Video summary
The Montpelier Design Review Committee convened on September 8, 2026, to address remote participation protocols and review two specific development applications. Staff member Meredith Randle provided an overview of Zoom access options, technical advice for maintaining audio stability, and guidelines for microphone etiquette and chat usage during virtual meetings. She noted that if the public could not access the meeting due to technical issues, the session would be continued at a later time. Following these procedural introductions, the committee unanimously approved the minutes from their August 3rd meeting with motions by Martha, Rebecca, and Stephen, effectively closing the administrative record for the previous session.
The first application reviewed concerned 62 Ridge Street, where Greenway Incubator sought to replace an old oil boiler with a new electric system utilizing off-peak electricity through Green Mountain Power's Flex Load Management Program. A significant point of discussion arose regarding the placement of the necessary transformer, as the applicant's initial proposal to locate it in front of the historic Martha Schuler building faced strong opposition from committee members who wished to minimize visual impact on the structure. After debating alternatives constrained by property lines, existing infrastructure like paving and a coal bunker, and utility requirements, the committee agreed that placing the transformer along the west-side driveway was the most feasible solution. This location allows the equipment to be positioned as close to the building or sidewalk as possible while meeting code setbacks, a change the applicant confirmed would not significantly increase costs. Consequently, the application was unanimously approved with a recommendation to locate the equipment along the west-side driveway.
The second application involved Amber French's proposal for 29 Main Street, which included installing projecting and wall signs for a new salon and barber pole business in the former Walgreens building. However, the committee noted that the applicant expressed uncertainty about the viability of this specific location, as they were simultaneously considering an alternative site at 388 River Street, which falls outside the Design Review jurisdiction. To allow the applicant time to confirm their final location without incurring costs for a new permit application, the committee unanimously agreed to table the application rather than approve or reject it immediately. This decision ensures that if the project moves to the alternate location, it may bypass the district's review entirely, whereas if they remain at 29 Main Street, further scrutiny regarding sign dimensions and mounting details will occur at the next meeting.
In addition to reviewing applications, the committee addressed a transition in their administrative processes regarding the generation of meeting minutes. They discussed moving from an external minutes writer, Tammy Smurski, to an internal AI-based system for drafting future records. During this discussion, members agreed that the previous short-form minutes were too brief and decided to trial a modified long-form format that captures important details while excluding repetitive discussions and irrelevant side conversations. The group also voted to exclude absent members from the attendance list in future records to streamline documentation. With these procedural changes adopted without a formal vote and Martha moving to adjourn the meeting, which was seconded by Rebecca, the committee concluded its business for the day.
Read the full video transcript
Welcome to the Tuesday, September the
8th, 2026
meeting of the Montpelier Design Review
Committee. I will let uh members and
staff introduce themselves.
>> Uh this is Martha Smurski, member
Rebecca Owens, member.
>> Meredithrandle, staff,
>> and Steven Everett, member. At this
point, we'll let Meredith review the
remote meeting procedures and process.
>> Okay,
we just have
applicants and members so far, so this
we should be able to do this fairly
efficiently.
All right. So, for anyone viewing
tonight's design review committee
meeting via Orca Media, you can
participate in the discussion using the
Zoom platform through either video or
telephone access options. For the full
video experience, please type this link,
I know it's really long, into your web
browser and you will be able to see
what's going on as well as um have us
see you um and be able to talk to us.
Um, alternatively, you can dial in from
any phone using the phone number here
and when prompted, put in the meeting ID
and passcode. Um, and then you'll be
able to hear everything that's going on
and um, discuss, you know, raise
questions if you wish. Um, if somebody's
trying to get in and having problems,
please email me at
mcrandlempillar-vt.org.
I will be monitoring my email throughout
the meeting. Um, for those attending via
Zoom, turning your video on is optional.
If you're having a lag in the sound, um,
turning your own camera off will help
tremendously. We won't be able to see
you, but you'll still be able to see
everything that shows up on the screen.
Um, and a lot of times that does help
with any lag in the sound. Um, we do ask
that everyone please keep your
microphone on mute when you're not
speaking. This helps reduce background
noise. Um and that um if you haven't
been asked to speak by the chair and
wish to speak, please raise your hand
and wait for the chair to call on you.
The Zoom chat function should be used
only for logistics or troubleshooting
issues. Um and so uh anything that is
substantive to the matter needs to be
made verbally so that everybody can hear
you. Um, in the event the public is
unable to access the meeting, um, then
it will need to be continued to a time
and place certain. I will now hand the
meeting back over to the chair.
>> At this point, unless someone has
something to add, do I hear a motion to
approve the agenda?
>> This is Martha. I move to approve the
agenda.
>> Rebecca will second.
>> All in favor of the agenda, speak your
names.
>> Martha. Rebecca
>> and Stephen. Agenda is approved. We can
move forward to the first applicant for
62 Ridge Street. Applicant owner
Greenway Incubator
is someone here.
>> We have lots of people here today.
>> Okay. Come forward and have a seat at
the table and describe your application
for us.
