Submind YouTube summaries
Thumbnail for Council 2026 08 17

Council 2026 08 17

Watch on YouTube

Video summary

At the tenth regular common council meeting held on August 17, 2026, the assembly convened with all ten aldermen present to approve the minutes from the previous session and process several administrative changes. The council accepted the resignations of City Attorney Tomomi Kanamaru, effective August 23, and Bob Rank from the Housing Authority Board, effective immediately, while deferring appointments to both the Housing Authority Board and the Mayor's International Committee. A significant portion of the meeting was dedicated to reviewing a comprehensive schematic design plan for the Harbor Center Marina in Suben, presented by Edgewater Resources. This proposal aims to revitalize the waterfront into a public park featuring an integrated marina, addressing critical issues such as aging docks damaged by ice and wind circulation. The new design introduces "Christmas tree" slip configurations that increase total slips from 248 to 320, accommodating larger boats without displacing current users, while also replacing a proposed private pool with a public splash pad and constructing a sustainable services building with green roofs and shared spaces for first responders. The Public Safety Complex update revealed that the project is approximately 60% complete in the design development phase, maintaining its original layout at 23rd Street with no relocation plans. The complex will house five distinct facilities, including Station 3, a support building, a fire training tower, a firing range, and an expansion for the police department's fleet and evidence storage. Station 3 is designed to feature durable, homey interiors with administrative functions on the first floor and living quarters above, while the support base includes pre-cast apparatus bays and a five-story live-fire training tower. Additionally, the primary response bay for Station 2 has been relocated from Meade Street to 18th Street in response to community concerns, though its functional layout remains similar to Station 3. The team targets releasing bidding documents in January with a goal of breaking ground in April or May, utilizing existing capital plan funds to cover costs for vehicle exhaust systems, security, and alerting networks across all five stations. Following the design reviews, the council addressed public input regarding the waterfront marina master plan before approving several financial resolutions related to clean water fund loans. Four community members voiced their opinions during a public forum: Michael Brunette criticized the city for allowing the area to become blighted and argued the plan failed to address safety needs; Fern Lamibo expressed disappointment over limited input and raised concerns about parking shortages, building scale, and bird-safe glass requirements; Peter Mayor supported the plan's integration of winter conditions and phased construction but questioned the financial viability of the Dand Park event building without subsidies; and Kurt Cobber strongly advocated for the project as a vital community asset necessary to retain local revenue. The council acknowledged these diverse perspectives while noting that phases can be approved individually to allow for modifications if specific elements, such as open shops or the splash pad, lack sufficient support. In closing announcements, the city clarified that no data centers are currently planned due to an existing moratorium, though a speaking series on the topic will be held at Uptown Social in September. The council unanimously approved resolutions regarding clean water fund loans for private LSL replacements and confirmed that the total preliminary costs for the marina project are estimated around $25 million, with $17 million already dedicated from TID 21. A market analysis by Visit Shboan was cited to support the design's viability, ensuring that the transformation of the waterfront balances economic resilience with public accessibility. With these items addressed, the meeting transitioned to conclude its agenda on public safety department updates, leaving the council poised to move forward with the approved phases of the marina and safety complex projects.
Read the full video transcript
[music] All right. Good evening. The hour of 6:00 has arrived. I will call the 10th regular common council meeting to order. Will the deputy clerk call the role? >> Alder person Boris >> here. >> Alder person Ber >> here. >> Alder person Close >> here. >> Alder person Decker >> here. Older person Gravine >> here. >> Alder person Heidman glad to be here. >> Alder person Kelly >> here. >> Alder person Mensor >> here. >> Alder person Mitchell >> here. >> Alder person Pela >> here. >> There are 10 present. >> Thank you. If everyone could stand for the pledge of allegiance. >> I pledge allegiance to the flag of the United States of America and to the republic for which it stands. One nation under God, indivisible, with liberty and justice for all. >> All right, Alder Boris, is there a motion to approve the minutes? >> I move to approve the minutes from the 9th regular council meeting held on August 3rd, 2026. >> Second. >> Moved and seconded. All those in favor of approval of the minutes state I. >> I. Any. >> Any opposed? Minutes are approved. Next is resignations. City attorney. >> Thank you. Tomomi Kanamaru from the mayor's international committee effective August 23rd 2026. >> Thank you Alder Bors. >> I move to accept and file. >> Second. >> Moved and seconded. All those in favor state I. >> I. >> Any objections? Hearing none. That is approved. Item six, city attorney. >> Bob rank from the housing authority board effective immediately. >> Alder Bors. >> I move to accept and file. >> Second. >> Moved and seconded. All those in favor state I. >> I. >> Any any objections? Hearing none. That's approved. Next item seven, appointments. City attorney >> Tracy Brunette to be considered for appointment to the board of housing authority. Brianna Bourne to be considered for appointment to the mayor's international committee. Jess Thy thyroan to be considered for appointment to the mayor's international committee. >> Thank you. Those will lay over till our next meeting. Next item eight is an announcement. Uh, the Board of Water Commission will have an election to be held on September 21st, 2026 for a three-year term for the Board of Water Commissioners beginning on October 1st, 2026, as well as a 2-year term to fulfill the unexpired term. uh as well. If interested in applying to be considered for appointment to the board of water commissioners, please reach out to the city council president uh older Boris and or uh the city clerk um as well if you're interested by September 17th. Thank you. Uh next item nine, we have a presentation from the sort preservation commission which will postpone uh for a future meeting due to a family uh situation by the chair. Next item 10 is a presentation uh on the harbor center marina design by our friends at Edgewater Resources. So take it away. >> Hello. Thank you very much. Um let's see here. Make sure this is [snorts] showing up properly on the screen. Thank you very much. Uh mayor and council. Appreciate having you and again appreciate the opportunity to work with you in the community of Suben. Um this will be a a quick presentation. It normally takes about an hour and a half and I've been asked to do it in 10 or 15 minutes. So, I'm going to go quickly. Um, by nature I'm going to have to cover some things quickly. Ask me any questions you like, of course. So, uh, this is a progress meeting. We're at what we call schematic design. So, everything you're seeing tonight is a work in progress. Uh, it will continue to evolve based on feedback that we received from you. We've also had public feedback on this already and we're already making minor modifications as we go. So, as we dive into this, sorry, get this to work. Um, I'll skip through all of our team here, but this is a really important thing. The goal of this project is to refine the waterfront master plan and build a new marine on waterfront park for everyone in this community. That's a really key factor that guides everything that we're doing. Um, there is a tremendous amount of of issues with what you have out there right now with the ice damage and those sorts of things. We're addressing a lot of functional issues, uh, as well as as transforming the way the harbor the harbor works, uh, for not just the voters, but for the entire community. As we jump into this, we've had a number of public meetings, had a lot of community input meetings. As you can imagine, we received um hundreds and hundreds of comments. I wish that I could respond to every single one of them and have everything everybody wants in one plan. That of course is not possible. What our job is to try to coalate all those things and provide the best plan that we can that meets as many of the goals as possible um with the minimum amount of compromise. We do not want to end up with a camel. It's that joke, a camel's a horse designed by committee. So, we're focused on trying to balance all these competing uses as best we can. Uh, inherently, not everybody's going to agree with all of it, but we're doing our best there. Some quick images that really capture what the community responded most positively to. This is 31st Street Harbor in Chicago. Um, and what I want to point out here is that is a waterfront park that has a marina in it, which is the goal of what we're trying to achieve here. as opposed to the marina driving every decision. This is a public waterfront park that drives the primary decisions with an excellent marina that happens to be a part of it, happens to be an economic catalyst as part of it. Everything that you see in that picture with the exception of the floating docks and the dedicated boater restrooms is open to the public and that's our primary goal here for this community as well. So, as we jump into this um thinking about public access, again, I'm going quickly on purpose. Um there is an hour and a half if you're interested. Uh there's an hour and a half presentation online. I'm sure you can all watch that if you want the full detail. Uh we met with a lot of groups, a lot of different neighborhood groups, uh charter captains, yacht clubs, public works staff, first responders, as many people as we could to get as much feedback as possible. Uh we've also done a lot of engineering to address the functional issues that