The video presentation provides a comprehensive update on the design development progress for several public safety projects, marking the transition from the 20% set to the current 60% package and seeking permission to move into the construction document phase. The project encompasses five primary buildings located along 23rd Street: Station 3 (Building A), support bays (Building B), a live fire training tower (Building C), a firing range (Building D), and an expansion for the police department (Building E). During this design development stage, engineers have finalized floor plans, interior and exterior elevations, material selections, and system designs including mechanical, electrical, plumbing, civil, and site work. The layout includes designated parking areas for visitors, staff, and range users, as well as sidewalks connecting the new facilities to create a unified complex with additional training spaces in the rear sections of Station 3.
Detailed renderings reveal that Station 3 is a two-story facility under 39,000 square feet featuring living quarters on the second floor and large apparatus bays below, connected by a mezzanine space. The interior design aims for a warm, homey atmosphere using durable materials with calming colors like teal and red accents rather than an institutional feel. Key spaces include a versatile training room that can be divided or used as an Emergency Operations Center (EOC), administrative break rooms, and communal living areas equipped with kitchens, dining tables, and day rooms designed to maximize natural light through wrap-around windows on the north wall. The support bays behind Station 3 are single-story structures utilizing architectural pre-cast panels that match the aesthetic of Station 3 but differ in material composition from traditional brick or masonry construction.
The complex also features a five-story live fire training tower accessible by three different departments, alongside a firing range described as a "dirty classroom" designed to withstand industrial use without requiring extensive cleaning between sessions. The police department expansion is a single-story slab-on-grade structure exceeding 14,000 square feet that includes fleet storage, maintenance areas, evidence lockers, and additional mezzanine space for further storage. A significant adjustment was made regarding Station 2 based on community feedback; the primary exit route has been shifted from Main Street to 18th Street to enhance safety during normal operations, with exceptions only reserved for specific events like polling or when north-side bay doors are under construction. Additionally, the scope of the firing range and dirty classroom was refined to be appropriately sized for the city's needs rather than accommodating full fire apparatus inside a confined space as originally considered.
Looking ahead, the project schedule proposes moving into the bidding phase by early January 2027, with plans to open bids shortly thereafter and aim for groundbreaking in April 2027, targeting completion by summer 2028. The estimated total cost remains around $54.5 million, which includes an additional $1.5 million allocated for department-wide security alerting, station alerting systems, and vehicle exhaust controls that were previously categorized as soft costs but are now integrated into the facility estimates due to their necessity across all stations. During a separate police report segment presented in the same meeting, officials noted improvements in violent crime rates despite high assault numbers compared to historical averages, attributed largely to increased traffic volume from construction projects rather than changes in driving behavior or distracted driving trends. The department also addressed rising fire reports caused by new federal reporting criteria and outlined proactive policing strategies such as neighborhood foot patrols and hotspot crime monitoring that are now being tracked more intentionally through updated data categories.
Read the full video transcript
[music]
So current
I can hear you through this.
[laughter]
I'm going to
Okay, perfect. And then did you want us
to use this or this one?
>> Handheld.
>> Okay. Can you hear me now? Okay. I've
never done this with a handheld mic, so
this will be fun. All right. Ready?
Okay. So, again, thank you for having us
tonight. Um, we're just giving an update
for the design development progress of
the uh public safety projects. So, um,
what we'll be reviewing tonight is the
project to date, the design development
package. uh just looking at all the
buildings that we're talking about and
then talking about the next steps of
design. So essentially we came to you in
the spring and we were done with our 20%
set and now we uh we had asked
permission to move into the design
development phase which got us to our uh
point tonight which is our 60% design
package and now we're asking to go into
permission or asking permission to go
into the construction document phase of
design. So essentially in the design
development phase we really start
working on the details of the
facilities. So we walk through each
facility finalizing the floor plans,
finalizing the interior and the exterior
elevations. Uh we started looking at the
interior and exterior materials that
will be used on the projects. Um we
brought in our mechanical, electrical,
um and plumbing engineers to make sure
that the systems are designed the way
that we would like them to design.
Working through things like where
outlets will be placed and how it's
going to be heated and all those items.
uh we started working extensively with
our civil and site engineers to make
sure that we are meeting all of the town
and um city ordinances on the site side
of things and then we continue to work
through our specialty design for the
live fire training tower and then also
the firing range.