>> Hi, I'm Troy McBride of Greenway. Um,
also here uh with us is uh Leaf Johnson
who's a project manager on the project
and uh available to answer questions. Uh
we're also like other times we've been
before you, we've been fortunate to have
Katie Gapsin uh help us with the process
and so she is actually going to lead
lead the discussion and Leap and I are
here to uh uh answer any questions.
So, if it makes sense, I'll just start
with a a brief overview and then maybe
um I'll sort of you've got the perfect
page up there so I can sort of help
locate some of the elements. Um
essentially, this project entails
replacing an old uh oil boiler located
in Martha Science building, formerly
known as Stone Science. um pictured
there um on the right hand side with the
letters surrounding it. Um that boiler
actually is part of a heat plant that
heats three buildings on the Greenway
campus. It heats uh Martha Schuler and
College Hall. So you can see all three
of those buildings. Um, so it's
replacing that old oil uh boiler with a
new clean electric boiler. Um, and as
part of that new boiler system, um, two
new elements uh, need to be installed.
At location A, right in front of Martha,
would be a new um, transformer.
And then located um where the sea is
would be hot water storage tanks. Um and
the idea with the uh hot water storage
tanks is that would allow Greenway to be
able to store energy in partnership with
Green Mountain Power and use off peak um
electricity to just be all that more
efficient. So hopefully I've described
that um well enough and maybe helped
locate some of those elements. Um but
I'd be happy to answer um any questions
from the committee.
>> Katie, do we have a picture of what the
trans I think you said a transformer
would look like in front of Martha
building?
>> Yes. So, if we go to
not the next page, I think it's the
second to last page. Um, so what page is
that? I think on my screen it looks like
page two. Yes, this one. Um, so there is
a pad, a concrete pad that the um that
is on the right hand side and then the
transformer sits on top of that. And I
don't know if anybody is familiar enough
with campus to um be able to picture.
There's actually another one of these on
campus right on the back side of college
hall. So it sort of ends up looking like
um a a metal
um container. Um and the
in terms of the dimensions,
I think it's about 5 and 1/2 ft tall.
um and not quite um as wide as that. So
maybe three or four feet wide.
>> Yeah. So there isn't a mockup, Martha.
Um and for So just a a note for people,
I forgot to say this at the beginning.
>> Um we're using a new system for minutes.
So, those of us here in chambers where
all the sound goes through one system
will probably want to state like who we
are when we're talking here at the
beginning um until it can get used to
us. So, this is Meredith. Um so, the I'm
going to scroll back up the first page
here. So, with the photo A,
>> um is showing the location where that is
going to go. There isn't a mockup of it,
but uh Katie, you said it's going to be
about 5 feet tall.
>> 5T tall. Yes.
>> And is it going to go tall? Like
>> is it going to go to one side or the
other of this bush that's here in the
middle? Do you know?
>> I I think that that probably the exact
location will have to sort of be
determined as the installation is
happening with Green Mountain Power. I
don't know. Troy, do you do you agree
with that in terms of the exact
location?
>> Yeah, I think they have some some
requirements like set back from the
building and
>> Yeah, there's code requirements about
how far exactly from different parts of
the building is probably going to have
to go um and for the the conduit and
everything to work. Um, so if the
committee has requests for screening and
everything,
we could work that in and as long as
it's still compliant with safety code,
um,
make sure that that fits. So like if you
want some additional new shrubbery like
closer to the front of the parcel to act
as some kind of screening especially if
any of the shrubs close to the building
have to go away. Um you could make that
request because landscaping and
screening are part of your purview.
>> Is there what is the code requirement as
far as distance from the building?
you know, Leaf, it's
>> If you know Leaf, you need to come up to
one of the microphones. Either the
standup or you can the stand up works
fine and just say who you are for the
record.
>> Uh Leaf Johnson with Norwich
Technologies. Uh I'm uh I don't know
what the uh setback from the transformer
to the building is. Um in in terms of uh
project management, uh we had uh been um
uh presuming that Green Mountain Power
would uh uh you know supply their uh
requirements for location.
I'm looking at the picture of the the
the long tanks, 51 ft tanks off the back
corner of the building and then it looks
like there are lines that come along the
side of the building and come in close
close to the front
>> on the side there.
>> Would it be possible to move the
transformer like on the side so that
it's not right out front of the
building?
Um so the uh the general position of the
transformer uh in front of the building
is based on the location of the
electrical service uh we would be using
which uh the last uh sort of the end
pole of that service is immediately
across the street uh sort of adjacent to
the parking lot for college hall if
you're familiar with that location. Um
and so that would be the um uh having
the transformer um immediately across
the street would involve the minimum
additional poles and electrical
infrastructure.
>> And isn't there a I'm sorry is that
overhead lines or underground lines
>> underneath the underneath the uh uh
ridge street which is a private road. So
>> right. So under underground.
>> So if they're going if they're going
across the street towards the front of
the building, is it not possible to come
across the street and then angle over to
the side and have it there? There's not
that much difference of underground
conduit that's be required.
>> Is this paved already though?
>> Well, I'm looking at I'm looking at the
picture of the building and there's
nothing on the right. It it is
>> or or is it paved?
>> U so just to clarify what what's on um
uh I believe predominantly the west side
of the building that we're discussing
there.
>> Yes.
>> Um so there are uh paved uh uh sort of
walkways and an old uh concrete um
>> coal bunker.
