The September 16, 2026 hybrid meeting of the Department of Public Works Building Committee focused on approving previous minutes, welcoming new members, and reviewing critical project constraints that have already necessitated scaling back the proposed facility. To adhere to strict budget limitations, the committee decided to exclude several specific divisions from the new building's scope, including freeze protection systems, wastewater infrastructure, street lighting, traffic signals, and solid waste management facilities. This strategic reduction was driven by significant environmental findings during site investigations, which revealed wetlands requiring mandatory setbacks on both potential locations and a small stream on one site that triggered conservation notices. Furthermore, geotechnical analysis identified unsuitable fill soils ranging from two to sixteen feet deep at the sites, necessitating costly removal or improvement, while environmental sampling detected borderline petroleum contamination on the existing DPW property that requires a dedicated soil management plan.
Significant discussions also centered on optimizing space utilization and fleet management within the revised project parameters. Industrial engineers conducted an inventory of existing equipment to inform room data sheets, leading to concerns about potentially oversized office spaces and high circulation allowances; consequently, the staff support and muster room was designed as a versatile multi-function area capable of seating approximately thirty-nine people for meetings, training, storm response, and emergency sheltering rather than just daily breaks. Regarding vehicle storage, the committee justified maintaining five maintenance bays to meet industry standards for simultaneous work on multiple vehicles and dedicated state inspections, though the garage would only be partially heated to protect fluids without conditioning the workspace. While the plan allows smaller gas-powered vehicles to remain outside, six specific units require permanent indoor coverage, whereas wastewater treatment vehicles were explicitly excluded as they belong to separate departments, with suggestions made to address storage deficiencies in other town departments separately.
The committee ultimately agreed to proceed with a 53,000 square foot building footprint as a flexible starting point that is not locked to a specific site or design, allowing for multi-story configurations up to three floors with ground-level space allocated for shops and maintenance operations. Although some members felt the office space allocation was slightly luxurious and advocated for further scaling back, others defended the current plan based on the functional requirements of engineering and administrative staff who need large tables and equipment storage, while staffing levels were deemed appropriate given current road mileage and future projections without immediate plans for contracting out services or regionalization. Public comment highlighted substantial concerns regarding construction costs estimated between $600 and $800 per square foot plus soft costs, prompting requests for more detailed material data in advance, alongside a strong argument to holistically consider site selection in conjunction with the planned South fire station project to ensure optimal emergency response times rather than prioritizing centralization alone.
In conclusion, the committee acknowledged the necessity of working strictly within budgetary constraints rather than following the full original program and committed to conducting further cost analysis before finalizing the scope. Recognizing the need for better preparation, the group agreed to improve pre-meeting documentation to address public concerns about costs and site logistics more effectively. These discussions set the stage for moving toward schematic design, with the next meeting scheduled for October 21st to continue refining the project based on the environmental, financial, and operational realities identified during this session.
Read the full video transcript
Okay. Uh, welcome to the the EPW
building meeting. It's Wednesday,
September 16th, uh, 10:00 a.m. We're in
the first floor meeting room meeting in
person, but we're also doing a hybrid
meeting using the new device, the owl.
So, if there's technical difficulties,
do the best we can. Uh there's ex life
and um pursuit of chapter 2 of the acts
of 2035. This meeting will be conducted
both in person and via remote means.
Members of the public wish to access the
meeting remotely do so via zoom or via
telephone.
So I going to ask if someone will do
minutes someone
thank you. Very nice. Um so uh before we
approve um the minutes I'd just like to
introduce our new member. We have a new
resident member who's starting with us
today. Uh CJ Joe Diamond and um you know
maybe it's good if we just and we'll
really challenge I'll do quick
introductions around the table so he
knows who we are. Um I'm Christine Ring
um chair and president
member
>> Paul manager
>> Angela staff support
office
finance
>> David off resident member also Bob Eric
special capital project coordinator and
serving in the role as a house OPM at
the time being for the project
more
words
Can we do the online people too?
>> And I I still only Oh,
>> Jason Steels Public Works.
>> Yeah.
>> And we also have our designer here from
Western Samson, JP Paris, if you want to
say.
>> Yep. Good morning, JP Paris. Uh, project
architect and manager from Weston
Samson. And Jen is on as well.
>> Jen Katy, um, architect from Weston and
Samson.
Right. Hello. All right. So, we have
some minutes from August 12th
and they uh were in the packet. Um is
there a motion to approve the minutes?
>> So moved.
>> Second.
>> Yeah. Any comments, edits, additions
that anyone have to the minutes? I
don't see any hands. So, um, uh, with,
uh, I, uh, do we approve the minutes? I
>> I
>> Yeah,
>> good. They're all good. All right.
Banana. Great. Approved. Okay. So, we're
moving to agenda item number three,
which is discussion, review of the work
status, and scheduled by Wesley Samson.
Um, and there's two tasks that we'll be
uh doing under that. Bob, do you or JP
who's who wants to take over?
>> I'll start briefly and then turn it over
Samson if you'd like. So, as all the,
uh, committee members, uh, other than
our new committee members. So, I don't
know if you forwarded a copy of the memo
I sent out about a week ago, but if you
were, great. Thank you. Um Gilford and I
have been meeting with Western Samson on
a weekly basis over the last month plus
since this um meeting last
uh Western Sam has accomplished a lot
and what I did was I provided copies of
some of the work product to date along
with the me memorandum. Um, I did want
to note that as I did in the in the
memo, there are already we're going into
this project recognizing that some
decisions need to be made in order to
meet the budget that we have available
to us. Um, so some decisions regarding
scaling this project back have already
been made. um particularly in terms of
what divisions of the DPW may not be
located within a new building and that
would be not free and grounds not
wastewater not street lights and traffic
signals and not solid waste. So at least
the concept that we're working on right
now would be to have everybody other
than those divisions within DPW located
at this facility. Uh but again as a
necessity we are going into this thing
with a fixed budget and we expect to
have to make decisions along the way to
meet that budget. So with that
>> case what are those board divisions
again?
>> Uh freezing grounds wastewater
street lights and traffic signals and
solid waste.
they are included in the staff matrix
but then when the staff needs are
projected and not included within the
staff need projection within the zone.
So the ones that are being included are
administration, management, highway,
water and vehicle maintenance.
>> Not water.
>> Well, yeah, water would be I think water
>> water is okay.
>> Okay, you're right.
>> Yes.
>> Thank you.
>> It just seems there now's rejected.
So, no unification,
just keeping it the same.
>> So, I think with that, um, if Westmin
would like to get into a little bit more
detail, I I did share with them the memo
that I sent out to the committee. So,
they've seen that, but if you want to
expand upon that, JP
to kind of talk through the process that
you've gone through today. you know, we
are looking to one present what's been
done and then get input on what's been
done in order to try to keep moving in a
straight direction on this project. Um,
so if there is input on what's been done
today, today is really the time to try
to get it out on the table.
