Video summary
The 11th regular common council meeting convened with a quorum present to address critical public safety issues, including the controversial use of Flock Safety license plate reader technology and the proposed construction of a new pedestrian bridge. During the public forum, community members presented divergent views on these topics; while Trigg Jacobson urged caution regarding the termination of the Flock contract due to its success in recovering stolen vehicles and aiding law enforcement, Joseph Lawson condemned mass surveillance as corrosive to liberty and called for a ban on similar vendors. Simultaneously, representatives from local fishing charter businesses raised significant concerns about the feasibility and environmental impact of the new bridge, questioning manual operation methods during sensor failures and potential navigation hazards, while Michael Bernett criticized the administration for covering cameras without a council vote following a recent data breach where stolen motorcycle data was tracked but not recovered.
Following the public comments, City Engineer Kevin Jump introduced HDR consultants to present a detailed update on the pedestrian bridge project, which aims to resolve safety issues stemming from 51 crashes and three fatalities between 2015 and 2020 near a roundabout. The proposed solution is a movable rolling lift structure featuring redundant hydraulic systems, manual winch backups, and thermal cameras for fog visibility, with final plans expected this fall and construction scheduled for 2028–2029. The project carries an estimated total cost of $12.8 million, heavily influenced by conservative steel pricing estimates to account for economic volatility and design complexities like curved gutters, though architectural staircases and aesthetic lighting require separate approval. Operational details clarified that the bridge would remain open normally if locked in place, with operations typically taking 5–10 minutes including vessel clearance, while maintenance involves weekly lubrication and periodic seal replacements every 15 to 20 years.
The meeting also addressed the legal and financial implications of the Flock Safety contract, where the Shboen Police Department presented a report highlighting the system's instrumental role in solving crimes such as identifying suspect vehicles and locating missing persons despite strict policies against acting on unverified data alone. Discrepancies emerged regarding Flock's attempt to sell anonymized traffic data to the Department of Public Works, which contradicted the Master Services Agreement stating the company does not own or sell customer data, leading the department to decide on immediate discontinuation of services. Council members confirmed that Municipal Revenue Obligation payments are conditional revenue agreements rather than city debt and discussed the need to gather community feedback, particularly regarding impacts on minority communities, before vetting alternative technologies through elected representatives. The session concluded with the council unanimously approving the motion to discontinue Flock services due to privacy concerns and license plate reader technology usage issues, followed by a closed session to discuss non-renewal of a beverage operator's license and potential public fund investments related to the contract before adjourning.
Read the full video transcript
All right. Good evening everybody. It is
6 o'clock and I will call the 11th
regular common council meeting to order.
Will the clerk call the role?
>> Thank you, Mr. Mayor. Alder person Boris
>> here.
>> Alder person Bzer
>> here.
>> Alder person Close
>> here.
>> Alder person Decker
>> here.
>> Alder person Graine
>> here. Alder person Heidman.
>> Alder person Kelly
>> here.
>> Alder person Mensor
>> here.
>> Alder person Mitchell
>> here.
>> Alder personel.
>> There are 10 present.
>> Thank you. If everyone could please
stand for the pledge of allegiance.
>> I pledge allegiance to the flag of the
United States of America and to the
republic for which it stands. One nation
under God, indivisible with liberty and
justice for all.
Alder Boris, is there a motion to
approve the minutes from our last
meeting?
>> I move to approve the minutes from the
10th regular council meeting held on
August 17th, 2026.
>> Second.
>> Moved and seconded. All those in favor
of approval of the minutes state I.
>> I.
>> Any objections? Minutes are approved.
Next, under item five, under
announcements, the board of water
commissioners will be having an election
held on September 21st, 2026 for a
three-year term beginning October 1st,
October, excuse me, October 1st, 2026,
and a 2-year term for the unexpired
term. If anyone is interested, please
contact the city clerk or the council
president by Thursday, September 17th.
Thank you. Item six is mayoral
appointments, city attorney. Thank you.
Liz Kroll to be considered for
appointment to the board of housing
authority. Annelise Flynn to be
considered for appointment to the me
public library board. Carl Nelson to be
considered for appointment to the senior
services commission. Quinton Zufeld to
be considered for appointment to the
board of zoning appeals.
>> Thank you. Those items will lay over.
Next item seven, confirmation. City
attorney
>> Tracy Bernett to be considered for
appointment to the board of housing
authority. This um nomination has been
withdrawn. Brianna Bourne to be
considered for appointment to the
mayor's international committee. Jess
Thyroan to be considered for appointment
to the mayor's international committee.
>> Thank you. Alder Boris.
>> I move to file Tracy Bernett's
appointment and confirm the remainder.
>> Second.
>> Moved and seconded.
This is a roll call vote.
10 eyes.
>> Those are approved. Next item eight,
public forum. City clerk, anyone for a
public forum this evening?
>> Yes.
>> First speaker is Trigg Jacobson.
>> And then for those speaking tonight,
please state your name, the item you're
speaking on, your address, and then
you'll have 5 minutes. Okay. My name is
Tri Jacobson. Can everybody hear me? My
address is 222 Vrath Boulevard, Shboen,
Wisconsin. Mayor Sorenson, uh, members
of the Common Council, Chief Simple and
City Administrator Bradley, and fellow
citizens, uh, thank you very much for
giving me a few minutes. Nearly 55 years
ago, my father was teaching me to drive
in his brand new car. And we were
driving east on Erie Avenue, approaching
a green light at the intersection of 8th
and Erie. And when my father suddenly
yelled, he said, "Stop."
And a car traveling south blew right
through the red light directly in front
of us. And we were almost hit. And I
said, "Dad, I had the green light." And
he said, "Son, if you're dead, it
doesn't really matter who's right."
I never forgot that. And I've thought
about it as I've studied this issue
before you tonight on flock safety
because we're talking about two things
we all value. Our privacy and our
safety.
And we shouldn't casually surrender
either.
When I first looked into this, I thought
the question was going to be fairly
simple. Uh should keep flock safety or
uh should we terminate the contract?
today. I don't think it's that simple.
The resolution before you says, "Flock
safety offered our Department of Public
Work anonymize traffic volume, vehicle
type, and speed information derived from
the cameras, something our police
department says it didn't know or even
consent to."
The city considers that a violation of
its agreement. And that's serious
because at 900 p.m. last night on Fox 6,
Flock Safety publicly responded to the
specific Shbboan traffic data
allegation.
Flock Safety says it does not sell the
personal data. Instead, it says traffic
analytics is separate product from its
license plate reader platform and does
not contain personal license plate data.
It provides agencies with aggregate
deidentified roadway trends to support
transportation planning, public safety,
infrastructure decisions, and emergency
preparedness. So now we have a very
important factual disagreement. Shboan
officials have characterized the
situation as flock safety offering to
sell city years of traffic information
derived from its cameras. and flock
safety is now saying that
characterization is incorrect or at
least it it's not complete and that the
analytics product is separate from the
identifiable LPR data. I don't know
who's right, but before making this
decision permanently,
shouldn't we find out exactly what
happened?
Did they really break the contract? Was
anything actually sold or transferred?
Flock safety may have violated its
agreement. I don't know. But then hold
flock safety accountable. But let's
first establish the facts. And yet
there's also another side.
City officials will easily admit that
flock safety's technology has been
instrumental in removing violent
offenders from our community and
recovering stolen vehicles and property.
And in other areas of the country, Flock
Safety's technology has actually helped
return kidnapped children to their
parents.
So, two things can be true. Flock safety
may have violated Shbboan's trust and
their technology may have helped make
Shabboan safer. So, let's find out which
LPR system gives our officers the best
technology and the most useful network.
If another vendor offers something
better, well, then I I guess I would say
choose it. Speaking as a father of three
daughters and eight grandchildren, I
want our police department to have the
very best tools we can responsibly put
in their hands.
I respect Chief Zmple and I respect his
recommendation, but I also respectfully
ask you, does this decision have to be
made tonight? We might learn more
tomorrow, but then it's too late. The
cameras are already covered. And look at
how much we have just learned in the
last few weeks. Perhaps your decision
tonight doesn't have to be yes or no.
Perhaps it can just be a not yet.
And give yourself 60 days to establish
the facts to find the truth. Determine
which system gives our system the the
best technology analytics and network.
then establish the privacy, retention,
sharing, auditing, and reporting rules
that Shbboan would require of any
company that we choose.
Maybe flock safety should go. I don't
know. Maybe another company is better.
We don't know that. Or maybe the trust
problem could be repaired. Trig, you are
over time. Can you wrap up?
>> Can I take another 30 seconds?
>> Yeah, please. Please wrap up. Thank you.
>> I don't know. But that's pre precisely
my point. When when important
information is still arriving every
single day, wisdom isn't making the
fastest decision. It's making the best
informed one. My father taught me
something very important that day on
Athani. And having a green light doesn't
mean I shouldn't stop and look both
ways. Tonight, public safety and privacy
have arrived at the same intersection.
We need both. So before proceeding,
stop, look both ways, get our facts
straight, and then let's get this
decision right.
Thank you.
>> Thank you.
>> City clerk. Next person,
>> Joseph Jocelyn.
>> Good evening, common council.
>> My name is Joseph Lawson. I live in 3035
North 26th Street in Shuigan. I'll be
talking about the flock safety uh
contract and automatic license fleet
readers and mass surveillance. I will
email uh each of you a copy of this talk
as well as a Excel document full of
other um sources that I have for this.
This is not a conservative or liberal
issue. This is not a partisan issue but
concerns every single one of us and how
we want to be as a community and as a
nation as a whole.
Did you hear about the group in Boston
who committed major organized retail
theft of thousands of dollars of
property, destroying and looting as they
went? They worked together and conspired
against the laws and against the
property owner. It was an allout riot.
And yet today we lo them today as major
heroes to the American Revolution as
those who did the Boston Tea Party. Do
you think that we would have the USA
today if the British had had mass
surveillance such as Flock and Axon and
others and had the ability to track and
follow down any of the revolutionaries
of the colonists? as the colonists
themselves were lawb breakakers and
radicals. The tax parliament levied
against the colonist was legal. But was
it right? Just because something is
legal doesn't make it right, moral or
ethical. We should not argue if mass
surveillance is legal or if some judge
somewhere says it that or some company
salesperson says that it is. We
shouldn't argue if we should go to some
other non-flock company that says it has
better safeguards or a better contract
to keep the data in safer hands or we'll
retain data for 3 days, 3 weeks or 3
months. This is all beyond the point and
and a distraction from the real issue.