>> Yeah, bunker is the word I'm looking
for. an old concrete coal bunker um that
uh sort of sits uh adjacent to the
building on that west side.
Um
>> so you'd have to tear that all up versus
just the lawn.
>> That's correct.
>> Is the bunker below ground or above
ground?
>> Uh below ground.
>> Seems like a perfect spot to put a base
for your transformer.
>> This is Martha. I I agree with Steve. I
I have some problem trying to um
understand why it has to be in the front
because it is quite a large thing.
Big metal box.
I I will note that uh this is Troy. I
will note that there's is that same big
metal metal box uh behind college hall.
Um and uh it's you know painted green.
It's not particularly uh uh um
doesn't particularly stand out, but uh
>> but that that's behind College Hall,
right?
>> Which is on the same side as this,
right?
>> Just along Ridge
of the building.
>> No, I'm just I'm just trying to think. I
mean, the building's attractive. There's
trees there. There's some shrubbery
there. Uh if if anything it would be
better just in front of the absolute
corner of the building rather than
sitting directly between the entrance
and the in the side of the building this
thing sticking right in the in the
front. If it was off to the side you
could do a planting around it or
something to help hide it or it would be
ideal if it could go around the side of
the building if there's enough room for
the walkway and then to have the
transformer there.
>> I mean it's an attractive building. I
mean, this campus was laid up pretty
nicely when it was built, and it's a
shame that any utilities can't be sort
of off to the side and not predominant
like it would be with a box sticking
where that basically where that tree is.
>> Yeah, I think that that's uh uh I think
makes a lot of sense. Um, I think my
request would be that uh
we put it near that corner and then see
with GMP. I think around the corner is
going to be uh very difficult because of
the paving and the and the coal bunker.
But near that corner is is no might make
more sense
>> depending on code requirements. I guess
our first preference would be on the
side of the building at the nearest the
corner or the second choice would be if
that's impossible at least at the very
corner of the building so it would be
easier to hide it with some shrubbery or
or something
>> showing is that is second choice
>> first choice would be to tuck it around
the side somewhere
>> if possible.
beside that's where all your piping goes
in from the tanks anyway
is in that side. So that would be ideal.
And then second choice would be tucked
right right to the corner of the
building and as close to the building as
you can get it. And then that way
shrubbery that goes along the front of
the building could swing out.
>> Yeah. swing out
and and look like it was part of the
landscape design instead of a metal box
in the middle of the yard.
>> It'll need code requirements and I think
for this kind of equipment there might
be like a five foot setback. I have to
double check.
>> Um but as long as it can meet those two
>> then
you have some restraints there. But the
the least intrusive it could be would be
the preference. Again, it's a very very
attractive building.
>> Meredith, I I want to make sure that
just in terms of the conversation I'm
following. Um I I do I think what I'm
understanding is that the second choice
is in the front of the building off to
the side. the first choice is sort of
further back tucked along the side of
the building and the what I heard as the
sort of qualifier unless that's
impossible and I just want to get
clarity on that is quite an additional
distance to move it from the front of
the building to the back of the
building. It's closer to the neighbor.
So I'm just trying to understand what
not impossible means because if it
doubles our costs
um you know that that is uh just again
trying to understand the parameters
around the first choice which I think I
think greenway would agree 100% if we
can put it to the side of the building
so that it really is located um in a
place that is basically invisible to to
people coming through campus. Um that
would be ideal. But if that's you know
twice as expensive to put it there that
our preference would be to go with the
second choice of the design review
committee. So I'd love to get some
clarity on how we navigate that.
Again, we weren't asking or suggesting
to move it to the back of the building,
only to the side of the building, so it
didn't interfere with your line of sight
across the face of the building.
>> And and I think what's a little bit hard
to see from the pictures is that it's
paved all the way and there's an exit on
the side of the building. So it it
really ends up that other location that
we're talking about is pretty close to
the back of the building. So it would in
my estimation would at least double the
distance that we're talking about from
the front of the building as our sort of
second choice versus that side of the
building where it could potentially be
located
um if it meets all the other code
requirements. But I just want to flag
the fact that that is quite a distance
further from um the original. That's
there there's a picture. You can sort of
see the exit there.
>> So this so this so the picture C
is that side of the building and there's
that overhang there is a side entrance.
Is that like an emergency egress
situation with that path? Do you know?
Well, and now that I say it, Troy, is
that actually the um the entrance to the
coal bin area bunker or is that an exit?
>> That's an exit. And uh it's you know,
it's a it's not used often, but I
wouldn't characterize it only as
emergency.
>> Yeah, but it it it is an exit. So, we
can't block that. And we need to make
sure that that path remains, right? So,
you really have to go behind it. When
you're when you're looking at this, it
looks like there's a pathway, you know,
beside the building there,
>> but there's space beyond that. Depending
on what the code requirement is, there's
a space be just beyond that. Between
that and looking at it from the top,
there's a little building off to the
side. What is that building?
>> That's the next property.
The property line is, if you're talking
right there to the left on C, that tiny
I think that's the next property. The
property line is really close here.
>> This little building here. Is that a
separate house?