>> Sure, sounds good. Um, yeah, there's a
whole list of items. Um namely uh uh
first of all we've been able to take the
the survey drawings or the the GIS
drawings that you have provided uh Bob
and overlaid them with um both wetlands
and other um related items uh setbacks
etc and other constraints on both sites.
uh that I think was shared and then
there was a new version that was shared
uh this morning uh with some additional
information in there. Uh we've also
completed uh so sorry that included uh
doing wetlands delineation on both
sites. So we've we've gi GPS located all
those wetlands. Uh and then in addition
um we've completed uh test bits and
borings geotech borings on both sites.
Um we have some very preliminary data
but not much yet. Uh that's sort of
being still studied and laboratory
tested. Um I think they saw you know a
little bit higher uh uh water table on
the existing DPW site probably not too
surprising.
um and more sandy grally soils on the
Ruxton site also not terribly surprising
but again we don't have a lot of detail
yet sort of waiting for that analysis uh
to happen which is part of this process
uh in addition um we had our envir
environmental group out there uh taking
some samples again we don't have any
results yet but they take air quality
samples as they're digging and looking
at the borings
as expected Ed, there were some, we'll
call them hits basically, uh, on the
existing DPW site, um, levels that are
borderline
reportable, uh, uh, contamination, most
likely, uh, petroleum as far as I
understand.
Not enough to say whether what that
means yet. Uh, again, further analysis
going to require that. Um, it certainly
indicates that we're going to have to
have a management plan for any excavated
soils on that site, which means we want
to avoid exporting any soils off that
site if we can probably during
construction. Um, so that's more more
detail to come on all of those items.
Um, Jen, what else am I missing?
We also had our um industrial engineers
go out to the site and meet with the
maintenance um the maintenance team and
and the mechanics. They um took
inventory of existing spaces um and all
of the existing equipment and they are
in the um process that was on the end of
last week. So, they're in the process of
um sort of going through and and
processing all of that information and
we'll have um recommendations and and
reports forthcoming.
>> Great. Um,
and I guess I I mean I guess the biggest
uh information at this point is
particularly on the existing DPW site if
you've seen the
um those sort of survey drawings we've
provided
uh you know the wetlands that is
partially on the property to the north
of the of the existing DPW site um does
impact act that existing site in a sense
in the way that whatever work we're
going to do on the north side of the
site is going to trigger uh a notice of
intent and working with the conservation
commission. A lot of that land
>> the updated drawings have not been
shared with this group yet.
>> Okay. There's not
>> if you want to talk to those that might
be a good thing.
>> I
>> Oh, sorry, Jen. I don't know if we're
able to share share screens, but I
actually have that updated one open and
we can
>> sure
>> share it.
>> That's possible. Yeah, it's it's it's
basically just taking into account a
small um perennial uh what's the term?
>> It's a small stream that runs from that
uh wetlands back down to the river. um
it kind of just extends the the setback
line all the way to the back of the site
essentially. So it's not a much bigger
impact, but it just extends what we are
finding as an impact. So again, uh we
actually have a call into the
conservation commission to kind of
preliminarily discuss with them, you
know, what this might mean. Again, a
large portion of that area is already
disturbed and is already impervious,
either paved or gravel or or tight tight
partially paved. Um, so that has that
could allow us some leeway. Um, it's
something we're going to have to explore
in more depth with the conservation
commission um to see what they think
they might allow us to do. Uh basically,
you know, there's already a structure
there that that uh the water garage is
already well within the setback line. Um
so
it's going to depend on their their
their look at it. Yeah, go ahead.
>> I can't see the labels on this figure.
Could you just elaborate on what those
three sets of lines mean?
>> Yes. If you can zoom in a little bit,
Jen,
get my glasses on.
>> Yeah. So, the 50-foot setback is
basically a no build zone.
Uh, and you're not supposed to disturb
at all. As you can see, it's already
developed and disturbed land past that
point. Um, there's some partially paved
and and gravel areas, as well as the
that that uh rectangular box that
crosses that 50ft line is the is the
water department uh garage that's
sitting there. Um and then the 100 the
75 uh foot I guess is a no build zone.
So the 50 foot is a no disturb I think
is the term. So
>> no work. Yes. 50 foot is no work.
>> Yeah. And then the 100 foot basically
anything beyond within that 100 foot is
within the jurisdiction of the
conservation commission. So any
disturbance, any proposed work will have
to go in front of them. And clearly no
matter what we do, we're going to be
across that line for sure. So we know
they're going to be involved. we we want
to have preliminary discussions with
them before we even get very far to kind
of understand what their take is going
to be on this. Similar with the other
site um there is an existing uh
>> Hey Pete, while you're on this site, can
you talk about natural heritage um
before we jump to the other site?
>> Oh, sure. Yeah, Jen, if you want to zoom
out again. So that orange hatch that you
see surrounding the site is what's
called natural heritage uh uh boundary
which means indicates that there's an
endangered or classified uh species. Um
and typically it's not known what it is
until you actually request a survey. Um
but in older uh maps that line actually
crossed right across the DPW land. It's
been updated to acknowledge that that
whole area is developed and there's no
there's no species living on that. It's
only really up against the river. Uh it
does go back along the the you can see
the north side there. It it jumps back
along the property line essentially. I
think it's a fairly wooded un
undeveloped area back there. So the
assumption is I mean it I expect it's a
turtle or or a similar species. Uh it's
probably indicated.
basically.
>> Again, while we're on this figure, could
you point out where the soil samples
were found at the uh elevated air
quality measurements?
>> Uh yes, Jen, I don't know if you have
access to those real quick. The boring
locations. I do have
>> We have We have on this map the
>> Oh, there they are.
>> TP the TP locations are the test pit and
then B1 and B2 are the borings. I don't
know specifically which ones were
flagged. However, it's probably the ones
at the rear of the site is my guess, but
I I don't think I know which exactly
which ones.
>> The only one that was clear was the one
at the front by the parking lot in the
front.
>> Okay, that makes sense. Yeah. Okay.
>> So, what did you say?
>> The only one that was clean was the one
in the front by the parking lot.
>> Okay.
>> Okay. Yeah. Yeah.
>> And there haven't been any borings near
the existing uh fueling station. There
wasn't Oh, there was.
>> Yeah, there was one there.
>> Okay.
>> It's the one right behind the building,
I think, Jen. Yeah, that one. Yeah.
>> Right.
>> It's dry.
>> No, it's actually It's wetter, but it
actually smells better. Well, it does
degrade. It does.
>> It does.
Yeah, and I think they encountered some
undocumented fill which would indicate,
you know, not great for foundations. But
again, without without the actual data
and analysis, I don't want to say I
don't want to say too much yet until we
get that back from our G team.
Um
but similar on the other site if you
could go to Pulpit Hill
um there's an existing uh I guess it was
a wash out pond or something uh for the
concrete plant that man-made or not it
becomes a wetland eventually um and
therefore there are also setbacks from
there but similarly it's it's fairly
disturbed around it um although now
pretty overgrown from what I understand.
Um, in any case, similarly, we want to
have a conversation with conservation to
understand, you know, what their take is
on this pond. Um,
and and sort of how how we might address
it. This does have more space.