We should be much more concerned on the
fact that this is indeed the mass
surveillance warned by so many authors
and critical thinkers and by history
itself
that will inevitably lead to more
governmental overreach and less liberty
and freedom for all of us. from the
reports I've seen and from the email
that was attached to the packet um that
Flock was, you know, as was stated had
attempted to sell years of data past and
potentially future uh to the city. Uh
Axon, another company, is no different
than Flock. Vigilant Solutions is no
different. Verata, Autovoo, Recor
System, and many others. All of these
are no different. They have financial
incentives to maximize profits through
data collection. No matter what kind of
contract they the city has or SPD tries
to engage them in or terms of service
they say they have, they will break it.
They already have. They will continue to
do so in the future. There should be no
benefit of the doubt given to these
companies when they have shown they are
unrepentant and repeat offenders. The
common council should not only cancel
the contract with flock and take down
the cameras and other sensors, but they
should ensure that the SVD and city do
not contract with or purchase any other
ALPR mass surveillance systems as they
are corrosive and corrupting to our puh
privacy and to our democracy. They are
anti-lberty and anti-american.
For those of you who don't know, these
are not just license plate readers. They
do much more than that. They determine
and catalog the make, model, color,
plate number, bumper stickers, DMV tags,
scratches, dents, dings, and other
damage to the vehicle. They're starting
to use facial recognition of the driver
and passengers, Bluetooth, Wi-Fi,
cellular fingerprints of the devices
inside those vehicles and the vehicle
itself and all occupants and devices,
whether they're adults or minors within
those vehicles, cataloging them,
creating unique identifiers for each and
comparing them to public DMV databases,
and effectively reducing all privacy of
movement to zero. They also sell this
data to third parties, advertisers,
insurance companies within that 30-day
window as it says uh in the contract in
the agenda. And we wonder sometimes why
our insurance rates go up. Um, what if I
could submit a foyer request or public
records request or even purchase this
data from Flock or any of these other
vendors considering that they have years
of our data still or other, you know,
LPR companies or their proxies for the
mayor's car, personal or private, for
any of your cars, personal or private,
and make a map of all that activity
where you have been, how many times, and
when. If that makes you uncomfortable,
then good, because uh you should be
uncomfortable because it is wrong. And
if you don't think it's right for it to
be known about you, why should it be
right to be known about any of the rest
of us? Who are the folks that you should
be trying to help and protect protect
from these things? Modern technology can
be helpful for law enforcement. And I
don't have a problem with that. I do
have a problem with police having a
freely searchable database of everyone
when and where they drive for weeks,
months, or years correlated through
companies with files on every single one
of us. The founders didn't write the
constitution, the fourth amend, and the
fourth amendment to make a law
enforcement's jobs easier, but exactly
the opposite to make it hard to ensure
that the government couldn't slide back
into the into the tyranny that they
themselves were revoling against. We
can't go about chiding the USSR during
the cold war, China currently for their
surveillance state, and and how terrible
that must be for their citizens, and
then turn around and say that our
surveillance state is good. Mass
surveillance is not safety. I urge you
all to not renew the flock contract and
critically I urge you to not implement
any other contract with Axon or other
companies mass surveillance or hardware
systems. Thank you.
>> Thank you. City city clerk
>> Roy Potter.
>> Roy name, address, item you're speaking
on and you'll have five minutes. If you
could just adjust the mic for what's Can
you adjust the mic?
>> There we go. Perfect. Thank you. Roy
Potter, 2625 South 8th Street. I'm here
tonight to address a few concerns of the
pedestrian bridge. We uh I am both a
member of the Great Lakes Sports
Fisherman and the Shogan Outboard Club.
We do a lot of things for community uh
children's programs um charter captain's
programs but our first concern is safety
and some of the things that we've been
looking at for the issues that we have
with this pedestrian bridge um would be
I guess
the first point would be it would be the
smallest distance across the river. It's
on a blind corner and in the fog, trees,
and current, you have a hard time
navigating. It's not a matter of putting
it in park and waiting for the light,
waiting for a bridge. There are
questions of who would replace the
sensors if it fails, how fast that
turnaround would be. We have uh a need
for a contingency plan. If the if the
river does fail, who is who would uh how
does that work out as far as uh
mechanical issues? We were told by the
engineers that the sensor would be the
biggest problem, but that it could also
be opened by a pickup truck. Um, on
conversations, we're looking at who's
donating the pickup truck when we need
it. Um, we know that there's uh a total
of u to $20,000 minimum probably of or
more or more of charter sales that go
through the bridge all summer long every
day. There's going to be a lot of people
affected by that. I am from the outboard
club, so I am already affected by excuse
me, I am already affected by the height
of the eight street bridge. I would have
concerns of the pedestrian bridge on two
different levels. I would have a
question to see um the Coast Guard and
safety v vessels if they would be able
to come up if that bridge was closed.
We've had several opportunities this
year where the Coast Guard and everybody
was was able to do what they had to do
on the river up from us and uh it's it
really needs to be addressed if the
Coast Guard or who would address that.
We have u
a couple questions as far as mechanical
issues that being it. Some of the times
the boats come out, the logs come out.
If that bridge is damaged, how much um
mechanical failure stress would that
bridge hold back? Um the logs and the
trees that come down that particular
stretch of the water,
they come up the river and they go down
the river. They go back and forth a few
times and when they're hung up there,
who is going to remove them at 4:00 in
the morning when everybody's going out?
or if anybody else can remove them, we
would need to know who can if we're
allowed to do it ourselves.
The other issue I had is the lighting on
the Eighth Street bridge. I've talked
with the lighting engineer and the 8th
Street Bridge, there's two red lights
and the green light only turns on when
the bridge is raised. I would ask you to
consider that with this other bridge. We
would really really prefer to have the
bridge open as a normal stand and closed
when the pedestrians go past. Um because
right now that lighting would really
mess up navigation lighting if it was
open and closed the red and green. Um we
would have questions as far as do the
boats have a rightway versus the
pedestrians, who goes first in what
order?
We would also have um let's see one more
here.
Okay. We'd also like to see if the
parking structure that that that is
going to be removed for that is being
considered by the businesses as that is
a large area there that is used would be
used for that future parking lot. I
don't have uh any more questions but I
hope you consider my questions here
tonight. Thank you for your time.
>> Thank you.
City Clerk
>> Brian Grunkkey.
>> Hi, my name is Brian Grinky. I live at
2402 North 6th Street in Shabboan and
I'm also going to talk on the pedestrian
bridge. Um, I'm also a slip holder
upstream and I run a charter business
out of Shboen. I've previously raised
concerns about the very real possibility
of lost revenue, as he had also
mentioned, to charter businesses when a
bridge becomes inoperable.
Um, I I appreciate the new design that
allows bridge to be opened by a a pickup
truck or manually versus the original
design, but there's still some concerns.
Will qualified personnel be available
24/7 to respond to mechanical problems,
or could a failure leave the bridge
closed for hours or even days? If an
unscheduled
unscheduled closure prevents established
maritime businesses from operating, who
will be responsible for those losses?
Like he had mentioned, that could be
$10,000 or more per day. Um, and that
would be de devastating to most of the
small businesses down there.
Boat traffic can be every few minutes
during the summer months. Guys are
purposely staggered in time so that we
don't have congestion at the fish
cleaning station. Um would the bridges
be opening every five or 10 minutes to
let every single boat through or would
be staged in 20 minute increments? What
happens then with weather issues or
safety concerns with health or you know
one of our passengers that needs to get
back to dock?
Um
my other concern is the new bridge now
design includes the placement of pilings
in the river that the first design
didn't have. How will this affect the
river flow? Um especially potential for
log jams or blockages upstream because
of the reduced flow
eddies and sholing downstream by the
currents and navigational hazards caused
by the turbulence of the bridge itself.
Um, have adequate environmental and
river flow studies been conducted,
especially with the new design and has
the city considered the long-term cost
associated with dredging if needed to
remove sholes or a blockage of the
debris.
Um, personally, I feel the potential
issues with this project outweigh the
small number of benefits that it might
bring to the community, but overall it
really comes down to what's best for the
community in a whole. Thank you.
Thank you,
city clerk,
Michael Bernett.
>> Michael Barrett, 611
Water Street. Sasquatch got his
motorcycle stolen a block from here.
Dude used his credit card at Quick Trip
between here and 76th in Brown Deer by
Old Northridge. 100 cameras it was on.
Did that get his motorcycle back? No. Is
his motorcycle ever coming back? No. But
that's not saying flocks that many, but
a hundred different cameras they tracked
on. Spo's had cameras for about 10 years
and not flock or whatever. And like
Trigg said, there's going to be some
kind or another. And it's one of those
you're dealing they're the big fish in
the pond, the big vendor. Um the
aggregated data,
nothing ever stays aggregated. When you
have good enough AI, it can break that
over time. And that is an issue and
what's going on. But what what freaks me
out more here is the governance issue of
how this all went down that today I hear
that
this breach was noted sometime in
summer. I'm like why didn't this come to
a committee? Why didn't it go through
council? Why didn't it do anything like
that? And it came out from uh the
administrator and the chief of police.
Then you had the mayor come in and do a
little song and dance in there. Brought
these guys here. I'm on no less than a
half a dozen cameras here. Feel very
safe. Um we're going to have something
one way or another. And it it's
fine. But right now what you did, what
blows my mind is how do you get to just
say without the council voting on this,
we don't want those cameras on now, so
we're going to cover them up. It sounds
like an Italian Job three movie where
the police are the insiders and they
said, "Let's cover up all the cameras
because we're gonna do this crazy stupid
stuff for for a little bit, then they'll
be back on." And I'm not saying anything
like that is happening, not whatsoever.