>> Um,
>> it this is Leaf Johnson. It may be
easier to look at this on the uh site
plan on the following page.
>> The colors are a bit more muted.
>> So, here's the property line.
>> It's okay.
>> There's not enough room between the path
and the property line to put that and
meet setbacks.
>> Yeah, I would I would There's t There's
not enough room. Then my again my
suggestion would be to tuck it as tight
to the corner of the building so that
the landscape design you know land could
come out and and go around the box if
possible just for screening and then if
it's 5t tall it's easy enough to find
some column or evergreens or something
that would go around that corner to to
help hide it again with the building.
It's a nicel lookinging building and it
would be nice to preserve that.
>> I agree with Steve. It's a gorgeous
building and I hate to see that first
facade interrupted in that in the way
that we're describing. Um, so if we can
put it on the side, I really would
prefer that.
And again, as this is as close to the
building as possible and then bring it
out to the edge of the the corner.
>> Is it possible to find out how much
difference it would make in cost to move
it to the side?
>> That would be very little. You're
talking about a little bit more wire and
conduit.
Well, I to move it to where you're
talking about I think makes perfect
sense and and shouldn't change the cost
much to move it uh somewhere like to go
underneath the
>> you can't go under I mean the property
line being where it is that that's
really
>> yeah I think that
>> pretty much impossible.
>> Yeah.
>> Yeah. So I think
so realistically Martha and Rebecca it
because of the property line being here
and all of the infrastructure that's
already here under that walkway and then
that they've got to run these pipes here
and you got to keep your electric and
this is water. So you got to keep your
electric and your water separated. I
think realistically it has to go here in
this corner as the sort of the middle
ground.
>> Okay.
Yeah, I'm I'm familiar with
>> that shouldn't change the budget.
>> Pardon my
>> I said I am familiar with the building
and that egress that we're talking
about. Um and it is just such a gorgeous
building. I I agree with Steve. If we
can make this as inobtrusive as
possible,
I I would truly prefer that.
I'd like to um add a thought too.
>> I can share whatever you need, Rebecca,
but go ahead.
>> When I look at um the site photos, the
first page and it shows the front of um
it's picture A and it's showing the
front. I actually am leaning towards the
original location because then it will
be in between the windows and then when
like if we're putting greenery in front
of it, it doesn't block the windows. I
think some of the location I actually
think it might become more obvious. So,
I would say either in between the
windows in that gap there where there's
like a large and maybe there's a window
behind it. And
>> is there a window underneath this one?
Do you know behind there?
>> Yeah, I don't know. But it's also that
I'm not sure it's tall enough to block
that window on the right there.
>> Yeah, this is a pretty because the
ground slopes down some here.
>> I almost think it's it might go
underneath there. Okay. Oh,
>> it'll be well under the windows
>> because this is this is a pretty high um
>> I don't know if that's granite, stone,
concrete, but the the foundation space
that you see there. I don't know all the
architectural terms,
>> but I think that that's pretty high to
get to the bottom of that window sill.
>> Okay.
I just think if it can be put on the
corner
and if you if there's landscaping that
can go around that it'll balance off
from the projected entrance at the
center of the building. I think it would
balance that.
Can I um add another thought?
Usually when I see these structures,
they're actually closer to the sidewalk
and I'm wondering if that was an option
or considered previously.
I think now we're This is Troy. I think
now we're actually talking about putting
it next to the
sidewalk coming from that
uh from that um
>> what we're calling the emergency exit,
the side exit, the that side exit that's
not used that often, but there is a
sidewalk there. And so this would put it
uh much closer to that sidewalk
>> for access by for to be able to get to
it in the winter and easier to
>> I don't think you need Yeah. But like
you never know.
>> Yeah. But just uh in general Yeah. Yeah.
>> Rebecca, just I'm curious if I
understood your question. you were sort
of wondering and asking if it could be
moved closer to the sidewalk rather than
closer to the building. Is that what you
were?
>> Yeah, more um the street sidewalk
because I feel like whenever I see
these, they're usually closer to the
street than they are the buildings.
And Troy, I'm not sure if we have a
sense or if Greenway has a sense if
if there is either something GMP has
sort of said to us in terms of that
location or Greenway's preference in
terms of what I had been hearing until
Rebecca asked the question is that as
tucked to as close to the corner of the
building is the preference, but now
Rebecca is sort of just asking what
about if we moved it closer to the
sidewalk that's closest to the road. And
so I'm I'm not sure if Greenway or GMP
has considered that. So I'd like to try
to give Rebecca an answer if we have any
information on that. So Troy, I'm I'm
passing it back to you.
>> Yeah, this is Troy. Uh I I would say in
general uh that uh we'd be happy
anywhere along that um that sort of
line. If you wanted it closer to the
sidewalk, closer to Ridge Street, that
that's uh you know, fine as well. Um I
it's like
low voltage wire costs a little more
than high voltage wire, but it's not
it's not that uh uh big of a difference
there. Um
uh so any anywhere along that line would
be uh fine if if you thought it would be
better away from the building and closer
to the uh closer to Ridge Street.
