The September 14, 2026 meeting of the Rochester Selectboard focused on a wide range of departmental updates and financial matters, beginning with grant progress and infrastructure projects. The town anticipates receiving two USDA reimbursements totaling $3,960 for the Hannes project within the week, while the Austin Hill Better Roads grant is complete but awaiting check processing; meanwhile, the Bethel Mountain sidewalk project is scheduled for October to widen the road using concrete and insulation to protect water lines, though final designs regarding drainage and ADA compliance are still under review. In the energy sector, volatile oil prices have prompted the town to delay locking in heating rates until closer to October or the election to avoid high costs, with the Hub remaining the primary energy user. Additionally, a cell tower application initiated by Vortex has been withdrawn because the proponent could not redesign the route to cross an abutting landowner's property without permission, effectively closing the project unless new plans are resubmitted.
Significant discussions also took place regarding community services and local governance structures. The Housing Committee has officially disbanded, with a final area plan meeting scheduled for September 23rd at Huntington House to discuss redevelopment using recent grant reports, including a market study and environmental review. Concurrently, the Select Board addressed critical issues with school bus transportation, noting that a missing driver is on maternity leave and an existing afternoon route arrives late around 5:00 PM, causing students to wait up to 90 minutes; the town plans to escalate concerns if this issue persists into winter. The Arborist Park and Cemetery department identified three trees requiring immediate removal due to safety hazards, such as a large-cavity sugar maple in the park and specific trees in North Hollow and Village cemeteries, while seeking quotes from local arborists to establish long-term maintenance relationships after state funding ended. Furthermore, a proposal was presented to reform the dormant park committee to oversee maintenance tasks like debris removal and dog waste management, with informal information sessions planned for September 22nd and 24th to gauge interest in forming this group.
The meeting also covered broader economic and educational topics, including a Business Roundtable sponsored by Two Rivers and Green Mountain Economic Development that discussed housing, employment, and growth with local business owners. Regarding the Norwich Solar project, discussions continue about a resiliency zone initiative in the gravel pit, noting that while a contract with Green Mountain Power exists, it requires legal reconfiguration. On the education front, a community forum regarding RSU school consolidation plans was scheduled for the following night at Stockbridge School, where attendees noted that while state legislative intent favors centralized high schools, current elementary choices may remain for existing students before a phased transition over five years; however, concerns were raised about the potential removal of these school choice options. The Select Board also reviewed the July 2026 treasury report but deferred it to the next meeting to allow for better digestion alongside upcoming budget meetings, while confirming that the Fiscal Year 27 state road grant agreement had been signed.
The proceedings concluded with a brief discussion on attendance, where participants acknowledged the necessity of attending meetings but expressed difficulties due to childcare responsibilities and scheduling conflicts, specifically noting an inability to contact Jamie for the following day. Following these remarks, a motion to adjourn was made, seconded by another member, and passed by those in favor, bringing the session to a close.
Read the full video transcript
[music]
Good evening everyone. Thank you for
coming to the select board meeting. Uh
it is September 14th, 2026 and it is
5:00 p.m. We have posted the agenda uh
three different places which includes
the three places around town. We've
posted it on our website and we have
emailed it to a large list.
So um I believe that we are ready to go
with a
legal open meeting.
Are there any agendas to the agenda? Are
there any
>> additions? [laughter]
>> Additions to the agenda.
>> Okay.
>> No hands.
>> How many people do we have online?
>> Um,
three. And Orca.
>> Okay. One, two, three. That's double.
Um,
>> first I guess we're skipping right into
our departmental reports. Um, you want
to do the meeting minutes
>> on the minutes. Um,
>> maybe not me.
>> That's not me.
>> Circle back to the minutes so I can look
at it.
>> Yeah. And then we can circle back to
them.
>> Um,
>> you see those
>> grant updates.
>> Um, I have a couple. Um, I submitted
today I submitted two reimbursement
requests to the USDA for the Hannes
project. Um, totaling 136 or 3960.
Um, that'll come through pretty quickly.
So, I expect probably within a week we
should have full reimbursement for that.
And our um Austin Hill Better Roads
grant has been completed by the road
crew. Um, and now I'm just working on
the reimbursement and for checks to
cash. So that'll take some time.
>> Okay.
>> When I have that total, I'll let you
know.
>> What's up with the highway department
this week?
>> Coverts.
Done. I guess I don't mean to say that.
>> Oh, that's me. Um, Rita is going to be
here next week
to
Tory Hill Grant Park
and Austin Hill.
>> I get an indication the pavers may be
here next week, but [laughter]
that's for Quarry Hill.
>> Yeah.
>> Okay. Certainly
not.
Nothing.
>> Nothing is okay.
>> If I get out of here quick, I can still
make my softball game.
>> So, you're all set. Thank you.
>> Thanks. Have a good night.
>> You're welcome. Thank you, sir.
>> We'll we'll cover it from here.
>> Oh,
>> anyone from the library?