So in the design development package um
the five buildings on the complex remain
the same. So building A is indicating uh
station 3. Building B are the support
bays. Building C is the live fire
training tower. Building D is the firing
range. And then building E is the
addition to the police department. So
again uh located on the 23rd Street. Uh
essentially you can kind of see how this
is laid out. We have additional spaces
in the back for um additional training
opportunities. We have designated
parking for visitors. Uh we have
designated parking for staff. We have
designated or uh ample parking for folks
that are coming to use the the firing
range. And then we also have some
sidewalks connecting to the police
department to make this truly one big
camp uh complex. So essentially station
3 overview. So these are the preliminary
renderings that we're starting to work
through with chief. There are a couple
things that we're still tweaking, but
this is uh the direction that we're
generally headed on the facility. So,
this is a two-story facility and there
is a mezzanine space out in the large
apparatus space and it's just under
39,000 square ft.
So, essentially the floor plan it
remained the same for all intents and
purposes. We just worked through
details. So, when you're looking at it
in this, the yellow is indicating
administration spaces. The purple is
indicating training areas. Uh the blue
is indicating uh personal
decontamination. The red is our
watchroom. The green is our exercise
space. And then the white areas are
different garage spaces for our
different types of vehicles.
The second story is dedicated primarily
to our living quarters. It's not the
entire facility. As you can see, it's
just a smaller chunk kind of in the
center of uh the northern part of the
building. And then we have a mezzanine
space that opens up to our large
apparatus space and then to our
mechanical space.
So, we're still working through the
interior finishes, but this is the
direction that we're starting to head.
It hits a very calming uh warm package
with some accents of some reds and then
some other uh teal type colors to make
sure that it feels nice and homey and
not too institutional, but just try and
make it nice. And we're working through
making sure that the uh materials are
durable and finishes, too. So, as we
start to work through our spaces in the
facility, this is our lobby. It's
actually looking back out the front
door. So, the training room would be
behind you and the front desk is off to
the left hand side. Um this is our
training room that we're proposing. So
we have a large training room that can
be divided down the center that that's
that center sophet that cuts through
there. Uh large displays on the front
wall and then there's also displays on
the side wall. So that way we can break
out and train in a bunch of different
manners. And then if we are using this
space as an EOC or an emergency
operations center, we have a lot of
different breakout areas to make sure
that we can cover all bases that we need
to cover. Uh this is our administration
break room. So, we wanted to make sure
that our admin staff still had a spot
that they can take a break for take a
break, walk away from the computer, um
eat their lunch, and then also, you
know, have a informal uh touchdown point
throughout their administration spaces.
Upstairs in our living quarters, uh this
is our kitchen area for our department.
And then we have this is looking the
other direction. So, you can kind of see
the kitchen's there on the left. Uh the
day room or sort of like your living
room is in the back on the right. And
then your dining room table is up in the
front and center foreground.
So the support apparatus bays are
located behind station 3. Uh it's about
6600 square ft. It's a singlestory
facility with six backin bays.
This will be uh architectural pre-cast
tipup panels instead of the masonry uh
brick construction, but the materials
will match what's on station 3.
The fire training tower then is just to
the north of that. Um it is going to be
used by the fire department, the police
department and can also be used by the
department of public works. And we also
have again additional space there in the
light green behind the apparatus support
base for additional uh on-site training
opportunities. The red arrows are
indicating the different ways that the
fire department will come at the
facility to use it for training. Uh this
is an example of what this will look
like. Uh all of these towers are
customized and yours will be slightly
different uh because of the needs of
your city. But this is an example of
what we're looking at here. But it will
be five stories. It is for live fire
training like I mentioned. And then all
three departments can use this facility.
Um when we go up to the firing range, um
again, just like there was the last
time, I'm going to go to this part here.
We still have our dirty classroom on
plan left and then we have our firing
range on the right. It can be used again
by all three departments. Um, we call it
a dirty classroom because it's a
classroom that we can go in when we're
doing our live fire training tower, uh,
live fire training. We don't have to
clean off before we go into this
facility. It'll be very, um, industrial
in that sense. We can just go in, do our
training, and head back out. It'll also
have entrances for both the police
department and the fire department. And
then just make sure that everyone kind
of uses it um, what in the manner that
makes most sense to them.