>> The boring on the map, too.
>> Yeah. She highlight them as she did the
other one. That was very helpful.
>> They actually moved some of these. So,
some of the locations she has on the map
are not right. like the one she just the
one boring the threes on top of a big
pile of jelly.
>> So they moved out.
>> These may not have been updated. Yeah.
>> And then there's the two they did on
>> two they did which was actually on the
underground power line.
>> They moved those.
>> Okay.
>> Yeah.
Oh, sorry. Go ahead. Well, I was just
going to say different when we went out
there, there were piles of debris from
various construction projects that are
is is the um
the high level is that the high spots to
the west of the existing building is
that naturally formed or is that
uh some of your debris piles?
>> Uh unless there are debris piles to
Okay. And this base mapping originates
back to 2020. Um, so it's what we have
available to the this we basically
haven't came into the GIS system right
now. We haven't done any detailed
on-site property survey as of yet. Okay.
>> So things on this side in particular may
have shifted a bit.
>> Yeah. Um, what you see today?
>> Right.
>> Question on the natural heritage area.
Was that uh established? When was that
established? recently wind the last
natural heritage ground they updated and
moved it farther in. It used to be on
stage space safe stream
>> and this is completely disturbed site.
>> Yes. And we actually went back to them
and talked to them about and they said
suck it up.
>> We don't establish the line.
Yeah.
>> Correct. Right.
>> Yeah. And it's only one there's only one
animal in this.
Is that a turtle?
>> Uh they they don't tell us like it's
it's actually held in secret. In fact,
>> well when we applied for it, we know
it's a hurdle.
>> Oh, okay. Got it.
>> The DPW site, the current site is in the
dwarf wedge muscle, which is actually
I think
Okay. Um, I am actually just getting a
little bit of a quick update on the
geotech. Just a kind of quick summary
uh for the borings. And I can read this
to you. It's just an email I just
received. So,
um,
on the existing DPW site, there's about
4 to 16 feet of fill.
Um
and then uh that fill is not suitable
for foundation. So it would either be be
need to be removed or improved.
Uh which would be a ground improvement
system very likely. Uh and then the
pulpit hill
they found about 2 to 9 ft of fill.
Um, also similarly not not particularly
suitable for foundations. So would also
likely need to either be replaced or
ground improvements
uh applied. Again, it's pretty
preliminary.
Um, but that that's a quick summary of
of what they found and both sites. So
>> um, it means some additional cost for
either removal of of unsuitable soils.
And when we say unsuitable, it means
they can't take the load of a building
basically without settling too much.
>> And they take parking lots.
>> Uh potentially potentially that depends.
Yeah. Some
>> and this
once we select a site there'll be much
more detailed geotechnical program
conducted at this point. So this was a
level geotechnical evaluation.
>> Exactly. It's just to give us an idea of
what's out there. Once we have a layout
and we can actually go back to Geotech
and say, "Okay, here this is where we're
proposing a building. Let's do borings
at each corner and one in the middle."
And we'll really get a better
understanding of exactly what the impact
will be.
Um, so yeah, I mean, you know, each of
these sites are a bit more restricted
than we anticipated. I think the Pulpit
Hill Road, we knew about that pond for
sure. Um the little wetland on the
existing DPW site doesn't really show up
on GIS particularly, so it wasn't clear
that that was there. And that does have
an impact on how we can use that site.
But again, until we talk to conservation
and get a better understanding of of
their take on that, um I don't want to
eliminate any pro possibilities there
yet.
>> Do we have that meeting scheduled?
No, we have an informal call with them.
>> We we can't schedule anything until we
actually have a plan.
>> Correct.
>> But we will not be meeting conservation
commission for quite some time.
>> Yeah, I should I should clarify. I don't
mean conservation commission that we
called. We called the conservation agent
>> which is the office that manages the
commission. So yeah, it's them that they
we would talk to and then eventually
>> to the commission. Correct. and JB I sit
on the other side of the cube from the
agent so
>> okay
include me in the discussion that would
be great
>> great sure absolutely yep y
>> I'll hear one the other
>> okay might as well be involved in it
>> yeah I I asked Jesse our our civil
engineer just to try to give a call just
quickly to see if they could get any
preliminary stuff before this meeting
but he wasn't able to get through to her
yet
>> thank you
so I'm thinking Jake really you know a
lot of the heavy work this month went
into, you know, the the staff analysis
and the space needs analysis. Can you
step through that process and sort of
explain where we think we are today?
>> Absolutely. Yeah. Jen, you want to take
that over?
>> Yeah, we can do that. Um
so we started the process by having
interviews and and and determining um
the needs of each
department and each group. Um and from
there we came up with
um the program that was shared um based
on a comment that we received back um
saying is there a way to show what we
currently have? we've added. So, what
you're seeing here is a little bit
different than what you what was
provided last week in that we've added
the existing square foot where it's
known. If it's not if it's not there,
then it's um either the space doesn't
exist yet or or we just don't have that
information. Um
so,
>> likewise, if you can send that along so
I can get it out to the committee would
be good.
>> Absolutely. Yep. This uh this was um
updated yesterday. So I will send that
out um right after this meeting. So we
have each um each division, the rooms,
the um
square footage, and the rough
dimensions. Uh and it's an iterative
process. So we've gone back and forth a
couple of times to make sure that the
sizes are correct, that the rooms are
correct, and where can we um where can
we make adjustments as needed. Um, so
we've got the water, we've got fleet
maintenance. Um, fleet maintenance will
be updated based on our industrial
engineers um, meetings last week. So I
had a meeting with them yesterday. Um,
and we started the process of refining
this uh, program. Um, and then we've got
our vehicle storage and our vehicle wash
day. And then from there we have um room
data sheets that get associated with
those um
each of those program elements um
and the room data sheets
look something like this. So this would
be an example of
in this case the public lobby and it may
or may not look like this in the final
um the final design but it gives an idea
of what that space
might look like. Um and we have a room
data sheet in this
um for almost every almost every room in
the program has a room data sheet
associated with it. Um, and I don't
think that this
has changed from the copy that the um,
committee received last week.
>> Are these room data sheets sort of
standard that you use for all your
projects?
>> We we do have because we've done so many
of these, we do have a number of layouts
that we're able to start with. Um, but I
wouldn't say that we have um one, you
know, we don't have any one lobby for
that we use for all of our projects. Um,
but these
>> we
a week or so ago, we did actually two
weeks ago starting step through each one
of these sheets and tweaked them to fit
what Gilbert and I thought matched the
town's requirements. So, they sort of
started with a standard and then the
standard was adapted.
>> Yes. the benefit
>> which which were provided to us is is
the is the tweaked version what was
provided to us
>> as I believe what Jennifer said what she
has up in the screen is the same thing
that Gilford Nar and then I forwarded to
you
>> is it opportunity to make comment about
this
>> absolutely
>> um I appreciate the fact that it's it's
um adjustable it
one of the comments in looking at many
of the office spaces is that it appears
the spaces appear a bit larger than you
know state employees, town employees, um
professional staff, whatever might
actually
um need in terms of efficient office
space. And I'm thinking, frankly, of my
own careers with uh cubicles and and
really good workstation furniture that
um there is an office
component that was included in here. It
was like one of the mechanicals at about
144 square feet. So 12 by 12 office
space.
