Conservation Commission Meeting - September 17, 2026
Watch on YouTubeVideo summary
The September 17, 2026, Arlington Conservation Commission meeting was facilitated by Vice Chair Susan Chapnik and conservation administrator Jackie, who confirmed a quorum despite the absence of several staff members and commissioners. The session began with the acceptance of corrected minutes from August 20th before addressing critical enforcement issues regarding property conditions. A primary focus was placed on an order for 103 Thornike Street, where the owner had proceeded with demolition and foundation work without recording specific conservation conditions, leading to concerns about standing water, mosquito breeding risks, and erosion control. The Commission approved dewatering only upon submission of a plan to the Town Engineer and scheduled a site visit for September 25th to verify security and review modifications like permeable pavement maintenance. Additionally, the hearing for this property was continued to October 1st, while another item regarding Zero Reed Street was also postponed to that date at the applicant's request.
Significant administrative and personnel updates dominated the latter half of the meeting, including the consideration of two candidates, Emily Scarf and Seth Federiel, to replace retiring Commissioner Nathaniel Stevens. Both candidates brought diverse expertise in sustainable landscaping and climate policy respectively, though they were encouraged to consider associate commissioner roles if not selected for full membership. The Commission also discussed management strategies for invasive species such as curly leaf pondweed at Spy Pond and Japanese knotweed near 53A Park Avenue, where Arlington Coen Lumber proposed repaving an eroded parking area and installing stormwater recharge tanks. Engineer Limhut Tiff presented plans to reduce impervious surfaces by 40% and stabilize brook banks, prompting questions about snow storage, heat island effects, and the feasibility of bioengineering discharge areas within regulatory constraints. To address vegetation management at Pond Lane, a motion was passed to allocate up to $2,000 from the stewardship fund to compensate a volunteer herd tender for goat-assisted removal, framing the payment as material support rather than labor wages to comply with fund restrictions.
The meeting further explored operational improvements and upcoming projects, including an approved increase in street sweeping frequency from twice to four times annually to enhance Total Suspended Solids removal and source control. This decision came alongside requests for a site visit on September 22nd to review stormwater plans, define snow storage areas, and soften the stone spillway outflow. The Chair presented a comprehensive transition memo outlining ongoing planning initiatives such as hazard mitigation, Milbrook Park surveys, hydraulic model updates, and aquatic invasive species management, noting that David White would serve as the point of contact for these working groups until his departure. The session concluded with congratulations to David White for his thorough documentation and final farewell arrangements, followed by a brief report on a heron rescue operation involving entanglement in fishing line or mud at the reservoir, before adjourning pending the next session.
Read the full video transcript
So, good evening. This is Jackie,
Arlington's conservation administrator.
The September 17th, 2026 public meeting
of the Arlington Conservation Commission
will be conducted in a room format
consistent with state legislation that
extends remote participation in public
meetings until June 30th, 2027. The
meeting is being recorded and the
recording may be made publicly
available. All materials for this
meeting are available at the link which
I will post in the chat shortly. Please
note the Zoom chat feature may be used
for questions and comments that
contribute to the commission's
procedures if it is used otherwise it
may be disabled at the chair's
discretion. Public comment period will
follow each hearing. The conservation
commission encourages attendees to ask
questions and offer comments during
public comment period. Susan Chapnik,
the commission vice chair, will
facilitate this meeting. Each vote taken
during this meeting will be conducted by
roll call vote. And Susan, can you
please review the agenda and take
attendance?
>> Sure. Um, thank you, Jackie.
Do we review the agenda or take
attendance first? Does it matter?
Um, I think either way would be fine.
>> Okay, I'm going to take attendance
first. Um, so Brian McBride
>> here.
>> Mike Gildiscane,
>> present.
>> David White,
>> I'm here.
>> Okay. Um, Chuck Terrone
is absent. Nathaniel Stevens
absent.
and Dave Kaplan
is absent. We do have a quorum of
commissioners though, so we can proceed.
Um Sarah Alero Franco
is absent
and um Eileen Coleman
absent.
Okay, I'm going to review the agenda
quickly. Um we do have some updates. So
participants who are here for some of
the hearings who might want to listen
which ones we're having. Um we'll review
the meeting minutes and correspondence
received. Um we have an enforcement
order for 103 Thornike Street that's
continued to tonight. Um three and four
on our uh agenda. Potential flooding
issues at 103 Thornike are similar.
fishing line working group, water bodies
working group, tree committee, uh SIMS
conservation and administrators report
uh request for allocation of funds for
landscaping
and conservation commissioner um
applications for a position being
vacated by Nathaniel Stevens. There are
two hearings that are on the agenda. The
first one was Zero Reed Street. that's
going to be continued at the request of
the applicant. So participants who are
in the um in the meeting uh who are here
for zero read street notice of intent
that will be continued to what's our
next meeting Jackie?
>> The date
>> I think it's October 1st.
>> October 1st. So that one will be
continued to October 1st. Um if you want
to stay on this meeting and just listen
you're welcome. But if not we'll see you
then. Um, and the second hearing is for
a notice of intent at 53A Park Avenue
and several other addresses. Um, it's
the Arlington colon lumber site in
Arlington. And then we'll have an uh
open form if there are any other um any
other meeting businesses, new new
business. And that's it for tonight. So,
we're going to start with the meeting
minutes. And what date was this? I'm
losing track, Jackie, because we
canceled a few meetings.
>> This was August 20th.
>> August 20th. Thank you.
>> And these minutes were prepared by
Jackie. That's okay. And I reviewed
them. Um, but we'll look at them now and
see if commissioners have any other
comments.
Okay.
So
I don't think it's showing the changes
that were made.
>> Oh, that's unfortunate.