>> Um, no.
select board updates. Um,
carry forward from the last meeting. Um,
I took a little bit of a different route
when we had a discussion about school
bus transportation to Mbury and um, I
spoke directly to the bus company
manager and um, she apologizes
profusely. Um, the problem that she has
with the missing bus driver was that the
bus driver's out on maternity leave.
So, she will be back is the good news.
Um um so since then I have heard that
they are running an afternoon school bus
but it doesn't leave until after other
bus routes are done. So I don't think it
hits town till about 5:00. So I think
the kids are sitting around for an hour,
hour and a half hopefully doing their
homework while they're waiting for the
bus to show up. But um a lot of
attention has been given to that and uh
so we're we're doing everything we can.
If if something develops where we get
closer to wintertime, we certainly will
be barking much louder.
Um
we had a business roundt meeting and um
we did have a dozen
business and entity owners in in the
village. Um it was a nice little lunch
meeting with way too much food, but we
did have discussions about housing, um
employment, employees, um how we would
like to grow and that was sponsored by
Two Rivers and um they took some good
notes from it and they will be
hopefully gathering information. We also
had Green Mountain Economic Development
here as well.
So, we'll see if anything grants or
anything come to us or ideas of how to
improve our town. Um, I am told the
Bethl Mountain sidewalk project will be
taking place in the month of October.
Hopefully, it's not delayed again
because that would put it into next year
and we don't want that. We want to get
it done this year. Um, but I I do
believe that now that they're locking
into doing it. So
>> to know on that project, did they decide
how they were going to widen the road?
They were going to take it from the
other side, not the sidewalk side.
>> No, they're going to do it all on this
side of the road. And then
>> this side is what?
>> The same side that it's on.
>> Sidewalk.
>> The sidewalk between Brook Street and
the parsonage. Brook Street and the
parsonage.
>> And are they going to make concrete
sidewalks?
>> I believe it is. They're not really
important for us. We have not seen
the design yet. There was some
discussion about drainage from the
sidewalk and we have yet to see what
they've decided to do. So, um
>> about the drainage.
>> Yeah.
>> Um I spoke with them about that.
>> Yeah. I spoke with the
the engineer from VOTE and the u the
design engineer from from private firm.
I'm drawing a blank on the name of the
firm. Um and uh um there was some
question about how uh deeply buried that
um
drainage pipe that crosses the road
there. Um
>> and you know, we had a discussion about
that. I brought to their attention the
fact that there's a water line there,
which they didn't know. Um thank you,
Terry, for pointing that out. Um and uh
uh the decision I believe if I recall
correctly a couple weeks ago now um
they're going to they're going to bury
that storm line 18 in which still should
leave it um a good couple of feet above
the water line and they're going to line
the uh the bottom of that uh the trench
that they're going to lay that pipe in
with some insulation board to protect
the the water line from freezing.
>> Okay, great. Just curious to know why
they're taking it from the sidewalk side
which has already taken so much of the
property owner's front yards as opposed
to the space that's on the other side
where there's a lot of setback
>> from house to road
>> where there isn't on the sidewalk side
and that the last meeting I was in they
were looking into taking it from the
other side two to three years
>> I know but what why would they decide
that
>> they were they were talking about
engineering this the the road itself and
moving it over to allow more room for
the sidewalk.
>> Yeah.
>> So, they're going to the road. The
sidewalk is going into the road, not
into the yards.
>> It's I really need to
>> We're not in 100% sure of that. And it's
also 100% funded by the state. So,
>> Right. But the design is something that
the town has to accept.
>> I I don't think the sidewalk is moving.
>> It has to be a little bit wider.
>> Yeah. So Cteril's just left, so I'm
gonna
>> say what he said to me, but take it with
a grain of salt because
>> it it's unofficial.
>> But at one point, he had a conversation
about the sidewalk and um
was a you know, to make it ADA
accessible. Technically, it had to be so
wide, but it doesn't have to be that
wide the whole way. So, they had
negotiated the width of the sidewalk
back down to something closer to what it
currently is and it still meets the ADA
requirements. So, I don't I don't know
if that answers your question or not
because I came into this very late. Um,
but I also haven't seen plans. Well, I
think we all need to see plans over
>> where there also were planning on
curling it around a little bit so that
someone was cross someone that was
crossing the road by the parsonage going
towards the Huntington house would be
more visible and there will be a little
flashy thing saying someone's crossing
the road. Um that that was all part of
the original design and I'm sure that
did not go away. So it was just a matter
of the drainage. So it's uh it it it is
what it is. If we want that sidewalk, we
have to bring it into this century. Um
>> do we have do we have plans here
somewhere in the magic town place?
>> No.
>> I I I have something. Um
>> well, they should be posted the plans.
>> Well, I mean it's
>> it's not town funded, so it's state
funed. It's the sidewalk is staying is
staying where it is.
>> The sidewalk is going to stay where it
is,
>> right? It's whether or not it's going to
widen towards the the property owners or
whether it's going to widen towards the
street. And is it going to be concrete?