Rebecca, was that because that was your
preference or just because it's an
observation where you normally see them
closer, so you're worried that GMP is
going to want it closer? It's
>> kind uh maybe more the like I usually
see them closer and then it it become it
feels more utilitarian just like other
like things along the street that you
need to have, you know, like a fire
hydrant or whatever versus like when
it's closer to the building, it feels
more like a design element. So, I didn't
know if the rest of the committee had
thoughts about if it was farther away
from the building.
>> This is how far would it have to be away
from the sidewalk if the sidewalks being
plowed or snowb blowed.
>> Yeah, I'm I'm guessing both of those are
the in the 5 to 10 feet range like from
away from the building and away from the
sidewalk. Uh, I believe the the one near
College Hall is probably within 5T of
the sidewalk, but you know, 10 ft of the
building cuz it's just not that much
space between the two. Um,
uh,
>> I'm just going to try and go to uh,
Google Maps and see if I can find it.
>> Meredith, you're reading my mind because
I can actually see it on the picture
um, where we have the three buildings
pictured. There's a little It's a little
green structure
um right on the sort of right hand side
of College Hall.
>> Yep. Near the
>> next to the ramp.
>> Yep.
>> Yep. Exactly.
>> Um I mean the difference is this is
behind it um behind the building but it
is there. So, give me one second and I
will share this
um just so that people can see.
Um
and I I I mean this was put here long
enough that I have no idea if this was a
this is where GMP wanted it. I mean it's
really right near the pole. Um so that's
the box here at the back of College
Hall. Um here's Ridge Street.
So, that's that. And it is pretty close
to the sidewalk and the pole. Um,
and then the other pole.
>> Where are we talking about?
>> Right there.
>> But it's that building, right?
>> Yeah. I got to go down the street. You
got to go down the street
cuz here's the utility pole. It's got to
come from the one we're proposing.
So here's it's actually
paved access for really trucks to get
back there.
>> Yeah. So it could be right where you're
>> So it could be closer to the sidewalk or
it could be tucked up closer to the
corner of the building.
Thank you, Rebecca, for bringing this
up. I I like your idea. Um,
>> get it further away from the building.
>> Yeah. Yeah. Because it, as Rebecca said,
it becomes more utilitarian and less of
a distraction from the looks of the
building.
Thoughts, Steve? because we do need we
need all three of you to agree on the
recommendation
for it to be official.
>> I think where wherever along that side
paved area along that walkway or
driveway whatever you you call it and
think anywhere anywhere along there. I
was just thinking if you got it back
towards a building, it could be
landscaped even further, which would
again take take away from the appearance
of a utility,
but whatever.
>> Yeah, I
>> basically move it more to the right
somewhere along there. somewhere along
that line
either out front or close to the
building so that landscaping could
provide a a distraction.
>> Yeah, that makes sense.
>> Any thoughts about the tanks or that one
all okay? Now, do the tanks is the
property line of that adjacent building.
I'm assuming those tanks have to be a
certain distance from that that
building,
>> correct? Yeah.
>> Yep. Those are that's the um
for the site plan, they'll be I think it
was whatever the setback requirement was
for my purposes. Um they're going to
meet that.
>> I'm assuming those are insulated tanks
that just store hot water,
>> correct? Where's the boiler that creates
the hot water?
>> It's in the boiler room, uh, which is,
um, if you that corner we're talking
about in the basement in that corner,
um, you know, where the
>> outside is the old coal shoot. And so
it's it's down in that corner.
>> And that's an electric boiler.
>> That's correct. Yeah.
>> And that's more efficient than an LP or
some other fuel source. Uh so it is 100%
efficient at turning electricity into
heat. It is more expensive
than LP or oil. It's clean. Um and the
reason it's can be cost effective is
through the Green Mountain Power Flex
Load Management Program. And so in that
program, Green Mountain Power uh is very
interested in selling power off peak at
night uh when people are using a lot
less. They have a lot available. So
they'll sell it for inexpensively and
actually that competes with the price of
fossil fuels. And so that's the reason
for the storage is that we're only going
to do that heating
uh off peak at night basically. And then
we'll actually provide the heat
throughout the day to the buildings.
Interesting.
Okay. Does anyone else have any other
questions? Again, the consensus is that
the transformer will be located along
that driveway to the east, I'm sorry, to
the west side of the building, uh, as
close as possible either to the sidewalk
or to the building itself.
>> Yes.
>> Okay. I have to read through a set of
criteria
for
That's the basis of the whatever
decision is made and I'll read through
that all projects exterior design and
materials of new construction or
alterations of existing buildings shall
be consistent and compatible with the
characteristics of the existing building
or other properties. Um, and we'll
actually move down to number three.
Proposed landscaping shall be compatible
with the neighborhood and site on which
the project's located if landscaping is
involved.
If
I'll say if used to screen the
transformer,
location and appearance of all
utilities, mechanical equipment, trash
storage, and fencing shall be cited to
minimize adverse visual ual impact. So
that was one of the reasons we're
suggesting something to try to
address that to minimize adverse visual
impact or adequate adequately and
appropriately screen from public view.
acceptable
architectural features including but not
limited the cornises, windows, shutters,
fan lights and table trim, other forms
of molding or character defining
detailing prevailing on the building.
I'm not sure that that applicable in
this case.
>> Yeah, I think not. I just wasn't you
were going to do to tweak it.