Excuse me.
seems like a really viable
um unit of measure. Uh a little bit
larger if you're going to include a
supervisory capacity. Um but it felt
like in general there's a little bit of
extra space. And what occurred to me is
when I look at exactly this floor plan
for instance,
there is a window component that you
already seem to have chosen that has a
large and a small window
um element and that that narrow window
element is literally the extra square
footage that seems a little unnecessary.
So, I didn't know if your if your go-to
floor plans, you know, essentially drive
the square footage of the office because
of your window components. That's really
pushing it. But, um, that's what
occurred to me when I saw these these
diagrams.
>> Um, the other
>> just
>> go ahead. Sorry.
>> Just to quickly point out, I mean, this
particular one is intended as a
superintendent's office and so it does
have that extra space. For example,
small meeting table. Yep. I understand
that.
>> Yeah.
>> Okay.
>> And there and there are lots of ways to
accomplish that.
>> Absolutely.
>> The other the other component that
struck me was your
>> um
circulation allowance and the the
grossing factor. Uh looking back at your
2015 and 2018 numbers, uh the gross the
circulation numbers were lower. You've
got in many cases in the office space
you've got up to 30% circulation
that seems in a very efficient office
space that seems pretty high
especially with an additional 10%
grossing factor. So, I wondered if you
could look at that and and actually
think through um
my my guess is that you're you're
bulking it up a little bit so that as we
as we come to budget considerations,
there's there's room to to bear off. I
don't know.
Um, I mean the 30%, if you can scroll
back up on the program, Jen, the 30% is
a fairly typical use uh or a number that
we use for circulation and includes
corridors,
um, you know, other stuff that's not
included as an actual space.
That number hopefully would become more
efficient as we actually design the
building. And it it will likely become
more efficient as we design the
building. But until we design the
building, yeah, we want to make sure
that we're covering the whole building
essentially.
>> The previous iteration had 15%
circulation. So I was surprised to see
30 in this in this round.
>> Well, it depends. It it varies from
section to section.
>> I think we've simply updated our
standards because that is that's kind of
what we use typically for all projects
right now is that 30%. Particularly for
office space, you can see that it does
reduce in in other types of spaces where
we know there's very little circulation.
>> Yep. So in the in the in the shops
areas, in the maintenance areas, it's
10%.
>> So it's strictly in the spaces where we
have offices that we see the higher
circulation.
>> Yeah.
>> Um
>> anyway, a number to look at.
>> Absolutely. Um, another question that I
had was, uh, under staff support, uh, if
I count up the staff, it's, you know,
maybe maybe 15,
um, 10 to 15 highway operators using a
break room. Um, how did you all size
that muster/break room? We've got full
staff of about 68 people, but on-site
folks given that the admin engineering
have their own break room um mechanics
have their own break room. What drove
this size?
>> Uh I think Jen, I don't know if you can
get to that the spacing sheet for that.
>> I'm looking for the matrix. I'll pull
that up right now.
>> Okay. Um I mean it's intended to be
>> 30 or about 39 chairs, 39 spaces.
>> What's what's the basis of that?
Yeah, I mean the basis is is to be able
to have an entire staff uh either
meeting or training sessions uh in that
room as well as uh you know being used
for uh storm event uh uh uses as well
whether it's a break room actually for
storm event people uh plowing or um you
know almost like a an emergency center
as well. So, uh, that specific number,
uh, I would rely on you, Jen, and and
what the discussions were on how that
what that actual number is, but yeah,
thanks. That that helpful. on the
screen. What I just pulled up is our is
our staffing matrix and it has all of
the employees and then all of the
columns in the spreadsheet um is whether
or not it's a future seasonal or a
full-time staff, whether they need an
office or a workstation and whether they
should be included in the locker count,
the parking count or included in the um
included in the uh DBW program. So these
are the numbers that oh well we don't
have that column but this is the number
that we used to determine um
how many people might be present to use
that room for for uh training purposes
or for storm events. Um it's truly
intended to be a multi-function space
rather than have a space for training
and a space for break and a space space
for a storm event. It's intended to be a
flexible space.
>> Yep. I I understand that. I was just
trying to figure out what your basis for
the capacity of that room is. If we have
60ish
um employees, you've got 9 to 15 people
maybe using it on a daily basis as a
break room. Um
>> actually I think the water water
division and highway division were both
using that as that primary break room
sets 30.
>> Okay, good.
>> Yeah.
>> While we're on that one, the storm event
uh use um does that include sleeping? Is
that what the CSS are for?
>> We're showing a a kind of a a cot
storage room. We don't show specifically
a sleeping room. Uh there's a code
difference. If we show an actual
sleeping space, it would require a
different fire rating and and an hour
fire rating wall around it. We could do
we could show an actual sleeping space.
We've done that in some DPWs. Um many
times we just designate some storage
space so that in emergency if CS are
needed, they can be pulled out and used.
um sort of informally, let's say.
>> Does that include storage for your
tables and extra chairs? If they were to
p if they were to put this room into
like a training mode
>> and had only chair seating, what's the
capacity and do you need extra chair
storage?
>> Uh that's probably a good question. I
mean, part of it depends on kind of how
we choose that furniture. Um and you
know how we choose carefully stackable
and foldable tables and chairs. I think
generally yeah the intent is the
furniture in here is very flexible. It
can be shifted around to be kind of
cafeteria styles as shown here or
individual desks or you know shared
desks for training sessions. Um that's
typically the intent. Yes.
And we want to make sure that that
storage is sized properly for that.
just roll down to the third page of the
space summary
because we don't have that gray column
right now. I just So the bottom total
was 50. Oh, it's changed a little than
what we have. Okay, so it's changed to
slightly.
>> Can you zoom in a little bit further?
Basically,
they get rid of the diagram on the
right.
>> 1835.
All right. That just gives us a
a number. Thank you.
>> Mhm. And Jennifer that
18,000 square feet since that is that
inclusive of inclusive of every space or
is that just an attempt to match spaces?
Is there space within the building that
isn't accounted for in that 18,000?
>> Um that we would want to verify. Um we
had a and JP maybe you know the answer
to this. We had um the existing square
footage from a previous study we had
done. So that's where we pulled that
information from.
>> Yeah, I pretty sure that is inclusive of
every space within the existing building
>> as
comparison.
>> So it is apple to apple pretty much
>> correct.
>> We'll do a double check before we send
this out to make sure that that what is
correct. Yeah.
>> So the existing square the existing
building is 18,000 square feet. I think
it's a little bigger because I I look
back to the old study too. I want to say
it was in the 20s. Um, but that might
include other building buildings on the
site.
>> 18 seems a little low.
>> They actually they actually measured it.
So
>> yeah. No, I just wonder if it doesn't
include
>> should be on the property.