>> All sidewalks are concrete now.
>> A lot of them are are car.
>> Well, that's good to know. But just to
be assured of it, being a homeowner
right there and just knowing the dangers
of the accessibility of the road to the
pedestrians, it's a concern to us.
>> I've been on the sidewalk with a dog and
passing traffic has hit the dog. I mean,
nobody monitors the speed of that road.
>> Yeah. I I was provided something to
facilitate the conversation about the
the uh the crossing and the of the road
and the water line. So I
>> But that's that's not a full plan. That
was what you sent.
>> Yeah, that's what I had.
>> That's the water line. Yeah. Um can we
get have they drawn up an engineering
plan?
>> Well, at our last meeting, we did not
think so because they were waiting for
us to answer a question,
>> right, about this,
>> right? So,
>> well, I mean that that's just one detail
of a bigger plan that right that was
already completed. So, I mean it's it's
not like, you know, okay, now they're
going to make the plan.
>> Yeah,
>> the plan was almost already completed.
This is one detail.
>> I can see if we can get the plan, but
>> yeah.
>> Um,
>> sidewalk and with
>> you know, I've been in communication
with these folks, so I probably should
take this.
>> Thank you.
Okay, I'm going to continue with my
select board report.
>> I'm sorry.
[clears throat]
>> Um that that Oh, and then um it was also
brought up that it is that time of year.
There's a chill in the air about CB oil
locking in prices again this year. I did
have a conversation with um Charlie
Martin of CB oil and um we have decided
to you try to use some procrastination
um to see what happens in a very
volatile market. um we would not want to
lock in an oil rate at this point in
time when it is at its highest and we're
keeping our fingers cross that if we get
closer to October or the election might
be a better time to have a discussion
about how the balance of the winter
would be. um most of the discussion that
we're having um affects the hub because
you are by far the biggest user of
energy right now. So um
if you are uh getting your oil
deliveries automatically.
>> Okay. So if you if any if anybody can
can monitor it and hold off a little bit
and see what happens. Right now it's at
the highest the highest rate and uh you
know I'm not saying run out of heat.
>> Um we are going to have that discussion
and for the time being I think we might
be still under a contract with it but
I'm not sure.
>> I think so too. I'm not positive either,
but I can limit
>> right now they're losing money on
selling fuel to our
>> I wanted to ask you about that like with
your discussions with Charlie is that
firehouse, garage, town office, hub,
library.
>> Uh, yes.
>> Everything that we did last year.
>> Okay.
>> I thought the library was included last
year.
>> They were included. She just said they
did their own and I said not last year.
>> I just saw their minutes they were
talking about.
>> Yeah, they were talking about it and I
told Barb that is sort of what brought
it all up.
>> Yes. Okay. I just wanted to make sure
>> is LP.
>> Um that is
>> Charlie.
>> Yeah, I know it. I know that. But I
don't know that we locked in rates for
LP because our it was mostly oil that
affected our budgets the most and you
know the hub being 75% of that. Um that
was where we were putting our emphasis
on.
>> Okay.
>> Cuz this is going to be out here too.
True. But it's going to be more
efficient.
It's going to have insulation around the
>> Where did we get our propane?
>> Okay.
>> Yeah.
>> That's what I thought.
>> Um and the last thing on my list is just
a quick announcement and I think Mary
might want to elaborate on it. Um,
regarding the cell tower application,
that application has been pulled by
Vortex, um, the initiator of the tower.
Um,
and I can let Mary go further with it.
[laughter]
Uh,
>> the state of the mirror.
>> So, um, they the road as designed uh,
crossed an abuing landowner property
without permission. Um, and so they have
to, in order to continue with the
project, they would have to redesign the
road. Um, and they were said they were
in the process of so doing, but they
hadn't submitted redesigned plans yet.
Um, and so, um, there was an individual
intervenor had made a motion to have the
case dismissed with prejudice. and um
the day before or so that that when that
would have been ruled on um the
applicant um chose to withdraw their
petition um so the the project as it
existed is closed and no longer exists.
If they choose to redesign the road and
move forward, then the process would
start again and we would get an advanced
notice with the 45 or 60 days, I forget
which, and then they would have to
refile a petition. Um and so
>> like start from
>> Yeah.
>> Yep. It becomes a new project because it
the
it was a substantial enough change that
they could have it it could have asked
the hearing officer to say that this
it's sort of like when we modify a grant
like it's more than a materials change
but is this a substantial enough change
that it's a new project. Okay. and
that's sort of where the conversation
was happening, but since they didn't
have the plans.
Um [clears throat]
>> Okay.
>> So, yeah. Did did that answer your
question?
>> Yes.
>> Um so, um we are done until further
notice. Um
yes.