But I think it's kind of ridiculous. And
you guys totally knew it was it was in
the docket. And on the first night of
the new council of swearing in, I said
to Brian Kelly as he walked in, I go,
"Hey, I got 97% certainty you're getting
this celebrated stuff with this Jade
Grant and D. There's not going to be any
discussion of it." Was there? No. And
that's the stuff that can break your
iPhone like instantly. And for
everybody, that's there. You're already
recording the other stuff. Um, you had
it on car readers a decade ago.
you have that uh stuff that you have
that civic software that's also tracking
everybody's uh emails to the city your
social media and everything and it
tracks sendment and it breaks it down so
they can figure out how to market to you
when something comes out a post on like
next door or something. It's really
being generated by that software which
the name is escaping my mind but it's
like but it literally is picking you out
and saying hey would you like to respond
to that that's how it's it's getting out
it's fighting
everybody speaking here and you go on
I'm going to flip over it to the to the
bridge thing that's going to be a
minimum of five out of pocket 5 million
which seems to be nothing compared to
the spending that's going on and stuff
and it's like but it's part of that um
dockyard project and stuff you know to
develop that area and I question the
need need for it and if you didn't need
to get across the river that bad cuz
you're also talking probably about a
million a year which sounds like of
maintenance but for sure cuz you're
going to talk all the maintenance that's
not going to be done you're going to
have to replace major parts all the time
it's what it is when Green Bay put in
their big Nichki bridge I was sitting up
in there in winter 3 months later
freezing my ass off taking pictures cuz
they had to change all the gears out and
that was like a couple million dollar
changeover and that wasn't planned. That
stuff's complex. This is winter. This is
Shboan. That's all I got.
>> Thank you. See city clerk. Anyone else?
>> That's it for this evening.
>> All right, that concludes our public
forum. Uh next we have a presentation
and I'll turn it over to our city
engineer Kevin Jump. Kevin.
Let's
put it on this one. Yep.
>> Thank you. Uh so we thought we'd take an
opportunity to give the council an
update on where we sit on the bridge
project. Um, so we invited HDR here to
provide an update. They're the city's
design consultant. Um, we've worked
through some public information reviews,
some structural reviews. Um, but I think
now is a good time for for our
consultant to uh give us a a detailed
breakdown of where we're at. So, at this
point, I'll turn over to HDR.
>> Thanks, Kevin. And thank you for the
opportunity to pres present before the
council tonight. We'll use the screen
here to assist us with our presentation.
My name is Chase Keeler. I'm HDR's
Wisconsin transportation program
manager. I'm out of our Madison office.
Uh spent 18 years in the industry. Uh
project manager for roadway and bridge
projects uh specifically in the state of
Wisconsin. Uh and then here with me,
happy to have Ron Sanchez. He's our
movable uh bridge design lead. He's
HDR's southeast region movable bridge
practice lead as well. Um, he's got 30
years of experience in the industry. We
also lean on Rob Moses. He's not here
tonight, but he's a special movable
bridge adviser. He's worked on a lot of
movable bridges in the state of
Wisconsin. He also worked on the Miller
Park uh roof.
Quick presentation overview tonight. Um,
we're going to talk purpose and need of
the project. Project location, I think
you're already familiar with that. Uh,
navigation study that we did. Uh, the
NEPA environmental document. Uh we're
going to cover some of the public
involvement that's been done thus far.
Uh project schedule. Uh and then Ron's
gonna we're going to talk construction
details a little bit and then Ron's
going to dive in on some of the the
actual preferred alternative bridge uh
approaches and then the movable span
itself in terms with a emphasis on
safety and reliability.
So, the project purpose in need uh is to
address some safety issues with bicycle
and pedestrian in incidents. Uh over a
5-year window from 2015 to 2020, there
was 51 crashes involving uh bicyclists
and pedestrians. We had three
fatalities. Uh there were six involved
with severe injuries and a lot of those
crashes occurred in the vicinity of the
8th Street Bridge uh specifically by the
roundabout to the south. Uh so that was
that was a big reason for addressing the
safety needs with this project. If you
recall, the city was awarded a federal
raise grant for 5.3 million in 2022, one
of only four uh recipients that year in
the state.
And then if you're not familiar, the the
project location again was is where
Virginia Avenue uh would would go if you
travel east into the river and then it
would connect to the Lake View Street
Plaza uh terminal on the other side of
the river.
In 2025, we did a navigation study. Uh
we looked at public data on AIS
transponders for boats and vessels in
the area to get a sense of frequency of
travel and the size of the vessels. Um
we also talked with charter charter
fishers, several charters we reached out
to and got feedback in terms of the
frequency of trips and the size of their
the heights of the outriggers. And it
was quickly we came to the conclusion
that a fixed bridge is probably not a
realistic possibility. uh the the height
that we'd need. We've got sailboats out
there that are 75 feet uh airdrafts. Uh
many of the charters are 25 to 30 feet
uh with the outriggers. So a fixed
bridge would dominate the skyline. It
would have significant rightaway impacts
and the costs would be uh significant.
So the aim was from from that point
forward is really you know looking at a
movable bridge as the prudent
alternative.
quick overview of the environmental and
agency uh coordination activities. We
don't have time to really dive into this
in depth uh but wanted to just highlight
what we've been doing and and
environmental components has been a
significant part of this project. Uh the
former rice coal plant and super fun
site of the river uh we've had to do
hazardous materials investigations. Uh
we completed a phase one investigation
uh which which revealed that we do have
to do a phase 2 and a half get borings
out there and address uh some some of
the contaminated materials. It does does
happen on on a lot of these engineering
projects that we work on. So it's not
uncommon, but uh something we'll have to
address. Uh section 4F, the funding that
was used for the boardwalks themselves,
we're planning to return the the
boardwalks to even better condition uh
than prior. Um flood plane, I think that
was mentioned previously. We know there
was an event in 2018. Uh the current
flood plane, FEMA mapped flood plane
does trickle onto the west boardwalk
itself a little bit. Uh we did a
detailed study that was uh independently
verified by another consultant firm and
we were able to prove a no rise
condition to that flood plane with our
current bridge alternative.
agency coordination that we've done both
both state and federal agencies ongoing
coordination with the DNR several uh
different members of the DNR
contaminated SE sediment. Uh we do have
a fish timeout window where we're not
allowed to be in the stream uh for the
salmon um from September 15th through
May 15th. Uh we've also talked with the
US Coast Guard uh for the bridge permit
as well as lighting permit we'll need
from them. Uh we've had ongoing
discussions with the US Army Corps of
Engineers for section 404 and section
408 permits uh as well as US fish and
wildlife on the federal side. Um and
then also the Wisconsin coastal
management program as well. Um we also
reached out to Native American tribal
liaison uh which is standard practice
for projects that we work on with
federal and state funding.
Um, and then we are nearing a draft
environmental document, uh, which will
be signed by FHWA. Uh, it's a type CEC,
categorical exclusion environmental
document, and we we're hoping to get
that signed this fall.
A little bit more on the public
involvement that we completed um that
that was held uh June of this year um at
Uptown Social in town on on June 10th.
Uh, we had a good meeting. It was well
attended. Uh we did have comments across
the board which you know is typical a
lot of times on on some of our projects.
Uh we had several members that se
several folks were very in support of
the bridge. There was some opposition.
Um specifically the aesthetics was
mentioned. Um and I think and Ron's
going to talk a little bit more about
the aesthetics, but it's kind of an open
template at this time. We haven't dove
into that level of detail yet. We really
are just in the preliminary plans phase.
So that would be the next step if if we
agree on the preferred alternative. Um
so Ron Ron will talk a little bit more
about that. Um that there was some
opposition to the bridge. I think some
of that's been mentioned tonight. Um and
we did have a charter focus group
meeting uh as well uh right before the
meeting that same day. Uh we did have
some opposition there at least initially
in the meeting. Uh we did talk about
some of the operations and maybe there
is uh a way to keep the bridge open for
a period of time for some some months
you know 4:30 to 5:30 when the bulk of
the charters go out. So there was some
discussion of that um and that seemed to
have more of a positive tone. Um at that
meeting we did have a follow-up as well
with one charter dumper Dan on the 25th.
We did receive letters of res of support
uh from six different businesses and
entities in the area. Visit visit
Shabboan uh the Shabboan County Economic
Development Corporation, Harry's
Prohibition Beastro, Blue Harbor Resort
and Conference Center, the Shabboan
County Chamber of Commerce, and Parker
John's Barbecue and Pizza.
Remaining project schedule again NEPA in
60% plan submitt is anticipated for this
fall with wrapping up final plans at the
end of first quarter next year starting
the permitting this fall hopefully
finishing it up next fall and then a
letting uh potentially in May of next
year with construction in 2028 and 2029
mentioned the fish timeout window that
does restrict us a little bit um and
then on the construction side you know
there's a there's a period of time for
contract contractor procurement of
certain materials s uh that take a
little bit longer to obtain. So that's
something to factor along with the fish
timeout window. We plan to keep
everything open to businesses obviously
during construction. We would plan on a
boardwalk detour as shown in with the
red dash lines here uh during
construction. However, we don't plan on
needing any real estate with the
project. There would be a fiber optic
connect connection, a small bendable uh
fiber optic line direct board beneath um
South Pure Drive to connect to the A
Street Bridge, Tender House.
A little bit more on the bridge
approaches before Ron dives into the the
bridge itself. Um but on the west side
you're looking at on the screen here. Um
this is just north of Parker John's. Um
you could see that Park and John's
building on the bottom uh for just to
kind of get yourself oriented. Uh but
multi-use trail reconstruction in
addition sidewalk reconstruction. We'd
be adding another ADA accessible uh
ramp. There's already one there. We'd
plan to potentially remove some stairs
and add two of those ramps. Uh we
another feature we've been looking at is
potentially adding some architectural
staircases. Ron's got some images that
he'll show a little bit further down in
the presentation. Uh but really just
trying to make that area attractive as a
place to uh experience. You know, it
could we we we see some some cool
opportunity there. Uh we'd be adding a
little bit of green space. As you could
tell, I think Parker John's would
probably lose their seven parking stalls
there that would have to be eliminated
to make this happen. And then we would
potentially close off access to the
south parking lot um as shown on the
left side of that image. Uh, but we
would plan to add a driveway for
accessing that south parking lot a
little bit further to the south than
what's shown on Riverfront Drive. It's
not shown on this map, but it' be a
little bit further. There'd be a
driveway added. Uh, there's some storm
sewer that would need to be redone. It's
fairly minimal. Um, some path lighting.