exist in the marina. You know, that there's ice damage. I would point out that the docks that you have there are not faulty in any way. They're just passed through useful life. Just like when you buy a car, at some point it just breaks because it's 20, 30 years old. Most dock systems are designed to last 25 to 30 years old. Yours are past that. But there are functional issues um that um physical issues I should say that do matter a lot. You're going to see a whole bunch of images as they go by here um that express what's happening with the water circulation and the ice movement. Um if you have questions, I can go into in more detail. But what we do need to do is address the way um when we have easterly winds, it stacks up low currents in or stacks up water in the outer harbor and that makes currents and things happened inside the harbor that are causing damage. We actually had cameras up all winter monitoring the ice damage and what was exact how the ice was moving and where it was damaging things. We actually have a very good idea of video evidence that supports what our modeling showed. And so what you're going to see here as I go by this is you'll see more and more uh activity inside the basin as I zoom past these and you'll notice you'll start to see some areas of red and concentration. What that red tells us is that's a very dynamic environment. And the best way to pro protect your docks is to not put them where that happens. And so one of the things that we're going to be doing is interrupting the size of what we're going to call the inner harbor by introducing a fixed attenuation structure here. And that breaks up and reduces the amount of flow in here. We have these two red areas here and here. When you see the master plan, you will notice very specifically we didn't put docks there. Um so as we look at this, that was a big driver. And I can go as far into that engineering detail as you would like. Uh there is also a sand intrusion issue along that outer uh federal breakwater that's owned and managed by the core. The core is going to come in. They built a lot of structures in the 80s that allowed intentionally so that allowed water to move through there. That was thought to be a water quality enhancement. What they found pretty rapidly is it allows a lot of sand to move in and it actually creates more problems than it solved. They are now correcting this at multiple harbors, including another one we're doing at Lexington Harbor in Michigan. They're going to be coming here to correct this one uh in the coming years. Um, our recommendation to you as we talk about phasing and constructing this is to stay away from that area to let them fix that problem and when they're done, we can come in and occupy that space. Fortunately, we have plenty of room to build all the marina that we need and not occupy that spot. So, quick overview of the harbor design. I'm going to start with the marina because that's kind of where we're at in the presentation. Then we'll move into the upland park design. So, the marina that you see in front of you here um is is uh the layout is quite different than what you have today. Very intentionally. Again, we talked about that red area. That's why we have this open body of water here and here. We've organized the marina into two main sections. Um we'll call these we call these Christmas trees just because it's a a single access with trees branching off to the side. This is uh we'll talk about the slip counts. This is actually allows for uh significantly more docking than you have now. I'm not recommending that you build a much bigger marina than you have. I'm saying we've planned for growth in the future if that becomes appropriate. When you get to the south end of the marina, we have a new public pier. That's that fixed structure that I told you about. That will be completely open to the public. This is what we call a shopper dock or or a or a um it's a service dock for just about anybody to use. One of the things that we want to do is be more welcoming to our trailer boers. When they go out and they go their boating, they come back, they put the boat on the trailer since there's nowhere for them to go right now. They put the boat on the trailer and then they drive home. And we want them to be be more welcome to the town and spend more time. So, this is meant to be a courtesy pier where they can get off the boat, come and enjoy all the amenities and go back out in boating and stay a little bit longer and just be more welcoming. Um, it could also be a place for a cruise ship yacht tender for example. It could be maybe at some point in the future uh the charter fisherman if they if the river doesn't work for them for some reason. So, that's a different factor there. We also have um one of the comments from the boating community is they were very passionate about the pool. We're not building a pool. That's not really that's not something that we're doing in public marines these days. It's very challenging to operate. It's also not the most appropriate use. When we did talk to the voters, one of the things that they said about the pool, it wasn't the swimming so much as it was the private space that they had. They had a dedicated room where they could have events that was kind of their own. And so we've talked about that with them. We're actually proposing in four locations out on the docks um where they're dedicated boater only gathering spaces out on the docks past the gates where they want to be. And so we're we're actually providing more spaces than they currently have for that particular use. The pool use in particular is replaced with a splash pad. So there is still water uses in in play and that sort of thing, but it's all open to the public as opposed to a dedicated boater activity in that way. Uh the only thing that's fully dedicated to the boers in this image are the floating docks, which is understood because they're renting that and and need security. And there will be dedicated boater restrooms that are specific to the boers. That is because a boater at 11:00 at night who's got their child and they're taking a shower. They need to be behind a locked door as you can all imagine. Um there are also many, many public restrooms and we'll talk about that. So that's the quick overview of the marina. We're relocating. The existing boater services building is over here and the fuel pier is way down here. That has created a lot of service um issues because it's a you know it's 10 15 minutes somebody calls for fuel and you have to send staff all the way down there. We we're proposing to relocate the boater amenities building and colllocate it with park features. I'll show you that building quite a bit a little bit here. Uh the existing building um is quite damaged from uh rot and mold and other issues. Um could it be repaired? Of course, anything can be repaired from a cost effectiveness standpoint. Um, it would be equally or more expensive to repair than to build these new structures that we're proposing. As we move a little bit closer, here's a quick uh 3D aerial just to give you a sense of it. We'll get to more on this in detail here. Um, just went through all of those things. We'll go in more detail here. This is some of the damage image from the existing restroom, existing motor services building. Um, again, could it be repaired? Of course, anything can be repaired. It's not the most cost-effective solution. Uh what we're proposing to do as we dive in here on the Boer Services building. I'm going to show you that building a little bit more detail. One of the things that we're focused on is building a much more sustainable building, a much better use in terms of things like um heat pump furnacing. Um we're talking about uh green roof um covered roofs for um uh water quality, for habitat creation, uh cooling the building. Uh a lot of different issues there. Plus, we can get grant funding for that. As we look at the building in the footprint, this is the lower level. This is the water side. We have um the these are the dedicated marina restrooms here and laundry and and lounge and fitness and that sort of thing. On this side on the north side of the building in the northeast corner, this is very public space. So, these are public restrooms for everybody. Welcome for everyone. You can come in here and get ice cream and pop and soda, whatever else you want to do. Now, this is Green Bay, so we'll be selling BRZ for sure. I think we should in Green Bay, Wisconsin. Um, as we look at this space, we have a marina garage and a parks department garage. This is coll-locating these uses um, specific intent of making that more efficient. And as you look at the upper level, we actually have some additional boater dedicated boater activities with the harbor master so they can view the entire marina. And then also looking at the emergency services in the northeast corner, that upper level building, that's a place where first responders can monitor the entire park uh, Fourth of July on all the big events. they'll be able to see everything and and do that. So, this is a shared use between parks and marina staff. So, here's just some some quick simulations as we're starting to do uh material studies and what things might look like. So, again, green roofs, very sustainable design using natural materials, wood, and so forth. Some quick AI renderings that are just they're just studies. So, you look in too much detail, you'll see some goofy things. Um, but just to give you a sense of the character that we're aiming for when we start to think about this main pier. Again, this is a public pier. So, this is meant to be a fixed structure that's going to help interrupt that flow. We will, of course, make sure that we have water quality and we'll monitor all that. We've actually already done the modeling. We don't have we we're stopping the flow of ice moving through to cause damage, but we have plenty of water circulation for water quality. This will be open to the public. Anyone will be able to go out here and enjoy these views and so forth. In terms of slips, you currently have 248. This plan shows 320, which is a 29% increase total. Again, this is the capacity, what we actually choose to build in phase one, and and phases will be determined later. One thing that's important, we did the marina market analysis. Um, the slips slip demand is trending upwards. When this marina was built, the primary boating size was 30 to 40 ft in length. It's now 35 to 50 ft. This is where the most uh uh number of boats are. So