>> And that's what we've been up to
>> since August 24th. Anything yet more?
the housing committee um has chosen to
disband as the entity that they were um
and so they were if so the housing
committee no longer exists um there is a
meeting on the 23rd of September um let
me just pull up the
>> at the Huntington House
>> at the Huntington House this is the
second and final meeting for the area
plan the first one had been at the um
Pierce Hall this one will be at
Huntington house from on Wednesday,
September 23rd from 6:00 to 8:30 p.m.
Um, it's going to start with a optional
tour of Huntington House and then a
facilitated discussion using Huntington
House as kind of a case study for
imagining a way to redevelop something
um in town. So, Henry um is going to be
there and it's going to be facilitated
and there will not be a remote option
for this um and Kristen's going to send
it out um at the email. Um the reports
for that came with this grant um the
grant produced
a market study and an environmental
desktop review. The final version of the
reports are in and they will be up on
the town website tomorrow. Um
and I'll give you language to put out in
the email too. So they are they are done
and they are there for public perusal.
Um and to the best of my knowledge that
closes out this grant. Um, I don't know
what the next steps would be. I'm
assuming that would be part of the
conversation on the 23rd.
>> What's next?
>> Thank you.
>> Um, so I have a call scheduled tomorrow
um with a representative from Norwich
Solar
regarding the resiliency zone up in the
gravel pit.
>> Wonderful. Um
>> I think
>> well we'll see. Um
you know they reached out to us so I
think that that's a good sign.
>> Mhm.
>> Um
you know I'm continuing to monitor this
and trying to get it to happen and I I
think it is going to happen but we have
to still be patient.
>> But uh I will learn more tomorrow.
So, they still have a relationship with
Green Mountain Power, a contract in
place.
>> They do. Uh, well, I'll learn more about
that. It
>> Okay.
>> The legality of the deal between Norwich
and Green Mountain Power had to be
reconfigured.
>> Yes.
>> Um, and the state of that, uh, I guess
I'll learn.
>> Good. Good. It it good to know there's a
glimmer of light there at the end.
>> Yeah. The other thing I'll mention um
and really this is just a something for
discussion. I'd like to hear from both
of you and end it from anybody. Um but
uh I'm contemplating reaching out to the
library
um to kind of
create more of a connection. Um, you
know, there there's kind of an
estrangement there between us and the
library that I think is
undesirable. And if we can kind of mend
fences and become friends again, I think
that would be a good thing.
>> I tried eight years ago. [laughter]
>> Well, there's a new board over there
now. I think it's worth another shot.
>> There is.
>> Unless you disagree.
>> Fine with me.
>> Always keep trying.
>> Good. I'm on it. [laughter]
>> Okay. [clears throat]
Be diplomatic.
>> Absolutely.
>> How about a utilities department update
>> going?
>> Okay.
>> I'm got still working on getting
wires growing in pumps cuz
number one pump is working now.
Did you have a chance to look at that
space under the the hub?
>> No.
>> Okay.
>> Haven't done it yet.
>> Did the messet guy give you a call? The
weather station guy?
>> No. Okay.
And we know that the old one the or the
one you thought you had is not around
anywhere. The harness.
>> No, I
you walked everywhere.
>> But you you thought that we had it when
we bought the pumps.
>> Mhm.
>> Wow.
I didn't pick it up and walk away with
it because I hear it's very heavy.
>> No, one person did.
>> Yeah.
Um
okay BHI management updates.
>> So uh piggybacking on the discussion of
fuel oil cost that's been topic of
discussion and uh the approach you're
taking is to try to reduce consumption.
I mean the price is going to be the
price and it's going to be higher than
anybody wants to be. We made some
assumptions about what that might be for
the rest of this year and into next year
but you don't really know till it
arrives. Uh so meanwhile we're going to
work very hard on reducing consumption
which means trying to keep the building
as cold as we can without freezing the
pipes with people. Uh we'll have uh a
walk through with efficiency Vermont uh
in a couple weeks uh to take a look at
what are the best opportunities for
further insulation and heat reduction.
We may need to buy some materials to do
that. some blue board and some window
plastic to put more of the uh we got the
window treatment on to which really
helped a lot and what was done last year
was very beneficial. So uh Drew Hudson
and Jeff Gard are both working with us
on that. They're the current
uh energy u uh leaders for the town. And
uh so that's the tractor taken. Try to
get it set up before the real cold
weather arrives again minimize the
consumption of fuel oil. That's another
we can do
at some of the
>> the uh controls the heat controls. We
know that some parts were adjusted um
before the town took ownership of the
building that resulted and there's some
some work was done to um which resulted
in some rooms being left wide open heat.
So we may need to do some adjustments in
the radiators. uh certain valves might
need to be installed or replaced to be
able to better control the heat flow and
the demand for fuel oil therefore from
the boilers. So looking at all the
things that can be done short of
replacing the heating system.