Uh, some small retaining walls. Uh,
leading up to the bridge structure
itself, which is shown in blue. That's
the fixed portion of the bridge that
won't move. Um the boardwalk itself you
would pass beneath the uh bridge
structure in blue. That's the the brown
shaded area on on the west side
only on the west side. The east side you
would just need to walk around. It's a
shorter walk on that side. Uh but then
on the east side, you know, a lot of
sidewalk reconstruction just uh just so
we can tie back in there on that side. U
we're not planning to do quite as much
on that side with the plaza. Uh and
again, we don't plan on needing any
right away.
I'm going to pass it to Ron now and he's
going to talk a little bit more about
the bridge uh preferred alternative.
>> Okay, thank you. So, um now we're at the
movable span, which is what everyone's
going to be which really where most of
the focus is going to be. So, the
movable span itself is a rolling lift
structure. Think of a rocking chair. It
rolls back to open and it's actually
pulled back by two hydraulic cylinders.
You can kind of see them. They're rather
small. Um on the right there, uh uh and
you can see the bridges in the closed
position on the right and then the open
position on the left. Um the main
gutters that look fairly complex.
They're actually just conventional
I-beam girdters with holes cut in them
to make them look more sophisticated.
There was a lot of decisions that we
made during the design here to keep the
bridge structure, the uh operating
equipment, the electrical system simple
so that they would be cost effective and
and easy to maintain.
Uh the deck type on the approaches is
going to be all concrete deck like what
you'd see on any type of conventional
bridge. On the movable span, we're using
FRP deck. It's a lightweight deck system
and that's meant to keep the bridge
weight very low and that has cascading
uh benefits throughout the project
keeping the span as light as possible.
Uh one of the things that uh we wanted
to make clear is that although we are
have progressed the structural
mechanical electrical designs pretty
far, we know what the bridge weighs and
how long it is and how big all the
components are. At this point, there's
still a lot of room for aesthetic
improvements. Things like lighting,
whether it be street lighting or
aesthetic lighting. Uh we're going to
show you some pictures of what is
possible with aesthetic lighting. Um
colors uh of the steel and concrete uh
the web geometry. You see that really
open design. Uh there's a lot of room
for modification on the open design. And
during the upcoming months, you will be
sharing uh with the city. um and
actually looking for feedback. What
color do you want the bridge to be? Um
do you want recommendations from us or
or do you want to just tell us what what
you'd like? And then you know um rail
type seems trivial when you're talking
about a movable span, but the experience
of the pedestrians, the first thing
they're going to see is the rails. And
so we have to make some decisions. Do we
want to use standard kind of basic rails
or there's already a rail type along the
boardwalk? we can imitate that or
there's room for more unique design. So
you have to think of this as there's a
canvas now because we know what the
bridge geometry is going to be but now
as as a community we need to paint on
this canvas.
Um so um Chase already discussed some of
the the the fact that the safety was a
major driver in the decision to
implement the bridge but there are
things that are specific to a movable
bridge in relation to safety. So there
will be pedestrian gates that prohibit
people from approaching the bridge when
it is operating. Um there's a few
devices that the operator will use in
order to control uh people using the
bridge. uh audible alarms and lights to
alert them, a public address system to
directly communicate with people who are
on the bridge that we need to get off
the bridge in order to operate it. Um
video and thermal cameras and the
thermal cameras are actually being used
so for to improve night vision and to
improve visibility in fog conditions.
Um, this and the rest of these are true
for all bridges, but I'm bringing them
up because you may not be familiar with
some of the safety features that are
natural to a mobile bridge. There's
bridge position sensing instrumentation
that tell the
uh control system what where the bridge
is. Is it fully closed? Is it open? Um,
there are channel sensors that are used
to make sure that a vessel is not in the
way when the bridge wants to be closed.
So this is a second and third indication
in addition to the visual cues uh
brought on by cameras. Um inside of the
controls of the uh bridge operating
system there are interlocks. What those
are are just gates that won't allow the
operator to move to the next step if an
unsafe condition is in place. In other
words, if the pedestrian gate has not
closed, the bridge operator cannot
retract the span lock. If the span lock
is not retracted, he cannot press the
button and operate the bridge. All this
is built in to all movable bridges. But,
you know, I'm just pointing it out uh
for the the public to understand that.
And then, of course, there are span
locks and centering devices that ensure
that the bridge stays where it belongs.
Uh let's talk about reliability.
So, uh the last thing that we want to do
is close and open the bridge with a
pickup truck. That's something that we
mentioned as a like kind of a last
straw. But before that, there's quite a
few things that have to go wrong. And
let's talk about those. So, uh, the
bridge is operated by two hydraulic
cylinders. Cylinders are operated by
hydraulic fluid. Hydraulic fluid is
moved using an HPU. It's a hydraulic
power unit. It's a device with motors
and pumps and reservoirs that move the
hydraulic fluid back and forth to make
the cylinders move. inside of the HPU on
this system, we're going to be using
directional valves. Directional valves.
And the reason this is important is that
we're actually kind of moving back a
little bit in technology.
Um, this is uh a more robust older
technology that is easier to maintain
and can and the parts can be replaced
more easily.
uh we have a twin pump motor system
meaning that there are two motors inside
of the HPU and either one of them can be
used to operate the bridge and uh the
hoses can be bypassed. If a hose fails
uh the hose system can be manually
transition to another that means that
there's a lot of internal redundancy
inside of the operating machinery. On
top of that, we have two cylinders that
operate the bridge. And we're designing
the structure so that it can operate
with one cylinder. Now, this is
obviously very useful for an emergency
situation if you have some sort of a
mechanical failure on the hydraulic
cylinders, but also if you're performing
maintenance, you can now remove a
cylinder completely, send it for
maintenance if that's needed, uh, and
operate the bridge with one hydraulic
cylinder. uh you can expect
uh that significant maintenance would be
needed uh say on the 15 to 20 years
that's the kind of the pace of
significant maintenance
I want to point out a difference between
Shabboan and 8th Street so 8th Street
has very large hydraulic cylinders that
are difficult to remove the hydraulic
cylinders on Shbboan are about a tenth
the size
uh and are obviously above the deck
which means that they can be removed by
a forklift
uh and shipping them is much easier as
well.
Um
uh we have provided the ability for uh
external generator power meaning a
portable generator can operate the
bridge in the event of a power outage.
Uh and then of course manual operation
with a winch and cable which could be uh
attached to a a truck. Uh for
maintenance we've uh developed a plan
such that uh maintenance can be
performed without any kind of equipment.
No snoopers, no cables. You open a
hatch, climb down some ladders and you
can get to all the equipment on the
span. We'll provide operating manuals
and training to the for the city staff
for the operation and maintenance
activities. And there are no complicated
drives or control cards on our in our
design. And the operation uses a vector
frequency drive. And what that means to
you is that that's an off-the-shelf
component. Many times drives on modern
systems are custommade which means they
have to be ordered sometimes 9 to 12
months in advance. That won't be the
case on this bridge.
Uh let's go on to cost. So our
construction cost estimate has the
bridge at $1.4 million. Uh when you add
on uh the construction engineering and
inspection, that's the folks that are
out there making sure the contractor is
doing his job and paying him. Uh that'
be a total of $12.8 million.
Um this cost is heavily motivated by the
steel cost. Um right now we have the
steel alone at $2.5 million. That's
using a $10 per pound estimate.
This estimate is really hard to nail
down because of the way the economy is
now and it's difficult to track uh the
unit cost of steel. And just because
it's such a big motivator, I kind of
wanted to dive in and let you let you
know. It's a we're using a very
conservative number. Uh Wisconsin's
uh average bid is $2.5 per pound. So,
and why? So, why are we quadrupling the
number? One is risk. We're building in
risk to the cost. Secondly, the $2.5 per
pound is really for straighter
conventional eye gutters. And of course,
this gutter is larger. It's curved. Um,
it's going to limit who uh what uh
fabricators are going to be have the
capability to do it. So, that's why we
had such an significant increase to this
unit cost. Uh, one strategy that we've
used to achieve low bid prices is using
a contractor pre-qualification meeting.
Um,
often times, you know, we we build these
plans, we put them out in the in the
streets and a contractor has 30 days,
sometimes 60 days to understand the
plans, absorb them, get subcontractors,
pricing, put it all together. So, it's a
lot of a lot. And we have found that
sometimes on these more complicate
complex projects that contractors will
build in their risk and you end up
paying for it. So um you know one option
is to give them more time uh in the
bidding. Uh but we have found it more
effective to have contractor pre-qualifi
okay sorry a window popped up on my
screen. Let me close it. Thanks. Uh
contractor pre-qualification meeting.
And that's actually meeting with
industry who what people that we think
are likely biders and talking to them
about the project and getting some
input, some feedback early on. We get
better bids and we also get some nice
free feedback from contractors because
they tell us what concerns they have
about our design. Um, uh, okay. Over the
next couple of slides, I'm going to be
talking about architectural staircases
and bridge lighting. And I want to point
out that our that these two features
have not yet been approved by the city,
the architectural staircase nor the uh
aesthetic bridge lighting. But we did
include the cost of them in the cost
we've given you because uh it's better
to give you a good sticker shock, not a
negative sticker shock. So, just so know
that the $530,000 that we estimate for
those items is already included and
would be removed if you didn't want
these uh aesthetic features. So,
uh so this is the idea of what the
architectural staircases what the
experience of them would be like. Uh
these are not shabboan. This is just
sort of the inspiration for them. And
the idea is to have a place for
congregation adjacent to the bridge but
not on the movable span because we don't
want people congregating on the span.
This next is a series of pictures that
would be uh uh concepts for uh bridge
aesthetic bridge lighting. Um
we are we have been speaking to uh
aesthetic lighting experts. This is like
actually like a a pretty refined
specialty. The the firms that do this
sort of bridge lighting, they'll provide
you with what the final uh aesthetic
appearance will be. And it's a bit of a
specialty. It's not We we do some of it,
but there's people that really just
that's what they're dedicated to. The
the entire firm's mission is aesthetic
lighting.
and
questions.
