotechnical
study will be completed before permit is
issued. Um and then just well first I
want to I want to thank everyone who's
here, everyone who called in. Um, I
understand this has been a long process
and and really at the end of the day, we
want to provide housing for our
community. Um, and I think all of us
would agree on that. It's it's how we
how we proceed and where we land that is
really important. And I want to thank
Council Member O'Hara for u the process
you walked us through today. I think
that that's really important. Um, and it
may uh result in longer meetings, but
it's worth it. It's worth it for us to
do this, right? Uh many of you continue
to ask us to deny the project and I hope
that you are hearing and seeing that we
are doing our due diligence and denying
the project even if we wanted to. I
don't know that all of us would want to.
Um it's not an option. I made a friendly
amendment for one of the concessions to
be struck out and our city attorney
pointed out that we're at risk of
litigation. To me, that was a very
important incentive and concession for
the city. You know, it's about equitable
outreach to our community members. It's
about transparency. It's about tracking
what's happening in our community. But
in my mind, it didn't seem that
impactful to the applicant. But even
with that
consideration, we were reminded that we
would be at risk of litigation. So just
for the community who's here and who's
listening, please know that we are
trying to engage. We are engaging. We're
not trying. We're engaging in a
thoughtful process, but when you ask us
to deny a project, you put us in an
impossible situation. Um we're with you.
Um we are open to hearing your
suggestions. We hope that more of these
conversations will ensue with future
projects. We've given direction to staff
to give us more data that is
quantifiable and hopefully this will
result in a more thorough transparent
process in the future.
Thank you for the debate or discussion
uh Mr. Bane let me ask you a quick
question. There was, I believe, either
during someone's testimony. In any
event, this afternoon or this evening,
we've we heard a sentence that I thought
said that 24 months have gone by and
somebody's permit isn't is voided.
Can you speak to that issue? I don't
understand what that was.
>> Yes. Um I believe that in most cases uh
permits most permits are all are good
for three years.
>> Um
>> get a little closer.
>> Sorry.
>> Thank you.
>> Um I did look at the conditions of
approval for the original project and it
does refer to 24 months uh two years. I
think that's in rel I think that's
specific or it was relating to the minor
land division which those are
>> I see
>> good for two years versus the other um
permits that part of the project. Um
that being said they did the subdivision
>> and so they've exercised the permit
>> and within that two years.
>> Thank you. That was my only question.
Further questions or comments? Clerk
will call the role.
>> Council member Tgerero. I
>> council member Newsome has himself.
Council member Golder.
>> Hi,
>> O'Hara.
>> Hi,
>> Vice Mayor Kellory Johnson.
>> Hi,
>> Mayor Keely.
>> I motion passes and awarded. Thank you
all for being here. Madame clerk, is
there more business to come before the
body?
>> City attorney, more body, more business
to come before the body.
>> No.
>> Okay. A motion to adjourn would be in
order. Council member Golder moves and
council member Triggero
reluctantly uh second that we will
adjourn. Non-debatable. Those in favor
signify by saying I.
>> I oppose. Motion carries and so ordered.
We stand adjourned.