>> Yeah,
>> but I know
>> let me see version. I did review it. I
know it was so long ago at this point.
>> I did review them as well. There were a
couple of though right there. There are
two situations where there was just a
misspelling.
>> Oh, okay. Yeah. Hole and hole. Yeah,
there you go.
Thank you. Um, these might be the the
change version because I didn't do track
changes. I just did it straight in the
document.
>> That's fine then.
>> Yeah. Yeah. So, this looks right,
right? Just going through
that hearing was continued.
There's a little bit of open forum and
new business
and adjourned at 9:10 p.m.
>> Right. Um, would any commissioners like
to make any further edits or make a
motion?
>> I'll move to accept the minutes uh with
the revisions as noted.
>> Thank you.
>> And do I have a second? Who is that?
David White. Okay, great. Okay, any
other discussions? I don't see any, so
I'm going to take a roll call vote. Um,
Brian McBride.
Brian, did you say yes? Oh, okay. Sorry.
Um, David White,
>> yes.
>> Mike Gildisgame,
>> yes.
>> And Susan Chapnik says yes. So, those
minutes are accepted. And we're going to
go on to the next agenda item, which is
um so correspondence received. Um
Jackie, do you put a link in the chat
for us for um any correspondence? I know
that we did get correspondence on
Thornike Place um which as as we know is
being adjudicated by the um by OADR by
D. Um so if anybody wants to review
those communications, they should be
posted. Um,
and
I don't think there was anything else of
note, Jackie.
>> Um, I added your comments about the um,
six PPD queen own storm water testing
and SVOT testing results.
>> Thank you. Yes. So, we did get
correspondence from myself because I
wanted it in the record um, reviewing
um, those results. I'm not going to
discuss them now unless there's a
question, but we could do it in new
business if you want. Um, so we get
through the agenda.
Um, the I'm going to So, there's the
discussion items are enforcement order.
Um,
I think I'll go to the enforcement order
next and then I might skip through some
of the other ones and go to our
conservation commissioner applications
and then back. Um, so enforcement order
103 Thornike Street. I know we got some
materials just today which the
conservation commissioners would not
have gotten a chance to review, but I
know we have um Chi Men here.
>> Um if you could walk us through um what
you submitted in in terms of uh
compliance with our enforcement order.
>> Yes. Uh I can give you a quick overview.
I don't want to take too much of your
time. So basically we asked the client
to assembly a date of you know in order
of what happened uh on the whole
process. Um the project was first
approved back in July 2024.
Um I you know I did the plan and I
represent the client on the uh obtain
the order of conditions and they also
got a CBA approval of the plan.
um believe is sometime around August
2024 which is slightly different from
what the conservation was approved. Uh
unfortunately the
uh order condition was never recorded
and they sold the project to the current
owner um and the current owner did not
know about the order conditions. So they
followed the protocol of u regular
building permit process. They got they
went to ISD, went to DPW engineering,
got all their duck in the work and they
start the demolitions
um with the with the CV approved plans
um and then you know later on they they
got the season and disease order and
also um the uh enforcement order and
they realize they they are in
violations. So um so unfortunately the
the prior owner sold to the new owner
and they did not know. So right after
that they've been taking actions um and
they um you know um recorded the order
of conditions. they put up the D sign
and um and I asked them to put in the
order of you know the order of what
happened you know when they get the
building permit and so forth and they
you know when they got the you know
during the the
the um construction process they got
their building permit you know they went
to the DPW got all the um submit the
dewatering plans that got approved by
town engineer and that's how they
proceed with the constructions and you
know um and then they find out they are
in violation with conservation. So they
take immediate actions, stop all work
and at this time you know from the last
hearing in between last hearing and now
basically they want to make sure the
site is all secured erosion control in
good conditions. Um they haven't done
any work other than you know just
securing the site and you know keep the
site in good conditions and all the um
you know um the storm drain outside of
the work on on the street they all have
seal sack they they are they've been
kept in good conditions the street been
clean um so we just moving forward to
the next step I have recently between
the last hearing and and and and and
today uh updated the zoning approval
prints
um that
was uh revised per the uh order of
conditions switching some of the print
on on the um on the plan um other than
that I don't think there was a big
change the deviation between the um
conservation approval and the soon board
of appeal approval. There was additional
overhang deck on the second on the on
the first floor, second floor which is
up above their open deck. So um drainage
wide you know
rainfall for on the deck they just you
know uh um go through the gap you know
the decking into the ground. Um there is
a slight different on the permeable PA
the area the size um and but the again
they are designed as a permeable PA. So
they so so the rainfall they infiltrate
right into the ground. So h um
hydraulics wise hydraology wise that
pretty much no change the footprint of
the building relatively stay the same
with the roof area. So I don't think
there's any um effect to the sizing of
the um
the the bio retention area and the
grading. Uh I would have to do a little
bit of grading change basically um cut
it down a little bit but again we are
not because the resource area on this
side is really um land within front
zone. So um we are cutting down the gray
is not going to be losing any fresh
storage as comparing to the uh approved
plan actually it's going to be
additional uh front storage. So we are
ready to submit that plans to the
commissions to the uh as request for
modifications as part of this process
and um unfortunately I I was trying to
um I understand Mr. Morgan was out for
some time, so was going to contact the
um commissions, maybe do a site, you
know, the agent, do a site walk or
whatever, but uh I understand he was out
and I just find out today he's going to
be leaving the commission. So, um we are
just going to find out the next step
with the commission. You know, we
schedule a sidewalk and um we submit the
plans for the modifications.
Um and I did look at the violation of
the um uh the enforcement order on the
on on the I mean a a number of them has
been resolved. You know a few of them
refer to the recording or the order of
conditions and the DP signs and and so
forth. Uh but again you know all the um
erosion controls and everything else is
in order. Um and then we some of the
item is like pre-construction meeting
and stuff like that. So we are we're
trying to
work with the commission and do a
pre-construction meeting and moving
forward and basically comply with what
they're supposed to do.