>> All right. Thank you for the
presentation. We don't have any item on
the agenda tonight to vote on. This was
just forformational purposes before it
gets sent to committees. But any
questions from council members?
>> Alder Prella.
>> So a couple of questions just about the
to clarify what is the vision that you
have as far as um the frequency of
opening it keeping it closed by open by
default closing at needs. Um can you
please speak to that since it is a you
know an obvious concern and question.
So,
how do I So, that's not something that
we dictate for the user. Uh, the way
that functionally this works, obviously,
it's an owner's choice. However, you are
subject to the US Coast Guard and the
direction that they provide and what
they will allow you and how they will
allow you to operate the span and that
coordination. What what the Coast Guard
will do is that they will reach out to
mariners
and solicits input from the users of the
waterway and in order to accommodate the
usage of the waterway. Um what I can the
the what I can give you is um anecdotal
information about what other users use
do um on this in in
one of the busiest areas that I know uh
for waterways is the Miami River and the
inter coastal waterway in Fort
Lauderdale including the New River. Uh
these are working rivers. They uh the
Miami River is an industrial river. It
has heavy barging. The New River is a um
recreational river, but it also is a
fabricator of recreational vessels,
large sailboats,
um yachts, things like that. those those
bridges are almost all set to open
uh on the half hour.
Uh the inter coastal waterway is set to
the hour and it's on the on the quarter.
Some half half of them are 15 to 45 and
the other ones are 30 and 1 hour. Um but
keep in mind that those uh bridges are
for um vehicular traffic. the demand is
much higher, much more insistent. Uh
you're talking about uh beachgoers
crossing to go to the beach on Labor
Day, right? Opposing this navigation
traffic. Um this bridge
could be could easily be left uh
normally open and still perform its
function. It could be um
uh I think that this is something that
both
because the users are not remote. Often
times one of the issues with uh
waterways in other areas at that your
users are not immediate. You know it
could be someone coming from hundreds of
miles away to cross the bridge. That's
not the case here. The users for your
bridge are intimately close. you are
neighbors and you presume that there'd
be a way for a compromise to be made
that would be that would be useful for
everyone.
>> Follow up older Prello.
>> Yes. Would you agree though that in
order to before proceeding even we would
need to establish what that frequency is
because if if there was any red flag
about frequency of opening and closes
>> as you said since it is established by
the user in this case by us
>> then we would need to establish if it is
you know um
used enough if it can be open enough to
justify such an investment. Right? So it
isn't that something that we would need
to understand or establish in more
details before proceeding.
>> Um it's difficult to uh quantify future
need in in facilities that don't
currently exist. If you have a bridge
that exists, it has two lanes and you
want to decide if it should have four
lanes, that analysis is pretty
straightforward. you look at your
traffic, how many users want to use it.
Um
uh so
the the need has been established on
this project as I understand it chase
due to safety. Keep in mind
unfortunately for you I am the
structural engineer not the traffic
engineer. So um the uh I don't know I
don't have an answer for you about the
uh the need
Do you have anything you want to
>> No, I think Yeah, I think that's just
something I think we'll have to have
continued, you know, talks and we talked
with Kevin. Do we do we designed for
options, right? Make sure we can handle
with loans in the open position for long
periods of time. It sounds like that
might be something we want to definitely
want to consider is to have the options
and consider that in our design plans.
>> Well, I I can answer that at least.
Sorry. Okay. So as far as the the design
of the bridge, there is uh a requirement
in the code that if a bridge remains in
the open position normally, and I want
to define that because I think there's
some misunderstanding about what what
normally means. If it's design bridge is
held in the open position normally, then
it must be designed for um
uh uh stronger wind loads. But the idea
there is that longer or left in normally
means that no one is there to close it.
You open it, you lock it and you walk
away, which means there's some risk that
someone may not be able to come back and
close it, right? So that that's
different than the bridge is open and
then closes for pedestrian traffic.
That's not normally open. Normally open
means there's nobody there to close it.
So then you have to uh and we've already
tal talked about the the configuration
of this bridge would make leaving it
open fairly straightforward. There's we
would have to add a locking device in
the open position so that it would be it
wouldn't be the machinery holding it
open. It would be actually a lock and we
there's a pretty straightforward way to
do it. It wouldn't add very much cost.
Um but again um
the the the
need is not the need for from a traffic
perspective is not something that we've
investigated.
>> Thank you,
>> Alder Decker.
>> Okay. Thank you, Mayor. Um yes, I a
couple quick questions. Um first of all,
I just want to confirm that this uh this
bridge in the closed position will have
the same clearance as the A Street
bridge.
>> That's correct.
>> Okay. And then the other question I have
is is there any um bridges similarly in
in Wisconsin or in a nearby state that
that are that similar design that we can
kind of compare to it all we can look at
uh that's been built recently and and
and and see how it's working. Uh, no.
This is a a very unique structure
primarily because it's a pedestrian
bridge, movable bridge, and that's a
fairly new um they they've come into
vogue recently. A movable bridge,
pedestrian bridges as movable bridge is
not a something that a standalone
movable bridge is not very common. Uh,
in my career, I've only worked on two
mov pedestrian bridges. And that's not
because I haven't. It's just because the
industry has not provided that
opportunity. Um,
that is not to say that this bridge type
is altogether that innovative. This is I
think the simplest design I've ever
worked on. It's been great. I uh the
it's a very straightforward bridge. Um
the design is simple. The machinery
design is simple. Um there's nothing
about this structure that is um unusual.
Honestly, we've been able to put
together a design that looks very
unique, but from an engineering concept
perspective, it is not.
>> Okay. Any followup, older Decker?
>> Thank you, Alder Graine.
>> Uh thank you for your presentation. I
was just wondering would we have any
idea approximately of how long it would
take for the closing and opening of the
bridge to be done?
>> Yeah. So, uh the actual operation is,
you know, honestly off top of my head, I
can't remember. It's typically around 70
seconds. I think we held it at 70
seconds for actual operating time. Now,
what usually takes longer are the boats
clearing.
That's usually so a typical operation
would be on the order of uh 5 or 10
minutes and that is made up of
uh clearing the span, closing the gates,
disengaging the locks, operating the
bridge. That's a very short period of
time. Usually people focus on that, but
that's not what takes a lot of time.
Allowing the vessel to pass and then
reversing everything. So the time
sequence is the pe the the users moving
around not the bridge operation itself.
>> Follow up. Um you said that the this
bridge is a little bit unique. There's
not a lot of them but like other
standard uh raising bridges and things
like that. Um, is there anything out
there that tells us whether like a
schedule plan or um, you know, having
set times for it would be better than
like on call?
>> I
it's it's it's very very specific to the
to the situation. I would say my my
advice to you would be to start on call
because that provides everyone with the
most flexibility and then listen to each
other and if there's an issue the the
these things this it can be easily
changed the schedule especially if you
make it on call then it really becomes
up to you what you do and the Coast
Guard is not involved. If you set a
schedule with the Coast Guard of certain
times, you're stuck with that. Whatever
agreements you make with the Coast
Guard, you're stuck with those
agreements. But if you keep it, you
know, in the family, then you can make
the adjustments yourself.
>> Alder Ber,
>> thank you, Mayor. Um, so I'm just
thinking a little longer term here. Um,
so you mentioned that we could expect
maintenance in approximately 15 to 20
years. Mh.
>> Um, could you give a couple examples of
maintenance that we could expect and
what would those costs be associated
with those?
>> Okay. So,
routine maintenance is uh greasing or or
lubricating the hydraulic cylinder.
There are lubrication points that are
that are
uh attached to the bridge. Basically,
this means once or twice a week sending
maintenance crews out there for about an
hour to lubricate the the cylinder. If
you do this well, you will greatly
lengthen the uh usable life of your
hydraulic cylinders.
Um, typical maintenance on a on a
hydraulic cylinder uh that has been
well-maintained is replacing gaskets and
seals.
Um
this work can be done in the field. Uh
often times it's it's uh uh more cost
effective to remove the cylinder and
take it to some place to be uh to for
that to be done. um the the cylinders
on if you you cannot use 8 Street as an
example a comparison because it's a
completely different scale structure
internally. The cylinders on Shbboan are
going to be a tenth of the size of the
of the cylinders on uh H Street. and you
you don't have the same difficulties of
removing them uh because of their size,
because of the fact that those are
inside of a pier.
As far as cost goes, I hesitate to give
you uh exact cost cuz it depends on the
variability, but I I I can give you a
large range. Uh, I would say
somewhere between $15,000 and $100,000
for a foot per cylinder every 15 to 20
years.
>> Any followup, holder?
>> Um, so thank Yes. Just one. So,
hypothetically, if we were to have to
remove if you were to have to remove one
of the cylinders, which I think you said
may happen, if that was the case, the
bridge would then be inoperable for
>> No. No,
>> because you would do one cylinder at a
time.
>> Okay.
>> So that you can continue to operate the
bridge with one cylinder and then you
remove one bridge one one cylinder ship
it to if if you if it turned out to be
more cost effective to do the repair.
Now mind you, even if you were doing the
the gasket repair on site while that was
going on, that cylinder would be
inoperable. So, in this case, because
you have another cylinder that can
operate it, it's probably better to just
remove it, take it to a shop, get the
get rehabilitate the cylinder, and bring
it back.
>> Okay. Thank you,
>> Alder Kelly.
>> Hi. Um, so I've got two questions if
that's okay. So, the my first question
is, um, how much can this design change?
I just have a concern over if we're
investing this money to make the
pedestrian experience in this area
better. It seems like there's a couple
elements like that. Um one section on
the the east side of the river where you
had said that people would have to walk
around the the structure. I I worry that
that would be an annoyance to people
walking compared to what exists now. Um
whereas on the opposite side, it sounded
like there was going to be room to still
walk under there. I think that sounds
good. So, I'm just a little worried if
we're going to make the pedestrian
experience for regular boardwalk users
or regular um people that walk along
that river might be a degraded
experience.