>> You get multiple levels as well when
you're
>> We'll go back and recheck these and make
sure before we send this out officially,
>> right?
>> But it's certainly in that range.
>> Question. Um, I really appreciate the
the review of the vehicles and the um
the equipment storage and so forth. Um,
can somebody explain
if we have um in terms of fleet
management?
I wondered if we have I think three
employees in that branch and there are
five in five um maintenance bays plus an
inspection bay and I just wonder if
someone could explain to me the need for
five bays with only three employees. I
know it saves time to keep something up
on a lift rather than moving it around,
but do we actually need um five
>> right
>> maintenance phase? Yeah, as exactly as
you say, the the there's an industry
where there's a complex
uh uh calculation in the vehicle
maintenance industry that basically
comes down to the standard is typically
around 1.5 bays per mechanic. So that
ends up being five bays for three
mechanics. And the reason is yes, very
typically they're working on two uh more
than one vehicle at a time and typically
one vehicle is a long-term project
whether it's waiting for a particular
part or you know some large complex
assembly and therefore they can still
work on other vehicles on short-term uh
by having open bays. And from what we
understand as far as the state
inspection go, they inspect all the town
vehicles for state inspections and
therefore that gets a lot of use and
really needs that full uh independent
bay for that and so it's not ever taken
up by a vehicle under maintenance.
>> Thank you.
>> Bay just for inspections. We kind of
collection
when you go to when you go to Jiffy Lube
there's only an inspection day. They
don't pay or change his sight. Right.
>> Right.
>> So, is that maintenance uh structure
intended for all town vehicles
or just the inspection for all town
vehicles? Is that what I'm
understanding? We do all except the
school buses.
So, police cars, police, fire, um the
LSSC vehicles, the library vehicle, the
rest vehicles, those all come to us. The
only ones we don't do are school buses
right now. We used to do the school
buses. We'll probably start doing it
again sometime, but not not right now.
>> And does this facility have capacity for
school bus?
>> One.
>> Yeah.
>> Yes. It does. It actually has capacity
for the fire trucks. We're supposed to
in school back there, we're supposed to
have inside, but we don't.
>> Okay.
>> They stick out.
>> I'm imagining I'm just trying to imagine
it's big enough to drive a school bus in
and have it lifted up.
>> For vehicle inspections, you don't lift.
>> I was thinking of the maintenance part.
>> The maintenance part is JP talk more
about that.
>> They don't work on Do they work on buses
and fire trucks with depending what it
is?
We're not we're not certified to do a
lot of work on the fire trucks, only
little stuff. Yeah.
>> Um and we haven't done anything almost
as far as maintenance goes, except
whenever they come in for an inspection,
used to change a light bulb.
>> And again, we we have two trucks that
are as big as the school bus. Well, I'm
I'm I'm thinking of just, you know,
building for decades ahead and it may be
efficient for the town to do all its
maintenance at one facility at some
point in the future. And is this being
built big enough to do that
is my question.
Should it be built big enough? I guess
it's another that would be a decision to
make. Yeah.
JP, can I ask um the square footage, the
53,000, is that something that's
potentially achievable with our budget
or is there more work to do?
>> I would hazard to guess that there's
more work to do. Yes,
very likely.
>> I wouldn't expect that number increases,
>> right? Do we
>> I think you've said this in the past, J.
Is there a rough ballpark co uh
construction cost per square foot out
there right now or will we anticipate
when construction might happen?
Um yes there are yes there is um I mean
you know at 53,000
uh it can vary but we're talking
probably between $6 and $800 a square
foot in some
>> we're in the right order.
>> JP just a question about the vehicle and
equipment storage garage. Is that heated
and or is that space unheated?
>> It's what we call partially heated. So,
it's half that. It's it's basically
heated to say 50° to stop it from
freezing. And that's that's the key for
all those trucks that are going to be
kept in there between the diesel and the
hydraulics. Uh it's really important to
keep those above freezing, but it does
not need to be heated to 68 degrees.
It's not a workspace
um or, you know, simply for storage. But
from a construction costs perspective,
it needs to be insulated to code and
things like that.
>> Absolutely. Yes, it does. Yes. And the
other I mean the the other big factor
for that and the maintenance bay is the
ventilation requirements because we're
bringing in uh diesel and gas vehicles.
Uh there's pretty very heavy uh
ventilation requirements for fresh air
for both of those spaces in in different
they're treated in different ways. But
>> JP, one other question. Um I assume it's
too early for this to reflect whether
there's additional mechanicals from
solar or any net zero components. Um
does that typically add square footage
or does it depend on what we choose?
Uh I shouldn't really add square footage
per se as far as like
if geothermal for example is an option
to the site or um you know all object
>> uh no it shouldn't really add space. Uh
there are certain strategies
that um will help with those systems as
far as actually designing the spaces,
but I don't anticipate the building
getting larger for any reason because of
that if that's what you're asking.
>> Thank you.
>> Um I was going to build on exactly that.
So in the in the admin area I think
there were there are mechanics
mechanical room
>> and my question is is that sufficient in
size for for all the geothermal pumps
and piping because that is that's pretty
significant
um and all the air heat exchange
um equipment
>> right about 192
192 square feet
>> I And that's honestly to be determined
to some extent. Uh, a lot of that
actually ends up outside as well. I
think it's a pretty generous mechanical
room. It is an estimate at this point
and until we start actually designing
it, it could get bigger, but it's a
pretty small percentage of the whole
building. So, I'm not concerned that
it's going to affect the overall square
footage all that much. And we have
other, you know, there there are other
sort of uh strategic ways of using
space. for instance,
locating some equipment up on a
mezzanine which won't increase the
footprint of the building, for example.
>> Yeah, I was just worried that it was not
large enough.
>> Mhm.
>> Um we go back to the vehicle and and
storage garage. Um sort of in a similar
vein,
that seems to me that it could be a
separate building. it wouldn't
necessarily have to be um
attached to the main office and
workspaces. Is that um is that true?
Does that give you any flexibility in
terms of citing that kind of a facility?
Uh it definitely gives flexibility as
far as sighting and in fact um you know
one of the one of the ways we proposed
to phase the project was to build a
separate garage if we were using the
existing site. The downside of that is
probably more expensive because we're um
you know we're not able to uh double up
on foundations and exterior walls and so
on. So it does end up being slightly
more expensive.
But yes, if necessary for a flexible
site, then that's what we that's what we
typically would do.
>> Any other questions?
I'd like to go back to the uh staff
matrix
and I I'm not sure where you are in the
process here but um my understanding is
we're we're trying to estimate
uh staff needs over decades
which of course is very difficult to do
but you folks have the experience to
know what trends in in needs of DPWs are
and so on. Uh so do these numbers
reflect your judgment as to what we what
Amoris will need in terms of DPW
staffing 10 years, 20 years, 30 years
from now
or you're still doing that analysis. I'm
not sure where you are. Yeah, I mean as
to be honest I mean many uh each DPW
municipality is quite different as far
as their future needs because it depends
a lot on the population growth. Uh if
there's a lot of undeveloped land and no
knowledge that those are going to get
developed into more housing for example
bringing in more population it's more
likely the DPW will have greater needs
and a greater uh need to grow. So it
really is quite dependent. Um so we're
sort of relying more on the municipality
and the DPW folks to tell us what they
think the the growth is going to be. We
don't typically do an in-depth analysis
of again population or density growth
for each town. We have done some of that
work on some bigger cities. For example,
we have a project in Cape Coral, New uh
Florida that is growing exponentially.