>> Thank you for the update. So, it sounds
like you've addressed most of the issues
in the enforcement order and that we're
at the step of
um doing a sitewalk
>> and and evaluating
um
uh modified plans when you submit them.
>> Yes.
>> Before you can start work. So, Jackie,
let me ask you. Um, Jackie Yei is our,
um, administrator,
our conservation administrator, and
she's going to be taking over this these
kinds of issues, um, when David's gone
until we get a replacement. Um, so she'd
be your contact
uh, for this project. Jackie, do you
know if you or David had been able to go
to the site and make sure it was secure?
um prior to this meeting or No,
>> I haven't been. I'm not sure about
David.
>> Okay.
>> All right. I'll have to ask him. I have
not been out myself, but I think what we
should do is have a site visit um
planned so we could make sure that these
the violations we talked about, the
erosion controls, the dewatering, that
the sign, not that we don't trust you,
um but you know, we have to do our due
diligence. um make sure everything is in
order and then discuss while we're on
the site what the modifications are that
you'd be requesting
>> okay
>> to the permit
>> and and just another thing is you know
what they have been uh been doing is
basically excavated down to uh where
they can start driving piles um the site
we we we know that it's soft soil
underneath so the building is designed
with pile support to the um to the to
the main structure. So, um basically
right now it's a bowl. So, you know, any
rainfall is going is just sitting on on
uh um in the in the excavation hole
right now. So, I I I saw the um the next
item potential flooding issue. I'm not
sure what that is.
>> Yeah. So, yeah,
>> I mean that I suspect, you know, people
see water standing there that that's
what happened. you know, we have a hole
excavated out and um if it's if it's
rain, it's just sitting there. Um the
water
>> you are dewatering,
>> we have not well we got a we got a
permit to devoid it from the
engineering,
>> right?
>> But um that wasn't submit to the uh
commissions and we are happy to submit
those plan to the commissions and um and
move forward with that. And also uh what
we have been doing is basically doing
the um the foundation work. So the work
up to date is really comprised to the
original approved brands. So um nothing
is de deviated from the original
approved prints.
>> Right. I was I see that Mike and Brian
you have your hands up and I'll go to
you in a minute but I'm a little
confused now. So I thought at the last
meeting you were dewatering.
>> We did dewater at the u when we was
trying to do the the prep work for the
foundations um uh drilling because you
know they can't drill without you know
with the water sitting in there and the
dewatering was done with the approval of
the town engineer and when that was done
at the time they was they was not aware
that they have the conservation
approval. So right after that we got the
cease and disease order and we stop all
work and working this process out.
>> Okay. So I think we need to clarify um I
wish David Morgan was here. We might
have to circle back. But I we should
have clarified.
>> Okay.
>> He is here now. We should have clarified
that dewatering was allowed. We wanted
you to cease and desist on construction.
>> Okay.
>> Um but anyway um let me go to Brian
McBride. I think he had his hand up
first, then Mike, and then maybe we'll
ask David if he has anything else he
wants to say. Brian.
>> Yeah. Can Can you hear me, Susan?
>> Yes.
>> Yeah. So, similar question. I'm just
wondering I I know we had a safety
concern about water accumulating in the
bottom of that hole. I see the fence up.
That's fabulous. So, that's a a relief
in terms of safety. But, is there still
water in the bottom of the pit? And I
guess it relates to Susan's question.
How can we get rid of that water for
safety reasons?
Um I guess we really have to pump it out
because you know um the groundwater um
is pretty high over there. Even we we I
think we dig down about 4 feet right
now. Um we are really hitting the the
groundwater and in addition if there's a
rainstorm coming you we really have you
know maybe a couple feet of water
standing there. So
>> okay. So, so, um, I'm going to go to
Mike Gilda's game now and we'll circle
back on the deatering. Yeah.
>> Just a quick note for which we'll
probably take up later is that with the
porous pavers,
uh, there needs to be a a plan for
vacuuming or sweeping on a regular
basis. That's just a note for the future
when we get that far.
>> I would hope that we put that in the
permit. Mike, but we'll have to check
that.
>> Yes.
>> So, that's a good reminder.
>> On the original um uh approval, they
came with a uh operation and maintenance
plan and the original design already
have the permial PA. Um the Sun app of
appeal approved plan the PA the PA area
was expanded. So, the design is the
same. It's just the the area is
different.
>> Okay. Thank you. But we'll check that
mic. That's a good point.
>> Okay.
>> Um David Morgan, have you had a chance
to go out to the site before this
meeting?
>> No. No, I haven't been since we issued
the enforcement order. No.
>> Okay. Was it your understanding that
dewatering was going to be continued to
be done or not?
No, because uh Chuck, our chair, had
said that we would want to make sure
that the proper protections were in
place for ensuring that, you know, as
you drain into the catch basin, you're
catching all the fines and the sediment
and so forth that would be going with
it. So, I think he wanted us to consider
that as part of the scope.
So
they put silt sacks in.
>> We put the seal sack in and uh the the
water go through a filter bag before you
even discharge into the seals sack. Um
the plan was submitted I should I should
actually submit it to the commissions.
The plan was submitted to uh tongue
engineer. It got approval from town
engineer before the dewatering happened.