>> Yeah, I think thank you. Um and I think
right now we're still in the NEPA
environmental phase, right? So, we
haven't officially signed off on the
preferred alternative. Um, so you know,
I think there is still flexibility if we
did want to incorporate some changes in
design. I'd say right now, you know, I
think we've we've tried to balance, you
know, what we're our goal here with with
meeting, you know, matching the eighth
street clearances um without excessively
exceeding them just because of the cost
that we've seen, you know, and as soon
as we, you know, if we make it so that
there's an underpass on that side, there
is a little area you'd have to walk
around. It's I had it measured and I
forgot what it was. It wasn't I remember
thinking it's pretty minimal. Um it is a
little bit that you'd have to walk
around there. Um but if we were to raise
it up right to get the clearance, I
think we'd be talking oh I want to say
another at least 5 ft of height at that
location which is obviously going to you
know add the cost considerably. Um so we
we had looked at some different
clearances and vertical clearances and I
think you know soon if you I want to say
if you go an extra 10 ft you're looking
at an extra million dollars. So, it's
it's kind of balancing that at what's
important, but I think there still is an
opportunity if that was a strong thing
that consensus to look at some of that.
I think we could still incorporate some
changes if that was desired.
>> Another um another point here, we talked
about this a lot by the way because we
really wanted to maintain the continuity
on both sides.
The problem is, especially on the east
side, there's a price to pay and
touchdown point. So if we raise up that
side 5T to get underneath, you end up
extending
uh 500 ft
uh out to so you end up in in the middle
of the street. Right now for you know
ADA the path is longer but not
significant longer. And for for people
who can climb stairs you're really just
deviating
to I don't have a mouse. You know see
the brown stairs right there. you can
just you can walk up and down those
stairs and get across. So, it's a fairly
small deviation.
>> And then um
>> second one.
>> Yeah, my followup is um I with the
pedestrian detour um it looked like it
was a fairly significant detour on the
side with um the restaurants like Parker
John's. Is the whole boardwalk coming
out during this construction or is it
just a more limited thing and the the
detour was just where the next
pedestrian access was to the boardwalk?
So on this side we can go under, right?
>> Yeah. So on this side, if you look at
the the brown area was is that's the
area really that we're looking to
reconstruct. So that that larger square
area, there's an existing ADA ramp there
that we would plan to remove. And that
we have two ADA ramps, one on the north
side and one on the south side to
replace it. So that's really about as
much uh boardwalk re reconstruction as
we'd anticipate. Um, so it's uh the
reason it extends to the north uh as you
go underneath the blue structure is
because we had to lower it. We had to
remove those stairs there to get the
clearance we need for for uh people to
walk underneath. And so in order to get
that clearance, we had to lower that
section and ramp it up at an ADA uh
maximum ramp uh that's allowable. Uh, so
it's it's it's fairly minimal I think
for for the boardwalk reconstruction,
but yeah, in terms of the detour route
itself, it extends a lot further out
just because trying to find an ADA
accessible trail, right? You could have
a soft closure there and then you could
have a hard closure once you get closer
up here that's just like, okay, please,
you can't go into this construction
zone.
>> Alder Pors,
>> thank you, Mr. Mayor. Um, so you're
starting to touch on the topic that I
wanted to um ask you about, which is ADA
accessibility. Um I noted that in the
drawings one side shows a ramp um
indicated in red, the other side does
not. So is the other side at uh bridge
level and there is no need for it.
>> Yeah. And I have to admit that drawing
has since been updated. At one point we
thought we weren't going to be able to
get that ramp under uh 5%. We since have
have have corrected that. So there will
be two ramps on that side. Um I think
the one that's existing is pretty close
to where the red is right now. And then
the other one that we would plan to add
is next directly adjacent to Parker
John's. We'd eliminate those stairs. I
think there's three stairs. So we would
plan to have two ramps that are ADA
accessible on that side.
>> But on this side there is no need for
the ramp
>> and then sorry on the east side.
>> The east side I think yeah and the whole
bridge itself right is is ADA obviously
with with the slopes that we have. But
um yeah, the ADA so I think you know the
bridge approach you can see where the
structure ends there is the blue and
then there's a little bit of bridge
approach. I don't know if it's about 50
ft. Um so that's kind of the the path uh
that that someone in a wheelchair would
take.
>> That's right. Around that there's no
need for uh any ramps.
So, um, and to Alder Kelly's point, uh,
if the boardwalk does not pass under the
bridge on that side, it is more of a,
um, it is more prohibitive for somebody
in a wheelchair to get around that and
continue on the boardwalk. That is a
further distance for them. Um, they
wouldn't easily be able to cross over
that then at that point in time.
Correct.
>> Uh, you they cannot cross the blue,
>> right?
>> That's correct.
>> Okay. Thank you, Mr. Mayor.
>> Alder Pr.
>> Thank you. I have just one quick
question if I can. Yeah. Um, how noisy
is the the bridge to operate when it
opens and closes? Does it generate a
noise?
>> It's not noisy at all.
>> It would be difficult to hear actually
this. So, you get more noise on uh
electrical gear machinery uh or even
machineries with trunions sometimes get
popping. But a rolling lift like this
with hydraulic cylinder, it would be the
only noise I can imagine is if you
started to get like whistling sounds
from the HPU. That's a failure. That's
not a normal that that would be
indication of some maintenance needed.
>> Perfect. Thank you.
>> Thank you, gentlemen. Appreciate it.
More to come. All right. Next item on
the the agenda is mayor's announcements.
Uh for the sake of the meeting today, we
do have other pressing matters. So, I
will uh skip my announcements for this
evening. Next, we'll jump into the items
on the consent agenda, items 11 through
24. Alder Boris,
>> I move to accept and file all reports
and adopt all resolutions.
>> Second.
>> Moved and seconded. Under discussion,
Alder Boris.
>> Thank you, Mr. Mayor. Um, I would like
to uh ask a few questions if I could
specific to the items on the agenda
related to the MRO's. There are several.
Um item 18, 19, 21, 22,
23.
I think I got all of them. Um but I had
a few questions if I could. Um, first,
uh, Director Zinert, um, planning, could
you talk to some of the questions that
have been asked, um, outside of council
in, um, emails to alders and things of
that nature regarding changes to the
processes that govern the development
agreements and the MRO's in general.
Could you speak to those changes, what
they are, and why they exist at this
point in time?
>> Yes, absolutely. uh the city is is
always looking at ways that we can
refine our processes and things of that
nature to make to make them more
efficient. With that being said, uh the
city had looked at the development
agreement that holds that holds the
developer and the council to the
development specifically the MRO
payment, the municipal re revenue
obligation payment. Uh with that being
said, we felt that the development
agreement could be tweaked and changed
just to make sure that it's most
efficient. With that being said, the
resolution language has been changed to
make sure that once the development
agreement is passed, the the resolution
mirrors that to make sure that it does
not have to re return back to council
specifically for that MRO payment. So
the the ch the change was to make it
more efficient.
>> Thank you. And and to follow up on that,
um there's also a change to uh or there
has been a change not specific to these
items necessarily, but with the
commencement um as well. Correct. That's
something that's been added so that
consistently going forward commencement
of a project is now more clearly defined
than it would have been in the past. Is
that accurate?
>> That is. Yes. The city did not have a
formal process when it came to the
commencement notice. Staff had
identified that as a area that we could
improve. With that being said, that
process is is now more formalized.
>> Thank you. Two more questions, Mr.
Mayor, please. Um, so, Administrator
Bradley, um, regarding the MRO, and
again to address, you know, concerns
that have come up from constituents, um,
is MRO a debt? That would be my first
first part of my question. And secondly,
um what checks and balances exist in
order to ensure that MRO is managed
appropriately once they have been
approved by council?
>> Yes. Uh so MRO as uh director Ziner
pointed out is is called a municipal
revenue obligation. It is not a debt. It
is not a liability to the city. It's
simply an agreement that says we will
return a portion of revenue if the
revenue does not occur. that is spelled
out in the development agreement. Uh
essentially if if worst case scenario uh
the value fell um or expenses the
priority payments which means the city
expenses exceed um the available MRO
then nothing would be paid to the
developer. So at no point does it become
an obligation to the citizens that it
would be something that we would have to
levy for to make up any shortfall or um
any expense related to the MRO. Um now
as far as the checks and balance um what
is actually being issued by
uh the finance director is essentially a
payment an estimated payment schedule um
at the start of the project. Um the way
an MRO works over the life is that that
payment is readjusted each and every
year before a payment is ever made. So
um as we know council sets the levies
every year as a part of that process
that changes the MRO. The value of a
project changes over the life of its
project. So um in you know some of our
rehabilitation TIDs are a 27year TID. So
there's 27 recalculations of that mero
schedule. So what is being issued by the
finance director is essentially an
estimate of what will be paid over that
27-year period. And then every year as a
part of the budget process, the council
approves a TID budget for each and every
TID that includes what's been
calculated. Um and that would be an
opportunity for council to review the 27
different payments that are made over
the life of that that specific MRO. when
that TID uh likewise there is an annual
report that is submitted to the joint
review board where they review it. We
just entered into an agreement with
Ellers and Associates. So a uh more
in-depth report will be given to the
joint review board and council. So um
throughout this entire process obviously
it goes to committee of the whole it
goes to the um the various subcommittees
and then ultimately all of council and
then it will also go to the joint review
board annually. So this will be reviewed
multiple times for each and every
payment. The MRO that's being issued is
not a payment. It's an estimated
schedule that's outlaid in the
development agreement.
>> Okay. Thank you. And then one final
question, Mr. Mayor. um
for um our finance director for uh
director um Krueger, could you um just
explain
the what what administrator Bradley
already described to us, but could you
explain the process that you go through
on an annual basis um for budget and how
council is responsible for approving the
MRO on an annual basis?
>> Sure.
>> Bear with me. I'm I've lost my voice
over this weekend. um happy to explain.