And so their future growth, obviously
not a completely different scale, but
their future growth is is just off the
charts. So um but I you know I think
this reflects a fairly typical growth
pattern in my from what we've seen
>> with our budget limitations. We don't
have a lot of capacity to build
something in anticipation of a future
need that we don't need. That's always
the balance, right?
>> Yeah.
>> Whereas state coral, yeah, they know
they're going to grow, so they have the
tax
college.
>> Yeah.
>> Right.
>> I guess the same same sort of question
would apply to the vehicle uh inventory.
Um can we assume or shouldn't we assume
that the number of vehicles we have and
the types of vehicles we have is the
right mix and it will continue to be
that same mix going you know decades
ahead
>> it will all change every year
>> it'll all be done by AI right
>> no
>> and every every director will bring a
different you know different approach to
managing the department then time will
change things as else.
>> We're trying to build a facility today
that we can within our available budget
that is as adaptable as we can that gets
as much done as we can.
>> We don't know. We've learned a new term.
Our new term is work to the budget, not
work to the program. So that's our new
TPW motto. Work to the budget. Got it.
Okay.
The biggest vehicle change we might see
in the future is going to electric, but
that doesn't seem to be happening all
that fast for those big vehicles. So
>> JP, does the garage house or maybe for
Guilford, does the garage house all the
vehicles that would normally be at the
DPW site or will there still be some
that have to go outside?
Yeah, I know some will be housed at that
nice water or train grounds, but
>> Jake, you can ask about
>> sure. I mean, typically what we try to
do is size the garage for
>> the total number of large uh diesel
vehicles. Um
>> in addition, you know, any vehicles that
really need to be indoors for emergency
purposes, then we typically try to
provide a coverage out an outdoor
coverage storage for other vehicles and
or equipment that just need to be kept
out of the weather. And then yes,
there's there we typically will identify
in order to keep the scale down,
identify a number of vehicles that are
going to be kept outside. Some of those
are vehicles that that staff bring home,
for example. But typically, you know,
they're sort of smaller pickup trucks,
etc., gas powered vehicles that are fine
to stay outside, just inconvenient.
>> And I believe the plan right now shows
about half of the current DPW vehicles
being located inside.
If I recall, correct?
>> Um, Jen, I don't know. Can you answer
that? I'm not quite. We have
>> um current layout shows the um three
large vehicles, 19 medium vehicles and
six small vehicles and a number of plows
and trailers. And then we also have the
paint truck inside um in inside the
paint bay. And then the water truck um
is also in a separate bay um we're
calling it the emergency
uh emergency response
>> right
>> bay. um so that it's easily accessible
if there's a middle of the night water
main break. These are all the items um
on the last page of the fleet storage.
Um all the items that are not
>> currently in the um in the in the uh
storage garage. So these would be out
under a covered canopy or or out in in a
parking area. Um and to JP's point, a
number of them are smaller pickup trucks
or or trailers.
And this is preliminary. Um if there's
discussion that says this really needs
to go inside, this can stay outside,
then these can these can shift. But what
we're showing is a
um is a conceptual layout of what could
fit in this garage. Um and making sure
that the bays are sized appropriately
for the vehicles that'll be using it.
>> Guilford, did they run all those
vehicles by you? like these are the ones
that really ought to be covered.
>> We talked there's really six six
vehicles we talk about being inside all
the time.
>> We talk and then we talk about what we
So there's like these are the six you
can't send outside. These are the
preferred ones. These are the ones that
can go out.
>> Yes.
>> Yes. we talked about.
>> And Jennifer, the the deficiencies list
that you have you showed a moment ago,
does that include vehicles that are
assigned to say wastewater treatment?
>> No. No.
>> All the wastewater treatment vehicles
are wastewater
and they're not on this list. And
they're not
>> they should not be on this list. We'll
make sure. We'll confirm that.
>> Okay. The list the list is each vehicle
list has each assigned to some take the
tree grounds and electric and waste
stage. Okay.
I wanted to make a comment about um you
know we're talking about this facility
but if it's clear that we have
deficiencies in our other departments
um I would like to not at least lose the
idea of addressing some of those
deficiencies as part of this project
just because it's not specific to the
new facility that's being designed.
here. And I don't know what that means
yet. Um, but if I think of tree and
ground, if I look across the field, um,
you know, see where they've parked all
their vehicles and their equipment,
they probably could stand some
additional cover storage, that kind of
thing.
>> I don't want to forget the other
divisions.
>> Yeah, it's just on the money. Anything
else? Okay, we're this is we're going to
be hardressed to fun this and then
expand the scope
and
we're just going into it knowing this is
not going to do everything.
>> It's going to do what we can afford.
>> Yeah.
>> But try and maximize
>> any questions.
A question for Jennifer and JP. What
type of direction would you like from
this group today going forward? Um
because we have a schedule that we want
to maintain. Um,
is there
>> Well, I
>> I think you know our our first steps or
I should say our next steps are going to
be compiling all this site information
we've gotten
and and then taking this program and
determining a minimum footprint for the
building. So I guess I guess at least
for the moment for you know conceptual
design purposes
is the committee in agreement that at
least the current program we're showing
which is like 53,000 square ft is a
starting point that that's okay to use
as a footprint essentially to start
looking at the sites. It's not a final
design. It's not a final program but it
is a a placeholder for the moment for us
to pursue looking at the other sites. I
guess that's maybe a question that could
be answered.
Or or do they want us to, you know, hone
that down before we start looking at a
at a footprint, I guess, is the
question.
>> When you say footprint, you don't mean
like the actual footprint. You're saying
this is how much has to be contained
within a building, right?
>> Yeah. basically so that we can and I
don't I don't mean to belittle our
design process but you know we have a
chunk of building that we need to fit on
a site and and we need to know how big
that building is and it's not
necessarily a single building as pointed
out earlier that may be constraints
where we actually have two separate
buildings for example but these space
needs sheets in this program defines a
footprint eventually um and
>> 50 53,000 ft could be uh a 40,000
foot footprint but because it could be
under multiple stories.
>> Yes,
>> that is true.
>> The total total area of the building it
all one floor it would be 53 but we do
have mezzanine. There's opportunities
for second floors. Yes.
>> Right.
>> Can you potentially go three stories in
that zoning area or is it two?
>> It's a function issue. It's the way the
building.
>> They looked at that 12 years ago. I mean
JP you could answer more. This will make
so many things you could ever move and
then code gets triggered like the
bathroom.
>> Could we build three floors?