The police department expansion then is
located on the far east side of the
existing police facility. Um this will
also be architectural pre-cast panels
that will be tipped up. Um we will have
the materials matching to the best we
can the existing facility. So they'll be
kind of a gray block on the bottom and
then the horizontal um blue or gray on
the top to match what's there. Although
it is a different material so it won't
match absolutely perfectly. And again,
we're still working through some of
these design um finished materials, but
this remains a single story facility,
slab on grade, just over 14,000 square
ft.
Um this is showing you the basic floor
plan. So we have fleet storage uh
throughout the most of the facility. We
have a me um maintenance storage in the
red, evidence storage, and then um you
can see where the existing facility goes
through. And above the maintenance and
evidence storage, there's additional
storage space in a small mezzanine
space.
So, station two, um I think the biggest
change of station two is that we worked
with the department um hearing the
concerns of the community. So, instead
of having them primarily um egress out
onto me, we're going to have them
primarily egress out onto 18th Street.
So, I think that that's the largest
change. In terms of the floor plan,
though, it really did not change. It
remains a two-story facility um about
15,500 square feet. And again, this is
the architectural direction that we're
heading at this point. Um we're still
working through details, but that's
where the direction we're taking.
So um as I mentioned, the floor plan did
not really change. So we still have our
exercise room up in the upper um upper
quad quadrant in that green. Uh little
training entrance space at the top. Uh
some administration spaces which are
really limited to one office and a
conference room in this facility. Our
watch room and then our personal
decontamination with our two drive-thru
and one back in bay on this lower level.
And then when we go up to the upper
level, it's living quarters for our uh
departments. We have our dorms and then
our kitchen, dining, day room. And just
like with station three, we're going to
keep the same materials, just bring them
over. So this is our lobby space. Now
you're looking from the front entrance
in. So that door there is to our
conference room, and then the door on
the right hand side, the smaller door is
uh to our living or to our um exercise
room and administration spaces. Uh this
is our dining room that we're working
through right now. our well it was our
kitchen. This is our dining room kind of
turning the other direction. One of the
things that was important to the part
department is trying to get as much
natural light into these spaces as we
could. So what you're seeing here these
windows that kind of wrap um on that
north wall uh so they can get some
natural light into that space. And then
the two windows on the right hand side,
those look down into the apparatus bay.
And then this is our uh living room
space or our day room.
And then now we're into what's next. So,
uh, like I said before, we just wrapped
up our 60% document set. So, we're
hoping to continue the design process
and move into construction documents.
So, construction documents is where
we've just finalized the bidding
documents that would go out for bids.
So, we still have to work through the
door hardware. That's a big thing that
we have to work through yet. And our
interior finishes, as I mentioned, we
were still tweaking some of those. Um,
the next things that we'll start working
through too are our owner purchased
items such as vehicle exhaust, uh, the
security system, which includes the door
hardware, and then station alerting. And
then last but not least, we'll have our
90% page turn with the owner where they
look through the whole set of documents
to make sure that everything that
they've told us for the past two years
has been implemented in these drawings.
So overall schedule, um, what we're
proposing is that if we move into
construction documents, it says July,
but it's really truly August now. um
that we would be continuing this
throughout uh the rest of the year and
be ready to bid right after the first of
the year. So this is our proposed
schedule and again this is proposed um
we would be back again for permission.
But our uh what we're proposing is that
we would give the documents to the owner
the first part of January 2027 and then
we would come to a council meeting in
early to mid January to ask permission
to go out to bid. Once we are able to
release the plans for bidding, we
typically have about a one-month uh
period for a project of this size for
that bidding. And then once we open the
bids, we would vet them, make sure
everything makes sense, nothing was
missed, uh make sure the uh contractors
are qualified to do the work. And then
we would come back and ask for
permission to approve the bids and
eventually award the contracts. So, if
all goes to plan, we would be
groundbreaking about April of 2027 and
then finishing in the summer of 2028.
So, in terms of the estimate, our
estimating team has been working through
diligently. Um, you'll see a couple
variants there in the numbers. So, um,
what we ended up doing because we wanted
to do the station security, alerting,
and vehicle exhaust for the entire
department, not just these facilities,
we pulled those numbers from the soft
costs in the five facilities that we
have listed above and put them down
below. That's that 1.5 million that's
that covers that cost. So essentially um
the additional cost has been because we
just added the additional security
alerting and vehicle exhausts to the
additional stations. Um when they
finished up the DD estimate, it was
still a range and we were right on track
with the 54 and a half million for the
whole project.