>> Okay. Okay. So, in my opinion, I see a
few things that need to be done, but um
commissioners, you can tell me if if you
see it differently or or Jackie or
David. Um I think dewatering needs to be
done because that is an issue for
mosquito larve and just protection. So,
um, please submit the plan to the
commission. Um, but since you have the
sils sacks in the filtering, I think
that there is not a problem with de
dewatering. Um, second, we need to plan
a site visit for Jackie um to go out and
anybody else from the commission who
wants to see it um to to understand how
the site is secured right now and what
your proposed changes are. And then you
need after that site visit
um to give us the proposed changes
um you know the the updated plan um and
your proposed modified changes. Does
that sound right to everybody?
Okay. Um so
I don't know how we want to set up a
site visit. What's the easiest thing?
Well, Jackie only works on Fridays right
now. So it would have to be next Friday.
Is does that work for you?
>> Yeah, that works for Mr. Okay.
>> I can accomodate.
>> You can accommodate that. Jackie, what
what works for you?
>> Um I think next Friday is open. Let me
just double check.
>> That's the 25th.
>> Thank you.
>> Um yeah, let me double check. But I
think anytime
would work. Yeah, anytime on the 25th.
>> Okay. So, why don't we make it in the
morning?
>> Yeah, I think morning is usually easier
for
>> for people
>> other people,
>> right?
>> So, well, we actually try to schedule um
per the out of condition. We're supposed
to have a pre-construction meeting.
Should we schedule that on the same
date? um since you are going to be on
site so we have we can have the
contractor there and um go to
>> Yeah. So that's that's part of the order
of condition. So
>> Sure. So it'll be to to evaluate the
enforcement order
>> to make sure that that's taken care of
and then as a pre-construction meeting.
>> That's fine.
>> Okay.
>> What time on the 25th?
9:00.
what works for people.
>> I know that Chuck usually likes it
early. David Morgan has his hand up.
>> I was wondering about scheduling the
preconstruction
site visit because Yeah, I was
maybe I heard incorrectly, but I was
thinking that there were changes to be
>> Oh, that's right. And the changes
wouldn't have been approved, so we
couldn't do the pre-construction yet.
Well, that's my quest. That's also my
question too because we are only
proceeding on the foundation work.
There's no difference on the plan on the
foundation works. So, we can proceed
with the original plans
>> until the modification. The modification
is really just the the expansion of the
PA area and the overhead um the above
above ground deck. I think with the
height of the groundwater that you noted
and the considerations about additional
uh pvious surfacing there, we'll want to
hold off on the foundation work too. I
think the idea would be we want to make
sure that there's sufficient separation
that we're not displacing groundwater
with the foundation and then you know
trying to infiltrate it on top of that
heightened level of groundwater. You're
going to have a lot of mounding around
that foundation and at the
>> points where it's exfiltrating. So, I
think the commission should take a a
close look at the groundwater levels and
the you know plan the modified plans
compare them and see if they work out.
>> Um, was this was this building supposed
to be elevated on piles or is the
foundation in the ground? the the found
well the the building is supported by
piles because we have soft soil out
there. Um and the because it's in the
front zone, the front portion of the
building is designed uh on gray with uh
flow through panel, the uh front vent
and the rear of the building is actually
open uh supporting the second floor
because um the way it was designed, we
cannot have um any fill on site because
we cannot have any loss of storage
volume and that
>> so you don't have a foundation like a
concrete foundation like a normal house
>> on the front of the building. Yes, we do
have to do it on the front.
>> Yes. Found. Well, I should correct that.
It's a foundation but the um uh the
foundation wall but below is has a deep
pile foundations supporting it.
>> Okay. So, it's it's not a 4ft foundation
that um a traditional
uh foundation that has to go down 4 ft
into the ground.
>> Okay.
>> And since the groundwater seems so
shallow,
um have you I I think we asked you this
once before. Have you looked at the um
the separation and you know how high the
groundwater is and whether
you're going to be flooded all the time
or this is going to work.
>> Yeah. Well, the um the the ground floor
is is is not uh livable space. It's only
used for storage. So, it's designed that
if a flooding event come in, the water
can flow free in and out of the ground
floor. all the living space is up on the
uh upper floor.
>> Okay,
>> that's good for compliance with the
building code and so forth. But I think
Susan's question is getting at whether
the exfiltration from the pvious
surfaces or from the rain garden would
have sufficient room to infiltrate
before hitting groundwater,
>> right? because otherwise
it doesn't exfiltrate.
>> Yeah. Well, the the design is up above
the groundwater and we have a vessel of
course under the uh pores pavement
that's um I think it's almost like 12 in
of crush stone. When it's rain, the
water can uh filter flow into the uh
crush stone reservoir layer and let that
sit there for a period of time. Let it
slowly infiltrate into the ground.
That's that's how it works.
>> Yeah. So, I would encourage
commissioners to take a close look at
those figures and make sure that the
engineering is dialed in as tight as you
can get it. I've it may well have the
separation that's needed. Um that you
know in in light of a not a conventional
foundation granted but anything
additional going into the groundwater
there you want to make sure you're not
running into issues in a neighborhood
that's that's known to have flooding
problems.
>> True. Um let me ask you one more
question Mr. Man. Um, did the town
engineer review this um
the the permeable pavers and the and the
rain garden and where the groundwater is
and the whole storm water system.
I would I would think yes because we
went through both conservation and um
Sony border appeal process and I believe
the town typically send it to the town
engineer for comments.
>> Jackie, could you follow up and check on
that if we have any um town engineer
comments in our project files? I'm not
sure we do. Um,
>> yeah.
>> Yeah, but at at some point. Okay. So, I
think we're we're circling back. Um, I
think I'm going to take David's um
recommendation to heart that the
pre-construction meeting is going to
have to be after the site visit because
there might be other
changes that we discuss or we might make
a recommendation. So, um I don't know
that we could do it at the same time,
but we can do it, you know, shortly
after that.
>> Um so, let's do the site visit on the
25th. I know that Chuck prefers an early
morning. So, could we do 8:30? Would
that work?
