Video summary
The Montpelier Development Review Board convened its session on August 3rd to address a significant request from Vermont Rental Solutions and Capstone regarding the demolition of a historic structure at 144 Elm Street within the downtown district. The applicant argued that full preservation was economically unfeasible due to extensive flood damage, with engineering assessments indicating that retaining the building would cost approximately $500,000 more than new construction without external funding. While acknowledging these financial constraints and liability issues associated with salvage contractors, the Historic Preservation Commission suggested a middle ground: salvaging the front 12-foot facade could stabilize the foundation against flood risks while preserving streetscape character similar to practices in Georgetown and Charleston. This approach would add between $200,000 and $300,000 to project costs but offered a viable path to integrate historic elements into new affordable housing units intended for the cleared lot.
A central point of contention during the deliberation was the issue of "segmenting" the approval process, specifically approving demolition without a finalized plan for the subsequent building phase. Board members and neighbors expressed concern that granting permission solely for Part A (demolition) might deprive the developer of reasonable use while failing to guarantee sufficient public benefit if future development plans were not secured. Neighbors also testified regarding safety issues at an adjacent under-maintained parking lot, questioning who would manage the site post-demolition to prevent vagrancy or dumping before construction begins. The applicant clarified that current contractual obligations required maintaining leased surface parking spaces until permits were secured or leases expired in late 2026, but agreed that these agreements could be terminated once construction commenced indefinitely. The board ultimately decided against mandating the immediate cessation of surface parking upon demolition start, agreeing instead that maintaining the current use provided necessary flexibility without prematurely extinguishing rights.
Further discussions focused on site conditions and regulatory standards, including erosion control measures resulting from filling basement footprints with gravel rather than permeable surfaces like grass. Staff proposed a condition requiring applicants to return within three years if no new building permit was issued to update screening, landscaping, and compliance standards such as silt fencing during construction. Environmental concerns were also raised regarding combined sewer overflow impacts and the feasibility of district heat versus electrification for the proposed building, with board members criticizing segmented projects as poor planning practices that limit long-term viability assessments. Despite these complexities and questions about whether additional parking spaces could be designated for future development—which was clarified as moot since specific numbered spots are already in use—the board proceeded to vote unanimously (7-0) to close the public hearing and move into a deliberative session before formally voting on the application later in the meeting, following which elections were held with Alva elected Chair and Rob Vice Chair.
Read the full video transcript
We will uh call this August 3rd meeting
of the DRB to order and uh the staff
will begin by um reviewing the remote
meeting procedures.
All righty. So, give me just a second.
Share my screen.
All right. So, so far Oh, we do have
Yep. We do have members of the public.
All right. So for anyone viewing
tonight's development review board
meeting via Orca media, you can
participate in the discussion via the
Zoom platform using either video or
telephone access options. For the full
video experience, please type this link
into your web browser. Alternatively,
you can call into the meeting using this
telephone number and when prompted, put
in the meeting ID and passcode. If you
have problems accessing the meeting,
please email me at
mcrandlemountpillar-vt.org.
I will be monitoring my email throughout
the meeting. Um, for those attending via
Zoom, turning your video on is optional.
For everyone attending remotely, we ask
that you please keep your microphone on
mute when you're not speaking. This will
help reduce background noise. Um, if you
do wish to speak about an item on the
agenda,
um, we ask that you please raise your
hand and wait for the chair to call on
you before unmuting and then speaking.
Um, and please remember to state your,
um, name and um, if you live in Melar,
your address for the record. Um, this
helps both with the meeting minutes as
well as to make sure that we can provide
copies of any decision related to the
relevant application to you afterwards.
Um, the Zoom chat function should only
be used for troubleshooting or logistics
questions.
Um, any uh comments or questions about
actual items on the agenda need to be
made verbally.
do. Um, in the event the public is
unable to access this meeting tonight,
it will need to be continued to a time
and place certain. I will now hand the
meeting back over to the chair.
>> Okay. Thank you, Meredith. Um, so next
item would be the approval of the
agenda. Um, I think uh traditionally we
have uh done the officer elections at
the end of the meeting. Um, so would
anyone uh prefer to uh make that motion
as amended? I move we do the officer
elections at the end of the meeting.
>> Seconded.
>> Um the
>> Yeah. All those in favor of the
amendment say I.
>> I.
>> Um and uh so all those in favor of
approving the agenda as amended.
>> Actually we need a motion in a second.
Sorry.
>> All right. We have an agenda.
Uh do you want to introduce members?
>> Yeah. Um so we will start uh by
introducing members. Uh starting with
Bill on the end here. Um I will note
Bill is alternate and uh this is one of
the first times in a while we've
actually had uh all of our members
present and uh so Bill will be a
participating but non- voting member
this evening.
>> Start out.
>> Go ahead. John, member, ERB.
>> Kevin O'Connell, member.
>> Meredith Kandle, staff.
>> I'm Rob Goodwin, the staff. Um, the
chair.
>> Catherine Burgess, vice chair.
>> Brian George. Brian Jones, member.
>> Alierana, member.
>> Alex Helas, member.
>> Joe Kieran, member.
>> Okay. Wonderful.
Um
uh so comments for the chair. Um feels
like it's been ages since we met, but uh
really not that long ago. Um believe our
last meeting we had, um one application
that was nine Heaton Street. Um the
decision on that um well to report out
on the deliberative session from the
last meeting um the board did uh render
a decision on that. um and is uh
currently drafting the decision uh and
ready for distribution to the applicant
and the public. Um anyone have any
questions on that?
>> That was that was the only application
that was had a deliberative session at
the July 6th meeting.
>> Right. There was another application,
right?
>> Two others.
>> Two others
and all right. So we had Granite Shed
Lane was also at that meeting and then
also the fence on College Street, right?
Grand Shood Lane, Fence on College
Street and um
brain there was a I can't even remember
what the third one is right now to be
perfectly honest that were decided but
this is just reporting on deliberative
sessions right so we don't have to worry
about that right the second those other
two decisions are done lane is still uh
in process
>> it was the downing street parking
>> thank you
was
And that decision has been uh been
issued.
>> Yeah. Yep. That was done. 31 colleges
done.
>> Yeah.
>> So, Granite Shedane is the only one
outstanding.
>> Okay.
Um All right. Well, then um any board
members have any comments uh before we
get started?
Well, seeing none, uh we will move into
uh the 144 Elm Street application on our
uh agenda. Um, an applicant is Vermont
Rental Solutions. Um, and who do we have
representing the applicant? Uh, here.
>> Uh, Lucky Boardman.
>> It's just you. Is there anyone else
here?
>> Just me.
>> Okay. Um,
who do we have um
on the Zoom platform as members of the
public that wish to speak on this
application? You just introduce
yourselves.
I think that's just you, Paul.
>> Hi, I'm Paul Carneahan, member of the
Historic Preservation Commission.
>> Okay. Um,
so be Lucky uh and Paul on Zoom and uh
anyone else in the room planning to
speak in this application? Could you
Okay.
Um, do you tend to provide testimony
tonight?
Okay. Uh, and
Steve, you tot
witnesses. We'll do everyone at once.
Um, this includes the applicant and any
members of the public. All those
interested in u providing testimony on
this application, would you please raise
your right hand to be sworn in as a
witness?
Uh, okay. You solemnly swear or affirm
the testimony you're about to give is
the truth, the whole truth, nothing but
the truth of the pains and penalties of
perjury.
>> I do.
All right. Thank you very much.
Um, so, um, Meredith, do you want to
just give an overview and then we'll,
uh, turn it over to Lucky?
>> Yeah. I'm going to keep this.
>> I'm just going to ask that you actually
make a little bit more sound or the
technician.
>> Yeah. Well, part of it is the speakers
behind the pillar behind you. So, we
we'll definitely try and speak up. Could
you hear Paul over that? Okay, I can
increase the volume of those
and make sure one is pointed a little
more towards you
from our diaphragm.
Um, so I'm going to uh just try and keep
this brief. It's a fairly big staff
report. Um, fairly full application. So
um this application is coming before the
board um for two main reasons. one, it
involves um demolition of a structure
that is listed as a contributing
historic structure on the National
Register as part of Mont Pillar's um
downtown historic district. Um and so
any demolition of those historic
structures as defined in our regulations
have to come before the DRB. Um I cannot
approve those. Um, and then the second
main factor is that surface parking as a
primary use on a parcel versus parking
to serve other uses on a parcel um is a
conditional use in this zoning district.
Um, and so again, I can't approve that.
Um, as a reminder to board members, this
is probably, not even probably, I think
this is the first time that the board
has evaluated a historic demo
application under the historic demo rigs
that got modified a few years ago to try
and clean them up and create these three
different options for um, standards that
could be met to approve a demolition of
a historic structure within the city.
Um, and so I tried to spell those out
and those options and the different
criteria under each of them um, in the
staff report as fairly clearly and and
maybe a little bit more than I needed to
just because I wanted to point out and
make sure you were following along as to
how that provision actually works
because I don't think you've looked at
it before. I think maybe a couple of you
were on and the other um decisions about
something like this years ago, but we
just haven't had one. Um and this
building was flood impacted. Um so this
is also the first of what may be over
the next few years several requests
um to demolish, you know, either some or
all of a historic structure that's been
impacted by flooding. Um we have several
other in the city that just nobody has
come forward yet to do any major work on
them. Um so
it's it's a weighty one.
I guess
couple questions as I yeah just make
sure you're there.
>> Couple questions as I reviewed this.
>> So I I will recall one complete
demolition that we it was Home Farm Way.
It's the only one in my recent time, but
that's different, right?
>> Um the garage slash I don't know if
there's ever a gas station, but the auto
repair place in front of
um the former Thresh Tavern building
>> for my
>> former like Sonoka. That was before you
were on the board.
>> Yeah.
>> Really?
>> You weren't here in 2018.
>> I was here end of 2018. I got
>> Okay. So, it must have been the
beginning of 2018. So that was the only
Yeah, that was the only full other than
five home farmway. Um demo
>> the difference because it's in
>> I forgot about five home farm way to be
honest.
>> View district that makes it different
than
>> uh because it's the different five five
home farmway. Yeah,
>> it's
there's different factors at issue. I
mean it's in the historic district so it
has an impact or moving it has an impact
on
the district not just that building
itself.
>> Okay that's great. Um I think my second
question was related to
um so we have we have guidance to sort
of on technical matters rely on uh the
city's experts for instance uh drainage
goes to public works or whatnot. Uh who
who who would be the city's expert like
does this historic preservation
commission serve that role? So the
historic preservation, so in the zoning
regulations,
there is no requirement that these
applications go through the historic
preservation commission. Um
because the building is in the design
review, it did have to go through the
design review committee and the design
review regulations actually have a
provision specifically about demolition
of buildings in the design review
district. So they have reviewed it. They
have approved the the demo, the design
review committee. We do also have the
historic preservation commission. The
historic preservation commission, one of
their charges is to advise other bodies
and it is called out including
city council, development review board
and I think planning commission on
historic preservation matters.
Um, and so I typically big projects
involving historic buildings, I will
typically
um keep HPC apprised of those. Um, and
part of that is also I staff that
commission as well because of the links.
Um, and so the HPC is sort of your
historic in-house historic
um, experts, but
they don't have a formal role in the
permit review.
It's not required.
>> The board the board could could decide
they have a formal role. Maybe
>> I mean the board can take their their
input as evidence, right? Yeah,
>> they they can and they can definitely
take their input as evidence.
>> Wonderful.
Uh
so for process forward, I don't see what
board members think. I'm into turning it
over to the applicant to state their
case and then I'd sort of like to hear
directly from the historic preservation
if they're here to sort of um give us a
summary of their findings if that makes
sense.
Um,
okay. So, Lucky, uh, we'll turn it over
to you to introduce yourself and, um,
sort of, uh, state your, uh, arguments
for this application and project.
>> All right. Thank you. Uh, my name's
Lucky Borman and I'm here representing
Vermont Rental Solutions in the demo of
144 Elm Street. Uh, we purchased the
property after the flood knowing its
extent of damage um for housing
development. Um, so that was our intent.
um walking through. So, we've had
engineers, we've had appraisers, we've
had the state out, we've met with the
historic preservation,
multiples times on site to deem um well,
the affordability, the cost, and the
just the ability in general to
uh preserve any of that building. Um Bob
himself came out with one of his
um I don't know historic
uh people Elliot and um I haven't heard
anything back from them as far as the
feasibility of it but everybody we've
contacted in the last 6 months who would
have the ability to uh save a section of
the building possibly store it for the
construction duration uh deemed not to
want to get involved or it wasn't worth
the value. Um, what we've established is
that if if we did try and save any of
the building, we'd be running into about
a half a million dollars in additional
costs.