And that brings us to the end. So
questions
Yeah.
>> Yeah. So, uh after our meet, previous
meeting, um after things were brought
up, we did re-evaluate and it wouldn't
change really anything with the station
other than the direction we're exiting.
we exit Alpha 18th. Now, it is wider. We
feel that 90% of the time as we exit
there, it's safer for the community. Um,
there will be times that we will exit
off of me, for example, when we have
polling, we'll close, we'll turn our
rigs around and face the other way. Uh,
but those are three, four times a year
max. Uh, so our understanding is it
really won't impact. The only other time
we would be exiting on me is if our um
if we couldn't exit through the north
side bay doors are being worked on the
uh concrete anything. So we would have
to turn around and go off of me but
those situations should be aware but uh
rare but it it is due to uh feedback
from the community. Yes.
Yeah. Yeah. So truly it was a change in
scope. So when we first met and so we
have a design partner that helped us
with the um dirty classroom and firing
range. And so when we first met and
started designing it, the facility that
they were that they were helping us
design for that dirty classroom was much
more elaborate. So now you have
something that in my opinion is right
sized for your community. So when you
walk in, you have the classroom space,
you have a mezzanine space where we can
do um certain tactile training methods,
and then you have the firing range. And
it's a nice size firing range. It's
totally appropriate for your department.
What was originally being thought of was
that we were going to have a much more
elaborate facility that it was much
bigger and that you could actually drive
a full fire apparatus inside of it
instead of just a small vehicle inside
of it. So, in the firing range, we can
still drive like let's say uh like a
Chevy uh Suburban, you can still drive a
vehicle of that size into the range, but
we can't drive a full-on engine in. So,
the actual firing range itself was just
right sized. And then there was
additional training props that were
already included in there such as uh
confined uh trench drain like collapse
trench drain training out in the back.
There was a couple other training props
that we determined that you might not
need right away and so they could just
be have space for it in the future if we
wanted to have it. So it was just kind
of understanding like where we should be
as a community and right sizing it to
make sure it meets your needs. So we
actually didn't even come to you all
before that the department took a lot of
that out.
Yep.
>> Thank you.
And then um we are working on uh getting
into the school programs as well, which
is a fall program. So we'll be hitting
all the K through uh fifth grade uh
students for that. So you'll see some uh
stats in that. Uh glad to answer any
questions if you have any.
Thank you, Chief. Questions? Alder
Pereella?
>> Just if you can speak to that decreased
number for about the inspections. I
assume that inspections generally
speaking also have a mission focus
educating and so on. So, can you speak
to that?
>> Yeah, so we're 75% complete. So, we're
still in the inspection season. So, as
we roll into the next quarter as well,
you'll have more updated numbers on
that. But we are still uh that's why
it's less. It's just a matter of getting
into the businesses. We we schedule
inspections with the owners or property
managers. So, it's all based on timing
and scheduling. But, uh if you recall,
we have roughly uh uh 2100 uh roughly
businesses or inspections that we do
annually. So, we should be on track to
hit that mark hopefully. So you don't
expect to I mean you expect this to be
comparable to other years and it is not
an issue related to staff.
>> It it is somewhat related to staff. So
we continue to try to meet the
inspections and hitting the benchmarks.
Uh the hope is that as we do more
businesses stay fires safe and meet the
codes. However, as the city increases,
more businesses come, we add more
inspections. So, it's kind of like a a
cascading effect, our staff does the
best we can, but we also are getting
busier. And I truly I have a fire
inspection bureau of one, which is
division chief Noster. So, he can is is
doing the best he can to stay above
water, but as we do more reinspections
and more of those business plan
inspections, uh it's getting tougher.
So, it's just like our call volume that
you've asked in the past. We will keep
an eye on it and we are are doing our
best. However, we will have to have a
discussion in the future about staffing.
But currently, we are meeting the
criteria. Um although it's getting
tougher and tougher because our call
volume is increasing and uh our our
inspections are increasing as well. So,
>> just one followup. So just to for the
sake of educating the public and us um
the inspections you're talking about
about businesses and um commercial
facilities and so on are these um
are they due on yearly basis or it's
basically you can randomly inspect?
>> No, we uh we try to get to every single
business in a year. try uh schools
again, different criteria for the
schools. Uh it but we do the best we can
to get in there and some businesses or
some schools we go in twice a year like
nursing homes and all that. They have
different criteria based on the state.