So every year the council adopts the
levy amount um for the general fund and
all the other operating um of and
capital debt funds. That amount is
determined um and then placed um against
the expected value or guaranteed value
that's supposed to be having occurred um
in those projects. So the TID um has its
every TID has its own fund um and that
comes forward in the large packet that
you can get see online every year um for
each um payment. It's underneath the
developer incentives line items. So
those are called out in the budget
annually. I also would like to mention
that the payments and before finance
issues those checks to any developer, we
actually go through a review process to
make sure that the taxes were paid as
they should be and are required to be
paid by the developers annually. So we
check that, make sure the value is still
consistent with what has been required
by the development agreement and then
calculate based on those items and
checks. Uh that's when we finally issue
the payments. So we do a couple
different variations of those
calculations. We do our first estimated
um which is included in budget and we
finalize those typically in September or
October based on the development
agreement requirement for payment. Thank
you for that. Um and then it's my
understanding that going forward with
future development agreements, we will
see the um anticipated MRO schedule
included in the developer agreement. um
and understanding that on a
year-over-year basis with um
levy amounts with the uh varying
yeartoear etc with the taxes collected
etc. Those will change in terms of what
is approved but the estimated amounts
for the schedule over the 27-year period
will initially be included in the
development agreement. Is that correct?
Yes, that is correct. The plan moving
forward isn't to conclude a draft of
that expected schedule right away in the
development agreement so that there
isn't any question on what that MRO
looks like um ahead of council's
approval.
>> Perfect. Thank you very much. Thank you,
Morer.
>> Any other further discussion on any of
the items on the consent agenda? Seeing
none, this is a roll call vote.
10 eyes.
>> All right, those items are approved.
Next under resolutions, item 25,
resolution number 992627
by Alders Decker, amending the updated
city of Shboan business revolving loan
fund program manual. Alder Decker.
>> Thank you, mayor. I ask to suspend the
rules. Any objection to suspending the
rules?
Hearing none, please proceed with your
motion.
>> I move to adopt the resolution.
>> Second.
>> Moved and seconded. Under discussion,
Alder Bors.
>> Um, could we just have an explanation of
why we are suspending the rules on this
item?
>> City administrator.
>> Yes. Um, so couple different things
here. So, we've been bringing this up uh
multiple times, I think, over the last
couple years. Uh we've been working on
trying to uh make changes to the
revolving loan program. Um my entire
tenure, I believe, uh finance director
Krueger actually started this about four
years ago. Um so, this has been an
ongoing effort to update all of our CDBG
programs. Um we've been working
extensively with HUD uh through this
process. they actually brought in
technical assistance to help us through
this um just to uh make program changes
um to make sure that we're fully in
compliance and we're following best
practices. So um this has been a very
long process of auditing almost every
single loan that has been made um in all
the various programs. So um as a part of
that we've been working with RDA.
Obviously the RDA is a significant
portion of the business loan side of
this. So um in working with HUD uh they
made it very clear on the expectations
of what they want to see um going
forward out of our program and um RDA I
think we spent the last two meetings um
going through the manual um and we've
been talking about it for quite some
time. So, um, essentially what HUD said
was they wanted to see us get this
adopted this month. So, that's why we're
at the suspend and adopt, but this has
been something 3 to four years in the
making of getting to this point. Uh, and
the RDA chair is here as well. Uh, since
this originated in your committee, Chair
Flicky Pinesky, additional comments that
you'd like to add?
I'd just like to second how long we've
been working.
>> Please introduce yourself.
>> I am Robera Felicki Pineski. I am chair
of the redevelopment authority
and thank you for that commentary. And I
also want to thank city staff because
there has been hours of input with this
as well as my colleagues on the
redevelopment authority because they
have been very diligent and very patient
as we have worked with HUD that have
attended our meetings recently. Um the
revolving loan fund is about a $3.5
million
pocket. Uh right now we have just under
$2.5 million on the street with about a
dozen businesses in the city of Shabboan
and we have an additional 1.2 million or
so that is yet available. So I would
look at the alders and say it's
available for your constituents if they
want to create new jobs in the city and
if they want to deploy capital
improvements with anything in the
designated area in the city in need of
redevelopment. So there's there's just
under $1.5 million worth waiting to get
onto the streets. And if you know of
anybody that does that, I know two
people sitting over there who would be
happy to discuss it with you. So
continue and thank you very much.
Appreciate the time.
>> Thank you, city administrator.
Um just on the the functional side of
what what's really changing here the the
biggest overall change there's um some
setting of various parameters there's uh
kind of a window of 1 to 4% for loans uh
the current practice on on the business
loan was prime plus
plus one yes um so that that's a
significant change but ultimately
what'll happen is RDA will now make a
direct referral for a recommendation
ation of approval of a a loan
application and that'll come directly to
council. So the final vote um in this
process will be by council and not just
from from the RDA committee and that was
that was a direct requirement of HUD. Um
so that's ultimately why we're here.
What you'll see is there's a very
well-defined process, a very well-
definfined manual. Um, but ultimately
we're we're doing this with all of the
HUD programs and working our way through
that. And I just wanted to say uh thank
you to the finance director Krueger for
all of her work. Um, this is, as I said,
um, it's been a lot of hours with the
RDA. Um, but it's been hundreds of
hours, um, on the other loan programs. I
think we went back to the 1990s.
Um, and we're going through uh deeds
that were put on properties and things
like that. So, um, there's been a lot of
staff uh, in the finance department. I
believe uh, we had some some title
companies that got involved to help out
with this process. So, um, a lot of work
has went into that and um, director
Ziner and her staff and all the work
that they've done on the policy and
procedure side. It's been extensive. Uh
this has been a a really big project
that's involved a lot of folks. Um even
at the HUD office, they've brought in
multiple resources to help guide us
through this process and um develop best
practices. So um great working effort by
all of our staff. Elder Prello,
>> I just have a question about the CDBG
program. So will all the projects that
historically
had been um
to which had u funds from the CDBG
program were uh deployed
where all those are going to go through
the RDA now or is there a different um
section of the money for the C of the
CDBG program that is allotted and
decided outside of RDA.
>> Finance director.
>> Sure. We are going to make um be
bringing forward loans both um from RDA
on the business side and then finance
and personnel will soon be seeing the
home loans that for rehabilitation that
homeowners can uh apply for. Finance and
personnel will see those loans coming
through. So they will be final approval
at common council moving forward for
anything with the loan program. When it
is related to activities within the
consolidated plan or the annual action
plan, those are items that are typically
budgeted for or brought through with
budget amendments and contracts and the
common council would adopt those at
those times.
>> May I have a followup?
>> Yes,
>> a quick followup. So just to clarify a
nonprofit that historic that operates in
in this industry and that historically
had CDBG funds who is going to decide
again about that.
That process will not change. Currently
those come forward every year with a
recommendation from a staff committee or
a committee um that can kind of get
introduced to those uh nonprofits and
based on the consolidated plan which
gives us the let's say leading um factor
or initiatives that the city has focused
on for example current is the unhoused
population is what our consolidated plan
is focused on currently. So those come
forward annually for approval through
the annual action process. So that will
still go to finance and personnel and
the common council.
>> Thank you.
>> Thank you. All right. Seeing no more
discussion, this is a roll call vote.
>> 10 eyes.
>> Thank you. Those that is approved. Next
is a contemplated close session. And
just before we make the motion, just for
the viewers uh and for the public, we're
going to be convening into close session
to confer with legal counsel uh and
discuss possible investment of public
funds regarding the flock contract. Uh
we'll be coming back in open session for
discussion and uh some comments from the
the police chief.
>> Yep. Alder Boris,
>> I move to convene in close session under
the exemption contained in Wisconsin
statute S 19.8518. 851A for the purpose
of deliberation concerning the
non-renewal of beverage operators
license number 5255 for David Penny
and under the exemption contained in
Wisconsin statute S19.851G
for the purpose of discussion related to
a possible investment of public funds to
wit the city of Shbboan's contract with
flock safety.
>> Second.
>> Thank you moved and second. This is a
roll call vote.
This is a roll call vote.
>> 10 eyes.
>> Right. We'll adjourn in open session and
we'll convene in close session and we
will reconvene into open session once
close session is concluded.
All right, it's 8 o'clock. We'll
>> Yeah, no worries. Okay. Oh, all right.
Alder Boris,
>> I move to reconvene in open session.
>> Second.
>> Moved and seconded. Will the clerk call
the role?
>> Get it up.
>> What's ever easier?
>> Just call it. Yeah.
>> Sorry.
>> Alder person Boris.
Yay.
>> Alder person Bzer.
>> Here.
>> Alder person Close.
>> Yay.
>> Alder person Decker.
>> Yay.
>> Alder person Graine.
>> Yeah.
>> Alder person Heidman.
>> Alder person Kelly.
>> Alder person Mensor.
>> Alder person Mitchell.
>> Alder personel.
>> All right. We are back in open session.
Item 28. Report 252627 by the licensing
hearing and public safety committee
submitting findings of facts and
conclusions of law based upon testimony
and exhibits presented by a quasi
judicial hearing held on August 24th
2026 regarding beverage operating
license number 5255. Alder Boris
>> I move to accept and file report to
non-renew license number 5255
>> moved and seconded. Further discussion
on this matter.
Seeing none, this is a roll call vote.
>> Alder person Boris
>> I.
>> Alder person Bzer.
>> Hi.
>> Alder person Close.
>> Hi.
>> Alder person Decker.
>> Hi.
>> Alder person Grain.
>> Hi.
>> Alder person Heidman.
>> Hi.
>> Alder person Kelly.
>> Hi.
>> Alder person Mensor.
>> Hi.
>> Alder person Mitchell.
>> Hi.
>> Alder personel.
>> Hi.
>> 10 eyes.
>> All right. That is approved. Next item
29, resolution number 100 2627 by elders
Boris and Heidman directing city staff
to terminate the city's agreement with
Flock Group Inc. DBA Flock Safety and to
not appropriate funds for the 2027
budget for flock safety services. Alder
Boris,
>> I ask to suspend the rules.
>> Any objection to suspending the rules?
>> Hearing none, please proceed with your
motion.
>> I move to adopt the resolution.
>> Moved and seconded. All right, I'll call
on the chief of police to tee us up on
this one. Chief,
>> thank you, Mayor. I I wanted to give a
little bit of background uh about the
history of how we got here with the use
of license plate reader technology. Also
to talk about how we use it, um what our
policy is and uh uh just some of the um
uh basically circumstances that led to
the um to the breach uh what we believe
is a breach of the uh master services
agreement.