you actually have while there's only a 29% increase in the number of slips, we have more larger slips. So it's actually 40% 46% more capacity available. I want to point out nobody's going to lose their slip. All existing voters will have the same slips that they have now in terms of size and capacity. So we're not displacing anyone. And in terms of actually the construction, uh we should be able to set this up so that the construction occurs during the off season. The Boers might lose a few weeks at the very end. We might have to move them to another part of the marina. and when they come back in the spring, they should have a brand marina, brand new marina to come to. We simply can't lose a boating season in the Great Lakes. We have 100 days. So, um, so just some quick numbers there. Um, moving past that. So, we also have a second set of, uh, public and bo restrooms over here. What you're seeing here is it's primarily public restrooms. There are three um, marina dedicated um, shower rooms on the backside here. So, there'd be a shower and a toilet in here behind a lock. Everything else is public. So about uh 80% of that building is public over there. Just some quick imagery of what the docks might look like. We're looking at different materials and we'll be going through that in greater detail as we move forward. Um and then as we start to talk about the public spaces. Um we're just using some examples here of some interesting spaces about how we might build cool um places for people to walk and enjoy and sit and sit and enjoy the views. um and build interesting shapes and play spaces with cool interesting lighting. Uh movable seating, thinking about, you know, people like to sit in a lot of different ways. Some want to sit in a bench, some want to sit in a chair, some want to sit in sort of these cool seat walls and features like this. One of the things I want to point out is the night lighting. Uh we want to be very careful and use dark sky lighting, which is good for um it's actually very safe. Seems intuitive that you have it's it's darker. Well, it's it's actually less contrast. And so when you have even lighting like this, what you end up with is this beautiful lighting character that you see on here. What you don't see a lot of are light sources. You see the glowing pools of light. We light up the things you want to see. What you actually find is in the night you can actually see color. When you've gone from a bad lighting environment to a very good dark skylighting environment, you it's amazing how much better you can see even though the overall volume of light is actually a little bit less. It's also good for u not impacting migratory bird and insect species. So it's a very good very good approach that we're focusing on. So, just some more images. We talk about a splash pad. The splash pad we are proposing will be a flat plaza that has jets that come out of the ground. We're not talking about Crayola colored structures up in the air with, you know, donkeys and buckets. This is meant to be an elegant solution that is fun to play in. But if we need to turn it off and use that space for something else, you turn that off and you have a usable, functional plaza space. as much as possible. All of our upland spaces will be multifunctional, be able to use for different uses at different times depending on what the park needs to be. We focus less on building super dedicated spaces and more flexible spaces. So, talking about fire pits, accessibility of course is completely integral to this. So, as we start to look at this part of the plan, um what I want to talk about quickly is the upland circulation. So, we're showing um first rate off is you'll notice that we've taken out about 30% of the parking. The parking situation you have today is about 90% of the time you have way more parking than you need. And that other 10% of the time you don't have anywhere close to enough parking. And so the compromise in the past was well build as much as you can. And what that meant is you lost a ton of park space that's otherwise usable for the community. So the the proposal here is to say, hey, let's make certain that on 90% of the days we've got all the parking we need, that we've got excellent drop off, that it's functional for the voters, that on a reg it's very functional and useful. I'm not saying parking is not important. I'm just saying it's not the most important thing on your waterfront. And so we're changing the way that that works and we're going to work with the operations team about shuttling and so forth. We've also added raised table crossings to address the drag racing that is clearly known to understand out there. If you look at Google Earth, you can see the the burnout marks. We've talked about an entry loop over here. We've had some good questions about that entry drive, whether it's a conflict for this and whether that's the priority. We're working through those issues. Again, this is a work in progress. So, these all of these topics are up for conversation as we evolve. And then as we get out to this end, we're calling this the point. We'll talk about this as a multifunctional building. we'll get into in detail, but I'm going to focus on this area right here, which we're basically turning from a parking lot into this cool interesting space, which has a series of outdoor rooms that will be um reservable when, you know, in terms of picnic shelters. Um there'll be little, they're not going to be walled rooms, but they'll feel like there's a dedicated space. And so, this is going to be set up for uh you have very large events here. Um we've designed this around events that could be as small as 50 or 100 people up to in some cases thousands. So, uh, as we talk about the building, we've got spaces for 50 and 100 and 200 and 400. Out in here, we have a series of spaces that can be small gathering rooms that can be used and to expand the function of everything else. So, voters could come in here, just like they said, we want to have our space of our own. You can come in and you reserve this just like anyone else. And they'll have covered shelters, maybe a fire pit, some green spaces, and so forth. Interesting. Cool. Public walk. Uh, instead of traditional benches, we're proposing swings. Something about a swing. People are attracted to them like a magnet. It's the craziest thing. So, we'll be looking at some of that. So, here's some quick what this might look like during the daytime and then a quick view of what that looks like at night. So, cool, fun, interesting spaces that create different uh usable um rooms for people. So, then pushing back into um the main end of the building up here. This is a large building. This is a This is actually an AI simulation, so don't get too excited about when we see some goofy things. The surfers are going the wrong way. Um, but again, it's just a quick study thinking about how this space might start to work as we get into this building. This building is really driven primarily by the upper level uses, which is the need for very large um, uh, gathering spaces for 200 um, and up to 400. Um, and that led us to looking at uh, the way this lower level works. So, one of the conversations from the previous master plan was this was a restaurant. It was a specific use. And our recommendation is that that puts entirely too much pressure on one business to succeed. And if that business goes away, then you have this empty hole in your waterfront. What we're proposing that you consider is to think more like the Milwaukee public market where you have a series of smaller businesses where maybe existing restaurants downtown can put a satellite out there and that you have eight or 10 small businesses. It might be a surf shop. It might be a cheese shop. It might be different restaurants, tacos, whatever. It's kind of a food hall approach. And that means if one of them disappears, it's not the end of the world because it's it's if you go to the public market and one shop's gone one day, it's not the end of the world. You still have a really vibrant space. Of course, we have a lot of public restrooms and a lot of other uses in here. We're also proposing at the northeast corner. One of the things that we found when we were doing our public meetings is it was a very cold December day and the surfers were having a great time and uh they're stripping down and drying off in the parking lot. They looked really, really cold. [laughter] So, we're proposing to create some amenities for the surfers so that when it's offseason, they have a place to go change, get warmed up, get a warm shower, and do those sorts of things. Not that I have a problem with people changing in the in the parking lot. They just look really cold. Looking at the upper level, we've got a series of of spaces. So this does replace other types of uses. So we have 100 sp 100 100 guest space here and then we have two um 200 spaces 200 person spaces here that can be broken down further. So you could have a series of 500 person events. You could have a 500 person event. They all have roof deck access on the outside. And this is a public roof deck that anybody who can who wants to come downstairs and maybe get tacos or whatever they they want to eat here, they can pop up and sit on the roof deck and look and so forth. So, looking at the exterior of the space of this is, of course, uh we're working with the first responders to make certain that they've got all the access that they need for fire trucks and emergency vehicles to get in here. Again, we've got the splash pad here. Cool, interesting seating so you can be out on this point. We want to make a much better connection from this point out to the pier. Right now, you kind of have that it's a little bit of a afterthought sidewalk connection. We want to do that better. And then this is a dedicated space uh that would be like an outdoor bar. You could be out there and have music, have shows, all these sorts of spaces here. And then we're also showing what we're calling the winter garden with an outdoor fire pit. So you can sit there and watch the surfers and sit there by a fire and do some cool things there. And then some outdoor plaza spaces here. So that again is just some quick examples of where the architecture inspiration is coming from. Some people think that when we talk about a green roof that we're talking about grass. We are not talking about grass. We're talking about very specifically selected sedums and other uses. Um this this type of green roof is actually in a tray system. So