So, um we do what we can. We are
beholden to the property managers and
the business owner or uh business
owners. We can't really just pop in and
say, "Hey, we're going to do an
inspection." City buildings are
different because we own them, right?
So, we could schedule that with uh
Director Cardanius and and do that, but
um properties are a little different.
>> Thank you so much.
>> Mhm.
>> Alder Kelly,
>> apologies if I missed this, but it looks
like the number of fires reported is
significantly higher uh compared to the
2025 year to date, and it seems like
there's a different code. Um could you
go into like what the differences is and
why we're seeing so many more fires
getting reported?
>> Sure. So uh it used to be the feds used
the federal government used to have what
they called NFERS which is a national
fire incident reporting system and they
switched this year to nearest and it's
uh the na national emergency response
system something like that. Anyways,
moving on. UH, so that changed the
criteria. They changed the federal
government changed the criteria what
they classify as structure fires or
certain. So, we have to follow their
guidelines. Our calls, we didn't
increase that drastically in calls, uh,
but the requirements. So, it makes it
look like we have more. It's just the f
all fire departments have to do that
follow.
>> All right. Thank you.
>> Yep. No.
>> Okay. Any
>> I'll know what Ner says next time.
>> Any other questions?
>> Okay. Looking for a motion to uh accept
and file.
>> Motion to accept and file.
>> Okay.
>> Motion was made by Alder Heidman,
seconded by Alder Kelly. Was close
though. Um [laughter]
all those in favor say I.
>> I.
>> Any opposed? Chair votes I. That passes.
Moving on to item
nine, report number 212627
by police chief pursuant to section
30-50 of the m municipal code submitting
the quarterly report showing the
benchmark measurement for the police
department for the period commencing
April 1st, 2026 and ending June 30th,
2026.
Do we have chief with us?
>> Yeah. Yes, I'm here.
Chief, you want to go ahead with your
presentation?
>> Thanks. Uh, so hopefully you've all had
a chance to look over the uh uh the
numbers. I would point out that uh
things are uh going well this year as
well from a crime and safety and uh um
traffic safety standpoint for the city.
In every we are uh
at or near his assaults uh is less.
Um
>> Chief, we have a bit
>> overall violent crime is
>> Chief, we have a bit of a delay with
your
>> video and audio.
So assault.
>> Okay.
>> Would you like to hand off to your
sergeant who's here?
>> [laughter]
[snorts]
>> She she she says she says no. Um
[laughter]
she says no. Um
[laughter] let let's let's keep going.
Let's see if we can get through with
you.
>> All right. [clears throat] Yeah. Sorry
for the uh sorry for the delays. Um am I
back? Am I caught back up?
>> I think so.
>> All right. Matt is suggesting that I
kill my video. So, let's try that.
Apparently, there's a lot of activity on
the hotel network right now. Um, I meant
to mention that Doug and I are both at
the state chief's conference uh in Green
Bay. Um, and I'm a member of the board.
Uh, so that's why we're here uh rather
than there in person. Can you hear me
okay yet?
>> Yes.
>> Okay. All right. I'll I'll just start
over again. Um, things are going well
this year really in in virtually all
categories. Um aggravated assaults are
down compared to previous years, but um
assaults overall uh remain high, which
is our main driver of violent crime. Um
and and that's high compared to historic
averages, but not necessarily uh to
other similar similarly sized and
situated cities. Uh property crimes
continue to uh trend very very well um
uh including a pretty large decline in
thefts overall. Um, we have seen about a
10% increase in traffic crashes so far
this year. Uh, I'm sure you've probably
all noticed the um, uh, the construction
around town, which of course puts
pressure on uh, the streets that are not
under construction. And so we believe
that that uh, is a contributing fact to
our increase in traffic crashes. Uh, and
um, uh, just a couple other things to
mention. Uh so last year we were
reporting about um parking tickets not
matching um what we've done historically
uh because of the city's technology
issues. Um however the uh now that
that's been restored this year we are um
trending towards what our historical
norms are for uh parking enforcement as
well. Uh the last thing that's in my um
information sheet for everyone is I want
you to be aware that on Wednesday of
this week we will be holding a largecale
um basically emergency preparedness
exercise in in conjunction with the fire
department, the school district and lots
of other agencies uh from around the
area. Uh basically to conduct a
large-scale uh active shooter uh
scenario training. Um there's an outside
agency that comes in and does this
training for uh significantly low lower
cost. That's Mercy Health. And uh they
basically are able to prepare the
training. Um they're quite detailed in
the way that they've approached it with
the facility um having um uh training
facilitators and safety officers on site
um so that really everyone can
participate in the scenarios uh rather
than having to have our own people be
responsible for conducting the training.