>> Yeah.
>> Okay.
>> Yeah.
>> Would that work for you, Mr.
>> Yeah. Whatever. You know, whatever time
we can come.
>> Okay. 8:30 a.m. Does that work for you,
Jackie?
Okay.
>> Yeah, that works.
>> Okay. So, we'll do a site visit on 9:25,
8:30 a.m. And that's to review the
enforcement order issues and also to
discuss what are the potential
modifications that you want to make so
that when we do the pre-onstruction
meeting, all our ducks are in order. Um,
sounds good. And in the meantime, I
think I don't know if we need to modify
the enforcement order to allow them to
do dewatering.
It I don't think it says either way,
does it? The enforcement order. Don't
know if anybody has it up. I don't think
it say
>> there is a in the chat. the uh owner of
103 Thornike says there's no water on
site now.
>> Well, that's nice. Thank you.
>> Yep. Um on the special conditions
51 is talk about any dewatering
operations shall confirm to the
following. Um basically we have to
submit the plans to the commissions get
approval before we start.
>> Okay. So that's
>> so just submit that plan that you had
from the town engineer approval
>> and then you can
>> that's one of the violation on the
enforcement order.
>> Right. Okay. So you said you have that
plan. It was reviewed by the town
engineer. So submit it to the
conservation commission. Um the agent or
or Jackie um because David's not going
to be here can can look that over
quickly and give approval for dewatering
going forward. until we get this
enforcement order um all um fixed
because we don't want to have a huge
storm and then say, "Well, we can't do
anything."
>> Okay.
>> Okay. So, we did that and we have a site
visit and then we should put um you on
the next
uh meeting
>> for followup and that would be either um
that would be the October 1st.
>> October 1st. Okay.
>> Okay.
>> So, we should continue to that meeting.
>> Do we need to
um advertise for the modifications?
I'm thinking that I would I would have a
plan be submitted so we can actually
review the modification.
>> I think you should have a plan. I don't
know that you need to advertise for
>> Yeah. I don't I don't
>> I don't think normally I don't believe
but I don't know if the town has that
you know requirement.
>> Yeah. Jackie David I don't think he
needs to for a modification but what do
you think? I I don't know
>> if it's an amended order it would need
to be advertised.
But if it's a minor modification, see
this is where we always get in trouble.
We have to decide if it's a minor
modification or an amended order. And in
order to decide that, we need to know
what are the changes.
>> Okay.
>> So, based on what you've told me
already, it almost sounds like it's a
minor, not an amended order.
>> And so, Jackie's right. If it's
significant enough that it's an amended
order, then we do need to advertise.
>> Yeah. I I think the original of
condition cover for everything.
>> Okay.
>> Basically,
>> and these are minor. Okay. So, um
let's let's
assume that's right. And if we get in
into um an area where we think, well,
no, this is getting to be too much and
it's an amended order, then we'll have
to do it at the next meeting. Um but
we'll start out assuming it's the minor
um changes. So, we'll continue this to
October 1st.
>> Okay.
>> Um, and is there anybody um in the in
the public who would like to make a
comment about this enforcement order?
I'm going to open it up to public
comment, which is the chair's discretion
on non-hering items.
You can either raise your hand using the
raise hand function under um the re
reaction button or just wave and turn
your video on.
Don't see anybody. Am I missing anybody?
David or Jackie? I don't see anybody.
Oh, Francis son.
>> Okay, Francis, could you um you can
unmute yourself.
>> Yeah, Francis is the owner.
>> Oh, he's the owner. Okay.
>> Uh go ahead.
>> Yeah. Good evening everyone. So
>> good evening.
>> Uh I believe so we already done the last
dewatering uh before the last hearing
the last meeting. So uh during the last
whole months I have track on site and I
took a photo this Monday and uh I think
chim already submitted. I believe no
water on site now. So okay less issue.
Yeah.
>> Thank you. Thank you very much for
reporting that. And if you did take a
photo, could you forward that to the
conservation commission?
>> Yes, I think a chim already did. So,
it's in there. Okay. The packet I
emailed today has a lot of photo in it.
>> Okay. I didn't get to review that
carefully um because it came so late.
>> So, um for the October meeting, if you
could get the materials in a week
before, if you have a revised plan, that
would be helpful because then the
commissioners have a chance to review it
before.
>> Okay.
>> Yeah. Okay.
>> All right. I'm going to close public
comment and um can I get a motion from a
commissioner to continue this meeting?
This Yeah, continue this discussion.
Sorry.
>> I'll motion.
>> That was David White.
>> Do I have a second?
>> Second.
>> And that was Mike.
>> Yes.
>> Okay, great. Okay. Um Brian McBride.
Brian, do you hear?
>> Brian, are you there?
>> Are you Are you saying yes?
>> Frozen.
>> Are you frozen? All right, I'll come
back to you, Brian, because I need you.
Um, okay. Uh, Mike Eldest Game.
>> Yes.
>> David White.
>> Yes.
>> Um, Susan Chapnik says yes. And can I
get
um Brian McBride?
>> Yes.
>> He put a thumbs up, so that's good.
Okay, so we're going to continue this
discussion.
um on October 1st and you need to um
submit the dewatering plan that you had
from um the town and you're going to um
submit a revised
uh plans which will have some
modifications and we're going to do a
site visit on the 25th and we'll have
some site visit notes from that at the
meeting as well. Thank you.
>> Thank you.
>> Thank you very much.
>> Thank you.