if there's an issue, it's like when you buy a flat of beonas at the plant, you can lift up the whole tray and access if you need to do something with the roof. It's a very well understood system. Works very well in environment. It's doesn't create bird issues or those sorts of things. It actually extends the life of the roof quite a bit because it protects that liner. So So with that, that is an hour and a half presentation in about 15 minutes. >> I'm sure there are questions. So >> thanks Greg. We appreciate any questions from olders. Alder Kelly. >> Hi. Thank you for your presentation. I've seen uh quite a few of them and you're doing a really good job consolidating it down. Um so one point I just want to make sure is clear. So if we adopt this plan as presented, does that commit us to spend money on every aspect of this plan? >> Absolutely not. This is a master plan that sets out a long-term vision and as you go through, I would imagine you'll be approving each individual phase as it comes along. clear the marina is the immediate priority and and so as we're working on that you'll be able to say that marina makes sense and I'm certain as we get to that point there'll be an actual bid and you'll say that's the right amount of we're comfortable with >> one followup if that's okay >> um so just a comment and you alluded to it um item F and G um looks like it's a relocation of a shelter bathroom uh in order to make u an access drive so I I understand where that's coming from um and I I do think that we should prioritize the experience of people at the park rather than people trying to leave the park. Um, so I I just feel like we should maybe step away from this idea in terms of a more cost-effective way to handle the traffic issue that seems like it would be just for sort of the big events. Maybe we change the traffic in a different way rather than tying in, you know, a specific access drive just for a couple days of the year that might have um heavier traffic. But otherwise, um, great job. I really enjoy, um, hearing about the, you know, flexibility built into the plan. I think that's really important going forward. So, thank you for your presentation. >> Alder Heidman. >> Thank you, Mayor. Um, again, this is I've seen his presentation a couple times and we've had conversations. Um, so we're going to adopt a plan. We're going to say, "Yeah, we're really all in favor of this. Uh, how are we going to pay for this? Is there a is there a special tax? Is this all out of TIFF district? If you could give me an understanding on how this is actually going to be paid for, I'd appreciate it. >> City administrator. >> Um, so in the TID 21 project plan, I believe we have about I think it's $17 million um dedicated to funding this portion of the project. So, the marina redevelopment waterfront. Um so on top of that we also plan on going for quite a number of grants that this project will qualify for. We've had preliminary conversations with state agencies with private foundations things like that. So um the total amount available still not fully understood until we have so once we get to this point if we're moving forward uh the next stage obviously would be kind of kind of like what we're doing with the fire stations. we're at each stage of this. Um we're going to bring it back and get get your input, your feedback, and then if you want us to move forward to the next stage or not. So um this stage basically gets to the point where we can start applying for grants and start getting that better understanding um of what potentially we'd be eligible for. So we have a whole matrix of various grants from different agencies uh whether they're state, local or private um that various elements of this project will qualify for. So um you know there's transportation grants that we can go after for the uh sidewalk and infrastructure inside of the the area here that you know like the sidewalks aren't going to qualify for but the multimmoal paths will. Um there's grants for clean water funds uh related to the water and sewer that would go in here. And then there's grants available for storm water runoff that we can address um both public and private that will help address and um various issues or various components within this plan. So we need to start putting all of that together um to give you a really good idea of what funding might actually be available. And we also need to nail down what the actual projected costs are. >> So the next stage of this is getting more, you know, right now we just got kind of AI renderings and we've got, you know, that schematic design where it's just basically lines on paper. We need to start having the conversation of what are the materials that are going to be used. What are the actual layouts of these buildings? And once we start honing in on that, then we can get a better idea of what exactly we would need to fund these projects and then is it actually fundable. >> Okay. Thank you. Uh just a followup, mayor. Um when this all started, I'm I'm 100% behind having marina that is functional and appropriate for the city of Shuagen and it's going to and the boating community is going to be taken care of. That was the initial thing. Now all of a sudden we morph off into all this other stuff. And I guess if if I had an opportunity to get one and I we we talked about it earlier if and and if you want to give me that number just the cost of of the marina alone is approximate with that building with the other building because we have to replace that other building. I understand that. Just ballpark it for me. >> I would say the marina itself is in the $17 million range. That public pier is in about a three and a half million dollar range. very preliminary and that building right there is in the 3 to 5 million range. We're working on that with contractors. So all of those things together at this point I would say is in the 25ish range and we're we're working on that. It's very preliminary but we're comfortable. We have a higher level of confidence in the marina design because we know so much about that. the upland design of the building takes more time >> and and I appreciate it and I think that it's important that the citizens realize what we're we're trying to adopt as a plan and going forward with that we actually have an idea of what it might cost for a change as opposed to later on peacemealing and saying now we're not doing this now we're doing this now we're doing this so the initial concept and what we just talked about I'm 100% for so thank you very much >> thank you Alder heman uh Alder close. >> Thank you. I I just wanted to comment that uh looking at this design, the original design of the marina was so much more focused on Boers and amenities for Boers that this really changed the focus of the marina uh from a strictly boater oriented type of destination to a true destination for the people of Shboan and also gives an opportunity for a lot of the local small businesses to really shine and showcase what Shboan is all about. Uh, unfortunately, a lot of the people who come to the marina might just spend time in the marina and then head back out in the water. Now, they actually get a chance to see what the small businesses are all about and have the opportunity to uh share in some of the amenities that we enjoy here at home. So, thank you. >> Thank you. Thank you, Alder Close. Alder Brimzer, >> thank you. Um, I I agree with Alder Close. Um, I just appreciate that the design has those dedicated spaces for folks that are living in Shbboen. um not just for the voters. So, um I think it's easier to get behind this when I know that my kids can use the splash pad and we can all head down there at any time and enjoy the space. Um the folks that live here, I just have one question. So, those four shelters um that would be along the marina. >> Um so, you said they'll be like open >> open buildings. So, and then they will have like a fireplace. So would those be reservable or would it be like first come first serve? >> I think I think the plan at the moment it's an operational issue but they'd be reservable in the same way other dedicated you know picnic shelters and things would be reservable. Yep. >> Okay cool. Thank you >> older per. >> Thank you. Um just to make I just want to uh clarify again. So the next if we um we go to the next stage >> Mhm. Will we still be able to um remove some parts of these projects that we do not feel we want to support? So, or in other words, your plan is a comprehensive plan. Mhm. >> And so if we don't want those open spaces, right, those uh open uh shops or we don't want the the splash pad or we don't want the whole event new event building. >> Mhm. >> How comfortable will you be? Will be as easy as remove that part from your part project, remove this, remove this, remove this and go on to the next step. I want to make sure that we as a body are able to truly um assess each individual piece piece of this project rather than arriving at the very last and say oh now we cannot do anything anymore or now we are forced to or whatever else we it would be presented at that time I don't want this body to be in that and then the other concern so I I will let you answer that but then the other concern I have is this is as cool as it comes, right? It's hard not to like it. However, I also think there is nothing more sad that a cool place that is not used. >> How [clears throat] do we know that this actually will be as used and attractive or generate the type of business we want? What is the type of study we have done as a city? uh will there be an interest for little restaurants there? Will there I know the wants that we all expressed but I don't know what is the type of assessment we truly have of the return >> um on this investment. We have lived and experienced in Marina for 30 years that has not been profitable. >> Mh. So if we have to learn from the past uh that is something that speaks pretty loud about it and I keep saying the same thing over and over again because I don't think we have a clear I don't think we have addressed this clearly enough. >> So what I would say is this is the schematic design level. So everything's in process. We as a design team take our direction from the steering committee which is made up of many of your staff around here. Um so your direction to the steering committee would pass to us in terms of components that stay in or go. Um so from that perspective we'll continue this again is an overall vision and so if a major element would come out one of the