um that's not something that we've done
uh in this area. Uh and so we're we're
appreciative for their support um and
for the other agencies being involved uh
to try to mimic what the response would
be like so that we're already and can
work out some of the um some of the
foreseeable and unforeseeable issues
responding to a large scale incident
like that.
Um I also wanted to mention a couple
other things. Um alders may be aware
that uh we have had a couple of um ebike
related crashes uh and in particular
illegal ebikes which the state refers to
as emotos. Um and uh I can tell you
we've had many conversations both
internally at the police department and
with other city departments about how to
handle enforcement of those um uh
violations. We believe that um we
essentially we have a plan both uh to
communicate the enforcement expectations
internally to officers what they can and
can't enforce to ensure that uh number
one that illegal uh bikes aren't out
creating violations. Uh but that uh also
the public is aware of where the line
is. Um and so uh you should expect to
see a lot of um media and uh information
being shared with the community over the
over the coming months um regarding uh
that issue. I know that's something that
this committee has been interested in
for some time.
Uh and uh lastly, I just wanted to
mention I know that I've I've um gotten
several comments or questions from uh
alders about flock cameras. Um, I I I've
had individual conversations, but uh um
it it seems like this committee would uh
probably be interested in a in a broader
presentation about it. Um and some
regular reporting. Um we're working on
that right now. Uh, I can tell you that
we've had a policy about automated
license plate readers for uh since 2014.
Um, that I think addresses a lot of the
concerns um regarding how it's used and
verifying information that's obtained
through uh license plate reader systems.
Um, and so I I can certainly prepare to
uh go through that with this committee
and address any of the concerns. uh uh
also in conversations with uh
administrator Bradley about what a
regular reporting um process would look
like and what information it is that
that uh we can share so that there's
accountability and transparency about
it. Uh and with that if there are any
questions I'm happy to answer.
>> Thank you chief. Um very thorough
update. I appreciate all that
information. So thank you very much. Um
first of all a couple of questions. the
training that's coming up at Horus man.
Have we done a within our community?
Have we done training on this scale
before or is this the first sort of um
training of this level that we've
conducted?
>> So, we have regularly done joint
training with the fire department uh for
what's called what's known as warm zone
training uh essentially for response to
uh scenarios like this. We have done
training with um uh the sheriff's
department at times as well. Uh this is
really the first time where we're able
to put all of those pieces together
along with the [snorts] school district,
along with other city departments, along
with other area law enforcement
agencies.
>> Okay, thank you for that. Um your
comments about ebike um education
regulation enforcement. Um I know we all
appreciate that. that obviously is a
topic that we have discussed before um
and you know very unfortunate situations
that have happened recently in involving
ebikes. So um thank you for bringing up
that up as part of your update today.
And then lastly regarding your comments
about flock obviously you and I have had
conversations as you mentioned um we've
had conversations with other members of
the committee and other members of
council. We appreciate your um you know
willingness to provide us additional you
know insights, transparency, reporting
etc. I know it is a very um hot but
button topic not just in our community
necessarily but um really across the
state and beyond that. So um just
appreciation for your uh openness to
have those discussions and to walk us
through um you know that piece of it. So
um I'm going to turn it over to other
alders. Um Alder Kelly.
>> Uh thank you chair. Uh most of uh my
comments were touched on by you already.
Um so I do want to say thank you for um
bringing up the ebike issue and flock. I
know those have both been issues that
I've been reached out to frequently
about. Um so thank you for touching on
those and I look forward to more
information coming out. Um one question
I did have about um the traffic
accidents. You had mentioned there were
10% more. It looks like there are more
traffic arrests compared to the same
time last year. Have you been noticing a
pattern in types of violations? Like is
it more distracted driving, more drunk
driving, things like that that you're
able to share? [snorts]
>> Nothing that's really stood out as any
different than what we typically
experience. Um, you know, a lot of our
violations are failure to yield rightway
violations that lead to crashes. um
people not um uh yielding from stop
signs or you know uh getting across
intersections um without uh colliding
across traffic. Um I I don't know that
we're seeing an uptick in in attentive
driving or anything like that. I think
it's just really has to do with um with
increased volume.