Um, so we're
we're inclined to uh demo it, but if
there's a grant or a fund or anything, I
was talking to Bob or if there's any way
through the future permitting process
while we have the time to come up with
some money to save that building and add
it to the new construction or whatever,
we'd be happy to, you know, revisit
this, but mainly our goal is to level
the lot um clean it up and with act 47,
the home act um provide between 40 and
50 new residential housing units.
That's the gist.
>> Um can I ask a question about the
inspection by Elliot Lothrop that's
referenced but I guess it hasn't been
prepared yet. There's reference to um a
rough estimate for the work and
availability of capable contractors but
that hasn't been forthcoming. Correct.
>> I haven't seen anything about it. Um
it's all speculation as well. I mean the
conversation I had with them is
every anybody can put a value on it. You
could, I could, anybody in the room
could but who will actually do the work
and who will hold the liability? Um, the
biggest problem is for the construction
of it and the amount of construction,
you'd have to physically remove the
section of building off site during the
whole process and somebody would have to
be liable to store and hold that and
then come and install it back onto the
building. You can't half demo something
and and build around it. I mean, the
efficiency and liability is insane. Um,
so there's been a lot of amazing thought
to it, but again, until somebody raises
their hand, it's all just
that.
>> Alex,
>> we're not considering how many units
might go on this property at this
hearing. Am I correct?
>> Correct. This is this is
demo. Uh but it it it may come it could
theoretically come into play in the demo
decision if you're using the public
benefit analysis,
>> right? Um so that's why it is still a
relevant
but then it comes to if you're using
that that analysis there may be some
other factors for conditions of approval
that need to be put in there. Um so but
otherwise yeah this does not approve any
towards the future other than that
interim surface parking use. so that
something can be done with there while
future plans are developed.
>> And those future plans would potentially
be relevant to the economic viability
standard as well in reference to income
producing property
>> with what what it is that he they're
trying to do with the parcel.
>> Okay.
>> Just one moment.
>> Go ahead, Bill.
I think the the economic value and the
value to the community is important here
in regard to what the future of the
owners is at this point that I don't
think we are approving just a parking
um because right now it's worth $340,000
and uh as it is uh but a parking lot
would not be worth more than that I
don't think. So I think in some way we
are looking at uh the the total picture
even though as far as the specifications
for how many units uh is is not part of
the standards uh I think we are looking
at its future value to the the city and
the community as part of uh the intent
of the owner to do more than just put uh
what is it 18 new parking spaces is up
there.
>> Um, so I think Alex, it's good question.
I would just widen it a bit for me.
>> Yeah, it's the it's the number that I
think can because I don't I was trying
to look for where the numbers are
because there's various numbers get
offered here. Um, and some of them are
can be perceived as alarming. Um, and
some of them less so.
>> Yeah.
>> Um, and I I can't find them off hand.
>> Sure. Well, I think that, you know,
there's a lot to this application and I
think with these historic applications,
it's really important that we sort of um
go in in in sequence um and the staff
was laid out, you know, with the you
know, the demolition provisions of 3004
first um and their specific criteria,
make decisions on that and that will
sort of guide where we go from there. Um
Lucky, did you get a chance to review
the staff report that was distributed?
Um, honestly, no. No, I did not. I was
trying to do it this evening. Um,
>> okay. Well, um,
>> it did get you did get the copy. I
emailed you on Friday, though. Okay.
>> Yeah. Yeah.
>> Um, so I'm I'm guessing preparing this
application, you did get a chance to
sort of review the um criteria for
demolition that we have to use um in
section 3004.
>> That's correct, Jim.
>> Yeah. Um
so maybe you could summarize a little
bit or we can go by them one by one. Um
just the sort of the provisions that you
feel apply to your request here. Um you
know is it economic viability, historic
integrity, is it a combination of the
two? There's a whole list.
>> Public benefit.
>> Public benefit. Yeah. Um, just you could
maybe talk a little bit about your
uh sort of thoughts on how 3004 applies
to your project.
>> Uh, that's a good question. So, I don't
3004.
>> So, if you have the staff report open,
>> yeah,
>> it starts really at the bottom of page
seven.
So there's a general statement about
what the three standards are at the
bottom of page seven and it bleeds onto
page eight.
>> So it continues.
>> Yep. And then pages
like eight and nine have the three
different standards laid out. So there's
the historic integrity standard um that
starts at the subf. There's economic
viability standard specifics at subg and
then on page nine is the public benefit
standard specifics. So, so as a board we
have to decide that um it meets um one
or more of the three standards. One, no
historic integrity. Two, economic
viability standard uh and three, the
public benefit uh standard.
>> Well, I would definitely say the public
benefit and uh economic viability are
um are affected by this. I mean,
having new housing uh in the city of
downtown is in the city of Montlair is
what everybody wants. I mean, it's being
screamed from the rooftops and here we
are. Uh, the opportunity to build
anything in in town is limited due to
the size of the city and and what's
available for lots. I mean, this is the
chance to
utilize some uh developmental land for
for such a thing.
>> Okay. And then you talked about the
costs um uh associated with uh
rehabilitation. Um I'm guessing that is
maybe economic viability.
>> Yeah. I mean the cost of
doing anything with the
uh the existing building just takes it
out of any financial feasibility. I mean
the uh without a grant or some kind of
third party funding. It you just can't
finance something like that in a project
and have affordable housing
or workforce housing is what we do.
Okay. Um,
I think that sets the record clear of
what the applicants asking for. Uh,
folks want to turn to the historic
preservation to kind sort of get their
take.
Yes. Um,
so yeah, I'd like to invite anyone from
the Historic Preservation Commission um
up to uh speak on this application.
So you can sit at the table or at the
podium, whichever one you want.
Whichever one's more comfortable for
you.
>> Just introduce yourself and go right
ahead.
>> I'm sorry.
>> Just introduce yourself and
>> Bob McCulla. I am the vice chair of the
historic preservation commission and I
have uh I'm retired from UVM where I was
uh a faculty member for 30 years at the
historic in the historic preservation
program.
>> Do you think you could just you maybe
summarize what you discussed in the
feeling of the board?
>> Sure. Um, you have a letter I think
that's part of your package and the
letter was drafted by the preservation
commission
and there are really two parts to
the origins of the letter. One is the
overall broad concern about the uh
impending demolition of buildings along
uh flood damaged buildings along Elm
Street and the effect that that will
have on the historic streetscape of uh
that part of the city. And it's it's a
form of er erosion that will occur in
fairly large increments as buildings
come down. And the historic preservation
commission speaks for the built and
cultural environment and uh
the commission is concerned about the
long-term effects of what will probably
be numerous requests for demolition.
In this case, uh we have a building that
dates from
1875 1880 uh that is an Italian uh
residential structure that was modified
in the early uh postw World War II era
uh with the addition of a church which
is intrusive to the building's
architectural design and details
substantially intrusive. The building's
principal historic significance is what
it contributes to the streetscape.
And
if you're like me, you probably are
familiar with that building from the
view moving north on Elm Street. And the
first thing that becomes visible is the
church itself, which is again intrusive.
But if you walk past the building and
then turn around and look back toward
the southwest,
you get a completely different picture
of the building and it's much easier to
see how the building contributes to the
streetscape. And I think you have any
copies or photographs of the of that.
And so they were they're on the table,
but I'm going to share it up on the
screen so that you can see it as well
because u
>> and so um we've been we've worked with
with Mr. Boardman on a number of
occasions and have looked at the
building and it's the role of the
commission to advise the development re
review board and to um suggest ways that
the development review board might
address potential loss of historic
resources.
One potential way to do that in this
case is to salvage the front 12 feet of
the building as a facade and meld that
part of the building
into the design of the affordable
housing.
And
I don't for a minute uh disagree with
Mr. board's uh ref emphasis on the need
for affordable housing in W Pillar. It's
it's an important concern and so the
development review board is faced with a
choice between
trying to figure out ways to salvage
some of its historic resources or
provide provide more affordable housing.
The actual feasibility of preserving the
front 12 feet, although it may sound um
challenging is actually not that
difficult. The foundation beneath that
portion of the building is good and the
building wouldn't have to be moved. It
would be uh that the front portion of
the building would be uh simply
stabilized
and one solution with regard to the
foundation would be to uh simply pour
concrete into it at a height that would
that would address to some extent the
concerns about flooding. Um
Elliot Lo looked at the building with me
and with Mr. Borman and I don't have
Elliot's estimates for the costs of
doing that. I think Mr. Borman is
correct. It will increase the cost of
the project and that's another
consideration for uh the board. Um but
it is one device that is available to
try to salvage an element of this
building which does contribute to the
streetscape of Elm Street. And again,
it's the role of the preservation
commission to
make those uh make the development
review board aware of those potential
opportunities.
Um
I think that is a pretty good sum
initial summary and you probably have a
lot of questions about
how we would how this would would take
place. Um uh I don't we don't have the
hard numbers and that's a bit of a a
problem. Um I think the figures that Mr.
Borman discussed with me and Mr. and
Elliot Loth were in the vicinity of
300,000.
I can only guess somewhere between 200
and 300,000. Um but again that's that is
an increase to the project costs and
that's an important factor to consider.
Just to clarify
the 200 to 300,000 that number would be
how much more it would cost to save the
>> I think in addition to the overall
project costs. Yes.
>> Okay. And Mr. Borman's estimate was
300,000.
>> What was that?
>> And Mr. Borman's estimate was 300,000
roughly.
>> He can provide those specimens better
than I can I think. But but somewhere
like somewhere in that vicinity. Yeah.
>> Yeah. Okay.
>> Go ahead, Alex.
>> So, it's a pretty big branch.
>> What does 12 ft mean? Does it mean the
front facade and then going back 12 ft?
>> Front facade and the 12 ft from the
front facade.
>> So, it would be like a architectural
portico some kind
>> in a sense. Um,
this isn't an ideal preservation
treatment by any means, but it has been
used in a number of urban areas,
Georgetown, Virginia, and Charleston,
South Carolina, where large large
projects have been developed, and the
cities have
felt that preserving the historic
streetscape was important.
I think that it's probably within the
realm of experiment here and we're in a
position where the city needs to
experiment. How are we going to address
this incremental erosion of streetscape
along Elm Street? What are the
opportunities available? What are the
devices available?
And uh
this is would might be an experiment
that would that would tell us how well
it works or or uh whether it's it's not
uh uh very effective at all.
>> Thank you.
>> Yeah.
>> Y
>> um so we have both the minutes from the
meeting where um this proposal was
discussed and the letter. So I feel like
the letter offers additional nuance in
that it's more forwardlooking than the
notes from the meeting. But could you
talk us through I think in the notes for
the meeting.
>> Just clarify. So I think we have the
minutes from the
>> design review committee.
>> Design review.
>> So that's design review committee. So
those minutes are provided to explain
the vote that's on the recommendation
form
>> because there's two different entities.
>> Okay.
>> Um but the Yeah. No, the historic
preservation commission minutes aren't
in here. This is their letter because
that's
>> Yeah.
>> Okay. I'm sorry I mixed up.
>> That's okay. You guys don't usually get
minutes from the design review
committee. So
>> So that might be a question more if
we're able to hear more from design
review. I did want to say something just
for this is broader more a like resource
discussion versus a question.
>> But um I've heard of a group called
Keeping History Above Water. Are you
familiar with this?
>> Bigly. Anyway, it just could be
interesting to look up. They did
conferences in Annapolis and Charleston
all around strategies for working with
flood vulnerable properties in historic
districts,
>> right?
>> And um yeah, I I thought it was
interesting to see, you know, it
>> I think a lot of their findings were
about looking more broadly at at you
know what what is history? What does the
structure you know how can the
structures use or even location evolve
over time?
>> Yes. uh and I have I have listened to
one of the individuals who is in I think
involved with that group and the point
was that um the incre the problems with
flooding in places like Annapolis are
just beginning.
>> Yeah.
>> Yeah. And looking you know looking
forward Yeah. the flood vulnerability is
likely to increase as well.
Yeah. Anyway, that's sort of a an aside,
but I think it's an interesting um it's
interesting to think about other Yeah.
cities that are also dealing with this
right now.
>> Yes.
>> So,
>> right.
>> Yeah.
>> I think for me, I think that what you
said was very helpful to for context
here. So, thank you.
>> Kar.
>> Okay. Um I think that was very helpful
testimony. Any board members have any
more questions?
I just have one question.
This is kind of for Bob and for Lucky.