conversations be well what goes there and how do we address what what that space will be wouldn't leave an empty hole for example. So I would say that your your feedback to the marina steering committee will come directly to us and that's that's how our how we're set up um as it relates to uh what what I think of as the market analysis. And so, um, you know, I I really appreciate the comments. It's not about the boers. I am a boater. And this is from a boater perspective. This is fantastic because boers want great docks, but they also want cool, great spaces. And one of the things that we've done, we actually did a survey of over 5,000 voters um for a project in Michigan for the state of Michigan. And we asked them to name the best harbor just with no context, just what's the best one. And they they picked a place called Charavoy, Michigan. And when you look at it, it's all about this space with this great park and this cool interesting the ice cream and the restaurants and the stuff. So, it's exactly the things that we're putting in here. So, we know that that is what at least the voters want as it relates to what the rest of the community wants. And I would back up. We actually did a a marina market analysis for this harbor for the um uh the what's the name of the organization we did the study for? [laughter] >> Visit Shbboan. >> Vision. Vision. Thank you. Sorry, I should know that. Visit Shbboen. So, we did the marina mark analysis. So we know that we have actual data from doing a mark analysis um for this. So when we're sizing the actual slips and all the things very high level of confidence in the slip sizing and everything else what boats are out there. So on the marina side we've done that on the upland side. Um exactly programming the building and exactly what's coming. I will tell you this um I know that the one the problem we have right now and what people didn't feel welcome was they didn't feel welcome in you know there's the bar on the second floor of the Marina building. Can I go in there? you know that this is a space that's exactly the reverse and so when everything's about the community you have that what I would recommend as that building evolves there's certainly the need to engage local businesses and everybody else going hey if we have this will you come and you so that is a process that would go on we're we're designing the building and the program for it actually confirming that program and with local business is a process that would be ongoing through design development >> good okay any other questions all All right. Thank you, Greg. Appreciate it. >> All right. Next, uh item 11, another presentation by the Shboen public safety departments, uh for the design development process, and then we have fire chief and Laura will give an update. >> Thank you. >> Hi, mayor. Thank you, council members. We're at that point again where we're seeking permission to move to the next phase. With me is uh Laura Eisenogle from Wendell 5 Bugle Design. She'll give you a little presentation uh on where where we have been, where we're at, and then we're moving forward. So, she'll make it quick, but here I'll turn it over to Laura. >> Got it down here. Sorry. >> Yeah, I was going to just make it um I [clears throat] was going to do one thing real quick. I was going to go like that so it's bigger >> and then go like that. Okay, perfect. Excellent. Um again, so thank you so much for having me here tonight. Uh my name is Laura Eisenog. I work for Window and Five Bugles. Like Chief said, I've been here several different times to go over this presentation and just kind of give progress. So um as Chief said, we're going to go over the project to date, what we've been covering over the last couple of months, and then what we're proposing going on to next. So essentially, we started um couple years ago, a year ago now. Uh we went through concept design, we came and spoke to you, schematic design, which is where these folks are at, then design development. And so now where we are is we're about 60% done with our documents and we're hoping to move on to the construction document phase and then ultimately bidding. So um into the design development phase the it's exactly what it says. It's the development of all the design details throughout the project. So we really started focusing in on specific systems materials uh how things are really truly going to function. uh we really uh talked a lot to your departments about the civil engineering, how that's going to work and the specialty design with your firing range and with your fire tower and just kept working through all the details. So essentially over in the overall picture, not much has changed. It's just a lot more uh details have been developed on it. So, we still have our five facilities on the public safety complex with the station three, the support building, uh the fire uh training tower, the firing range, and then the addition to the police department for their fleet storage and evidence storage. So, again, just kind of zooming in on this. Um we did not move the site. The site's still at 23rd Street. So, everything is just exactly how you saw it before. Um we are to the point though that though that we are developing what the exteriors look like in more definition. So, this is the direction that the building's headed. It's not final yet. We're still working through some items, but you can kind of get the overall uh understanding of what we've been developing with the chief and with the department. In terms of the floor plan design, again, really nothing changed. We really started diving in. You know, hallways might have tweaked a little bit here or there, but the overall intent of the project has remained the same with training and administration on the first floor and personal decontamination. our primary response bays and our support uh command garage and then our exercise room is all on the first floor of station 3. And then on the second floor of station 3 is our living quarters for our department. Um in terms of interior finishes, we started working through interior finishes as well as exterior finishes with our department. They are not finalized yet, but you can kind of get the uh impression that they are going for very comfortable homey uh surroundings that are very durable and will last the test of time, especially with fire departments. Um, in terms of what we're starting to look like on the interiors, uh, this is a picture of our lobby space. This will be coming out of the training room looking back to the front entry with the entry to the fire department, uh, administration on the left hand side. Um, this is our large training room that we have. This will also be used for public for voting. Um, but it's primarily used for a training room and then as an EOC or emergency operations center. Uh, this is our administration break room. making sure that our administration has a spot to take a minute throughout the course of the day. They can also use it for an informal conference space throughout the day. And then when we move upstairs, this is an image of our day room or a kitchen space to make sure that our responders have a nice big kitchen. And then this is looking back at their dining room in the foreground, the day room or their living room in the back right, and then the kitchen space in the back left. Um, located directly behind station 3 is our um apparatus support base. This is a singlestory facility. It's six backin bays. Um, this will be made out of pre-cast. So, we're still working through how that pre-cast will relate in terms of finish to station 3. And then located behind or next to that is our fire training tower. And um, again, this is an example of what the training tower will look like. Each one of these training towers is specifically designed for your department. So, yours will be a little bit different, but all intents and purposes, this is what it will be. It's a five-story complex for live fire training that will be used by the police department, fire department, and the public works departments. Um, in terms of the firing range, um, again, the for plan for this has not really changed significantly. We've been working through how it's going to function, though. Um, but we still have our police department entry from the north, our fire department entry from the south. We're still having our dirty classroom or classroom space that we don't have to worry about going in when they're coming from the live fire training tower. they can go right into the space without doing too much of a decon process. That's what it means to be a dirty classroom. And then the firing ranges in the red with the training mezzanine up above. Um our police department expansion, we are proposing doing that in again pre-cast tip-up panels to help save cost but also still make it a very durable structure for our police department. We're working through what this one will look like, but our intention is to have it reflect the existing building with the gray block and then some uh horizontal banding that will kind of blend into what you have there already. Um, in terms of what this looks like, again, the floor plan did not change. Uh, so we have our fleet garage space, maintenance storage, evidence storage, and then it attaches onto the existing facility. In terms of station two, the only change that we really had to this project was instead of having our primary response to the south on me, we are going to have our response onto 18th Street. Um that was a decision that the department made after hearing some concerns from the community and then thinking through how they are responding and how the roadways are constructed. So just like with station 3, uh we're still designing the exterior elements, but this is essentially what we are um pushing forward with with the design. very traditional looking fire stations. And again, not much has changed on the floor plans. We still have our exercise, a little bit of uh training space, a small administration of one office, and then a conference room, and then our watch room. M. Uh the main thing on this first floor are our apparatus bays, which are two drive-through bays and one back in bay, and then our personal decontamination. On the second floor, then uh we have our um dorms and our living quarters. Our living quarters, our kitchen and dining space. We'll be keeping the interior finishes the same from interior and exterior finishes the same from both stations uh to keep it nice and consistent. This again is the lobby. So, this is