All right. So, the other um report the
other discussion items have reporting
from working groups. Um I'm going to
skip over that for the minute. Um and
I'm going to go to conservation
commission applications. We have two um
potent two applicants
>> for uh that that have shown interest in
the uh conservation commission position.
that's being vacated by Nathaniel
Stevens and um
Chuck and myself self have have
interviewed some of them and David has
interviewed them and Jackie I think
you've met have you met some of them as
well hopefully
>> I met one of them yes
>> okay all right so we have um Emily um
Scarf here with us and we have uh Seth
Federiel. So Emily, could you please
just introduce yourself, why you want to
be on the commission, what your
background is, and we'll have
commissioners ask you questions as they
see fit. Thank you.
>> Sure. Yeah. Um, hi. Nice to to see
everyone and and meet everyone virtually
if I haven't met you in person. Um, I'm
a licensed landscape architect. Um, I've
been practicing in the Boston area for
close to 15 years and um, I work for a
small womenowned business uh, in Boston
and I've worked on a number of projects
large to small, a lot of work in the
public realm and I've also been on the
other side of the conservation
commission um, uh, guiding projects
through the permitting process. Um I
have a master's in architecture and in
landscape architecture and when I was a
graduate student I worked at the uh Lady
Bird Johnson Wildflower Center in
Austin, Texas uh working on the
sustainable sites initiative and writing
those guidelines.
>> Thank you Emily. Um any commissioners
want to ask any specific questions um of
Emily?
We did get your resume. So, so they have
that background, Mike.
>> Okay. Thank you.
>> Quick question, Emily. Thank you for
being here tonight.
>> Yes, of course.
>> What What do you think your strengths
are in terms of the work the
conservation commission does? What
strengths do you think you'd bring to
the story here?
Yeah. So, I've lived in Arlington um I
guess uh almost for six at least six
years. And um I think I have a really
good understanding of um the sort of
nuances of um conservation and sort of
the is put forth by the Commonwealth. Um
a and I think that as a landscape
architect, I have a really good um
understanding of um ecosystem services
and the different um you know factors
that influence
um what the the goals of the
conservation commission are. Um and
through my practice as a landscape
architect, you know, um obviously plant
material and specifying native plants
and adaptive plants um has been a big
part of that work. Um so I really think
I have a broad understanding of um of
what's needed to be a conservation
commissioner in this town. And I'm sorry
we're having a bit of a my daughter's
having some sorry it's a meltdown. I'm
very sorry if you can hear that.
>> It's all right. Don't worry about it.
>> Okay.
>> We've all been there.
>> I'm sorry about that.
>> No problem.
>> Okay.
>> Any other questions for Emily?
>> Um
>> Brian Brian, sorry I didn't see. Yeah,
go ahead.
>> Yeah, sorry I lost my connection a
second ago. I'm not sure if Mike's
question covered this, but I'm curious
if you've ever worked uh with projects
that were uh near near protected areas
and wetlands and what kind of specific
project might have um exposed you to
some of the Massachusetts or Arlington
regulations.
>> Yeah, good question. And um I can
definitely say that I have worked on a
number of different projects that are um
you know near water resources um near
wetlands
um within the 100 foot buffer adjacent
to the 100 foot buffer um near
freshwater bodies um near coastal water
bodies um and I've worked for state
agencies um like Massport on projects um
that are in these resource areas um as
well as projects in the city of Boston
and um Cambridge and some of the smaller
towns on on the Cape.
>> Thank you.
>> Well, thanks Emily.
>> Thank you.
>> Yeah. And I'm going to go to um Seth
Federsfield. And I'm sorry, Seth, I
didn't get to to meet you because I
missed that Zoom, but I get to meet you
now.
>> No problem. Happens to the best of us.
Um nice to meet everyone. Thanks very
much for having me this evening again.
My name is Seth Bispiel. Um I've lived
in Arlington for 13 years. Um I work my
background is in climate change policy.
Uh so most of my work has been for uh
governments at the federal, state, and
local level um implementing climate
change mitigation and adaptation uh
programs and policies. Um, I'm
interested in joining the conservation
committee um as a way to get back to
Arlington and kind of blend my interest
in um, you know, protecting natural
areas and getting people involved in the
environment as well as enabling
sustainable development. Um through my
work in Cambridge, I was in the planning
department there and really saw the need
to balance, you know, development, you
know, particularly given the affordable
housing crisis we have with
environmental protection and making sure
that we're being responsible with the
natural resources we have, particularly
in urban environments like Arlington, um
where the natural resources we have are
are really important. Um
so I would bring um again you know a lot
of experience working in that kind of
government regulatory setting. Uh in
Cambridge I worked with the zoning and
development division um to help new
development in Cambridge um comply with
the conservation and uh climate change
regulations. I helped to write the um
zoning code for the green building
requirements around energy and
environmental requirements. Um I also
both in Cambridge and at the state
worked to help uh update the building
energy codes. Um so I'm familiar with
kind of that code language. Um and I
also saw um oversaw implementation of
the Cambridge climate adaptation plan
and thinking about that how that fit
together with development and um other
services within the city. Um so I think
you know again I'd bring to to the
committee that somewhat higher level
perspective of how all these pieces fit
together um but with a lot of comfort
with government and regulatory
processes. I think I can work
professionally um with the rest of the
committee as well as with project
proponents um as they go through the
process. Um so thanks again for having
me and happy to answer your question.
>> Thanks Seth. Appreciate it. Um any
questions from commissioners for Seth?
>> Yeah, I have a question. Um, so
have you been involved at all in the
climate change um,
initiatives in Arlington or this was in
a different town?
>> Yep. So um, both professionally and
personally, I've worked with the
environmental team in Arlington. So Dave
and I go back several years and I know
Fox quite well.
>> Um, and so I've helped with the climate
mitigation work that Talia has led, but
also with David. some some of the
climate adaptation work. Um, and
currently I work for an organization
called the Building Electrification
Accelerator and we support cities and
towns statewide with their climate
change work. Um, so David and I were in
a meeting yesterday around natural gas
leaks in Arlington and and creative
solutions to to getting off of gas for
the city. So So again, familiar with
with kind of cities across the state in
that way.