Uh there was this conversation about um
uh
about funding potentially, right? Uh and
I just thought it'd be interesting for
the board to understand where that
funding might come from, how feasible it
is that it could actually be um you
know, it could play out and and and
maybe be available to help offset these
costs. That's a good point and I'm glad
you brought it up because I forgot a
segment of what I wanted to say and that
is that as part of this decision that or
as part of this challenge that the city
is facing there's the question of
funding and this is a larger concern
than just the individual project here
and um if the city is committed to its
historic resources then I think it's
important to consider ways to help
individual property owners address
funding concerns. concerns and u other
cities for example have developed um
ways of freezing property taxes for a
short period in order to encourage
property owners to rehabilitate
buildings. Um but I think that's an
important part of the conversation and h
being able to again it's a larger issue.
It's not. And the question becomes
whether
an individual property owner should be
burdened with uh an effort which
is uh um not a complete preservation
effort at the at at maybe unfair
expense. Um so yes, I I agree
completely.
>> Okay. Um sorry Ed, thank you so much.
the the um the other piece of my
question um was
trying to just get a little bit of more
of a survey for the board about what the
where that money might come from, the
grant that might be available through
the state entity or something like that.
I'm wondering if that conversation came
up at all.
>> We've talked about it and there aren't a
lot of grant programs that would um I
think help this situation. The
Preservation Trust of Vermont has small
grants, but not really for this type of
solution.
And so that's the the universal
challenge. Where do where do we find the
money?
>> Right.
>> Okay.
>> Thanks.
>> Yeah.
>> Yeah. This might be I have a question
maybe more for Meredith like when I saw
that note in the letter around you know
mitigating the hardship is you know a
grant is one way to mitigate a hardship
which is out of the purview of this
board. I think if this process was
different, you know, there could be
other strategies around you know density
bonus or whatever else but that's uh you
know that that's not in alignment with
the way that the application is judged
per the yeah per the regs here. So I
just want to ask Meredith if you had any
other thoughts there.
>> Yeah. No, I mean that's that's part of
this conundrum. Yeah.
>> Right. is that the board is charged with
making this decision based on the
regulations that we have. Um
that
the
city's
ability to provide any financial
assistance is outside of the board's
purview. Um and um there just aren't a
lot of programs available for this this
type of trying to salvage part of the
historic structure. Um as Bob said,
there's just not a lot available for
that. Um there are you know there are
times where the city has entered into
development agreements to help um and
the I can't remember the words but yes
freezing your assessment at a certain
value usually that's for you know your
improvements to an existing building.
Um,
and this is a little bit a little bit
different situation and this again
outside of the board's perview or or
mine. Um, that's an agreement that is
usually managed with the assessor's
office and city council and the the
developer. Um,
so
how you know any sort of financial
evaluations you make have to be within
the scope of what's in the regulations
unfortunately and not not necessarily
where the money's coming from.
which is why making sure you have
depending on what which calculus you're
using here, which criteria you're
looking at, it's making sure you have
the data to to back up your decision um
for going down the road is my
suggestion. Um let's try and try and
make sure you have all the info you need
to make that
follow.
>> Go ahead, Bill. We're kind of
brainstorming on this.
The other thought was if in fact the
the future project that's coming out
with I'm going to refer to this um if
the cost of of um holding as much of the
historic facade of the building as
possible can be built into how the cost
of the future uh property uh and the
profitability therefore of the future
property looks like and the and where it
comes into the board's approval and I I
noticed there are several uh offers of
conditional uh provisions that you
suggested and I think several of those
were good that the conditional uh
provision would be tying the development
of a of the demolition of a the historic
property into a parking uh we condition
that into a a um the future of this
project. Uh and therefore its
preservation of the historic value is
within the future of the project that is
conditional uh under one of the
conditions that you suggested in terms
of uh uh 30004 uh economic viability and
304
uh public benefit. Looks like it comes
under or could come under either or both
of those as a proposal to a condition to
approve a permit for a parking lot on a
property that's worth considerably more
um to the owner I think to the city and
to the historic value of Montior and
even Vermont for that matter. So, if
that's a
brings it back into the the board's
purview, uh I'm just suggesting that as
a as a possibility that we when we get
to deciding and deliberating on
conditions, which I'm just, you know,
thinking ahead might have a few in this
proposal, that might be one of them. So,
just my two cents on it. Well, 30004
refers only to demolition, not to the
parking lot aspect, right?
>> Correct.
>> Yeah. I I think it was just a you can
condition the demo on
have conditions included there as to
what needs to go on the site,
>> right?
>> In for future permits. like you can say
future development after you know in
addition to the parking lot next phase
has to be within X scope. Um it's not
usual. Um it's it's it's a fairly
unusual thing for the board in my eight
years here, but if that is part of the
like if you're going public benefit and
you're saying the public benefit is
building housing of x number of units or
however that's the condition, right? And
that that would be in place with whether
it's the current applicant going forward
or if the property gets sold to the next
and the next owner would still have to
develop within the scope of the that
condition.
>> Go ahead.
>> Thank you, Mayor.
>> Go ahead, Alex.
>> Um the report from
can't remember which one it was, the one
that examined the condition of the
building, not the appraisal. Um the
engineers report
>> the engineers report um talked about the
how it's a additive building. Was there
any discussion of preserving just the
original structure
>> which is like order
built structures now on the site
>> at the commission meeting actually yes
there was discussion about that and both
Eric Gilbertson and I met with Mr.
Borman and looked at the building. And I
looked at the foundation and the
interior of the building and its
addition
has been so
carved up, so altered that um commission
felt that efforts to preserve the entire
building would be uh pointless.
>> What do you mean by entire building?
Because that's the point of
>> the historic building. So the one
>> the residential structure, not the
church.
>> I can't hear.
>> No, no, more than that because there's
five
>> the original 1800s.
>> Yes.
>> The one that on the there's a colorcoded
picture
>> and it's just the blue part.
>> The I'm speaking about the 1880 Italian.
>> Okay.
>> Frame structure.
>> Yeah, that's the one I'm looking at.
Okay. So the original late 19th century
structure.
>> Correct. Right. I'll come back to your
question about how you would how we
would the 12 feet. Why 12 feet? Elliot
Lother and I went into the basement and
uh assess the way the building was put
together. And there is a structural
system that begins about 12 feet back
from the front of the building. And at
that point it would be possible to
remove the rest of the building behind
that 12 or 13 ft and stabilize that 12ft
structure. and then meld it into the
design of a new building.
>> Is that a usual practice? It seems very
curious.
>> It's an unusual It's not as I said it's
not ideal but it's the alter the only
alternative here is demolition of the
entire building.
>> Okay. So there is I mean because there
was stuff about knob and tube but knob
and tube could be replaced that you know
there were other other things that
deemed it too expensive or not
rehabilitatable.
We the other there really aren't any
other preservation devices available.
>> Thank you.
>> Yeah.
>> I mean this would be a purely aesthetic
preservation in terms of the
>> aesthetic in the sense that it it
salvages what this building contributes
to the streetscape, the 19th century
streetscape
which is a little more than just
aesthetics. It's the overall
environment, the built environment.
Yeah.
>> Uh one final question, one final
question for for you, Bob. Go ahead. Um
and it's simply uh the question of of
narrative. Um is there anything that's
especially um interesting or historical
figures or historical use of this
property that kind of that contributes
to,
you know, it its identity?
I'm not aware of any association with
individuals or events that give the
building added significance. For me,
it's principally what it contributes to
the streetscape.
>> Okay. Thank you.
>> All right. Any more questions for Bob?
We'll relieve him of the hot seat.
>> Thank you. Thank you very much.
>> Thank you very much.
>> Thank you, Bob. Thank you.
Um so to keep things uh moving here but
yet uh sort of focused on our flow um
last heard from Lucky on uh sort of the
three options here. Um he raised public
benefit um as sort of the number one and
I think that that um is I'm sensing the
board is leaning towards like really
exploring that um um public benefit
standard um as an option here. um staff
put out um a few sort ways at which we
can ensure that that public benefit
standard is met. Um and I think it'd be
worth the board sort of discussing uh
what our sort of what more information
we might need in order to require one of
those conditions um or whether we feel
we have enough. Um just jump starting
that part of the discussion. Uh these
are on the bottom of page nine if folks
are following along in the staff report.
Um we can just go through them one by
one if you'd like. Um these are just
possible conditions. There's not
suggesting that these are required or
anything but just to get our um
conversation started. Um so one would be
requiring the documentation of the
historic and architectural elements of
the structure prior to its demolition.
Um and B uh the second one requiring all
other permitting and financing to be in
place uh before the demolition could
commence in cases where the
redevelopment is proposed. Um so if
housing is proposed and we feel like
that needs to meet the public benefit um
we could have a condition um requiring
you know financing uh and um and per and
permits in place. Um and then um
then the last one I think is what we we
discussed uh most recently which would
include uh the requirement that um you
know the the facade gets saved. Um
and um we have a note here that the
applicant has proposed professional
photographic documentation of the
building facade um that will be provided
to the historic preservation commission.
Um
and also I believe they have proposed
possible salvage of architectural
elements of the building um including
interpretive signage
>> and
>> oh and including
>> they've in they have uh proposed the
including of interpretive signage in the
future development and have uh having
new the new building design highly
compatible with the surrounding
historical context. Um, so that would be
just be like maybe pictures of the old
historic context inside the building for
a reminder what it was like
>> possibly. Yep. Um, as well as having,
you know, their proposal was that the
new building
would would also have elements of design
of that new building reflecting the
historic context in the neighborhood. Um
that's one of those things that the
design review committee will weigh um
when any new building gets proposed, but
the board could require you know an an
elevated aspect if they wanted to of um
you know a tip of the hat to the prior
building or who knows what. There's
there's you there's a lot of options
here, right? So the the suggestions
there are specific suggestions in the
regulations of potential conditions, but
the board has a lot of room to play here
um on what they think needs to happen.
>> Could I just add something?
>> Go ahead, Lucky.
>> Um it's almost impossible to have the
permits and everything in order um
before financing. I mean, it's hundreds
and hundreds of thousands of dollars to
do this. You got to do like ground
impact tests for the weight. You got to
do all this architectural engineering
and evaluation. I mean, you can't
self-fund something like this. And no
financial inst institution is going to
preemptively fund or lend money in hopes
that it's approved for demo one day or
it's just virtually impossible. I mean,
pretty much
I self I selfund this process. get
everything in order and present it to
the financial institution that I have a
project ready and they bite onto it and
then they fund the the progress of the
project and then we put the permits in.
It's months and months and months worth
of work. I mean this is what we do for a
living and it's I mean just the last
building we did in M player was six and
a half months of
work and permitting and tens of
thousands of dollars. I mean you can't
I'm not saying you can't but I'm just
saying you know you With the short
construction terms and the timing and
how long everything takes, nobody's
going to nobody's going to do that. It's
almost impossible. And you can't pre-put
in architectural development on a
project like this before financing.
I mean, it's to even touch the ground.
I'm gonna It's a half a million dollars.
>> Rob, go ahead, Brian, if I may. Um I
think it was maybe the second um
potential. I don't remember uh which one
it was, but it's okay. Um the the
concept here I think is is not
is not whether or not the approval is
given before the building is demolished.
It's it's simply
because I understand everything you've
said, Mr. Boardman. You're absolutely
right. you know, you got to kind of get
the ball rolling and keep it rolling. I
think that just to explain what was
presented there, it was a suggestion
that the DRB approved demolition of the
building when there was a project that
was feasible that was been that had been
presented. Is that right?
>> I don't think specifically, but uh it
was just a suggestion. So,
>> right,
>> I think the fear is is if there wasn't
anything that was feasible, right, and
then the building was demolished and sat
there for years and years and years, it
would be harder to justify, right, why
it was deemed necessary to be removed.
>> Well, I mean, I don't know what your
definition of feasibility is and like
what the critique on that is, but I
mean, we are actively pursuing this
project. We've already put the water in,
the sewer in. We've planning all this. I
mean, we're at a point now where I mean,
if it wasn't for the permitting when we
bought this project, not knowing the
city went on paper, uh, and the timing
it takes, this is not an insult, but
the, you know, we would already had
housing being under construction. I
mean, it's been 8 months. Um, our last
project in Northfield, we completed 15
units in 8 months and fully rented them.
Um it's just,
you know, it's a everything seems to
take a long process. Um so we're just
trying to figure out,
you know, what the plan is really. And I
want to be transparent because obviously
I want this to be successful. Uh I'm
sure everybody does cuz housing is what
we do for a living and the city needs
housing. I mean, you can't ask for 75
units a year and take two years to
permit a project. I mean, you I just
don't know what you do with that.