right when you're walking into station 2. So, those doors there, that's the glass door. That'll show you um that goes into the conference room. And then the door on the right hand side goes to the back of the station or the back of house spaces. When we go upstairs, this is our kitchen space for our responders. And then our dining room is uh connected to that space with some windows to the north to make sure they get some nice natural light into that space. And then the windows on the right hand side, the square windows, those go uh look down into the apparatus bay. In terms of the day room, this is our day room. Again, it's internally located. So we did have some windows that look down into the apparatus bays. They can get some borrowed light into those spaces. So what's next? Um like I mentioned, we just finished up our 60% document set. who are proposing we're asking permission to go into construction documents. Um so in construction documents we will finalize the the documents that would go out for bidding. So we'll really concentrate on the final details um door hardware, interior finishes and exterior finishes. Uh we'll dive into more of the owner purchased equipment such as vehicle exhaust or security systems and our station alerting. And then ultimately we will come back to the department. We'll have a series of meetings but it will culminate in the 90% owner review which is a final page turn that we go through. So in terms of overall project schedule this is a proposed schedule. Obviously we can flex it as much as we need to and you know adapt as we would like to but essentially our team will be ready to go to bid uh this January. So it would be our goal to hand over the documents in January and ask permission to go to bid in January. Um if we are given permission then we would release for bid. We are proposing about a one-mon bid period. Um once we have the bids received, we would read through them, vet the bids, vet the bids to make sure that everything is um appropriate and then come back to um seek permission to award the bids and go into mobilization. Um if all that goes to plan, we'd be breaking ground in the spring. Sometime around April would be the goal. Um March, if we have a really great winter, a really warm winter for us is great for construction. and then ribbon cutting would be about 15 months later. Um, in terms of the estimate, so we kept right on track with where it was before. The only thing that you'll see different is that we did break out the station alerting security and vehicle exhaust. Those numbers were up above for stations two, station three, and then the other facilities associated with this project. But we are going to be looking at uh including uh vehicle exhaust alerting and security at your other stations to make sure that all the stations are receiving the same type of equipment. And that's why that's broken out at the bottom. Um and that's it. >> All right. >> Questions? >> Thank you, Laura. City administrator TS up. >> Yeah. Can you go back one slide there? Uh just to point out for everybody, we we do have these in the budget to be replaced over the next couple years. And what we've asked the chief to do is to include them if we're going to do these two projects. It doesn't make sense to do two stations and then do the other three independently. Um so we would look at doing one bid for all five stations and that's why we've we've put it here. But um this wouldn't be new borrowing that we would do for the other stations. it's already in the budget and planned for. Um, so it just basically be done as a part of the capital plan as it's already planned just with this project to help uh reduce the overall costs. Instead of five separate projects, it would be one project affecting all five stations. Questions uh for for Laura or the fire chief? >> All right, seeing none. Thank you. >> Thank you. >> All right. Next item 12, public forum. Deputy city clerk. Anyone for this evening? >> There are four speaking this evening. >> All right. First, >> Michael Brunette. >> You have a question. Joe, >> uh, we're postponing that one. >> Yeah. All right. Mike, name, address, and item you're speaking on, and you have five minutes. >> 611 North Water Street, apartment 303, item number seven, and more. Okay, item number seven is appointments to the board, the board of the housing authority or whatever it's called. And uh basically they had they had a couple resignations recently and like everything shuigen everywhere everybody villainizes the old white guy. This dude, half you guys in here, white women, what it is, but the old white guy, most evil thing in the history of the world. Election times, people are rolling around saying, "Vote for this guy cuz he's this that, that, anything but the old white guy." Truth is, when you look at your boards, they're all white guys. They're all white women. It's just what it is. It's what it is. And right now in the housing authority board, you had a bunch of people resign and da da da and you brought in more of what I would call cronyism professional administrators and basically you had one person move in and another person moving in and I don't feel safe there. These are people that are hostile to me openly and they're becoming my they're becoming my keepers. And moving on from that, it's not going to matter. It's what it is. you had on on that board, you had John Donovan who was on redevelopment authority and he was on housing authority and he's there at the meeting. I'm there for a totally different reason and it's like but you go there and you're just like what the and literally he's telling everybody how he's in Ireland and he's doing this stuff and he's using his in-laws address and I mention it to Lisa Salgado. She mentions it and all a sudden it's a big huff huff up and I'm like gez, you know, it's like I don't mention it to people so he can use it cuz I'm no one actually goes here. So then everybody's mad at me for calling this out. But seriously, if this dude was in housing, he'd get kicked out of the building for doing what he would and he'd lose his pension or whatever this and that. D, but you're in there as an administrator. You're coming in there with no heart and you're looking at stuff from money instead of as people. And the same thing with what you're doing with all this other stuff. Now, one mention of people you're doing public safety, how much you're going to spend to keep people safe here. You created a blighted area called the marina where right now broken window theory. Somebody brought it up to me the other week. And I'm like, "Yeah, I kind of know what it is." But you created it there where you created a void. So, the kids are there, then you're calling the police on them, so the police are hassling them. Oh. Oh, that's a problem now. And that plan is ridiculous. There's no real plan there. They'll have somebody come in 3 to 5 years and and then the Army Corps will take care of stuff. You'll take care of this. That over half your boats are fishing boats. Just true. I I surveyed it, went through with my drones and got every square inch of that and checked on it. It's basically a junkyard on the water. Why are you only pushing one agenda down on the water that has failed forever? It was voted down then and you're doing it again. and the public safety thing. Just the insane amount of money you people are spending and it has nothing to do with citizens. We can't have anything. Oh, it's for the voters this and that and that. The hell with the voters. They had to run and they blew it to say the least. You can still have boats there. You just don't have to make it a big damn parking lot and then put in there basically you're trying to put a little mini summerfest grounds on. And the bottom line is you don't know how to run anything. You've proven that. You have proven that. >> All right. City clerk, deputy city clerk, >> Fern Lamibo, >> Fern, name, address, item you're speaking on, and you'll have five minutes. You just adjust the mic. Thank you. >> Fern Luma, 409 Wisconsin Avenue, and I am here to discuss number 17, which is the adoption of the waterfront plan. So, of course, I could nitpick a bunch of small little things uh that I'm just particular about, like the face of the building blocks, the view from the beach pavilion to the lighthouse. Like, there's a bunch of little things, but overall, the biggest thing that I get still am a bit disappointed to is that there still wasn't too much public input. Uh sessions allowed for it. I know when uh the comprehensive plan came through, there was push and we added more into it. you mentioned um that there were many and there were two the one in December um 18 2025 which was before this entire plan and these pictures have come through and since then we've had the July 21st one which was the only other one and from the city side of it even on their like social media there's only one post which was the event creation for the July 21st one and nothing else pushing it forward anywhere even closer towards the event which I find a shame cuz I love to try to inform the public on things. It's one of those things that I find the most important because an informed community has at least the opportunity to make a difference, but people that don't know what's happening get so lost. And so many times I get the comment of, "Oh, we're working on a marina plan. That's crazy." And I find it very difficult cuz I would love the city to just push for that forward so we do get more public input and get the ability to get just everybody's perspective. The other bigger thought on the marina building itself, I'm a huge fan of separating the facilities. I think it makes sense moving the boating things back down towards the boating area, keep it consolidated. Um, for the building itself, I do personally believe that we are biting too much that we can't handle. It's such a large facility that's housing so many different things, so many different businesses, buildings, and from my perspective, I've seen us struggle with the current Marina building. And that in itself, although I know it is not repairable for a reasonable cost, we still let it go downhill over the past, you know, 30 plus years to get to where it's at today. And for the management side of it, I know I've talked to the bar owners at times who were in there and they struggled. One thing I'll question is about just like the plan for signage. That was one of those things that was mentioned at the time that it was difficult to always get their name