>> We could go three floors. It's difficult
at a certain point because
uh
>> it's a small
>> the you know the big spaces like the
shop spaces or such they have to be on
the ground floor. The maintenance needs
to be on the ground floor. There's only
there's a limited number of there's a
limited amount of square feet that we
can put on a second or third floor. Um,
so there's only so much space we can
save. You know, administration could go
on a second floor. The staff support
could go on a second floor, but there's
only so much footprint that we can do
that with.
>> If they look at 2016 or they did it,
it's flow that makes see what happens.
the uh the square footage of per per
your calculation, the square footage of
most of the office spaces is roughly I'm
I'm tallying up in my head 16,000 square
ft. So your footprint would be 10 and
six or something like that. I mean a
10,000 square foot building is not huge
just in terms of
scale.
>> Correct. Right. Right.
JP, how do you feel? So, if we look at
53 or 55,000 square feet, how confident
do you feel that you could get all that
on the existing site and still have the
mobility and outside working spaces that
would be required?
>> Um, that's obviously an open question at
the moment, uh, particularly given the
possible conservation constraints on
that site. But I we we're going to
pursue as much as we can and see, you
know, what conservation will allow us to
do. Um what we can do within the
guidelines within the bylaws for that as
well.
>> So you're still grinding that out and
trying to, you know, get some ideas
going. I think the committee would need
more of that before any kind of final
decision would be made.
>> Absolutely. Okay. Yeah, understood.
Yeah, for sure. I think to JP's point
that 53,000 square ft
isn't locked into a site. It isn't
locked into your specific footprint. It
isn't locked into mezzanine second
floor. Just is that the right number
from a functional standpoint for this
community to be able to get behind that
then allows them to start trying to
answer some of those other questions.
>> Right. So, I look at the experts.
They're talking with people that know
what we're dealing with this town and
what we're using with what trying to
pro, you know, prophesize into the
future. Um, we look at it if this has
been a long long look at and we had
80,000 then we had 72,000. Now we've
removed chunks of the DPW out of this
building and we're at 53. I mean, if we
like grind out some hallways or
something, I mean, maybe we can get it
down a few thousand. But I think in
general, what we're looking at is what
we're we're looking at is something that
was really well thought of.
>> And it's not going to get bigger, right?
For I assume it's easier to shrink than
it is to get bigger, right?
>> If only if we reunite more of the BPW,
that's how it would get bigger. What
we've cut out is tentacles of the deep
government.
>> And it's unlikely if that 53 goes to 52
or goes to 51 that it's going to affect
any of the things that JP has to look at
next.
>> What's a million?
>> But for scenario planning working with
using the 53 that they've come to I
think reasonable approach.
>> Um and so that's what I think they
should
>> I would say. So by the way it would be
good for the committee so we don't come
back in several weeks and
>> Yeah. And so, no, it's too big. It
should be 45,000 square feet. You know,
we would like to get that input now.
>> Right.
>> I just I think it's hard to say the
range JP gave for square footage means
the build. I assume that was just
construction cost. JP the 600 800 all
total project costs.
>> Yeah.
>> No, that's should be soft.
>> Again, we we don't really know other
than
the $10 million range, right? So, things
be tough to say. definitely 53 that
there going to have to be some comparing
back at some point.
It's the evolution of a design. Do you,
you know, continue to get closer and
closer to the right.
>> As a as a as a committee member, um I
guess I could say that I'm comfortable
with the components that were um
identified. Uh you know, in thinking
through buildings and processes and
functions, it feels like, you know, most
of the items have been checked off. the
needs have been have been identified. I
would request that there be a somewhat
closer look at not to nickel and dime it
but but just think of general overall
office space. It's it um it feels a
little
luxurious. Um, and I think some of those
square footages of offices and and also
or shared workspaces, um, that should be
actually, you know, pretty, um, pretty
space effective. Um, might be an area to
look at, but otherwise it feels like the
components
from my, you know, basic knowledge seem
to be covered.
Okay.
>> So, have we done due diligence? Um, I I
think the process sounds like it has
been. We have experts who have done this
many many times. So, they've had
experience full time and look at um
regarding office space. I know from
someone who's worked in these areas,
it's not a paperless office. Um, this is
a type of work that looks at drawings
and maps and there's a lot of we roll it
out table. So when I see these little
like examples of room, I know that
there's probably going to be a standing
table, work tables, and even if it goes
to computers someday, it will be large
light tables and large screens. So they
are offices that I think in general
sometimes need a little bit more space.
They also tend to bring a couple boxes
of equipment in. It's not your standard
office with just people with a laptop.
>> Yeah. And that's particularly true for
the engineering department which we
>> will look at that administrative part.
>> Right. Correct. So I just want to say
that but I mean does you know Pam and I
are are saying some things here but does
anyone else have any issues pros or cons
or are they like okay this is where
we're sitting right now 53 of course
smaller is better for cost but we also
don't want to short change function and
and furnace and
>> I'll just chime in here on the staffing
and I appreciate JP's answer on this
staffing level you know looking ahead
decades Um and just my own take on it is
uh number of road miles in the town is a
pretty good surrogate for how big a DPD
DPW needs to be
>> because it dictates sewer, water,
paving, you know, plowing, etc.
>> Uh and are we going to increase road
miles in this town over the next
decades? Probably not a lot is my take,
my observation.
>> Maybe Hampshire, maybe Hampshire.
>> Maybe Hampshire be nice. How many years?
say 30 years just meanwhile think you're
going to end up having to do some
increases but you're not going to have
new
widening the same
>> we're take over all the roads again
>> they think you're going to find want to
widen some roads 30 years so your lane
miles will increase
till we're going from a rural community
to a more suburban community that
expects I see
>> complete streets bike lanes and
sidewalks people asking for sidewalks
>> that would have never been never
anticipated on the country road was just
certain farms
>> right
>> some bourbon eyes
>> yeah sidewalks definitely increase more
sidewalks
>> please
>> people on middle street and east tree
east
road east
sidewalks they thought they moved to a
nice place where you could walk on the
side of the road
>> cows
>> they will look at the cows
>> that doesn't sound like coral leveling
>> then I think we can't anticipate really
um you know what kind of technology will
be available I joked about it but I
machinery and so on may be sufficiently
efficient. But I I'm happy with the
staff is the bottom line with staff
estimates.
>> The only thing that could change would
be the service delivery method, which
would mean like suppose we get out of
the business of highway maintenance, we
contract with somebody. If we're out of
that business, we're out of water
maintenance, we contract with a
different company. Whatever it is,
everything can be contracted out.
There's some towns in community in
California, they have like two
employees, everything is based on
contracts.
>> That's not our method. That's not our
culture. I don't think that's where
we're going. But that's that's the only
thing. If you look to the future, that's
it would shrink if anything
>> that would take time.
>> A lot of issues
>> or regionalization, but most likely if
there was regionalization, Ammerst would
probably be the center of the region as
opposed to
>> probably
would.
>> Yeah. Yeah.
>> So, I'm happy with that. Bottom line,
I'm happy with
>> I am too. and and and Pam's um careful
assessment of the
uh space programs you thought u I'm good
with that too.