>> I'll just say not applicable.
So again, what it boils down to is the
location and appearance of all
utilities. And again, the idea is to
minimize adverse visual impact or
adequately and appropriately screen from
public view. Again, to try to preserve
the character and the beauty of the
building.
And again, our re the recommendation is
to locate it along that driveway, either
as close to the building with
landscaping or as close to the sidewalk
as possible. Again, to minimize the
visual impact.
All in favor based on that, speak your
names.
>> Based on that recommendation, this is
Martha. I say yes.
>> Same. Rebecca says yes.
>> And Steve says yes. So three to zero in
favor.
>> So Steve just needs to make sure he
fills out the actual recommendation on
there and then Troy since you're here,
we'll have you does it. I can
>> if you want to come up have you sign it
right there
>> and then fill in the recommendation.
>> Again, our goal was to visual minimize
visual impact. That was the whole
>> right part of the
>> gist of the of the issue.
>> Thank you. Thank you.
>> So, you'll get a copy of that so you can
see the exact text that goes into that.
Um, and we'll be able to move forward
with permitting tomorrow.
>> Okay. Great.
>> Awesome.
>> Thank you very much. Good luck with the
project.
>> I'll be curious to see how that works. I
have not seen one of those yet. You said
there's another one up there.
>> Not like that.
>> We have three oil boilers. This is our
the one that's the oldest.
>> Okay. That you're gonna convert to this
and then we'll see how this works.
>> Yeah. We don't have plans for the other
ones yet, but like we're improving
campus.
>> Good luck. Good luck and thank you for
your efforts. It's appreciated.
>> All right. Thank you.
>> Thank you.
We can move forward to the next
application for 29 Main Street.
Applicant Amber French
for placement of a science and a barber
pole.
>> Hi. So, my name is Becca. Um, I am here
as a partner of Amber French. Um, and
she is currently a nail tech with a
barber. Um,
and she is trying to open her own salon.
She is currently at the salon Posh and
Barry. Um, she is trying to do her own
location.
Um, a few things have changed since I
talked to Meredith and submitted the
permits. Um, we are unsure of if the
location in Mont Pillar in the old
Walgreens is going to work or not. Um,
we do have another location that she is
looking at. I obviously don't have like
the photos and the the cut sheets like I
did for the Walgreens building that I
submitted to Meredith. Um, we're willing
to do that. We just recently found this
out this week. Um, so we're wondering
what's if it's if the location is still
in Mont Pillar if we're able to still um
review the signage or if I would need to
start fresh, make all new cut sheets and
reapply
um if the location is different than the
one in Montpillar that we spoke of.
Um this is this is Martha. Um my feeling
is that if we are not proceeding with an
application on 29 Main Street that we
have to start over again and have a new
application. Is that correct, Steve?
>> Or we could table this one and have her
come back with different information.
So, so what I would recommend is that
the three of you at least look and give
your ideas on the location that's
proposed here. And what we can do in
planning is just hold off on issuing the
permit um and have it be you know it can
be and you can have it be tabled and
then we would need to do one other
meeting either to say yes this is the
location so we can we get a vote versus
if you have to switch it we're still in
a point where we could switch things
around on our end so you wouldn't have
to pay for two permits. Yeah, that would
be
>> so yeah, once you once you confirm what
the location is, then we would go from
there and either come back with the same
set of materials or um or whatever input
you got from the committee. Yes.
>> Or switch it to be able to review the
the new location.
>> Yeah. So, um we still are the barber
pole is still what we're looking for.
even if it's at a new location, we're
still looking to do the wall um the
projecting sign at the new location. Um
we just might not have to do the wall
sign um at the new location and that
might have to get switched out to do a
sign by the road. The new location that
we're looking at is um it's a new
building behind Salon 42. It's 388 River
Street, I believe.
>> We'll we'll
Yeah. So, just we'll have to talk about
the specifics there. If you're in a
groundmounted sign, you can't have a
projecting sign.
>> Okay.
>> Yeah.
>> So, we'll we'll talk about that with the
new possible location, but if they get
there, they can give input on this
location.
>> Yeah.
>> The the concept the concept of the sign
is nice. Uh the size of it depends on
its location. Uh
>> the sign would be again depending on the
size of the location. Uh so that it
might need to be smaller if there's a
smaller location or smaller frontage
>> and again the the size of the lettering
would would also depend on its location
as well.
>> Okay. But again, and there was one other
thing here that may or may not even
apply to a different location. Uh on the
under the mounting detail, it says
conceal fasteners into the brick. If you
have a brick face, any fasteners need to
be in the mortar joints between the
bricks, not in the bricks.
>> Okay. Okay, that's good to know.
>> Yeah.
>> But again, those are just sort of minor
changes.
>> Okay. And again, the sign will just
depend on where it is and the size of
the of the frontage of the building.
>> Okay.
>> Um, and
>> yeah, if if we table this, does she have
to pay for another application?
>> No. No.
>> That and that was that was the the good
part about the tableing it, right? She
can get comments or any ideas at this
location and then just come back when
they're ready. It's tabled. they don't
have to pay anymore.
>> Okay. Then then I think tableabling it
is the best approach.