Um so that's that front. U the bone
builders group is in there three days a
week. They seem happy. They are up
around 30 people I think in the last
time around and like the space. Um, so
that's going well. Um, and then on the
the phase one renovation project, we're
still pursuing two tracks. One gave us
getting the money, finishing up the
money that's needed to get started. Uh,
we have some very promising discussions
going on, but it's still discussion at
this point, which we want to convert to
cash as soon as possible, but this it
takes some time. And on the on the U
regulatory front, the fact Kath I just
got off a call with Sarah Ray to find
out where things are and there's still a
lot of work that needs to be done on
that front documents that she needs to
provide or needs to get from others uh
to be provided for from the uh architect
for example and get some clarification
on certain regulations from Nap
Cleveland and the a commerce and
community development. So, it's going to
be a while yet, but uh those are moving.
>> We're moving.
>> So, uh when does that money get released
from the the Nathan?
>> When all of the funding from the grants,
it's after we have spent our money.
>> So, we are working to close the funding
gap. We have over four million
>> in major grants. Uh and we have what we
have we're close to the to closing the
gap. Uh we have received money this
summer. We have 2027 pledges we learned
last week that the 2027 pledges in order
to count so that we can start
construction need to be converted to
cash
2026 because we want to start the
bidding as soon as possible. But we
don't know. I think we're much more
assured about money than we are at this
moment than what it's going to take for
the USDA to approve the deductions. We
did three deductions. They're really
sort of minor and more material uh
changes and so it's just looking really
close, guys. It really is to start phase
one construction, which we're very
excited about. But it would be a mistake
for us right now to give dates when
we're not in control of agencies like
the USDA, which has is an unprecedented
low staffing under this administration.
>> So,
>> okay,
>> I don't know whether you know this, but
they actually had
>> the town address for the NEPA
>> and so we had to get them to just do a
clerical change. I think it took five
months.
>> So, uh, none of these grants have
expiration dates on them, do they?
>> No, we're good with all that.
>> Five years on the
>> good with all that,
>> don't they?
I've never heard of a grant to not have
an expiration date.
>> Yeah,
>> especially with that amount of money.
>> The big grant from U
>> Sanders.
>> Yeah, Sanders grant, they had a fiveyear
window on it and it was in 24. Was that
granted?
>> Yeah, we got it. We got notification 24.
Yeah. So, five years from that, the uh
most recent grant from ACCCD, we have to
have all the conditions met by December
1st.
>> So, that's what we're It's not about
>> December 1st or December 31st.
>> December 1st.
>> It's really not about the two bigger
grants. It's really more about the state
is so rigorous as you must know. Uh so
it we've got to meet all their
conditions and
>> northern board
>> and and that includes the program
manager which is so loosely defined you
couldn't even hire somebody and let them
know what they're supposed to do. So,
we're asking for very clear uh
definition because we'd like to find a
local person who would be able to fill
that role and um
clerk of the works and the construction
manager is already in place and most of
the you know most of the jobs are really
under those two roles. So, um there's
some more permits that have to be
finalized and that's like what Kelly's
doing the architect. So, but in terms of
the actual fund campaign,
we're feeling very positive.
>> Okay, good. Yeah,
>> very posit.
>> We're going to be keeping it up for a
long time beyond phase one because the
the project is really both sides of the
building. So,
>> yeah.
I and um Drew I don't know if
>> Drew is here. I was told to put him on
last.
>> You can ask him if he has anything.
>> He's here. He gave thumbs up. I guess he
>> bring him in. Energy coordinator
>> or VHI whichever hat you want to wear.
>> Make him say no. Make
>> Oh, Mary wants you to say no or you
know.
>> Can you unmute and say no or whatever
she said? So, be official.
>> Oh, see. Hold on. He's finding the
unmute button.
>> Pretty small.
>> No, he's definitely just staring at us.
>> All right, that's fine. Move on. He's
good.
>> Okay, let's move on to new business. Um,
approve July 2026 treasures report from
the treasurer. Um,
I just hit this one. Um, July would be
not a lot of neat to digest. I wouldn't
mind if I could kick this down the road
to the next meeting.
>> Sorry.
>> So that I can I can digest it a little
bit more. Um, we'll even have a
budget meeting or two under our belt so
that we can chew on these numbers and
those numbers at the same time. So I'
I'd like to forward this on you two.
Okay.
>> Sounds fine.
>> Yep.
doesn't have a lot of data in it, but
it's a start.
Boom. Arrow. Um, number three, sign
fiscal year 27 grants and age grant
agreement. This is this right here.
And this is um an annual thing for us.
And is this Austin Hill?
>> Um, right now that one's to be
determined, I believe. Yep.
>> This is the new one coming up. Yeah.
Next Septemberish.
>> Is this the the annual road grant that
we get from the state?
>> Yeah. Okay.
>> Like ditching and Yeah. Ditching covers.
done.
Discussion of draft um requests for
proposals for arborist park and cemetery
state arborist report available at the
town office or online. So I'm going to
hand this over to Mary.
It's uh her baby.