>> So I would suggest to our designers to
keep moving on these numbers. Of course
we'll keep looking at them. We're not
locking into something right now, but
we're doing due diligence and we
appreciate your expertise.
>> Okay, that sounds good.
>> Booking ahead Christine.
>> Yeah. plan maybe another meeting a month
from today.
>> We have one scheduled for a month from
now. Um
>> yeah, I don't anticipate we'll be ready
for anything in two weeks. So I think
that would be the best time.
>> That's October 18th or
>> 21st October 21st.
>> 21st and then it's the 18th of November.
So we have two scheduled. We actually
have three. Then we have December 16th.
So, we do have three sniff out. And you
guys have a lot of work to do. JP,
>> we do
>> and Jennifer.
>> And Jennifer. Yes. I think I know JP
Park. So, I'm defaulting.
>> JP, do you think functionally after this
next meeting? After that is probably
when we start the schematic design phase
and we actually start putting something
on a piece of paper that would look like
a building.
>> Yes. That would be wouldn't be between
now and a month from now. That would be
the outcome moving forward.
>> Correct. Yes, that's right. Yeah.
>> Can I ask a schedule question?
>> Yeah.
>> Are we still JP? Are we still are we on
track for possibly cost estimates in
December still or do you think that's
pushed back a little bit
to where we are now?
>> Um I'm I'm gonna actually
say that I need to look at that which I
haven't been able to recently. So
>> yeah, just keep us posted on that.
>> We can give an update on that.
>> We might have actual contestants.
>> Sure.
>> And Jennifer, if that can be part of our
next meeting a little bit
schedule and how it's looking for the
next steps.
>> Absolutely.
>> I don't know what to look at the screen.
It's so weird. Or look at just look at
the people. Look at the chair.
>> Yeah.
Yeah.
Um,
anything else to let us and also you
bought us OPM is there anything else we
should know or do for the next
>> I think what we hope to get out of this
meeting today and we accomplished so
>> okay
>> go for do do you and do the DPW
employees all feel like they've had
their voices heard by this process
>> um mechanics 22 the mechanics have two
or three days Um, I think they are
probably the most impacted right now.
>> Um, everybody else has one day. I came
in for one day.
Jason, have you heard anything?
>> We can't hear you.
>> Can't hear you, Jason.
>> Hang on. Here we go. Sorry. Can you hear
me now?
>> Yes, we can. Um, yeah, I haven't really
heard any pro or con for, you know,
anybody, you know, complaining that they
haven't been heard or that their space
hasn't been looked at.
I'm sure there there's probably a few
outliers, but there always are.
>> I think it actually said it on one of
the sheets, someone wants a window.
>> Ah, yes.
>> We heard that only once.
multiple times though, right?
>> Yes.
>> Hey, speak out, right?
>> Yeah.
>> Um, okay. So, thank you, Weston and
Samson. And, um, thank you. Thank you.
And we'll see you in a month.
>> Sounds great. Thank you.
>> Say if you want.
>> Appreciate your time. Thank you.
>> Um, I'm going to move to item four. This
is a new one. It's a budget update and
invoices that Sean had requested. I
assume that's nothing but Okay. So, that
will be a repeat on the
>> left. No, we have not received any bills
today.
>> Okay. Good. No, that was sweet about
that. Okay. Um and then we're going to
move to five. Okay. So, it's public
comment. We have one person here.
>> Oh, did Hello.
All so tall. I Anybody?
>> We have two people in in the house. And
do we have anyone on in the in space?
>> So the people the particip if you dialed
in on Zoom if you want to speak raise
your hand.
It is.
>> Um
>> yeah, at least five.
>> Uh this is the public. This is the first
time we've used this new tool, the owl.
So bear with us here. Um
we're trying to figure out how we can
see if there's hands up. Uh if you want
to figure that I could take the question
in here.
>> Yeah. Jason panelist seen.
>> Oh,
>> Jason is a panelist.
>> Can you see hands? Jason
still with us. Um,
>> yeah. Looks like he's muted right now.
Yeah, with carrot we don't have it.
>> Christine, I am also online. Do you want
me to raise my hand so you can see if it
comes up?
>> Okay, it's up.
>> Ah, okay. So,
>> right, Maria. All right, so we don't
have any other hands raised that we know
of. So, um I'll go to public comment.
Maria,
>> great. Maria, put yourself out. Um
you're asking to unmute. I'm not I'm
gonna stay muted. Um, as long as you can
hear me that might get me back.
>> Yeah. Yeah.
>> Okay. Um, okay. So, uh, a couple things
back to to Sean's, uh, question about
cost with 53,000 square feet at a
estimate of $600 to $800
per square foot. If that is construction
costs
um and you add on 25% soft cost that's
talking somewhere between 40 and 52
months. If that 600 to 800 is all costs
it's still 32 to 42 million. So I I
think that that has to be considered to
to the other points of scaling back um
and being
um
the uh a plea to please make the
materials that wrote available to the
members of the committee
available in the packet because it's
very hard to follow along. Um and I'm
trying to do screenshots and try and see
what what's up there. So could you
please put that available before the
meetings ideally? Um and my last comment
is about site location. I understand
that you are still doing evaluations at
these two sites, but I just want to make
sure that the town's looking into this
holistically. There is another project
that's very important that needs to
happen in this town and that's a south
fire station which has been trying to
get off the ground since the mid 20th
century. Um, so
however you you're going to have to make
decisions
based on the sites you hear and
I think part of your decision is going
to have to be where would the fire
station go and where would be a good
site and if the only place to put the
existing with the south fire station
that made sense in terms of response
times to the vast majority of people who
full-time residents who live in the
South the ambers that has to go on the
existing DPW site and that's part of the
equation. Um and I think response times
of ambulance and fire is uh I think that
trumps um decisions about the centrality
of central location of the defility.
So thank you
Mr. Marshall
>> Marshall 64E
Maria I totally agree with that comment
that comment needs to go to town council
because town this committee is doing
what town council has asked to do to
look at these two sites they don't have
the jurisdiction to look at something
else so town council needs to change its
direction to this committee
>> I've got a counselor and a town manager
sitting here so I
Paul used to hear.
>> Yeah.
>> Um
I I will also continue with your
question and with your your request to
get things like Bob's memo into the
packet in advance of relief.
>> All I saw was the mints and the agenda.
>> Yeah.
>> I did the request for
I Yeah. Yes. In the future there will be
a greater effort made to make sure than
goes in the packet.
I mean it should be it should be in the
packet
days before half a week before the next
meeting. I mean they're clearly working
on some of the material this morning. So
none of us draft the program that you
had a week ago or two weeks ago.
>> Okay.
>> Yeah.
>> That's the part we have an aggressive
schedule. So I think we're racing, but
information needs to go unpacked so
people know what the hell's going on.
Yeah.
>> Anything else for solution?
>> No.
Okay. So, I think there's nobody else
out in Okay, we're good. Um, I don't
have any other topics that are
anticipated. So, I will see you all next
month on the 21st. Thank you all for
coming.
actually
already.
Yes.