>> Well, I think that answered my question
and I just I'm saying this to the board
and the other question that I asked was
for the board as well. It sounds like
the project is feasible because you've
already begun working on it and
>> sounds like um
>> yeah, we're in it. I mean, if you
>> if construction started tomorrow, I
mean, I would the demo I could demo it
tomorrow. Like it's we have all our own
equipment. We are we are ready. But I
mean I I think like I think what I'm
hearing from you, Brian, though, is if
we're if one of the if the assessment
here is largely on public benefit, the
public benefit of housing is that
housing is much needed in this
community. It's also beneficial in terms
of the tax role. There many benefits to
housing. The benefits would not be there
if the site was a parking lot in
perpetuity or even if it just became a a
single unit, for example. I mean that
that's a bit random to say single unit
but it's uh there are if we're assessing
it for public benefit the the benefit uh
would be derived from housing as opposed
to uh uh the parking lot site. So
>> I think
>> I do think the economic viability
standard has been raised. I mean, we've
been walking around it perhaps, but um
looking at the economic viability
standard for income producing
properties, the two points are that the
building site or object cannot be
feasibly used or rented at a reasonable
rate of return in its present condition
or if it is rehabilitated. And I think
we understand that in its present
condition with the building as it
stands, it's incompatible with housing
construction. And then secondly, denial
of the application would deprive the
owner of all reasonable use of the
property. Um, I do think that we're
touching on this if uh assuming that
denial of the application to demolish
would prevent further development of any
sort. And if that's a deprivation of all
reasonable use of property beyond
potentially a parking lot, I think
that's a an interesting and relevant
point.
um what what's the timeline on
construction? And I'm asking this
because it seems very clear that you're
ready to go and I think that's a
positive thing. Um but I think that the
question may be floating around to at
least in other folks heads on the board
and folks uh tuning in as to why there's
not a development proposal for the
proposed here as well. Uh I think you
the first thought was that financing is
coming together and maybe even parking
lot would be used to generate funds or
something to that extent. I don't know
that that sounds reasonable but just
back to the initial question I'm just
wondering um
you know what does that general timeline
look like because you said you could
demolish tomorrow. I I mean, are we
going to see an application for this in
the next couple of months to formally
approve the the project that to you um
to quote you is is uh is already on its
way.
>> Yeah, absolutely. Okay.
>> I mean the you know until today I can't
say for certain to the bank or any
financial investor or anybody that the
project is ready to go. So who like
where do I go with that? You know, if
you say no, then all the energy and all
the money and all the preemptive funding
just extinguished. So, you can't you
we're literally trapped. Um, if this is
approved for demo and the demo permits
approved, I mean, this project starts
immediately. I mean, this is we're
working on the Walgreens right now. The
day it got approved, we were moving
forward. Um, this is what we do. So, if
this is approved, the demo will be done
in 30 days of the permit and the
construction will start immediately.
It's got to get engineers and third
party people involved, but that starts
tomorrow.
>> I think Brian, you and I are on the same
wavelength on this. I'm pretty sure that
I don't think there's any question about
the demo ending up with a parking lot
and the only question is going to be
some some bit of the historic
preservation. There's some issue there,
I think. But other than that, you know,
tearing down the the building and and
putting a parking lot in, I think that
probably is going to happen. Uh I think
you and I the way I think you and I are
on is why isn't there a proposal to say
what this is going to be? And um that I
think I would certainly feel more
comfortable uh if I knew that if I was
going to do part A and uh and I was
planning on doing part B and both A plus
B was necessary to fulfill uh 30004
public benefit or even economic value
for that matter. It was A and B was
necessary from a regular regular
standpoint is what the board might
approve. Uh I with you I would want to
seek both A and B uh as a part of what
we approve as opposed to just A and you
know maybe B will come at some point
maybe a month from now maybe 6 months
maybe two years um I think that that uh
I wouldn't be as comfortable with that
situation as some others might be. Um,
so
>> I'm following you with your line of
thought
>> and I'd like to clarify quickly before
someone else speaks. Um, thank you,
Bill. I um I agree with most of what you
said, but I just want to clarify that I
think from the developer standpoint. I'm
just I want to put this out there to the
board. I can understand the logic of
wanting to get over this hurdle first,
right? And understand that the
demolition has been approved and that
you have a clean site to work with,
right? So
I I think it wasn't so much a question
of do we need to see A plus B together
at the same time. It was really just
more of a question that I was going to
circle back to Meredith as well and say
well we we don't have a zoning
application in hand right now to review
and that's fine. U Mr. Borman spoke to
that point said he's ready to go. Uh I
trust that he he seems very excited
about the project. I trust that he is
ready to go. I was just going to follow
you know it up by simply saying for
everyone's cont you know for context
right
what does the timeline look like right
between kind of getting an application I
mean is this the next meeting is this
something we're going to see in six
months and it may be irrelevant as well
but I just wanted everybody to have a
sense of of what that was
>> yeah I think board needs to also keep in
mind that we were reviewing the
application you know that's before us
and if there's deficiencies or the
amount of information that we have um
you know we need to request that
information but we can't be uh sort of
anticipating uh you know the next phase
of this uh
go ahead Alex
>> I was going to make the same sort of
point we've been here before um the
regulations allow
people to apply for permission to do X
which will entail Y but you don't have
to specify Y at the time so you're B
cannot be a requirement except in so far
as we said conditions. Have I got that
right, Meredith?
>> Yeah. And and here, you know, like I
said previously, if the board decides
that one of the standards being met to
approve demolition of a historic
structure is the public benefit
standard. And as everybody seems to be
discussing, the public benefit here
would be housing. the board's approval
can have a condition of this is this is
okay. We're allowing this in part under
the part or all under the public benefit
standard, but the public benefit is the
anticipated development of a minimum of
x number of housing units on this
parcel.
>> And that could be your condition where
it's a minimum of x, right?
um so long as future zoning regulations
continue to allow it once that
application is approved or I mean it's
just also a condition of the permit
right um conditions of permits
can hold even when future zoning
regulations change
um and I don't see I don't see housing
development getting restricted in
Montpillar anytime soon um you know
right Now, in the design review
district, there is no
residential density.
People can put as many units as they
want in as long as it fits all the other
standards at issue including the design
review. So, um that's a possibility of
going forward where here it's a little
different than some of the other
applications. There is here some
consideration of future and how that
comes into play.
That was part B or your Y.
That was my B or your Y.
>> Yeah.
>> And it's almost if I almost just have to
add a few words to uh I forget what
condition it is here.
>> Just trying to hone in here. We have
three criteria. It has to meet one of
them, but the board can require make
make sure that it meets two of the
three. Um, is there any feeling on the
board that uh we think this application
needs to meet
one of two of them or all three of them?
>> I think it has it presents minimal
evidence for both economic viability
standard and public benefit standard.
Some of it is conjecture, right? We
don't have a a development plan for a
structure itself at this time, but we
have an intention um towards housing.
And then when it comes to economic
viability, we don't have the report from
Elliot Lothrop explaining what the
additional cost of for example trying to
preserve the facade would be. Um we
don't have like an economic study of the
cost per unit. uh what that would com
what what would result compared to the
market rate with that additional cost
like we don't have that I don't imagine
we would either um but I think minimally
you you could argue for both
and I think happily we can all agree
that the building does retain historic
integrity and that's not under question
whatsoever. So, I think it's the other
two from my perspective.
>> Um, just going to ask one follow-up
question. Um, do you think conditioning
or to to achieve public benefit, do you
think conditioning it on a minimum
number of housing units to be built
would be reasonable?
>> Alex, you're saying no.
>> I don't.
>> I mean, the numbers that have floated
around here go between 22 and 50.
>> Yeah. And that's just too big of a gap
for any kind of conditioning. Um
>> I also don't think it's within
>> and I don't think it's within the scope
>> to mandate.
>> Right. I mean I could see conditioning
it on some form of attention to the
historical streetscape,
but that's a different matter.
>> Go ahead, Joe.
>> I just wanted to kind of clarify some
things in my mind. Currently, this
building is being used for what?
Nothing.
>> Nothing. It's vacant.
>> So, even if it was one more unit, there
would be some public benefit there,
right?
>> And on top of that,
>> in order for even one unit to go in
there, it needs to be a parking lot
first, right? Because the building
itself is not savable, right? Um, so I
mean, that's the economic viability
standard right there. You can't save it.
It's it's on its it's on its last legs.
And in order for anything to be of any
benefit there, no matter what it is, it
has to be first a parking lot, right?
>> Or something visually similar. So
that's just my feelings on it. It's not
giving us any benefit right now. It
could theoretically give us benefit if
the site is turned into a parking lot,
but it can't in its current condition.
>> I actually have one question. Go ahead,
Bob. Hold on.
>> I I totally agree with Joe on this. And
I mean, it has to be a parking lot
first. We can't,
you know, we could speculate till we're
blew in the face, but it's not going to
get us past the initial
first step.
>> We may even need to ask a question about
a potential hazard in its current
status, right? If the structure is that
compromised, uh,
>> you know, it can't even be a risk to the
public in its current
>> current state. So,
>> there's nothing in the suggested that.
>> Go ahead, Lucky.
>> Yeah, they did uh when the church had it
and they tried to save it, they did have
somebody come through and pull out all
the sheetrock and do a bunch of the uh
attempt of preventative mold and
everything. So, there is it has been um
you know, gutted, if you will.
Okay.
>> Um
>> I think it's important that we keep
these two things separate. I mean the
demolition is separate from the
conditional use as a part of
>> correct. We have not talked about
conditional use. We talked about the
demolition. So I've I think this is this
application has two distinct parts to
it. Um I would be inclined that the
public has been sitting here for an hour
now. If we open up to public comment but
limited to the historic definition, we
will the board and we'll get to
conditional use. If you could just limit
your comments to the um historic
definition that will open up for the
entire application.
Yeah,
we could actually open it up to
anything. I don't actually I was
thinking of that about 30 minutes ago.
We can open up to anything.
>> They make sure they get their comments.
>> Absolutely.
Uh
so um do you want to just come up to the
microphone and uh introduce yourself?
>> Either your choice stand or
>> sit.
>> Um you're both a butters. You can
>> come up together. It's fine.
>> Okay.
>> Um let me say uh Lucky. It's lovely to
finally meet you and I'm sorry that I'm
only meeting you now. Could you just
state your name and address?
>> Sorry. I'm Kathleen Keenan. I live at
128 Elm Street. I'm adjacent to the
property.
>> And I'm Kathleen's partner, Kim Bent,
and uh we live at 128 Elm Street. Um
yeah, we're um I I've got two very
simple questions I would really love to
get answered tonight. And before I get
to them, I just want to give you the
background on where we're coming from.
Uh we purchased our house on Elm Street
in 91 just in time for the flood of 92.
Uh and uh so we got in on the ground
floor of that experience. Um and um the
uh our house was adjacent to a house
that uh is now a parking lot. So, we're
uh seems to me talking about um the a
parking lot as if it's a future thing.
Uh when when Lucky purchased I'm I want
to so call you Mr. Boardman, but
everybody's calling you Lucky. So,
>> because we don't know we've never
>> Yeah. What?
>> Uh you were saying people are talking
about this parking lot as if it's a
future thing, but
>> but it is a parking lot. And um the fact
of the matter is uh that right now it's
a parking lot that's well on its way to
becoming a junkyard because there's
folks working on their cars out there
all the time. Uh it's a staging area for
the construction that's going on on Elm
Street now. And um
>> it's not being kept up at all.
>> It's not it's not being kept up. I I
know several people that um had
agreements with the former owner, the
Baptists, uh about being able to park
there. I've tried to contact Lucky um
over the past months uh or year or so uh
about the what what the arrangement is
there because we're all kind of left in
limbo and never never got an answer
about what's happening with the parking
lot. Uh it was my understanding uh that
I uh had from the Baptists again that um
they had an agreement with the
subsidized housing uh down the street
that uh they were uh providing a certain
number of parking spaces for those
tenants and um as far as I could see
that was the case. But before as a
condition, well, when they came to us to
get, you know, to talk to us initially
about getting permission to demolish the
house next door and make it make it a
parking lot, um we didn't have any
objection. We we gave us, you know, it
was it was a pretty rundown house. Um
and uh but um there was a a verbal
agreement that we thought we had with
them uh where they would they said,
"Well, you know, it's important once
you'll we'll provide a space for you in
in this uh in this parking lot."
>> And there were supposed to be a little
bit more safety measures to keep the
dirt and the trash
>> out of our yard and our property, but
that didn't actually happen. So, and
that's only gotten worse. Um,
>> so, so we never did get a parking space.
Um, and then, um, we, you know,
participated then, um,
moving our our extra vehicle, our second
vehicle back and forth in the winter,
you know, uh, for years and years. And
then COVID happened and the church
couldn't meet anyway. And so, they
didn't have any,
>> so they gave us a parking spot.
So they said pretty much said, "Yeah,
just use the parking lot whenever you
want." Uh so we h developed the habit of
parking our van there as did I think
several other people in the
neighborhood. Uh and then of course the
flood happened and again all the bets
that were off were doubly off as far as
the the parking lot goes. So, um there
we are. Uh still trying to find out what
is the arrangement with um the owner of
the church building and the parking lot.