>> Yes. So, Adam McCulla from the Vermont
Community and Urban Forestry Foundation
uh came down in July to do an inventory
of um a partial inventory of the trees
on the park. We also visited uh North
Hollow Cemetery and the village
cemetery. Um and he sent the report
which um I have a couple of copies of
here. There's a hard copy at the town
office and at Dave Pawn uh the website
under documents as well. Um it's a very
user friendly report. Um his assessment
um was looking at um risk and over three
years. Um and
uh because we asked him to do so much in
a single visit, what he also did was um
he did some video assessments
for and some aggregate video assessments
of the trees on the park. Um so he
assessed the ash trees as a unit. He
assessed the three pine trees um and
then he did two individual ones for a
maple tree um that has a deep cavity and
a maple tree that's having some fungal
issues. Um so those videos are also um
on the town website and super fun if
anybody wants to take a look at them. Um
so um based on that report I'm pulling
together um an RFP to get some quotes
for the immediate needs. Um
the I have copies if people are
interested in this. You want it. Um
anybody want it? You don't have that.
Yeah. Um
Nancy, I think you already have them in
the center. Um this doesn't commit us to
any money. It's it's basically to get
some budgeting lines as we go into
budgeting for the upcoming year. Um
so the immediate needs um based on the
thing there's three trees that he re
recommended removing. There's a 33inch
sugar maple in the park that's got a
large cavity. You may stick your arm in
all the way up to your shoulder and
still not reach the end. Um there's a
34in sugar maple in the North Hollow
cemetery and then there is a butternut
um over here in village cemetery that's
a lime tree. um he made some
recommendations for um preventative
pruning and support for a pine and a
maple on the park and um some similar
work for two sugar maples in North
Hollow and for an asht tree in the
cemetery down here. So that was the that
was the immediate recommendations. Um,
I'm also talking to arborists to try to
get a sense of um,
how to budget for longer term costs
because one of the things from Adam's
report was I asked him to kind of give
us some general advice for um, how to
care for the trees on a more regular
basis so that we're not just planning
for their removal. Um, the pine trees in
particular are in really good shape.
They're just really large. Um, and so
that makes them um, susceptible to winds
among other things. So, I've got um,
some sort of long-term things here that
I'm asking the arborist. The idea here
is to see what it would cost for us to
reestablish a relationship with a with a
regular arborist. We're not going to be
able to get that service from the state.
His position has been cut. So, it's not
he'll never come back and help us. Um,
but he can't come back anytime soon. Um,
so I'm trying to figure out what it
would cost to establish a regular
relationship with an arborist based on
the recommendations from the state. Um,
we may go through all of this work to
this is me gathering data. This is what
we should be doing based on the arborist
from the state. When we have those
numbers, the question then becomes,
how shall we pay for it if we can't? And
the answers are pretty straightforward,
which is to say it comes out of taxes in
the general fund. It comes out of
donations. It comes out of grants. It
comes out of volunteer labor. And so I
might we might do all of this and not be
able to pay for any of it. But I'm
trying to get all of the information so
that we can make an informed decision.
Um I've got three and a half arborists
that came through the treeboard list
serve that I'm talking to who and um
they want they all want to do site
visits first. So I'm going to send this
to them so they know, but they want to
come and do site visits. And then I've
got a couple more um local names that
people recommended that I reach out to.
I'm looking mostly for arborists, but I
am considering also people who do tree
work, but I've got to balance the all of
those things. Um so if if there is an
arborist or somebody who is interested
in in bidding out for tree work for the
town and the cemetery, they should feel
free to reach out to me and it'll go in
the paper. Um that's the long version.
Um and then I sent this out to you guys.
The only thing the cemetery I think I
said this maybe I didn't the cemetery
commission asked that we had when they
do the site visit to add a couple of the
cemeteries that Adam wasn't able to get
to to take a look at a couple of trees
at Woodlon and Bingo. Um and the ones
that I've talked to said they're willing
to do that. So that's my that's my
spiel.
>> Yeah. I guess the only thing I would add
is I mean we have no idea how much n
>> any of this is going to cost. Um uh you
know another consideration is well you
know you bite off what you can chew
>> um year one and then year two year three
it's going to be a multi-year program. I
mean these hopefully these trees aren't
going anywhere
>> but they do need a little love.
[clears throat]
>> Yeah. I'm very much pitching this to the
arborist as like we have a couple of
very specific immediate needs and
immediate just means like we need it
now. It doesn't mean we have the money
to pay for it now. It just means we need
it now. And then yes, multi-year,
>> which segus us into number five on our
list, discussion regarding park
committee and maintenance.
>> We have a park that has things in it
other than trees. Um and that um we have
not had a park committee for several
years. Um although we did have one for
many years. And so, um, at a previous
meeting, we had a number of people who
said that they were interested in I'm
just pulling up my, um,
my notes here, um, who said that they
were interested in volunteering to help
take care of the park. Um, and so I had
um come up with a
um
so I pulled together in talking with
people who have cared for the park over
the last many years a list of sort of
what that would mean. And this is the
discussion was do we want to reform the
park committee? Um if so, what would it
look like? Um and then
yeah, you want me to go through this
some more because it was the discussion
first. Take it.