>> Okay. Thank you.
>> Yes,
>> Alder Fella.
>> Yes. Thank you, Chair. Uh can you please
tell us what is that the neighborhood
food patrol, hotspot crime patrols and
field interviews? What is that those num
those items actually represent? For
example, the neighborhood food patrol
155.
What does that number represent in
practice?
>> Yes. So um so this is something this is
a change that was made to this report.
Um after we went through the goal
setting process for each of the last two
years um we um we identified essentially
internal benchmarks for us to be able to
track proactive work that our officers
are doing. Um and so I guess not to get
too esoteric with the explanation but um
there are different call types in our
computerated dispatch system. Um, and so
a miscellaneous call type is used for
something that doesn't necessarily um
result from a call for service or an
observed violation. It's something uh
that we can do to track proactive uh
proactive e efforts that are uh just
interaction interactions with the
community or addressing something uh a
problem that's been identified u but
doesn't necessarily lead to like a
police report being generated. And so
those miscellaneous call types, there
are lots of different ones. Um, but what
we ask officers to do is to um call into
dispatch on the radio and ask to be put
into a miscellaneous call type. Um, when
they're doing uh when they're out in in
their neighborhoods um maybe they're
just stopping to interact with some
people at the park, they're going to a
neighborhood meeting or other
neighborhood event or they're uh they're
stopping to address um uh just talk to
people about how things are going in
their neighborhood. Um that's the
neighborhood foot patrol um call type.
The hotspot crime patrol would be uh for
example um uh walking through the
downtown area to deal with crime or
disorder complaints. Um going to a city
park uh because there are people there
after hours. Um um maybe watching a
particular house where we suspect
there's uh drug activity or short-term
traffic. Um that's the purpose for the
hotspot crime patrol call type. And then
field interviews are uh essentially a
contact that is documented on um kind of
a brief report. So field interview uh
they used to be a card that was filled
out by hand. Um now they're entered
directly into a records management
system. And so that's a way for us to uh
sort of document and manage intelligence
that's gathered. So for example, if we
have a a problem with um car entries,
which of course we've had uh over the
weekend, you might have seen the press
about that. um that uh in a particular
area of the of the city, we're going
into proactively to try to um interdict
those types of of violations. If
officers are encountering people, first
of all, they might put themselves in a
hotspot crime patrol call type, but then
as they encounter people who are out and
about in the neighborhood at night, and
they stop and and uh talk to them, um
you know, with a consensual encounter,
uh they uh then document the information
that that person was out in the area at
night, uh maybe what they were wearing,
uh things like that in a field interview
so that that intelligence can be used if
there are other um reported crimes in
that area.
So basically these items were before
they were classified they were
incorporated
in other items
>> uh or they they weren't as intentionally
used to track proactive efforts. So,
it's one of the things that um with our
goal setting process, we've really tried
to ask our people to do is to be very
intentional about documenting what it is
that they're doing um so that we know
that we're meeting uh our goals with
that proactive work.
>> Very good. Thank you so much.
>> You're welcome.
>> Any other questions?
Then I'm looking for a motion to accept
and file.
>> Motion to accept and file.
>> Second.
Motion was made by Alder Heidman, second
by Alder Kelly. All those in favor say
I. I.
>> Any opposed? Chair votes I. That passes.
Okay. Moving on to item 10. Resolution
number 712627
by older persons and hideammen approving
alcohol, beverage, tobacco licenses.
Um, anything to share with us?
>> Just that the applications have been
reviewed and there's no concerns from
city staff.
>> Okay. Thank you very much. Any questions
on this item?
>> Okay, looking for a motion to approve.
>> Motion to approve.
>> Second.
>> Motion to approve was al made by Alder
Gravine, seconded by Alder Pela. All
those in favor say I.
>> I.
>> Any opposed? Chair votes I. That passes.
Our tenative next meeting date is
scheduled for August 24th, 2026. We are
looking for a motion to adjurnn.
>> Motion to adjurnn.
Second
>> motion was made by Alder Ples, seconded
by Alder Graine. All those in favor
state I.
>> I.
>> Chair votes I. We are adjourned.
>> Thank you.
[music]