out. This will be different because it's such a large scale facility, but with that, there's just so much going into it. all of the event spaces, all of the shops, and then let alone all of the pavilions. It is, I just think, too much to be assuming that we'll have be able to like manage all of it as a city. Um, the parking situation I do find concerning. If there's anybody that knows me, they'll know I will not advocate for more parking. Not a huge fan. I don't like driving. I'll walk and bike everywhere. But with the amount of parking spaces cut and adding all these facilities, I just can't see it. I was trying to math out how many spaces you would need, but having a 500 person event space and then even if those shops are running and you got workers there, caterers there, that parking space is already full with the like the 240 that was approximated to be um you know still maintained. The next public walking parking I guess would be street parking about 1,000 ft away from both entrances. And overall that part I don't know how feasible it sounds to me. Um storage facilities for all of it. Each one of the event spaces I'm very curious on. I know we're going to go into the further details but planning all the windows and everything. Some of these to me should be planned a little bit better where the chairs, the tables, first floor, second floor, restaurants, all of that. Uh there's a very minimal amount of like storage andor like backstock rooms for people to be able to like do the marketing for things. And I know we're comparing it sort of to the Milwaukee public spaces or the public market, but to me that's also a very different situation. Theirs is directly in the heart of town. Ours is on the edge and we're now turning a destination space away from downtown, away from the riverfront when we've already put so much money into those themselves and they're doing okay. I think they could always be doing better. I wish we did put some more attention into either one of those. Um, but that's where I do think it's just it is a lot. I've also been told to mention something about like birds safe glass is a big thing, especially with all those tall windows. There's like the restrooms number or letter C. I think they're almost a bit excessive to put another building in front of all the glass windows. That's going to be the bar and restaurant. It blocks the view, which is I think one of the biggest parts of doing that. Um, yeah, it's one of those things that I could really go and talk about way too many things, but I just like designing. Um, but the biggest thing is please do more public input, push bigger for people to come in, have more spaces, uptown social. I know there's a lot of things going on, but I think it' make a big impact for the members of community. >> Thank you, Deputy City Clerk. >> Peter, mayor. Peter, name, address, item you're speaking on. Five minutes. >> Thank you. Uh, my name is Peter Mayor. My residence is 1314 North Fifth Street. My office address is 502 North 6th Street. And I am uh the chair of the Marina Parks and Forestry Commission, but these are my personal comments. Um, I'm speaking on agenda item 17 in favor of adoption of the waterfront marina master plan and schematic design prepared by Edgewater Resources. In general, I'm in favor of the Marina plan because it satisfies the guiding principles, including the following. One, the plan addresses in the best manner possible the physical conditions, including winter, ice, and storm issues. Two, the marina elements are designed in a manner that will enable the marina itself to be financially feasible and self-sufficient. Three, the design plan brings the entire community, including non-boers, into the waterfront spaces in the best manner possible for the benefit of the greater Shboan community. Some of the design elements I like in particular are one, the opportunity to phase marina slip installation to grow the marina over time to meet demand as it increases and delay some front-end expenses for docks until the marina fully rebounds. to a right-sized, properly located multi-purpose marina building uh to better address parks department needs, marina staffing levels, and proximity to the fuel docks. Operationally less costly but sufficiently attractive boater lounge and other boater amenities to attract seasonal and transient boers. Uh and uh park security uh first responder and safety allocated space. Again, uh if you saw the numbers in detail, the prior Marina admin building is 11,000 ft². This one is 9,500. So, we're right sizing it but creating multi-purpose use. Um outstanding design, particularly of green space to encourage the entire community to visit the waterfront, including three smaller waterfront gathering spaces along the prominade with fire pits, swings, and park facilities. Uh and four unique uh popjet splash pad, attractively designed pathways, pergola seating areas, better park style lighting, surfers winter terrace with uh with fire pit, reduced parking lot size, public access pier, and courtesy dock that together better join a familyfriendly community marina to a familyfriendly dand park. Back in October of 2025, the Marina Parks and Forestry Commission recommended hiring Edgewater Resources, but expressed concern on two issues. Uh, first was a review of the current current marina admin building structure to determine whether it was adequate and could be maintained and continue to be used. We appreciate that additional review and investigation was done. Although the result was that the admin building can't be realistically retained, we're glad that that review was done just so that we're assured that that's the right step to take. The second element was that the Marina Parks and Forestry Commission uh voted to recommend only a restaurant and event space uh if it was privately funded uh to obtain and address the construction cost of the building. Um, with respect to the Dand Park Event Building, I don't have enough information on the cost of removing the well-liked and regularly used Dand Community Center and building the Dand Park event building, which seems to necessitate moving forward to the next step uh in order to obtain construction cost estimates. Um, I do very much like the Dan Park event building, including broad community access to event space and the small shop, small food stall marketplace, similar in concept to a scaledown Milwaukee public market, Chelsea Market in New York City, Reading Terminal Market in Philly, uh, Pike Place in Seattle, or Lincoln Eery in Miami Beach, which are all very successful community marketplaces. Um, however, I'm concerned about whether that building will be financially self-sufficient uh on its own. I don't believe that the Marina slip operations can financially subsidize and support the Dion Park event building. So, it's going to need to stand on its own. Um therefore I believe it's going going to be critical to have detailed operational plans and financial performs in place including tenant leases and eventbased market analysis before removing the existing dand community center and proceeding with the dand park event building. Again though that's further ahead. Uh right now we're at the stage of the master plan and schematic design approval which I can wholeheartedly recommend at this time while also recommending that operational plans and financial performs and market analysis uh be done on the Dian Park event building itself. Thank you. >> Thank you Peter. >> Deputy city clerk >> Kurt Cobber. >> Mr. Cobber name, address, item you're speaking on and then you'll have five minutes. All right, sounds good. Good evening. My name is Kurt Cobber residing at 534 Humbled Avenue. I'll be speaking to item number 17 on the agenda, adopting the new waterfront marina master plan and schematic design. Uh Mayor Sorenson and common council along with the city staff, I want to thank you for the work you do for our community. Uh the choice you do is significant and our city would not operate without you. So I want to thank you on the front end for your contribution to our community. I'm a fourth generation Shabboanite uh lakeshore homeowner, a boat owner, and someone who has been actively involved in shoreline issues from the Southshore Revetman project to the broader lakefront and waterfront. I'm here tonight to strongly support the Edgewater Resources Marina plan in its entirety. I'm looking at what really makes to be a successful marina. Tonight, we will talk about the first piece, which are slips, but there are two other pieces, storage and service. But slips come first, and that's what we'll focus tonight on. We need safe, modern slips in good condition, protected by the right breakwater infrastructure designed around actual conditions we experience in Lake Michigan. We definitely saw that tonight and the work that Edgewater did. I'm encouraged by that work because that's not always been the case when we've done these developments in the past and we've looked at extreme conditions in every direction and we clearly see that in the plan. I'm also encouraged by the design and how it opens up the waterfront to the broader community. This is not just a boater plan. This is a community plan and that was very clear from the beginning that the community was asking for the waterfront to be a waterfront for everyone and as a boater I support that. Uh yes, it improves slips and boating infrastructure but ultimately it becomes a broader community asset and we are so fortunate to have so many here in Shboan. Um, the other thing I want to consider is as we pl as you consider passing this plan tonight, think of ahead to the future and what might be required. As I mentioned, there are two other elements that will make this marina successful. It is storage and is also service. Uh, without those three legs of the stool, no marina is successful. And that's what we've missed for the last 30 years here in Shboen. I'll give you my own experience because I think this helps dimensionalize why these other elements are important. I recently moved my boat from out of the state of Wisconsin to here in Shbboan because I wanted to spend more time here with my family and use that asset on the water. On an annual basis, I'll spend $30,000 servicing this boat, of which $3,000 will be spent here in Shbboen. The remaining $27,000 will be spent in Manitwalk County on storage and service in the offse. Those are $27,000 I'd rather spend in Shuen County. If you take that math and extend it just to 200 slips and you cut the amount of