>> Uh so this is what it this is what it
means to take care of the park. Um which
is to say um the park maintenance
throughout the year is um pick up limbs
and debris. Um in January they remove
the trees and the lights from the band
stand. April and May rake for spring,
work with the road crew. In May arrange
for lime fertilizing, arration is
needed. May through October we have a
mowing contract. December set up the
tree and lights on the band stand. Um so
this park committee as would be
responsible for
coordinating this and doing it. Um
other things that they could be
responsible for would be identifying
external funding sources for the park
care because as I have been saying these
are all best practices but how we pay
for them is unknown. Um
that's that's sort of what the park
committee has done in the past.
My turn. [laughter] Okay. And um I'm
thinking if we are going to form a
committee um and they will have the the
authority to oversee the park physically
um I'd like to take it to the next
level. And um since
uh I'd like to see them do the approval
for the park use permits
and because the health of the park
pivots on the usage of the park so they
can coordinate who's using the park for
what reason and then they can also
inspect the park after the event to make
sure that if these people wanted to come
back and use the park again, they left
it as good as they found it. So they
would also be kind of the approval party
and the policing of the events that take
place on the park. Um another other
other things other chores that are done
for the park is um taking care of the
American flag. Um when it does need to
go half mass, bring it down. And when it
does need to go back up, get it back up.
Um I I do understand that because of the
lights that we have around the the
street lights that we have around the
village that it's not necessary to light
our flag at night. Therefore, it can
stay up at night. Um I'm just saying
that that it not somebody has to go out
and move it up and down every day
from what I'm from what I'm told. Um I
also feel as though they'd be
responsible for the picnic tables. Um,
some of the picnic tables I remember
were donated to the town and somebody
should be in charge of making sure that
they're being treated well. They go away
in the fall and come back in the spring
as well as monitoring
any abuse or use of the portaotty that
would need any attention.
And um
last but not least, dog poops on the
park and and the select board has had a
lot of has had discussion and requests
from people in town about that. So um
I'd like to have that park committee
actually take care of all aspects of the
park if we form the committee. That way
they do have purpose to meeting
virtually every month and they they
would have a a good power and a good say
over what happens on the park.
So anybody that's interested in forming
a committee if we decide that that's the
direction we want to go um Mary can take
it back from how she's going to come
about for us to make that decision with
a couple meetings.
>> Yeah. Do you want to say anything else
before I
>> No, no, go ahead. Um [clears throat] so
there'll be I will be here to have two
informal info sessions for people who
think they might want to join the park
committee next week. Um one there one
will be on
[clears throat]
states right before I
um
on Tuesday the 22nd
and Thursday the 24th at 6 pm. So, if
anybody is interested to come and talk
through that, um, part of whether or not
we choose to form a committee is going
to depend on whether or not anybody is
interested. Um, I'm just wondering if
any of the if anyone from any of the
organizations who routinely use the park
for their events every year whether they
would be interested in having a
representative on the committee
>> because they most invested in using it
for
>> it's open to the public.
>> Yeah, it's open to anybody. I I have to
say I'm not I'm not doing a ton of
outreach on this because part of it's
here and I'm going to put a little thing
in the paper but I
>> being on a committ forge forum
>> um
>> you too what
>> I could put it in my
>> Yeah. So, I mean, so we're like it's
here. It'll be in the minutes, you know.
Um, Crystal will put it out on the in
her email. She can put it on front
porch.
>> What you're doing,
>> but um part of part of this is somewhat
self- selecting, which is to say being
on the committee, you have to be able to
have some initiative, right? Um you have
you have to do things, not just wait to
be told to do things. Um, so I I would
be perfect I would be perfectly
interested and happy for organizations
that have gotten vetting permits from
the park to be to have a member of that
park committee. I'm not necessarily
calling through our permits and to see
if anybody wants to do it. Um,
>> yeah, I'm not looking for a committee
that's going to burn out in a year or
two and then it disbands. I I'm looking
for something that would is going to
stick around to give them something to
do and to expand to other parks as well.
Um, Riverside Park definitely is another
park that could be overseen. And if the
Lion Club people ever want to give up
the Lion Club park, then we could pick
that one up as well. Um, at least the
oversight of it. So, um, this committee
will have power. We'll have will will
have some good substance to what their
duties are. So hopefully that brings a
lot of people forward.
>> You know, the last thing I'll just say
is, you know, that park is a jewel. We
are so lucky to have that.
>> Yes.
>> Um and you know, taking better care of
it um is a fantastic thing. Uh getting
more hands makes light work. Um so I'm
with you.
That's it. That's what I got. Yes, we
don't have Orca here. The one time that
we probably would want to have Orca here
so that people could watch this.
>> Go back to this.
>> Okay. You want to come back to it?
>> Yep.
>> Okay. So, um we are going to circle back
and approve the prior meeting minutes.
Are there any changes?
>> No.