Is there some agreement that the city
has uh that um that um did not get
transferred with the sale of of the
church or or not?
Does anybody know?
>> Kim, you're talking about the parking
lot
>> of 144. Yes. Not the parking lot on the
other side of your house. It's a very
shallow.
>> Is there
>> There is no parking lot on the other
side of our house. There is some
parking.
>> It's just a It's one parking lot. The
parking lot used to be a house.
>> Got it.
>> Was demolished and it to make room for a
parking lot.
>> Got it.
>> Yeah.
>> So,
>> so that was swapped.
>> Yeah. Um, so I'm not aware of any permit
conditions related to the demo of the
house prior to create that parking lot
that would come into play. Um,
>> well,
>> and I don't know of any I mean there's
there's no like as far as I know there's
no city agreements about anything like
that. It would have been um the church's
agreements with other whoever they were.
I I I don't have anything about their
contracts. that would be something that
would have been passed on to to Ly's um
to the entity that bought the property
which Lucky I'm not aware of any
>> I think we're confusing these two lots
here you're you're referencing the trash
and parking you're referring to the one
across your street 144
>> is they live right next to No they're
right next to right next door to you
>> there's nobody
>> Yep. Hold on. I'll show you. I'm gonna
pull it up on the map.
>> But there's no
there's no trash. There's no I don't
understand what you're referring to. And
>> trash from the people their cars. They
you know they
>> a pile of tires and car parts there now.
Um and uh yeah,
>> but this is a a privately owned lot now
owned by Mr.
>> Right. We're just saying that we've
noticed a deterioration.
We also had our um our own and it's
probably just coincidence, but our own
property got vandalized um recently and
we've never had any trouble with that
before um where they um some somebody
just came along and clipped off our our
um bodega lights.
>> So I understand your
>> when we go home,
>> you said you got a couple questions. I
just want to make sure that we got them
answered. Um,
I guess you're maybe wanting more
information on the type of parking that
it's being proposed.
>> Yes, that would be great.
>> And I'm also um wondering about what
protections will be in place for um the
the neighbor, right? um in terms of how
that it um affects our own property, in
terms of lights flashing in our windows,
which the church was supposed to put up
something that really blocked that and
they didn't. Um and you know, we've been
living with that and that's fine, but um
you know, it was just a that I mean, it
seems like eventually we're going to be
talking about quite a significant
change. Um and I so I wonder what our
protections are going to be. And I'm
also wondering where how do we um find
out about what's going on and when you
talk about public good obviously housing
is
a criminal need right now but I'm also
wondering if you can in your
consideration of public benefit you also
take into consideration the neighborhood
um because what is being proposed
is going to substantially change our
neighborhood And um
and again, it's also I'm so glad that
Mr. Boardman met with um historic
preservation and other groups, but not a
knock on our door, not a note, not an
anything about what was going to happen.
And we've also had um issues with trees.
And we've tried to reach out via email
to Mr. Boardman and not received any
response. and our tree guy is like,
"This is really imminent and we need to
deal with it in the there's several
things." So, I'm just concerned about um
how how you know how it's all going to
impact us because we and and the
neighborhood because Elm Street has
gotten ridiculously
um busy and um you know, just
>> the side the sidewalks are not adequate
as it is um for pedestrian safety on Elm
Street anymore. And um so yeah, so these
are my these are my concerns and I I
don't know
>> I I'm looking for information on um how
neighborhood and and um neighbors factor
into the public good and
>> what what processes are available for
communication.
>> Okay.
>> I think that yeah I think much of what
you said is are requirements for us to
consider during our conditional use
review. So, I think we get to that meat
of that.
>> But, um, I think since you brought up
parking, there are two sort of questions
that
>> were flagged in the staff report that
are, you know, related.
>> I guess one is, you know, the
application states that the parking, the
proposed parking use will serve existing
local uses. Um, Lucky, I don't know if
you could maybe expand upon like what
that plan might look like.
>> Well, currently it's rented by Capstone,
so we're not adding any additional
parking. So they
>> still uh utilize that parking lot as
they do. Um we're not I mean the goal is
is that's just a stepping stone for the
project. So we're not doing anything um
special for for parking. I mean it's
just keeping as it is.
>> By capstone you mean what used to be
known as the Barrett block buildings?
>> No. No. Capstone. Um they do programs
like Head Start and they well they had
another name formerly
>> they do weatherization work also right
>> or for offices.
>> So
>> I think they take care of the parking
but I don't know
I don't know how you know how they
facilitate that. I'm not in their inner
circles, but we we rent to one master
lease uh for the parking and they do it
for whatever housing development or
whatever they do.
>> Got it.
>> So, we should be talking to caps.
>> That's correct.
>> Okay. Good to know.
>> Good to know. All right.
>> One question answer.
>> Do you uh
>> I'm sorry.
>> You you asked said they used to be
called something else. Yes, I can.
>> Community action.
>> Okay.
>> In in answer to your other question,
anything that's about this property, you
will be notified.
>> Well,
so so
if so for future things, right? So you
got the notification about this hearing,
correct?
>> Right. So that's because the the
application, the zoning application was
for something that required DRB
approval.
>> So a new build, right? Building a new
building on there um would be another
thing as long as it wasn't just a single
family home or two unit home, right?
Anything more than that is going to have
to come back before the development
review board. Oh, sorry. It's not two
anymore. Now it's four. Anyway, right.
Lucky is talking about a much bigger
building. As long as it's something
along those lines, right? It's going to
have to come back here and you'll get
the same mailed notification under under
our rags the way it's set up right now.
So, it's construction of those new
buildings that triggers major site plan
review. It's going to come here and
depending, you know, if what the Yep.
And so that's that's that's just
conceptual, right?
>> That hasn't gone through any kind of
reviews or anything. That's that's not
>> Yeah.
>> Right. Lucky put that in because um
questions were asked about the future
design at the design review committee
and the historic preservation
commission. So he sent that to me on
Friday. So it's just a it it's not part
of the analysis, but he wanted to
provide that. Um, so
with what Locky's talking about, it
would be something that would come here,
you would get notification about it.
>> Okay.
>> Um, certain smaller projects that are
administrative, you don't get that kind
of notice because it doesn't come before
the board for a hearing.
>> But how do we So my may may I follow up?
Um, thank you so much, Mr. Jolie.
>> Or I hope I said that even close to
correct. Yeah.
>> Um I just want to know how we is there
um other than trying to converse with
Mr. Boardman, which for us, and I'm sure
everybody's incredibly busy and gets too
much email, has not been successful yet.
Um, how do we make sure that
construction noise, the demolishment,
the the debris from demolition that our
property, that our home is protected
from that?
>> Well, I think
>> I would say that largely
the conditional use standards
>> um require us to address some of that.
um not necessarily during construction,
right?
>> Um
>> the long-term use.
>> So So
don't even think about long-term use.
All the board has in their purview right
now, right, is the demo, right?
>> Whether or not the demo happens,
>> correct?
>> Um and really the conditional use, which
is the parking lot situation. Um I
don't remember to be perfectly honest.
um
all of the demolition standards. I did
not write all of them in the staff
report cuz there's a bunch. So, give me
one second. I'm going to stop share so
that that's not dragging. Um if there is
something in there about
or what's in there cuz that would be
because I mean we the building is on the
other side of the parking lot. Um
I don't know other people can look too
while they're at it. Um other board
members. Um
>> there's a note in there about and so
forth. Yeah. Debris to remain on site
for more than 14 days has to be
screened. I mean stuff isn't supposed to
like leave the site. Right. Right. But
like like other than as it's you know
intended way to be
>> right there's not a whole lot of
requirements of demo in here when it
comes to things like
you know dust or noise things like that
right? So noise is very much the city's
noise ordinance.
>> That's where that comes into play. Um,
and so that usually limits the hours of
operation. Would you agree for something
like this?
>> Supposed to be at 8 o'clock in the
morning.
>> I'm not gonna say, but I don't off the
top of my head.
>> Even the regular I use all the time. So,
so that kind of thing,
>> there's not a whole lot in the
regulations about that.
>> Um, and then
>> the board's review of conditional use is
going to be about the parking, right?
future construction of something in the
future. That's all going to be separate
permit decisions. Bailey,
>> well, we just experienced the demolition
in the neighborhood. Yes. With Katie's
house being taken down across the
street. That's that simple. It happens
quickly. Um, you know, it's not that's
not going to be that disruptive. kind of
>> well like you know
>> but um we do have a contract with Silven
Tree Care to take down a couple of
really big ash trees right behind our
house in the bank there
>> technically
>> um and um so we were hoping also to get
some sense tonight of a timeline or um a
demolition if it should happen so that
we would be able to coordinate those
projects. Um, yeah.
>> So, so what I can tell you
is
one, don't know if the board's going to
make a decision tonight or at a later
meeting. In any event, once the board
actually makes a verbal decision in a
meeting,
>> yeah,
>> there's a lag while a written decision
comes out. The written decision is the
formal decision,
>> 30-day.
>> Well done. And then once the written
decision is signed, there's a 30-day
appeal period.
>> Okay? So, if you're trying to do
something really really soon and
coordinate to be able to get trucks in
through the parking lot, I would maybe
get Ly's contact for Capstone, work out
that type of situation if that's what
you're trying to do separately. There's
there's a window. There's it's there's
not even a verbal decision doesn't mean
that
>> you know stuff is is moving forward
right away on the site.
>> Yeah. Okay.
So if your comment is going to build on
yours um is not you're concerned about
the you know the demolition's going to
occur or increase the interaction with
your property in some not positive way
I'm guarant um are you concerned about
how the property will be managed?
>> Of course
>> when once it is finished and it's just a
parking lot. Um, and I guess the
question to Mr. Lucky would be, um, is
Capstone going to be still managing that
or is Lucky going to be managing that or
who's going to be managing it such that
you don't get vagrants parking in there,
you don't get a lot of trash dumped in
there, you don't get whatever is going
on that it's managed well. Maybe it's
the parking lots are permitted, you
know, and policed and maybe there's a
gate on it or something like that. Are
you concerned about how that property
for you don't know how long actually
because we're not in discussing what's
going to happen to that later other than
what this may be at some point in the
future. Um are you concerned about
managing the property once it's
essentially a vacant lot that's been
paved over? Um are you concerned about
that? I don't think it's in these
conditions. I don't think it's anywhere
in uh what was submitted by Mr. Lucky or
or what I think Meredith is condition.
Are you concerned about that?
>> Um
I would probably Yeah.
>> No, I don't mean to put you on the spot,
but uh
>> now that you've brought it up
where you were headed,
>> yeah.
>> Uh then what what are we
>> I think we got to Well, yeah, I think
>> I mean obviously these are things here.
I'm not seeing a specific uh you know
question. Uh and we got uh make sure
that everyone gets quick comment here.
So
>> yeah, publicly. Okay. I just
>> No, you're going but that's okay. Sorry.
>> No, no, no. Thank you. Thank you for
your time.
>> Thank you very much.
>> Um
Mr. Mr. Whitaker.
>> Steve Whitaker Viller.
I'm a little concerned about what's
called segmenting. Segmenting a project
into little pieces is not sound practice
in the planning world. Uh that's what's
been tried to do with country club road
water and sewer. You know, up up to up
the driveway up the road. That's not the
housing. It's and this segmenting that
limited purview. I keep hearing you got
limited purview and yet there's a big
five-story project graphic being
proposed here and you're saying we can
only talk about demolition a building
and that's just not true. That's not the
way act 250 works. It's not the way this
board should work either. You should not
segment and and think about little
pieces at a time so that you can make
more make foreclose options before you
understand what the next phase is. That
that shouldn't be happening. Um
I could not find the historic
preservation letter in the packet. Uh
is it in the packet? Yeah, it's attached
to the uh um uh the design review
minutes.
>> There's a second there's one big staple
piece which is what the application was
>> and then
>> and then there's design
>> which would be
very last page of the staff added
section.
>> All right, I will look for that later
then. um
a a a major factor of the feasibility of
this, you know, moving forward. Uh and
that we really need to think about in
all of the projects you're reviewing. No
high density project like this should be
moving forward if it's going to add to
the combined sewer overflow. Dumping raw
sewage in the river needs to stop now.