>> Okay. Thank you. Um, any other questions
from commissioners
or Seth?
No. Well, I will say thank you so much
for joining us tonight and the process.
I'm sorry if it was a little disjointed
over the summer if we were lacking
getting back to you because there were a
lot of vacations and summer is hard to
deal with things. Um but the process is
that the conservation commission after
meeting you tonight and and reading your
resumes will will come together and vote
on um who they want to put forth as the
full commissioner to replace Nathaniel
Stevens. We do um have associate
commission positions. Um, I don't know
if you're aware of those, but what those
are are it's very similar to a full
commissioner except for the fact that
you don't have as much responsibility.
You're not expected to meet make every
meeting and you don't vote, but you do
have a voice and you do have, you know,
specific projects or specific areas of
interest sometimes that you spearhead.
Um, right now we have two associate
commissioners. one is our liaison to the
tree committee and the other um is
actually an agent in the town of
Burlington and she brings a lot of storm
water um expertise. Um but they don't
come to every meeting and they do
specific things um for us and they they
really add to to our work. Um, so I I
would just like you both to consider and
and I'm not going to put you on the spot
now, but if you could email us back the
Concom and just say if if you were not
chosen as the full commissioner, would
you consider an associate position? Um,
and if you could just email us back,
that'd be great. Um, so that we
understand that we you have a lot of
talent, both of you, and you bring
different um areas of expertise. Um, and
I I wish we had two full positions open.
Um, because sometimes we are we're
looking for people and now we have two.
Um, so so if you could follow up um via
email and you can just send that to the
concom
um and don't email David directly
anymore because he won't be here. Uh,
but um, Jackie will be here and I'll
I'll be spearheading this with Chuck
Terrone who couldn't be here tonight.
So, thank you, Seth, and thank you,
Emily.
And we'll tell you by the next meeting
because we'll do a vote at the next
meeting. So, we won't keep you hanging
that long.
>> So, we should email you tonight and let
you know and then you'll let us know
after the next meeting, which is on
>> because we have to do a formal vote.
>> I see.
>> Um, yeah. So, but I'd like to know your
position, whether you would be
interested in just a full position or
you're interested in either position.
And um that would be helpful to us when
we vote.
>> Okay.
>> Okay. Thank you. And our next meeting is
October 1st.
>> October 1st. Okay.
>> Okay. All right.
>> Thank you so much.
>> Thank you so much for spending your time
virtually. Yeah. Right. And at some
point we're we're going to do at least
one inerson meeting this year
>> because we need to do that. So yeah,
>> thank you.
>> Good. And you're welcome to hang around
if you have the time for the rest of the
meeting. See what we do.
>> Okay. So we're going to go back to the
rest of the um discussion items. Um I
think we can get through them quickly
and get to our hearing by close to 8:00.
So we have the um fishing line working
group has not met. I am the liaison to
that. So there's no update. Uh the water
bodies working group David White.
>> Okay. We are going to really miss David
Morgan because he's a key a lot of
things we do. We need to think about the
next RFPs who work for next year. So
we're going to have to pull together to
make that happen.
>> Okay. And um
so it's a more work for us and harder
work for us to do, but we're trying to
pull it together.
>> Okay. And I'm hoping that Jackie gets
gets up to speed on those.
>> I'm also thinking having one vendor
rather than multiple vendors for things.
>> Okay.
>> Think about consolidate things might
make it simpler as well.
>> Okay.
>> Though in the past we consolidated and
then we weren't happy and that's why the
vendor. So there's pluses and minuses
there. So, how can he manage
>> right now? I hear what you're saying.
Um, yes. So, so we do need to focus on
that. I I I like the model that we did.
Well, you tell me if it's working. I
know Brian um I mean Dave Kaplan isn't
here tonight, but he was at least
spearheading
the uh man, you know, following the
management of the contract for Spy Pond,
right?
you know, keeping on track on top of
them and making sure that
>> that they they did everything that was
in the contract and
>> deliverables, etc.
>> Our next our next task is get the RFPs
together
>> probably by November.
>> Okay. All right.
>> Okay.
>> Um,
>> one more piece of news.
>> Okay.
>> Okay. There is apparently a heron
>> entangled at the reservoir.
>> Mhm. I'm not sure. Well, there's a
fishing line, maybe been a fishing line,
maybe been mud, I don't know. But there
was a big to-do and a rescue operation
this week, including the placing the
fire department,
>> right? I heard about that. The fire
department came out and so did the
Arlington
um
>> animal control officer,
>> the animal control officer um and
several volunteers. And actually the the
egret, I think it was an egret ended up
spraying itself. Um, but it looks like
it had a hurt leg. Um, so hopefully it
will will survive. But there was some
concerned
>> Oh, you did? Good.
>> Good.
>> There was some concern about the um
level of the water in the reservoir, but
my understanding is we always drain it
to that level.
>> Always drain to the level. Yes. Always
lowered the lowest level this time of
year after the beach closes.
>> Okay.
>> And this year we have a additional
problem. I think we have a lot of plant
life
um leaf pondweed that is sort of knotted
rotted on the surface as well. So that's
a different thing this year. Usually
it's just sort of mud. This year we have
plant materials as well.
>> Okay. And is maybe that's something we
should look at with the with the
management evaluate the level that we
should take the water down to or
>> I think we should also look at how to do
about the invasive curly leaf pondweed.
>> Okay.
>> Because we have that at spy pond. So
what do we do? Do we treat it somewhere
or do we not let it there's all sorts of
comp complications and and the burers
like the low level. It's good mud flats
for migrating birds. Yeah, I've seen
I've seen a lot of migrating birds
there. Um depated. Yeah.