service that someone spends on an annual basis, that's another $3 million in revenue that we are not getting in Shboen County. And so again, that's not the issue tonight, but as you continue to plan forward, think about what it takes to make a successful marina. It is the slips that we're talking about tonight, but it's also the storage and the service that comes with it. So tonight, I encourage you to approve the plan, get the slips and infrastructure right, create the kind of onshore and offshore waterfront this community deserves, but let's keep going forward to explore what storage and service look like in this community. I think when we do all of those things together, we'll not build not only a better place for voters, but we'll build a better place for our community that's more economically viable in the long term. Thanks for your time. >> Thank you, Mr. Cobber. All right, that concludes our public forum for this evening. Uh just a few notes and announcements on my end. Um the city council requested um uh more information regarding uh data centers um and and the city just announced earlier today uh about uh several speaking series that we'll be having coming up um regarding variety of different topics regarding uh uh um data centers. want to reiterate that we do not have a data center planned or proposed. We also have a current moratorum uh in place as well. We'll have four sessions on September 9th, 16th, 23rd, and 30th, all at 6 p.m. at Uptown Social. More information regarding the speaking series can be found on the city's communication platforms and comm and as well as the city's website as well. Also, the other week, uh we had a successful, uh block downtown block party. I want to thank uh the Department of Public Works, city staff, our friends at the Shabboan JC's, all the sponsors, our friends at Three Sheep's Brewing, uh as well as all the community car owners that stepped up uh and brought their cars downtown to Shbboan and had a wonderful event uh considering the circumstances of us having to pivot away from a primary boat focused event uh and making sure we still have fun in the community. So, I want to just do some shout outs and thanks for those that made that successful. So, those conclude my announcements for this evening. Uh we will move on to our consent agenda items 14 through 24. Alder Boris, >> I move to accept and file all reports and adopt all resolutions. >> Second. >> Moved and seconded. Any discussion on any of the items on the consent agenda? Alder Kelly. [snorts] >> Um just to address some of the items from the public forum. Um, with the Marina plan moving forward, uh, do we have public input sessions planned already, um, to address the the plan as it develops? >> You want to take that, >> city administrator? >> Yes. As as we work through design, um, so I think we had 25 individuals show up uh to the last public public [clears throat] input session, so it was pretty limited. Um we did hold a number of uh u user group focus groups as well to get direct in impact or input. So I believe the plan would be to do something very similar as this plan moves into the next stage. Correct me if I'm wrong Greg. I believe that was in the contract that we would so there will be an opportunity for more public feedback. Um you know it's it's always hit or miss or people are available. I mean, you know, we got to try coordinating all the groups together. So, um, we're not looking at a series of these. We're looking at because this is a multi-layered process. So, um, we're not going to hold a whole series like we did when we did the master plan. So, this is more each iteration, we'll get feedback. Um, so, you know, if if folks can't make it to it, but want to provide feedback, they're more than welcome to uh contact my office and we can get that feedback over to Edgewater as well. So, >> thank you. >> Thank you. >> Any other discussion on any of the consent agenda items? All right. Seeing no more, we'll do a voice vote on this. All those in favor of approving the items on the consent agenda, state I. >> I. >> Any opposed? Hearing none, those items are approved. Next resolutions. Item 25, resolution number 832627 by alders Boris and Close authorizing the issuance and sale up to 893,200 taxable private LSL replacement loan program revenue bonds series 2026A and providing other details and covenants with respect there too and approval of related financial assistance agreement. Alder Boris, >> I ask to suspend the rules. I move to adopt the resolution. Any objections to adopt or to suspending? Hearing none, can you make the motion again? >> I move to adopt resolution. >> Thank you. >> Second. >> Moved and seconded. Uh, anyone want to speak on why we're suspending? >> There you go. >> Okay. I I I got the cues. Yeah. City administrator, >> I'm going to Yeah, I probably [laughter] will. >> Thank you, Alder Hidman. All three of these items, uh, 25, 26, 27, um, all have to do with the clean water fund. So, this is this is a request from the, uh, Wisconsin Department of Natural Resources through the Shboan Water Utility. Um, you'll recall we've done this a number of times over the past couple years in trying to secure and procure money for uh citizens to replace u depending on what program they fall into and where they live in the city. Um this these loans provide a subsidy um anywhere from 100% to I think as low as possibly 50% um some may even go to 25% but um depending where they live uh the census track that they're in they qualify under various federal programs. This uh all three of these items here are essentially um our contribution to approving this and then it goes to um the water utility. the water utility uses that to fund. Um, and depending on which program they're in, the payback is either an agreement between the water utility, the city, um, to to pay it back if there's a a cost. If it's not 100% and if it's 100%, then there's just no cost to the citizen at all. All right, there's been a motion and second as well as an explanation. Any further discussion on this item hearing? None. All those in favor of approving item 25 state I >> I >> I. >> Any objections? Hearing none. That is approved. Next item 26, resolution number 842627 by alders Boris and Close authorizing the issuance and sale up to 247,500 taxable private LSL replacement loan program revenue bond series 2026B and providing for other details and covenants with respect there too and approval of related financial assistance agreement. Alder Boris, >> I ask to suspend the rules. >> Any objection to suspension? Hearing none, please proceed with your motion. >> I move you adopt the resolution. >> Second. >> Moved and seconded. Are there further discussion on this matter? Hearing none. All those in favor of approval of this item state. I >> I. >> Any objection? That is approved. Item 27, resolution number 852627 by alers Boris and Close, authorizing the appropriate city officials to execute the Department of Natural Resource Principal forgiveness financial assistance agreements regarding DNR project number 4901-18. Alder Boris, >> I ask to suspend the rules. >> Any objections? Hearing none, please proceed with your motion. >> I move to adopt the resolution. Second. >> Moved and second. Um, under discussion on this matter hearing none. All those in favor of approval of that item state I. >> I. >> Any objections? Hearing none. That is approved. Next item 28, resolution number 762627 by elders Boris and Heidman approving design development for the public safety complex and authorizing the appropriate city officials to proceed with the preparation of construction documents in cooperation with window company. Alder Boris >> I move to adopt the resolution >> moved and seconded under discussion on this matter. >> Seeing none all those in favor of approval of this matter please state I. I >> any objections? That matter is approved. Items 29 and 30 will be referred to the transit commission. Next, we have a contemplated close session. Alder Boris, >> I move to convene in close session under the exemption contained in Wisconsin statute S19851G for the purpose of discussion related to a possible investment of public funds to purchase Town of Wilson parcel numbers 5930454780 59304-54810 59304 54815 5 and 5930454782. >> Second. >> Moved and seconded. This is a roll call vote. Will the deputy clerk please call the role? >> Alder person Boris. >> I. >> Alder person Bzer. >> Hi. >> Alder person Close. >> Hi. >> Alder person Decker. >> Hi. >> Alder person Graine. >> Hi. >> Alder person heman. >> Hi. >> Alder person Kelly. >> Hi. >> Alder person Mensor. >> Hi. >> Alder person Mitchell. >> Hi. Alder personela >> there are 10 eyes I >> all right that is approved we will adjourn open session and we'll convene in close session and we will come back in open session >> all right we will reconvene in open session Boris >> I move to reconvene in open session for possible action relating to the matters discussed in close session >> second moved and seconded Will the deputy city clerk call the role? >> Alder Boris. >> I. >> Alder Bzer. >> Hi. >> Alder Close. >> Hi. >> Alder Decker. >> Hi. >> Alder Gravine. >> Hi. >> Alder Haidman. >> Hi. >> Alder Kelly. >> Hi. >> Alder Mensor. >> Hi. >> Alder Mitchell. >> Hi. >> Alder Pella. >> Hi. >> There are 10 eyes. >> All right. We're back in open session. Next is resolution item 33. Resolution number 862627 by Elders Mitchell Imprella authorizing the purchase of approximately 55.361 acres of land in Town Wilson identified as parcel numbers 5930454780 593454810 5930454815 and 5930454782 from Mark Pierce Kath Catherine Pierce, Rachel Olgan, Matthew Pierce, Mitchell Pierce, Alder Bors. >> I ask to suspend the rules. >> Any objection to suspension? >> Hearing none, please proceed with your motion. >> I move to adopt the resolution. >> Second. >> Thank you. Moved and seconded. Uh, under discussion. All right. Hearing none. We'll call a roll call on this one. >> Alder person Boris. >> I. >> Elder person Ber. >> Hi. Elder person Close. >> Hi. >> Alder person Decker. >> Hi. >> Alder person Graine. >> Hi. >> Alder person Haidaman. >> Hi. >> Alder person Kelly. >> Hi. >> Alder person Mensor. >> Hi. >> Alder person Mitchell. >> Hi. >> Alder person Pela. >> Hi. >> There are 10 eyes. >> All right. That item is approved unanimously. We've exhausted our agenda for this evening. Alder Boris. What is your uh motion? >> I move to adjourn. >> Second. >> All those in favor of adjourning state. I. >> I. We're at 7:55. Good night, everybody. >> [music]