And we can't stop it until we quit
increasing the flow of raw sewage going
into the river. I will be asking in the
regional P plan review process for
service areas that are still
contributing to the combined sewer
overflow. We've got six combined sewer
overflow outlets
violations in permitted by conditional
use. I don't know the phraseology. Uh
this you need to think about in context
of district heat. Uh it's been
unfeasible to bring district heat up to
Elm Street, but if building like this
that's proposed for somewhere between 22
and 50 units uh would dramatically
change the economics for bringing
district heat up Elm Street and we need
to think about that in a current
district heat running 200,000 a year
deficit. So we we can't separate that
from this discussion.
uh the feasibility analysis of the
existing building. I'm only talking
about the original 1800's piece. Uh
I witnessed the defective feasibility
analysis for the Jacob Davis homestead
out at Home Farm Road. That was not done
with integrity. the there was an option
of available piece of land at no cost
right across Route Two that could have
hosted that building had it been you
know rolled over there. Uh people who a
family that used to live in that house.
So I don't trust the
total disregard that the core piece of
that building couldn't be moved to
another lot and maintain its historic
value. Uh traffic I won't go into now.
Uh
so yeah, I think I've raised a lot of
things that merit further information,
but the segmenting is the is the
fundamental one. You're saying we don't
have to we can just decide to demolish a
historic building and worry some other
day about whether we ever see a permit
or whether there's, you know, 20 or 50
units going in there. Um
but yes, the noise and debris and all
the conditions that the neighbors need
to deal with uh should also be addressed
even if you were to allow the
demolition. But I think you should ask
for more information about the
possibility of relocating just the core
structure, not the add-ons. I I'm not
impressed with the idea of taking the
12ft facade and Frankensteining it onto
a new five-story behemoth. Uh that seems
kind of like what the church did.
>> Did you have any comments on the parking
conditional use?
>> You mean whether a
>> I just you seemed like mo much of it was
on demolition and I was making sure you
uh got my uh rescending the restriction
on that. Any comments on the entire
application? We're fair game here. Just
want to make sure we get confirmed.
>> I just think that that
if that that we can't be looking at it
just in those little pieces. It's the
time slice is not the proper planning
perspective for a board like this.
>> Could I could I answer two things for
Stephen?
>> Go for it, Lucky.
>> Uh Stephen, those are all good
questions. Um we did think about the
district heat, but we actually we've
been leaning towards electrification for
everything. So that's what that building
would be. It would be all mini splits,
air conditioning, and future charging
stations if need be. And uh when Elm
Street, they're doing all that work
right now on the street. So we were able
to utilize that and tie in the new water
and sewer um for the future building
already
just last week.
Okay. Thank you, Lucky.
Um is any other public on the Zoom
platform that wishes to speak on this
application? Any
other public comment uh in the room?
>> Okay. Paul's head is said no, so we're
good.
>> Okay.
Um
so
board members, we've gotten through I
think a pretty in-depth discussion on
the historic demolition provisions here.
Um, we have not yet really talked about
the um, parking conditional use um, yet.
Um,
how do folks want to proceed?
>> Keep going. Charge ahead.
>> Well, Rob, uh, I I'm wondering if, uh,
since maybe there were about three
considerations for the demolition scope
that maybe we could just kind of try to
make a decision on that before moving on
to parking.
at least a kind of consensus, maybe not
a formal vote, but
>> what was
>> I think there was a lot of um dust, for
lack of a better term, that got thrown
into the air with all this. And it seems
like it boils down to are we voting on
keeping the building, uh retaining the
first 12 feet of it, or maybe asking Bob
a question or two about what it would
mean to salvage a certain portion of the
building, right? That was part of those
provisions. which architectural elements
might be worth salvaging. Um, I don't
have an opinion on that and that's why I
asked for clarification on whether the
building had a kind of historic um
or maybe a more
historically significant story than
anyone here was yet aware of. Um, but I
think it just kind of comes down to
those three things. And if we can
discuss that in a short enough amount of
time to move on, maybe that maybe maybe
that would be more efficient.
>> Maybe what you're what you're getting at
is that um we seem to have a
recommendation from the historic
preservation commission and the design
review committee to consider um the
salvaging of sod a little more and get
some more information. Uh, anyone else
get that have that same interpretation?
>> No,
>> it's a question to the board as to
whether we should consider asking those
questions. Yeah.
>> I mean, I think it's I think it's
critical that we know what we're voting.
>> Yeah.
>> And I'm not sure that we all have the
same idea of what that is.
>> Well, I don't think anyone's proposing a
vote. I mean, just trying to get the
consensus of where we're at in the in
the process. And um I was just flagging
a you know an issue that's been
recommendations from the historic
preservation commission and the um uh
design review um about this
consideration of the um looking into the
facade more. Um and go ahead Meredith
>> just can I sort of paraphrase a little
bit refocus a little bit. So,
and it's going to come out as a question
for board members.
Do any of the board members have
specific
pieces of additional information that
they don't feel was in the application
or has been shared tonight that they
feel they still need
to be able to make a decision on either
whether or not the proposed historic
demo meets at least one of the required
standards
or
information that they would need to
decide on a condition of approval for
the historic demo. Like, is there
something missing that either has been
discussed, but you don't have the
information or some other piece of
information that you would need to make
that decision where it's something
that's going to take some time because
that just means, okay, that's one thing
that's going to be a to-do on somebody's
list. Um, or do you feel like you have
enough information to actually make a
decision on both the what standard
applies that it does meet or none of
them are met? Um,
andor potential conditions that you
think need to apply to the historic
demo.
Because if there's more information you
need, it's either ask it now and see if
you can get it or if you can't get it
but you still need it. That's something
for a future for a continued meeting.
The conditional use discussion can still
happen tonight to again get to that same
place. Do you have enough information to
make a decision or do you need more
information?
>> I have enough information for us.
>> Awesome.
>> Thank
I have enough information. I think we'll
have feedback for you. It's like broader
feedback for the city around what's
useful in these uh you know in terms of
the direction that the regs take long
term. But yeah, in terms of where we are
right now,
>> you feel like you have enough
information.
>> Y
>> great.
>> I I do as well.
>> Okay, that's that's helpful for historic
demo. Okay.
>> Absolutely.
Um,
>> and just remember if we do this in
deliberative session, you're gonna all
have to tell me
how you feel about where these different
things are met so that the decision can
actually get written appropriately.
>> Yes. Um, okay. Well, sounding like we
maybe should charge ahead and go through
the parking conditional use provisions.
>> Um,
so,
>> uh, be, sorry, before you do that,
unless you're going to go back and do
some of the general 300 standards, you
want to do Okay. You're going to go back
to like the version control stuff after
conditional use.
>> Yep. I was going to go to um, I'm good.
Thank you. Start on
page five of the staff report.
>> Oh, I guess where that starts.
>> But conditional usees 330.
>> If you're talking about conditional use
specifically,
>> well, we have general standards. Okay.
Couple things.
>> Yes. Um,
so here,
um, there's a proposal to have the
partial service parking off-site uses
while the applicant develops plans for a
new building. There'll be 18 parking
spaces with the extra room left on the
site. Um, so just two questions here.
Um, is there enough room
um
for parking
um to be used or for the parking use um
to continue during the development of
the site? So
when you're going to is this ask this
seems to be asking like is the parking
going to be happening if something gets
developed afterwards
>> during construction?
>> During construction?
>> Yeah, it's sort of a during construction
thing. Are you and part of this goes to
Lucky I think there I want to make sure
too the site plans that you gave that
had like parking numbers on them all
showed the continued parking for the
surface parking continuing to be where
the existing parking lot is.
And so if that was all continuing, would
that would that surface parking use
continue while you were building a new
building or would you end up ending that
once you were ready to start building a
new building? Because that would ex part
of the question is because that would
sort of extinguish that surface parking
use. Um, and then also just to confirm
where exactly the parking is happening,
if it is in the existing parking area or
were you talking about moving it
somewhere else on the parcel?
>> No, the contractual obligation we have
with Capstone, um, those units would
stay after demo until permitting is
done. They they only have a lease until
it's it's the end of the year, uh,
November, December. So after that lease
and our permits are completed um which
they're already aware of, we will end
that agreement uh for the construction
period and
indefinitely.
So right now it's just utilizing that uh
through their our contract period and
through the permitting time. So the only
thing we'd really change would be
removing the building and then uh adding
the proper materials to
fill that site in.
Okay.
>> So, the conditional use for parking
um maybe only applies until um the
demolition and grading would begin
>> if if I think he said until they start
till they have permits in place for the
new build. So at at at at at minimum
through the contract that's currently in
place which is due November or December
if there's lucky in my sense if there
was a delay in the new build for
whatever reason you might theoretically
continue those contracts or extend the
contracts for the parking if you're not
doing work on the site that leaves that
o option open for you to have the
surface parking use in place.
>> Yeah, absolutely. I mean, it's not going
to we're not going to extinguish it or
the the deal is or the concept is we're
not going to extinguish it until
construction can begin because there's a
holding cost to the property obviously.
So that assistant hold
>> So if it's approved for February 13th,
well that's you know their notices that
day.
>> Yeah. So, one of the ironies of the
situation then is that approving this
parking lot as with the idea that it
will be replaced by a building is going
to result in a net loss of parking off
street parking
>> on Elm Street. I just
>> I mean the theoretically based on what
Lucky just said
um it
>> Okay.
>> Yeah.
>> Yeah. We don't have any idea what's
coming and we're not voting on that.
Right. Right. Right. I know that.
>> But um but the the um visuals were maybe
including parking as well, but that's
beside the point. It sounds like uh this
is pretty practical stuff moving
forward. You're maintaining a parking
lot to gain minor revenue until the
point where it makes sense to start a
construction project, right? Um so my
question to Meredith is simply do you
think it's better structured as uh
determination of the use is conditioned
on the change of use for new
construction or is it better to make it
subject to the parking lot will cease to
be a parking lot when the construction
officially starts? Doesn't really
matter. You don't
the board is just authorizing surface
parking as the primary use on the parcel
>> at this point
>> right
>> when lucky or a later owner if that were
to happen comes back and says hey I'm
now ready to build part of that new
build would be the application for a
change of use
>> however it worked out because there's
already some surface parking there for
some reason they wanted to keep that
surface parking. They ended up deciding
they do want to keep some surface
parking and then build a building with
parking underneath it that serves the
new residents, right? You could have
both on the parcel now because the
conditional use of surface parking has
been approved, right? It provides them
some options,
>> right? They don't have to extinguish the
surface parking use necessarily to
rebuild. They can, right?
They they have the flexibility.
>> Okay.
No, that's an important distinction. I
don't I think
it it doesn't um this this this is going
to resolve itself in the future.
>> Yep.
>> Can I ask a stupid maybe stupid
question? I maybe didn't understand the
nuance of this.
What is the reason that conditional use
would be necessary now when in fact the
area is already being used for parking?
Yeah, I guess it's the hypothetical
service to the use of the parcel. I'm
not sure
that. So,
the parking lot was the parking lot for
the church,
>> right?
>> They built the parking lot for the
church, right?
>> Churches
have
a special status under zoning along with
other entities. So that zoning has
limited purview over them.
I couldn't find that they ever got
permission to like use that as surface
parking to lease out to somebody else.
They were just sharing their parking lot
>> for some extra money. Right. It was not
a authorized
primary surface parking use.
>> Mhm.
>> Right.
So it becomes primary surface parking
when the parking is not in service of
some other
>> of the of the building on the parcel. So
this is where the demolition becomes
tied to the conditional use because
we're saying there's there's
>> really no
use other than
>> there's no other use if the demolition
>> and it's it's my being strict about
what's happening here and also because
>> and lucky this is nothing about you and
your feasibility and anything there is
absolutely no guarantee
that the new build will happen. We
currently have a gravel parking lot next
to the pavilion building on State Street
that is in front of the former Thrush
Tavern building that there was a permit
permits got issued to build a brand new
building there and it just never
happened.
and the way the permit conditions were
were all tied in, they didn't then have
to come back and make that a parking lot
that actually complies with DVW
standards and everything else because of
the way things were written. And so it's
just a gravel parking lot with concrete
barriers and it does not fit in with any
other parking. Would that be a logical
condition in in this case to
>> that would be why that would be why I
proposed
>> uh a condition of within
uh
I mean part of it within three years of
the board's decision applicant owner or
future owners of the subject land shall
return to the board to update the
screening for the parking lot in
compliance with the design review and
landscaping and screening standards
applicable at the time of application.
And that's a one way or another, you're
either coming back because you've gotten
new permit to build and you're putting
in appropriate screening and all those
other things or if it's still just a
parking lot,
we're going to make you put in more
screening than we authorized here,
right? If they're proposing to build a
new building, making them put a whole
bunch of screening and plantings between
that potential building site and the
road doesn't make a lot of sense. But if
it's still going to just be in three
years it's still a parking lot, you you
better come back and it you better
figure it out and do something better,
right? That's why I put that in here at
the end of the staff report because I
don't want to see what's happening right
now in front of the thresh again.
Um,
all right. Just want to make sure we
don't miss anything here. Um so
we've finished general standards.