I have read them and I have also watched
the orca. Um, so I move that we approve
the prior meeting minutes from our
meeting of August 24th, 2026.
>> Second.
>> All in favor?
>> I.
>> Do we have any public comment?
>> I have a question.
>> We can take questions. Tomorrow night at
Dockbridge, there's going to be a
community forum on what's happening with
the school
and I'm just wondering whether there's
anybody going to go and listen to it
>> or participate in it.
>> Yes.
>> It's 6:00 down at Stockbridge School.
>> Are they talking about RSUD? They are
talking specifically about RSU
>> and basically what's going to happen
with our two elementary schools
>> is well I'm sure they're probably well I
don't know
>> and this is the this is the result of
the survey that went out to everyone in
town.
>> Uh I think they got a 100 responses.
>> Um
>> what time is it? But anyway,
>> I'm going to go to the meeting.
>> I'm not sure why, but I'm going. It's
important.
>> Yeah.
I wonder uh
which parents will be. But then
>> probably nobody from Rochester will go.
>> Yeah. This was not highly publicized.
>> No, it has not been. But everybody in
Stockbridge knows about it. Yeah.
Because I think Stockbridge has some
motivations.
>> Yeah. They're probably more vulnerable.
>> Yeah, I've been to all of these
meetings.
There's only been one or two people at
these meetings
from Rochester. From Rochester. Even the
one that was in Rochester a couple weeks
ago. Um,
Bill,
Debbie, and I were there.
>> Yeah. Because they're not being
publicized,
>> right? Um if they are
>> well it's posted everywhere.
>> Okay.
>> But we know [laughter]
it posted in three places.
>> We know what that means.
>> So I just think it would be nice if
people from Rochester would show up at
the meeting
at least to hear what's going on.
>> Good point. Good point. I cannot
>> I don't think we can be too confident
without showing up quite frankly.
>> I think a decision is going to be made
rather quickly about what's going on.
Really?
>> Well, you've gone to the meetings. Can
you give a little synopsis?
They're going to give the final synopsis
and and discuss what their what their
plans are. They had a retreat
school board had a retreat last week, I
think it was.
>> Yeah, that's an annual retreat though.
>> It's um
survey data
>> and it was it was to review the data
that came back from those surveys.
>> The data said that there's no conclusive
direction one way or another about what
to do in a school,
>> but they're going to be told what to do
with the school, who's going to be told,
>> right? But this just says community
discussion.
there was no decision to be made
by the state.
>> I I thought of the last iteration of
that that the town's desires were going
to be taken into full consideration, not
just being forced to close down
consolidation
is a loophole you can drive a truck
through.
>> Yeah. What one thing that u I think it
was Jamie said in that meeting was that
the state meaning the legislature
legislative intent was to create super
centralized high schools somewhat
centralized middle schools and and allow
for more of the local elementary school
just as a general thrust of where they
want to go consolidation issue. So, and
if that's the truly the direction, then
you know, town both towns may end up
having uh their own elementary school,
which both towns want, far as I can
tell,
>> but they may divide up the classes
differently. So, you might have
[clears throat]
>> four or five. Then, there's a whole
question of the sixth graders, whether
sixth grade is going to remain
>> in the school or is it better to have
sixth graders join junior high schools,
>> right?
>> They don't appear to [clears throat] be
ready. And that was one of the questions
on the survey.
>> Yeah. Yeah. So, and there's the next
meeting is uh 15th and
>> tomorrow night.
>> Tomorrow night.
>> Yeah. I got way unfortunately otherwise
we would have gone.
>> Right. And and one of the things that
they were talking about not siding on
was removing school choice from a town
like Rochester. And with the with the
high school situation, making the super
high schools. Um they were removing
school choice and you would go to a
design all the students in this town
would go to that school, not that one,
that one, that one, and that one. But
that was going to be phased in
over the course of five years from now.
>> In other words, children that go to the
current their current school would not
be moved.
>> One designated high school,
>> one designated high school, but it's
also going to phase in. So don't
everyone panic. If you're going to
Mberry, you're going to continue till
that all those students graduate and
then they'll phase in.
>> Right? That was the only thing that that
I thought would be a a major change to
how we were because I mean we're having
discussion now because
>> when we when we went from not having a
high school to school choice, one of the
gratifying thing was that you could
choose the school you wanted to go to.
>> Absolutely.
>> And now they're talking about taking
that away too. So
>> the state is talking about taking that
away. They're they're having a look.
>> It was and it was an option. It was a
proposal. I don't think it's in, you
know, written in pen. It's still in
pencil. All of these are still in
pencil. So,
>> I think the point is Nancy made the
point. We Rochester needs to be at these
meetings. Need to be
>> We do need to be there.
>> I wish I could go tomorrow,
>> right? But
>> just need to go and the ones who got the
kids.
>> Yeah.
>> But I can't call Jamie tomorrow.
Okay.
I move that we adjourn.
>> Second.
>> All in favor?
>> I
[music]