Uh so first of all um automated license
plate reader technology is not new
technology. Uh it's been around for a
long time. We have had uh since about
2014
um at least one uh Alper unit. So Alper
is the abbreviation for automated
license plate reader. Um, we had that on
a on one of our squads as a mobile unit
and uh there was a cooperative agreement
with many agencies in southeast
Wisconsin where data was hosted by the
Greenfield Police Department and it
allowed access for other agencies to
read uh plate reads across uh the
participating agencies.
uh the Alper system previously and I
just want to clarify um just like what
Flock uses today, it only captures still
images of a vehicle and its plate uh
when it was picked up by the camera that
it drove past, which provides a date and
time stamp and location that could later
be searched. uh Flock platform has
expanded on those capabilities and
allowed uh vehicles to be searched by
des other descriptors beyond just the
license plate as you heard earlier and
uh became more broadly used in the early
2020s by police agencies and private
businesses, gated communities, etc. Um
it actually started as a as a uh um a
system for gated communities to allow um
automated access uh to vehicles for
residents there um without having to
swipe a card. Uh the goal was uh for
information to more easily be shared
across jurisdictional boundaries because
as you know crime doesn't necessarily
respect our jurisdictional boundaries
and we have cases that that lead outside
of our jurisdiction and come here from
outside our jurisdiction. Uh, in fact,
uh, just so you're aware, the first
flock cameras that we were aware of in
the city of Shboen were actually at the
Aurora Medical Center campus. I don't
believe that they still have those
cameras there.
So, in 2023, the state of Wisconsin
offered grants to all law enforcement
agency agencies to help, uh, support
equipment, training, uh, and officer
wellness. Uh the Shbboen Police
Department used that grant for a couple
of things, but in part we used it to pay
for the first two years of service with
Flock, which this council approved in
December of 2023.
When we established the partnership with
Flock, we trained our entire department
on on our policy with the use of Alpers
uh with the firm message that anyone who
abused the system simply wouldn't work
at the Shabboan Police Department
anymore. After their installation in
early 2024, the cameras have been
instrumental in countless
investigations, including to help
identify suspect vehicles and serious
violent crimes, recovering stolen
vehicles and other property, assisting
in hit-and-run crashes, and even helping
to locate vehicles associated with
missing persons or missing endangered
persons. I should point out there are
many times when the use of an Alper
system does not result in any
investigative leads at all. And the vast
majority of the cases where we do get
leads are uh involve vehicles and plate
captures from our own network of cameras
in Shabboan.
However, the ability to share data with
other police agencies has al also often
been helpful when suspects leave our
jurisdiction. This includes the homicide
that took place in January where two
Milwaukee men came here and shot a
Shboan resident. Uh we had over the
summer a serious domestic violence
assault that involved two people passing
through our community who were later
located in Green Bay. Uh and they were
identified uh really with the assistance
of flock cameras and and probably would
not have been identified without that.
Uh there was a significant industrial
burglary this spring um where the
vehicle was observed leaving um uh in
Ozaki County with uh the stolen items as
it was southbound on I43. Uh we had a
silver silver alert. Uh so this is a a
system where jurisdictions are notified
when there's an at risk um older adult
who has uh maybe gone for a long drive
and and gotten lost. Um we had one of
those earlier this summer that was uh
that came into Shabboan and was uh we
were alerted of that person here uh
because their vehicle drove past one of
our flock cameras. These are just a few
examples of many cases that have been
solved at least in part with information
from the cameras.
I also want to emphasize how our policy
requires that we use license plate
reader information. They're used to
generate investigative leads. That's
all. Any law enforcement action must be
supported by corroborating information,
not solely based on plate reads from the
Alper cameras. Our policy specifically
prohibits acting solely on Alper alerts
that cannot be verified by other means.
It also requires that only trained and
authorized department members may use
it. And just like any other system we
access in the course of our duties, and
there are many that uh provide us access
to sensitive personal information, it
may only be used for official law
enforcement purposes. Officers using the
system must provide a case number and
the nature of the investigation as part
of their search record. We've been using
Flock's auditing tool for several
months. In fact, we were in the group of
departments that beta tested their
auditing system, which helps to flag
potentially suspicious searches, such as
multiple searches for the same plate or
searches outside the 30-day retention
period. Each of those searches is
required to be reviewed by a supervisor
to determine compliance with our policy.
And let me be clear, we have never
discovered an unauthorized use of the
Albert system by any of our personnel.
As a result of the training and internal
accountability we have in place, there
are no instances of abuse of the
technology here within our department.
We recognize that Flock license plate
reader system is a powerful
investigative tool that creates privacy
concerns, especially when the
information collected is used
inappropriately. And unfortunately, you
don't have to look very far uh for
examples of where that's taken place.
Ultimately, in a free society, we can
only police in ways that are tolerated
by our community. And we've worked very
hard over the years to earn the trust of
the Shabboan community by treating
everyone with dignity, respecting
individual constitutional rights, and
building relationships in our
neighborhood so that we can solve crime
and quality of life problems together.
This is why we believe data security and
accountability are critical to community
trust for any system we use that can
contain records of sensitive personal
information.
And in Flock's master services
agreement, which is attached to the
agenda, uh they highlighted the
statements that Flock does not own and
shall not sell either customer data or
anonymized data. It's also why we
adhered to a 30-day retention policy for
Alpert data as a means of balancing the
interest in identifying vehicles
involved in contemporaneous crimes and
other incidents against the legitimate
privacy concern if records were
maintained for an extended period of
time.
In late July, as part of a cav casual
conversation between the captain of our
patrol division and the city engineer,
we learned that the department of public
works received an email in March from
our flock sales rep offering to provide
traffic counts, vehicle types, and
speeds uh collected by our existing
cameras for use by the engineering
department to analyze road usage as an
alternative to the rubber hose pressure
switches that we've all driven across.
Uh the email indicated that Flock could
provide 5 years worth of data updated
every 30 minutes. This was the first
that we were made aware in late July of
Flock's attempt to sell data from our
cameras outside of our agreement. I
spoke to our Flock rep at a conference
on about August 8th uh confirming that
he sent the email and that they were
offering anonymized data collected by
our existing camera infrastructure.
Since then, they provided additional uh
information explaining the discre
discrepancy regarding the retention
period.
While the master services agreement
allows Flock to collect anonymized data
like that described in the email for
development, diagnostic, and corrective
purposes, the agreement again indicates
that Flock does not own and shall not
sell this data. Given the existing
concerns about data integrity and
privacy with such a powerful tool and
the apparent conduct by Flock that is
inconsistent with security and ownership
rights and obligations under the
agreement. We believe it is in the best
interest of the city and particularly
the trusting relationship between our
police department and community to
discontinue uh use of flock services
immediately.
I want to reiterate that we firmly
believe that responsible police use of
even emerging technologies is an
important part of providing public
safety and that discontinuing the use of
flock cameras or any other alper system
will limit our ability to solve crime
and provide justice for victims. In
short, I believe overall our community
is less safe if police do not have
access to such technologies.
But that access has to be consistent
with our community's expectations and in
a way that builds trust and legitimacy.
That means that we have to rely on our
technology partners to behave in ways
that support community trust as well. We
have made no decisions about replacing
flock technology and it is our intent to
consider alternatives with the input of
the community's elected representatives
just as we had discussed and addressed
many community concerns uh with many of
you alders already. uh uh concerns that
have come to us directly or been
filtered through you as their
representatives and that's consistent
with our collaborative and responsive
approach to public safety. My hope is
that we continue to cultivate the
positive partnership that we have with
our community while using available
resources including technology like this
to provide justice and protection to
victims and to maintain safe, vibrant
and welcoming uh the safe, vibrant and
welcoming characteristics of our
community. We look forward to working
with the council toward our goal of
making Shabuan the safest city of its
size in the country. Thank you.
>> Thank you, police chief Boris.
>> Thank you, Mr. Mayor. Um, I just wanted
to say thank you for that thorough
review. Um, Chief Zimple, I think that
the history of the use of this
technology in the community is important
for everybody to understand. I think the
appropriate use of the technology by the
department is also very important for
people to understand. um and the
concerns in terms of the you know MSA
potential violation of trust if you will
with flock being the um ultimate um
guiding factor for you know the genesis
of this decision. So thank you for
sharing all of that with us tonight.
>> Alder Close.
>> Thank you. And I also want to thank you
very much for your commitment and the
attention to detail looking into and
scrutinizing contracts. As we know, the
city operates with a large number of
different vendors and being able to
scrutinize those vendors can often be
very difficult. So, when those uh issues
are brought forward and we're actually
uh seeing the action take place and the
city administrator and the police chief
are taking action and looking through
these different contracts and making
sure they're consistent with the
expectations of how the city operates.
It's really good to see and I do believe
that it goes a long way to building that
relationship with the city like you
mentioned earlier. Thank you.
>> Thank you, Alder Close. Any other
discussion on this item? Alder Prola?
>> Um, it is not directly related, but if
you could mention please, you mentioned
before that you intend to there is no
plan to replace Flock and that you
intend to um
uh gather more feedback from the
community. What is that you have in
mind? If you can briefly uh speak to
that.
Do you mean what we have in mind about
the process of vetting it or uh
>> that's correct.
>> Um so
one of the concerns that has come up
with this type of technology is its
impact on uh minority communities. I I
think it's reasonable for us to consider
how to involve their input in uh in
vetting uh technology and and uh in also
getting input in our policy and and how
we use it. Um it's certainly something
that uh policy review is something that
we've discussed with the uh police and
fire commission as well um in their
oversight role. While they're not an
optional powers board, I certainly think
that they uh act as representatives of
the community as well. Uh and also we
have the licensing hearing and public
safety committee uh to uh to have those
discussions uh publicly as well.
>> All right. Any other discussion?
All right. Seeing no more, this is a
roll call vote.
>> 10 eyes.
>> All right, that is approved unanimously.
All right, we've exhausted our agenda
for this evening. Alder Boris, what is
your pleasure?
>> I move to adjurnn.
>> Second.
>> Moved and seconded. All those in favor
of adjourning, state I.
>> I.
>> We'rejourned at 8:16. Good night,
everybody.
>> What's that?
>> Yeah.