Um
staff report
talks about histo demolition and
whatnot. Um and the next area lagged is
erosion control which Meredith pointed
out us not to forget. Um I had a
question if someone could point me to
it. Um, I just don't know that I'm
looking at like the site plan that's
referenced in here.
>> Uh, we got the addendum, which is like
the parking
um lot
um ground floor plan.
>> Hold on.
I've got to zoom in on some stuff with
my understanding and then of course you
can definitely
>> get Ly's input. Um, so give me a second
before I share screen.
I don't get make everybody nauseous
and lucky. Correct me if anything of my
my understanding here is wrong because
there was a lot of documents and I've
reviewed things multiple times as I was
working with your staff to help put this
together. So, this is the existing
site plan with all this pink. The
current building. Okay, this is the
whole current building. There's some
green space here up front.
This is all like grally parking lot,
the sort of blue and gray dots. Um, and
there's some also some sort of hardscapy
stuff around here. It's that the front
is kind of a mix of paths and um green
space.
Then the second one of these like plot
plans
shows basically
the proposal is just hardscape
everywhere that the the the building was
as well as all the existing, right? and
it's going to get filled in where the
building was and and all be kind of
level to the existing grade if you
filled in the basement space. Um, and in
general terms, they're showing some
plantings here along the edge. a few a
different site plan has more detail on
the plantings to provide some level of
screening
um between where the building was and
this new space
or the uh next building to the north.
So then they have a different one that's
based on it that's shown on a survey.
Um,
and so you it shows where says there's
some existing screening
versus potential shrubs to be planted.
And it's showing where all the existing
parking is.
And I assume and and lucky it sound like
you clarified this, the area that's
going to be used for parking is going to
stay the same. So it's you're still
going to use these spaces for the
parking. It's just that this whole area,
these buildings are going to be
demolished and brought to grade.
>> Correct.
>> And so my my thing about the erosion
control is that if these are brought to
grade and then it's just sort of grally
hardscape
that's not really dealing with potential
like runoff from that if we're talking
about the erosion control or even just
dust. And it's also I don't I don't know
what kind of fill you're using. That
would be um because you're going to need
to be able to put in new foundation
supports, things like that. Um my
question was whether or not this should
all at least be seated as a erosion
control matter. So there is another
similar site plan um using the same
survey as the base
um and so that has these arrows on it
which is showing really the storm water
flow and it has some elevation data on
it. That's what those numbers are. Those
are the um one foot elevation lines.
It's just doesn't come out very clear.
Is that a proposed or existing catch
basin there in the
>> it's existing so everything's just going
to drain exactly where it is. I mean 90%
of the roof drains there already. So the
impervious surface will stay the same.
It's just now,
you know, driveway plant mix.
>> So that's the proposal is this will all
be hardcape just sort of like gravel
surface.
Um and so the water will continue. So
it's it's kind of a mishmash. I'll I'll
agree of a existing and proposed kind of
shown together. Um
>> yeah,
>> you sort of have to look at the four
different ones together to get a sense
of what's happening.
>> Yeah. Yeah. So uh are you showing
proposed grades on this?
>> Those are uh existing grades now.
>> Okay.
>> So then we'd be matching that grade the
grades across going to the catch basin.
>> So this application isn't proposing any
grading. It's just demolition and
>> well and filling in of the basement.
>> Filling in the basement.
>> Right. Otherwise you have a big hole.
So, no changes to the existing grades
outside of the um building footprint.
>> That's correct.
>> Okay.
>> Can I ask a question?
>> Yeah.
>> Lucky, what do you think of uh
Meredith's suggestion of using uh
seating the
footprint?
I mean, it would just change the
material we have to put down and then it
would change the maintenance. I mean,
now we'd have to have somebody, you
know,
mow it and and work with it and it would
be the same runoff per se because it's
all sloped. Um, I don't think it's going
to change much personally. Um,
but I mean, if that's the condition,
then that's what you'll get.
>> Am I wrong? Doesn't it change it to
>> perable? If I if if you've got a surface
there that things can grow in
um and it becomes grassed over or even
just like
you know crazy wild flowersowers or
something um even if it's just for a
season um it does become considered more
of a permeable surface
um because you're going to have more
water infiltration there than if it's
like a packed gravel.
But will that
>> go will that affect the next permit that
I'm changing the previous impervious
surface to pvious and then back to
impervious
>> um
>> in the typical in the typical way of
things it would
um you know if the the parcel is really
really large so
unless you're talking about subdividing
which we haven't tked at all if if the
parcel itself is staying the same,
that's not going to change like your
coverage max or anything like that. But
yes, it would mean that when you do your
new build, um it would count as probably
changing from permeable to impermeable.
Um and so depending on the size, you
know, and where everything falls, it
might trigger a storm water plan. Um,
the board has some leeway
to decide like or even just say as long
as the application comes back within x
number of years, we'll still consider
all of that area to be impervious
because it hasn't had time to have root
systems work their way down X or Y, you
could put that condition on and a time
limit. But if it then stays, you know,
if something something happens and
nothing happens on this parcel for 5
years, at that point it's impermeable.
You have a lot of stuff growing there,
right?
>> How about
>> or pvious, not impermeable? Sorry.
Right.
>> Could we reverse it and say that if
nothing happens in one year, we change
it to grass and seed just so we're not
doing because I mean I am ready to move
forward so I just don't want to.
>> Yeah. it the re this came up for me more
in erosion control, right? And to make
sure stuff doesn't wash away. So that's
that's all that's but it's it's I mean
the board has options here.
>> You you guys have you guys have a lot
more play on this one in some ways than
I think
>> I don't think anybody was suggest you
put in a lawn.
>> No. No. Just seeding it with you know
Yeah. What we weren't thinking lawn you
would have to mow.
I just have two questions for you,
Meredith, and they're both, you know,
the next uh they're both related. Um the
first one is
if it was just filled with gravel or
something.
>> Mhm.
>> Right now, can we call it a permeable
surface?
>> It's it's an impermeable surface. If
it's filled right now, it's impervious,
right? Building on it
>> like crushed stone like that you might
use to back fill, you know, a building
or something. It's highly permeable. But
that's just the part A and the part B
was simply based on its new use as a
parking lot. Are there any other
considerations that you know of
screening or some kind of silt or
erosion control along that edge between
the adjacent property and the parking
lot that you know that we have to that
we can that we can kind of approve with
the thumbs up like let's
>> Yeah, I mean you could definitely
require
um you know especially during within you
standard erosion control
practices are going to apply. And that
includes putting down silk fencing
downstream while they're waiting for
either compaction of whatever they're
using for the fill. Um, you know, in
step to prevent a whole bunch of
sediment from ending up in those catch
basins like those requirements apply
base level. Um, this just hasn't
triggered a formal erosion control plan,
right? They aren't doing enough to to
trigger that. Um,
so
>> you know if Lucky is saying yes, I
agree,
then we it could be a finding effect of
yes, they've agreed to apply the
standard erosion control practices. Um,
it's just that one of those typically is
seating of disturbed areas within a
certain period. You know, that's
typically a standard practice. This
situation is a little funky. And this is
why I can't just say here's here's what
to do.
>> And and maybe there's not enough
precedent for filling it with crush
stone or something.
>> Well, if you look at that plan, it is
showing silt fence. So that is
>> right. Yeah, you've got silt fence in
here in in places
already.
>> Yeah. I just want to be clear. I think
Rob's understanding where I'm going. I'm
trying to present a solution.
>> No. Well, I think that the solution here
is I think we got enough information to
sort of through the mechanisms of
whether we feel like we need public
works to, you know, weigh in it's in
some fashion, you know, here. Um, and
then we've got, you know, the plans with
some silt fence proposed. I think we've
got enough to sort of, uh, ensure
compliance through our lang wording of
conditions. That makes sense.
Um,
okay. So,
storm water management. Um,
I'm seeing no real changes other than
Well, maybe Yeah, the building might
change the direction uh a little bit,
but not really.
>> You mean removing the building?
>> Removing the building may um
>> it just because it won't flow off in the
other direction as much based on the
roof pushing it.
>> Yeah, I think that one's fine. Um,
and I think that that ties into our
previous conversation here um about
um temporary measures and addressing how
long maybe hardcape or grass or what
what triggers what. Um
uh so
that will move us on to storm water
management. Good.
And so we're saying that um we will
maybe have to find a creative way to
address the impervious coverage issue
>> question not issue
>> potentially.
>> Um
>> it's if if you require that it be
grasped over. The question is how does
that affect future development?
>> Right.
Um okay. Um,
so
I mean the conditional use for parking I
think um as Lucky testified to um it's
not really changing much from its
current use.
Um I think also testified there's no
plans to make this like a a public uh
you know metered uh you know parking lot
either which I think is is important for
our valuation.
Um,
any board members have any concerns or
questions around um, vehicle access and
circulation?
>> Nope.
>> No.
>> Um,
so Lucky, you're not you're not planning
on changing location or the dimensions
of the curb cut?
>> Uh, no. We looked at it when we were
doing the street work and it's
sufficient and functioning.
>> Great.
Um,
so no changes
um there. Um, you got a snow storage
plan?
>> Uh, yeah. I mean, I'll have 10,000
square feet of more area. Um, so it'll
just go there,
>> right? They're not required to have a
certain number of spaces, so you can
cover up as many as needed, I guess.
Yeah.
What a what a luxury many don't have.
Um,
so we currently have 18 parking spaces.
Um, like as discussed, you don't have
any needs or plans to change that
number.
>> That's correct. It's currently under a
contractual lease and then we won't
require that through construction.
And are is there current um currently
designated um ADA spots as shown on your
um
exhibit submitted with the ground floor
plan or is that a different layout?
>> Uh no, it's just all existing. So they
don't go into anything and they're all a
light grade. So I'd imagine that could
cough off a couple ADA spots if
requested but we don't manage the lots
or parking.
>> Okay.
>> Um
parking spaces,
bicycle and pedestrian access.
Not seeing any in any uh notes here to
uh flag our in-house experts.
It's pretty straightforward.
>> Okay.
>> Um, landscaping and screening. Um,
this one might take a little bit. Um,
because there is a suggested staff
condition related to screening, I
believe.
Um,
is there any additional screening or
additional trees that are proposing not
to be cut as part of this demolition?
>> So, Lucky, since you didn't read the
staff report, um the I noted in the
staff report that we've got I think it
maybe it's these triangles. There's a
couple of trees on either side of the um
current maybe it's not the triangles.
There's a couple of trees on either side
of the curb cut right now in the front.
They just aren't shown here on the site
plan. So, I didn't know if you were
retaining those large trees. Um, the
proposal is to plant a, you know, pretty
thick shrub hedge here to the on the
northernish side. Um,
>> I mean,
>> I wasn't sure if you were going to keep
the ashes or if you were going to need
to take those down. I don't know what
their condition is. Yeah, at this time
we weren't going to do anything beyond
the demo soap fence and those shrubs. I
mean, if those trees exist and there's
no need to take them down, I don't see
why I would. Um, they I don't I can't
recall them being problematic or unsafe.
So, or wasn't going to.
>> Okay.
Okay.
Um,
would you be opposed to a
condition that those stay as part of the
plan
to meet the landscaping and screening
requirements?
>> Stay as part while this is just a
parking lot.
>> Yeah.
>> Members, I'm just posing the question.
That was a question to Lucky, right?
That was a question to Lucky. So
>> Oh, sorry. I didn't Sorry. Uh, yeah. No,
I love it. I'll stay.
>> Great. Okay. So, what that means is if
in between
um,
you know, if there's a delay in you
proposing future development and the
what is it? The three ashes along this
property line or the two big trees out
front, if they just die, you'll have to
replace them.
>> Okay.
outdoor lighting. No changes there.
Um,
so finally the conditional least
standards
Um
so first provision capacity of community
facilities and utilities. Um
parking is a use um I don't see any
issue board member see any issue. No.
>> Um
traffic um I think we found that um
the existing use is not really changing.
Um so um any board members see issue
there. We'll continue on to 3004
character of the neighborhood. Um we've
already determined um not really um
changing I guess Um
any issues from board members of flag
with that?
This would be the place where if we had
concerns about a scenario in which for
some reason the current plans don't work
out, we might want conditions for
screening, right?
Or to make it more of a neighborhood
amenity.
>> Yeah, you could. That might be some This
would be one place to do that. Yeah.
where if it was if it continues to be
just a surface parking use
in x amount of time, then they may need
to, you know, you could say they'd need
to come back for a re-evaluation of
effects on, you know, the neighborhood.
And um
that sounds nice. We could have make it
a park.
But it's up to the boards.
>> Although the mandate is to maximize the
perception of open space. Um
we're on that path.
We're going to be giddy with consent
very soon.
Give me with consent.