>> Yeah. Do you have any thoughts on what
is presented? And there was they weren't
able to it was sort of a last minute ad.
The proposal here was to have the
projecting sign also have a wall sign
that would be un like near this left
hand um light. Um and the barber pole
because the barber poles we don't
actually regulate as signs. Um so with
extra time
um even if they stay with this location
maybe Becca you and Amber could mock up
like a size for the the wall sign if you
stay at this location for the next
meeting.
>> Okay. Um
>> I know that the barber sign was the
thing that you had said there were a lot
of details about. So um are there things
that we should know?
>> Nope. It it actually I went back to it
and what it is about the barber poll is
that it is we actually don't really
regulate it. It's one of the few things
in
in Montpillar where you can have it
lighted internally lighted and you can
have movement because we're
there's there's like state
mandates to sort of stay away from the
barber pole.
>> Okay.
>> Um because it's such a traditional um
>> Yeah. It's old.
>> Yeah.
>> Okay. So either way, you're saying we
would basically be able to put the
barber pole up? Yep. It's the key there
is to make sure that just like with the
sign that if you're mounting it into the
brick that the fasteners go in the
mortar joint so it's not damaging the
brick itself.
>> Okay.
>> Just out of curiosity, what was the size
of the space that you were looking at at
this location?
>> So, they took the old Walgreens and they
split it up into suites. Um the suite
that we were looking at was 532
square feet.
>> Okay.
>> And it's not along the windows. So they
they split it all up. So where the
windows are, that is a much larger
suite. And then you go down the hall and
there would be our suite. And then you
go further down and there's like five
suites downstairs and then apartments
upstairs. Would your space have any
windows at all to the outside?
>> Um, they are adding windows currently to
the side where the road goes down
between that building and the city hall.
It's just one small window per suite
that doesn't have the front windows.
>> Okay.
>> It's not very big. It's like the only
sunlight we would get in there.
>> Yeah.
Just for my curiosity, I'm going to stop
sharing for a minute and I'll share
again in a second just because we have
people here and you have another
location you're looking at. What was the
address of the other location?
It is
388. Wait,
>> it's the address of Salon 42. So, so 42,
but I don't know if it's considered
Berlin or not Pillar.
>> Yeah, that might be Berlin, in which
case come back to us. So, give me one
second.
>> What about 338 River Street in Mont
Pillar? That's another location. It's
right down the road from the wayside on
the opposite side.
Okay. Oh, okay. I see where that is.
>> Where So, what's happening is um there's
somebody professional office
condominiums.
>> Yeah. And so, there's somebody that's on
the first dibs already that they're
waiting for an answer. So, we're hoping
and praying that they decide to go
elsewhere or don't take it. And that
would be the ideal spot. Um
even in addition.
>> No, it that's that's not in design
review. So, that actually wouldn't even
come back to here. So, if you ended up
switching to there, we'd actually
probably we'd give you um just probably
I don't know. We'll we'll work it out.
But that that you wouldn't have to come
back here. That's outside review
district.
>> Um so that would be just a a permit from
me. Um
>> Okay. So yeah, there because they
already have this big um
sign with spaces for everybody in it,
you would have your signage there and
probably some interior directional to
point people to you.
>> Um but you wouldn't be able to do a
projecting sign. You'd have to do
something else on the building.
>> Okay. Um
>> so yeah, they've already got their
system going. Um,
>> so I think you'll, you know, let us know
what, you know, keep me informed of what
the plan is and we'll work out how we're
doing the permitting.
>> Okay.
>> Yeah. We, she wanted me to continue to
go through tonight with this cuz she
wasn't sure like how it went. So, I told
her I would still hop in and
>> um see, you know, what it entailed.
We're new to all of this, so we don't
really know. It's a dayby-day thing that
we're figuring out. So, we weren't sure
if it was like the sign itself needed to
be approved or the location. And the
sign is still going to be the same. So,
we just figured we'd hop in and check it
out.
>> Yep. So, and that's the It'll be because
if you do move if you do move out to
that River Street location, um, and that
one that we just looked at,
>> because there's already that big ground
mounted sign, um, you can't have a
projecting sign. I can't permit a
projecting sign, but we could do a wall
sign, but you don't need to come back to
design review if you switch there.
>> I would just go to you. Okay.
>> Yep.
>> So, again, we we can table this
application. And again, I would hold off
making any signs until you find out
where you're going to be because you
might have to you might have to change
the size and shape of it.
>> Okay. Well, I appreciate all of you
guys's input. I hope I didn't waste
anybody's time.
>> Oh, no. Not at all.
>> Okay. Great. Thank you for Thank you for
coming and at least getting some basic
information.
>> Absolutely. Thank you guys. I really
appreciate it.
>> And good luck finding your location.
>> Thank you. And Meredith will be in touch
either way.
>> Perfect. All right. Thanks, guys. Have a
good night.
>> Bye-bye.
>> So, at this point, do I hear a motion to
table this?
>> I This is Martha. I'll move to table it
until next time.
>> Yep. And Rebecca will second.
And all in favor of tableabling it until
they're ready to come back, speak your
names,
>> Martha,
>> Rebecca,
>> and Stephen.
>> Thank you guys.
>> Thank you. And again, good luck.