>> It's 9:15. Just trying to charge ahead
here. You know, board likes to get this
housing projects uh done even though
it's not a housing project, but um
anyway, um
I think that's it. Did we miss anything?
I don't think so. Try to hit all the uh
points here.
Yeah,
>> they still in the parking
>> uh
>> on the open it up to anything.
>> Oh, yes. I just uh had it out here on um
it was uh oh jeez well page 17 actually
uh up at the top uh small uh number two
said is not clear which oh some of those
words signal attention to me. Uh it is
not unclear if additional parking spaces
may be designated for applicant's use
related to future development of the
parcel. So a couple things raised my
attention. It is not clear and it isn't
uh at all um and does this uh
application have to provide such um will
be designated for applicant's use
related to future development of the
parcel. Can you explain maybe Meredith
why you wrote that in there and how um
uh Lucky will respond to it or how the
the group should respond to that for me?
Thanks.
>> Yeah. So, I think it comes down to like
if you look at this the site plan that
I've pulled up here. If you look at the
site plan I've pulled up on the screen,
um right, we have the 18 numbered spots
here in the existing parking lot, which
is the existing parking lot is what
Lucky is planning to use for this
surface parking use as he's testified
during the hearing tonight. So, that
becomes a representation of fact. Um,
that's that's sort of binds him to
that's what he's using. That's what he's
using this for the surface parking. Um,
and there are at least a couple of other
spaces
in this lot. And so my my throwing that
question out there was trying to find
the full scope of what is this surface
parking? Um, is it going to be
continuing to be used while he's
building the new building? and he
already answered that that his plan is
once he has the permits in place for a
future building on the site,
he's going to need the whole to have the
whole site accessible to dig things up
and reorganize and resite and build the
new building. And so he is not intending
to continue having this surface parking
lot, right? But either way, it doesn't
matter. He is bound to basically this
site plan unless he comes to either me
or you for a revision to the site plan
of how the parking places spaces fit in.
If he decides, oop, I'm just going to
build within this footprint where the
old building was for some reason, right?
He decides that's all he's going to do
and he's going to keep these parking
spaces as a service parking use. He has
that option,
>> right? The 18. He has the option to to
continue doing this
>> and and build and build
>> given the option to increase the number
of parks.
>> No, no,
>> no,
>> no. He's got a parking lot here, right?
If he decides to
using 18 spaces for the surface parking
use.
>> Yeah,
>> that's how many he can use for the
surface parking use to serve other prop
other uses off the property. Okay,
that's what he's coming here for.
If he then decides to build just in this
footprint,
he can do say he everything fell apart.
He sells the bu the property. Okay.
Somebody else can come and say I just
want to build a four unit building here.
That's all I have money for. Four
dwelling units here.
Unless the board conditions something
and says you have to build x number of
units. Somebody else could come in,
build four here,
use these two parking spaces for those
and like build a carport, right? Or
underground first level parking
and and it's not. Anyway, my my question
here is moot. The the thing in the staff
report at this point is moot because
Lucky addressed it.
>> Let me be great. I thought we were
restricting the parking lot to 18 spaces
unless there is additional structures
built on that property that require
additional parking.
>> If you
so if you put that
>> 18 space period
>> we're not limiting it there is
>> it's you can decide to
>> by another additional structure. So
Lucky has said he's using 18 spaces for
the surface parking. That is a
representation of fact that goes to if
he suddenly was starting to expand it
and and and lease out
>> 25, that's a violation of the surface
parking permit. Okay,
>> that's that's what I'm saying. But
>> we're not limiting going forward him
coming back and making some other change
of use unless you decide you're going
to.
>> He can come for additional permits in
the future is my point.
>> I see. Okay.
>> So if my question was
>> never mind
>> in the staff report is the surface this
site plan shows at least 20 parking
spaces.
18 of them are numbered. He's
represented in the application. He wants
to be able to have 18 spaces for for a
primary surface parking use where other
people use those.
>> Yeah.
>> Good.
>> But there was a conflict between that
and what the site plan showed. That's
why the questions in here.
>> Yeah. There's conflict otherwise too.
But I think we'll let that one run. Um
so I think I understand better. Thank
you.
>> Wonderful.
>> All right.
Board members feel like they have enough
information on all the items discussed.
to move forward.
>> Yes.
>> Um
I do think
the conditions on this may be a bit
uh complex and need some discussion
but um so I think a deliberative session
might be more efficient. Um
how do folks feel?
>> That's good.
and and finish out the meeting and then
close the meeting and have deliberate
discussion on the hearing.
>> Yes.
>> Yeah. Close the public hearing and um
um
>> take it up
>> take it up at the end of the meeting
>> session.
>> Yeah. So moved.
>> Yes.
have to repeat
>> the motion before a second and before a
vote. Okay.
>> We have to do that in two motions to
close the hearing or just
>> we it's a motion to the way you just
described it.
>> Motion is to close the hearing and take
up uh the deliberations on this
application at the end of this meeting.
>> Yes.
>> That was No, that was moved by Joe. We
have moved by Joe.
>> Second by Bill.
>> All right.
>> You uh No, you
>> Bill. Second.
>> No, no, we're Katherine showed up.
>> Yeah.
>> So, your alternatively,
>> I heard a second by Kevin.
>> You've been part of the discussion.
>> Kevin, Kevin, how do you vote?
>> Is there any discussion on the motion?
Seeing none, Kevin votes yes.
>> Catherine,
>> yes.
>> Brian,
>> yes.
>> Yes.
>> Alex,
>> yes.
>> Joe, Rob, the chair votes yes. That is
>> seven.
>> Yeah. Seven to nothing.
>> Wow.
>> Seven votes.
>> Five. That's
>> okay.
>> Okay. Wonderful. Um, so we have the
minutes from Go ahead.
>> Yeah. minutes and annual election of
officers before we can close the
meeting.
>> Um, hold on. Am I done here?
>> Sorry.
>> Uh, yes, Lucky, you can
>> I want to be done, too. I want to be
done, too.
>> All right.
>> Um, and, uh, there will be a written
decision at some point, but you you can
touch base with me tomorrow. I can at
least tell you if they voted, which it
sounds like they're going to.
>> Okay. Well, thank everybody for their
time and energy on this.
>> Yeah. Lucky. Have a good evening. That's
important.
>> Thank you, Bob.
>> All right, we do have to do these one by
one. Minutes from 62926.
>> Yep. Minutes from June 29.
They should be in your packets.
>> Yep, they are.
>> I'll make a motion.
>> Um, we have a motion by Kevin, second by
Katherine. All those in favor say I.
the
minutes from July 6th.
>> Move to approve.
>> Motion by Alex.
>> Second.
>> Brian, you were not there.
>> It's okay.
>> All right.
>> You don't read them. Yeah, if you read
them in type of
>> Alex and um
second by Brian. Um those in favor say
I. I.
>> All right.
Wonderful. On to the next order of
business which um we moved number five
down to
B number nine. Um so which is the annual
election of officers, the chair and the
vice chair.
>> We're still in open session. Correct.
>> We are still in open session and we will
be until the end of this meeting item.
stick the ground
know who's volunteering.
>> All right. So, uh who is who is who is
volunteering? Uh we'll we'll start with
uh
>> what's a better way to start with the
chair or the vice chair.
>> Well, what are you had said previously
what you were willing to do, but I don't
know if everybody here heard that
before.
>> No, I just But as far as
>> I would start with the chair.
>> Start with chair. Okay.
>> I think we should make this something
that somebody wants to do.
>> Yeah. different
uh I mean who who would like to be chair
>> or who is willing to be chair
>> you guys are pretty
>> remember you me as a bit of a back stop
take time
>> I would say
>> you're relinquishing your your position
as chair I I I'd be happy to um
>> uh
let someone else have an opportunity
>> um I think you're doing great and um and
to um I would also be happy to uh to
fill the role as the vice chair uh
happily uh and uh I think it's uh it's
very important for the longevity of the
board that we we do try and rotate the
positions around for diversity.
>> Agreed.
>> Um and um so um yeah, that's that's my
suggestion.
>> And I'll note too, just given you're
willing to be vice chair, I wasn't
planning to put myself forward again
because you probably noticed that in
virtual a lot. My husband has to travel
all the time and um I don't really love
uh or I I have been willing to chair
when Rob's out virtually, but it's not
ideal. It's better for the chair to be
here in person, though.
>> Yeah. Nobody.
>> Yeah. No, my position is paid.
>> Sorry. I take this as a job.
At least to get $50 a day.
>> And I don't live in I don't live in
Montillar.
>> I don't live in Montillar.
>> Um,
>> so does anyone else feel like they have
the the capacity to?
>> Well, you you indicated that you may not
love the idea, but you don't hate it.
>> Very recalcitrantly open to considering
it with extensive handholding. I um
think that well for one Meredith will
keep you on the toes.
>> That's true. That's extremely
reassuring.
>> Uh regardless of I'm willing to be a uh
a very active uh you know vice chair and
uh help out
>> that's what we need
>> preparations and maybe continue our
initiative to diversify the workload at
meetings and and whatnot. um group and
um yeah, whatever whatever initiatives
the uh the chair wishes to push forward,
I will be at your back and call.
>> I want to say too, Alva, you've only
been on the board a short time, but
you've been so thorough and always come
so prepared to the meetings and I I
think you do an amazing job as chair if
you're willing to do it.
>> I mean, considering that I'm even
hesitant to like put forward a motion,
it's a bit of a leap,
>> but
>> as chair, you don't have to put forward
any motions.
>> That's a good point.
Well, I'm just moving along. Uh I
nominate uh Alva to be the chair for the
next year.
>> I'll second the nomination.
Do you have to accept the nomin?
>> Usually we we ask for yes an acceptance
of the nomination before the vote just
to confirm. With the conditions of epic
handholding
uh and just general support on record, I
accept the nomination.
>> Congrats.
>> My wife will be so happy.
>> Uh so there needs to be a vote.
>> All right. So, um, should we do we have
we need a roll call vote? No. Yes.
>> I
>> All those in favor of electing Alvivera
as chair until August 2027
say I
>> I
>> congratulations.
>> Thank you.
>> I also nominate Rob to be the vice
chair.
>> I accept.
In your last official act as chair,
>> call the vote.
>> Call the role.
>> Call the role. Yeah.
>> Actually, actually that raises an
interesting point. Shouldn't the
existing chair remain as chair for the
open application
>> for deliberative session? He'll still be
chair for that for the discussion
because he chaired the hearing. So,
he'll still sign that decision.
>> Okay. Right.
>> Yeah. Yep. That's one reason we made
sure that
>> we didn't suddenly switch chairs just
before a new
>> Okay. So,
>> application.
>> Um,
yeah.
>> One more decision.
>> So, Kevin, how do you vote?
>> Or or unanimous.
>> Uh, you didn't do a roll call for the
>> chair. So, you can
>> Funny things happen. It's
>> Joe called a roll. I Someone called a
roll.
>> No. Vote. Vote. vote.
>> Call the vote.
>> All those in favor of electing Rob as
the vice chair until August 2027 say I.
>> I.
>> Thank you all.
>> Yahoo.
>> Wonderful.
>> I with gratitude for your service in the
role as chairman.
>> Thank you very much.
>> Uh
>> thank you for stepping up.
>> Yeah. Motion to conclude the No,
>> hold on. Hold on. Hold on. No, no, no.
you're doing fine except that I just
want to make clear and on the record
when everybody else can hear too in the
public that I do not have an application
for August 17th.
So unless for some reason you all want
to have an organizational meeting, there
is no meeting August 17th. I will know
by the end of this week if I have any
applications for the first meeting in
September, which is actually the Tuesday
after Labor Day.
Um, but the deadline for those is this
Friday.
>> So, what what's the date? What's the
date? Will you know on August 17th?
>> Or do you already know? No applications?
>> No, I just Yeah, I would have had to
send out the the public hearing notices
on that to last week, last Tuesday. So,
there's there's nothing for August 17th.
So, there's no meeting. Um so the
because the first
Monday in September is the 7th which is
Labor Day. The next meeting will be
September 8th.
>> Tuesday September 8th already
>> and I will be out of town.
>> Okay.
>> All right. So motion to conclude the
public hearing and move to deliberative
session.
Can we
please?
>> Absolutely.
>> Yes, please.
>> Absolutely.
>> Okay. So, sorry. Joe moved.
>> Who second it? I'll second. Okay.
>> All right. Um, any discussion on the
motion? Kevin suggested a fivem minute
break in between. Um, which we can do.
Um,
>> u Yeah,
>> nothing.
>> Kevin, any vote?
>> Yes.
>> Catherine?
>> Yes.
>> Ryan? Yes.
>> Yes.
>> Alleg
Joe
>> Rob chair votes yes. That's unanimous.