>> Yes. Thank you.
>> Thank you, Becca.
>> Thanks.
>> Okay,
>> everyone had a chance to look at the
meeting minutes from August the 3.
Um, this is Martha. I've read them both
both versions.
>> There's actually three versions.
>> Okay.
>> There's the traditional that Tammy did
>> and then there's two other versions that
are from our new AI subscription to MUN
mins that the city is opted to go with
for pretty much all of our committees.
So, if you want, you can just read
through the ones from Tammy for content
um and have those be, you know,
reviewing for the the last meeting
minutes for approval and then the ones
that are formatted a little differently.
Look through those to see which style
you prefer and then we'll be able to go
forward with that moving forward. It's
just different settings in the system.
You mean we don't have the choice of
going forward with Tammy's in the
future?
>> No, she couldn't keep doing it anymore
for us. Um, and she was the only person
who had been hired externally to do
minutes. She did them for
DRC, DRB, planning commission. Um, I
don't think she did city council. Um,
but she did at least those three. Um,
and she couldn't do it anymore. Um, and
so the city as a whole is moving to
these other minutes as the for the first
draft of them. Um, and then I, you know,
I would review them just like I do
already for Tammy's. Um, and then you'd
have a chance to review. Um,
but they have some different, you know,
base settings for styles for either
longer form or shorter form. I think
given design review committee's history
with wanting to make sure there's detail
um in the minutes about what was
discussed,
my thought was probably you would want
the longer form, but I wanted to make
sure you saw what the options were.
So, there's two different things that'll
need to be decided if you know the
minutes from Tammy are good, reflective
of the August 3rd meeting and approve
those or edit them and then which format
of minutes you want going forward that
will be used starting with tonight's
minutes for the September 8th.
>> Well, I'll make a motion to accept
Tammy's minutes the way that they're
written um for the August 3rd meeting.
Are you in favor of the long form or the
right short form?
>> Right now she's just doing a motion to
approve these.
>> Oh, okay.
>> As Tammy's minutes.
>> Okay. So, we'll do it in two separate.
>> Yeah. So, please
>> do I hear a second on the August 3rd
minutes?
>> I second to approve.
>> All in favor of the August 3rd minutes,
speak your names.
Martha,
>> Rebecca,
>> and Stephen,
>> those minutes are approved.
>> Thank you.
>> And what is your preference going
forward? The short form or the long
form?
>> I guess I think the the long form
because we actually get a reflection of
the discussion.
And if there's certain formatting things
you would like, like a little bit more
formatting with headers, things like
that, we can set that up so that that
happens. Um, we can put in some
preferences,
we're still kind of playing around with
it and getting to know it.
>> Yeah,
>> a long meeting. There's going to be a
lot of minutes.
>> Um,
>> I know. Yeah. Well, this is not the
longest longest option. Um,
there's there's like a super detailed
option, but that would only that would
almost be a transcript and we're not
that that seems
>> God help us. We'd have to relive the
whole meeting.
>> Yeah. So, we're we're steering everybody
away from that. We're like, no, somebody
wants to we can develop a transcript
from Zoom if we need to. Um, or somebody
can just go listen to the whole
recording
>> as brief as possible that it gets the
any important details.
>> Yeah. One thing I'm thinking about is
why in the roll call does it put in the
people who are absent?
Um, so we can have it not do that, but
it does
um
it is sort of a double check, but we
could have we could I could just erase
that going forward if you don't want to
see who's absent. Um
>> well you in the final version we could
tell the system not to include the
people who are absent and
>> just have the ones list the people who
were present.
>> Yep.
>> Yeah.
>> Makes sense to me.
And then again, if it's possible to
make brief account of what transpired as
opposed to some of the conversations
that went round and round and round, we
don't need to rehash all of that. Mhm.
>> So, if there's a way to
do a brief of them
of each applicant and the results.
>> Yeah, I mean we can
>> we can play around with how detailed it
is for design review committee. Um,
I think the the short form is too short.
what you're seeing here might be too
long, but I think we'll just see what
transpires. Does that work
>> and how it pans out?
>> Okay.
>> Yeah,
>> we'll do a trial based on that.
>> Okay. Definitely the short form is too
short, but we'll play around with the
long form
>> and this isn't the longest form.
>> All right.
Okay. And again addressing the important
parts.
>> Yeah.
>> And leaving out some of the aides that
had no eventual impact on the decision.
>> Yeah. And that may also be in part my
also just going through and deleting
some of it because I can do that. Um, I
mean that's I I I would often back and
forth both fill in a few things that
were important for the minutes and
delete some stuff that was aides that
didn't really matter
>> when we did it before.
>> So, okay.
>> Yeah. No, I can do that for sure.
>> Do we need to vote on that or just take?
>> Nope. Good.
>> Nope, you don't need to vote. I just I
needed your input so I knew where to go
forward.
>> Okay.
>> Does anyone have anything else or do I
hear a motion to adjurnn?
Uh, this is Martha. I'll make a motion
to adjurnn.
>> This is Rebecca. I will second.
>> All All in favor of adjournment, speak
your names.
>> Martha,
>> Rebecca
>> and Steven. Meeting is adjourned. Thank
you for coming.