>> Corant the what's that big corant? The
really large one.
>> It's a burning hot spot for migrating
birds.
>> Yeah. Yeah. Okay. Well, thank you,
David.
>> Okay.
>> Um and you know, I can help with that,
too. I know in the past I've helped a
lot with water bodies, but I stepped
back. So, I can step back in if you
need.
>> We'll join you in again.
>> Okay.
>> All right. Uh tree committee leazison.
Um Sarah is not here so we don't have an
update there. Sims conservation um Brian
McBride is there any update on that?
>> No, we uh we were unable to pull off our
meeting last week um due to scheduling
conflict. So we're trying to reschedu
for next week. I have I have to say I
have new respect for Nathaniel. It's
really cat hurting at a high level to
try to get everyone on the same page in
the same place. So
>> hopefully on good luck. I do have one
more piece of news, Susan, on the CPA
and maybe a quick discussion.
>> Sure.
>> Um the the preliminary uh applications
for CPA funding are due in about a month
>> and uh with David leaving um I just
probably we should get some clarity on
who's going to be managing those
applications, who's going to be
submitting them, which which properties
we might try to do some um applications
for. My my hope is that the committee u
sorry the commission would consider
doing a couple um uh applications
regarding some of our properties for
enhancing uh
oh I think we lost you Brian
well if you don't come back I'll speak
for you because I think I understand
that you're looking at conservation
properties for improving habitat and
biodiversity university. Um, and writing
something about that,
>> right,
>> David? Oh, there you are. Okay. Are you
back?
>> Sorry. My uh my connection is strange
tonight. Keeps
>> Okay.
>> David.
>> Yeah. I'll just ask David. David or
Jackie, are do you know who's going to
take over
assisting with the CPA um grants writing
or would it be the new David would have
to do that?
>> Yeah, it would be my successor.
>> Okay.
>> In the meantime, do you think Claire has
or anybody has any appetite for helping?
>> You can always ask.
>> Okay.
I met with David and Brian
was that a number of weeks ago now
to talk about the prospects and we had
wanted or well rather we hit on the idea
of doing something with the
Massachusetts tribe at window on the
mystic given the prior conversations
we've had with them about that property
and I just I want to encourage the
commission not to move forward that
until there's more community involvement
and support. So, um I I think as long as
if if you do choose to advance something
for other properties, that that seems
like a a great proposal to be overdue as
Brian's highlighted many times and
potentially the one that gets funded,
right? So you can just hand that to
whoever winds up in my role and they
will be able to run with it.
>> Talk about pond lane 2 is a priority
project.
>> That would be fantastic.
>> Yeah. No, nobody else is going to be
moving that one for a while. So if the
commission wants to pick it up and and
do something with it, I would be
thrilled.
So, Brian, are you still um taking the
lead on
maybe assisting someone when we get a
new David to to write um a proposal for
CPA funds for property?
>> Yes, sure. I'm happy I'm h happy to do
that. I think I just probably need a
little guidance and this helps what
we've just talked about.
>> Okay. You certainly Cooks Hollow and
Pawn Lane are the big the big swings I
think that David David and I came up
with a couple weeks ago,
>> right?
>> I you know, I have this personal desire
that we should it would be nice to start
a project to do some habitat uh work uh
land restoration work on one of our
properties like maybe it's Metobrook or
something. Maybe there's a pilot we
would do along those lines to, you know,
put up a sign, improve the path, maybe
have a a lookout or something. You very
simple um as a demonstration project. I
don't know if the committee commission
has interest in that sort of um uh new
new new kind of project
>> rather than um something that we have
some funding for like Cooks Hollow. Is
that what you're talking about?
>> Right. May maybe in addition to cook,
maybe it's only, you know, $50,000 to do
>> a little project, right?
>> Yeah.
>> A little demonstration project. That
sounds good to me.
>> Um,
>> and the goats, too.
>> The scouts.
>> Goats.
>> Yeah. Oh, the goats. Yes. Well, that's a
good segue, David. That's a good segue
because I know we're going to talk about
goats.
So,
Brian, did you have anything else to
bring up?
>> No. Um just maybe one last thing. Uh so
if uh you know David David and I have
this rough format and I think we have
some guidance Cooks Hollow, Pond Lane,
maybe a small demonstration project. Who
would who would I work with or David and
I work with in the next three weeks or
something until I don't imagine your
replacement is going to be chosen in
three weeks, David? And no,
>> we have a deadline in four weeks,
>> right? And the deadline is really just
for like an outline. I mean, this isn't
like the whole project, right? The first
deadline is really just a kind of
>> concept. So,
>> two or three paragraphs really.
>> Okay. So, I'd be happy to work with you
on that and maybe we can loop in Jackie
as she has time.
>> Perfect.
>> Okay.
Yeah.
Because I've written some before years
ago.
>> All right. Sounds good.
And you can keep us and you can keep us
honest, Brian, because I might forget
that it needs to get done and you can
email me
>> and we'll meet
>> a team team.
>> Yeah, we'll meet. Okay. All right. Okay.
So, now I'm going to go over back to
David Morgan to talk about goat
landscaping and anything else you want
to talk about.
>> Is this the administrator's report to
follow?
>> Sure.
>> Okay. So I suppose we'll tackle any
transition related conversation in the
administrative
report section, but um upfront on the
goats,
our recycling coordinator was just hired
Charlotte Milan's replacement and um she
came to me to meet the first day she was
on the job and in our conversation she
said, "Do you have any produce for a
herd of goats to do landscaping for.
I was overjoyed. I was like, "Yes,
absolutely." Um, knowing that we've had
them at a Sims in the past and it's been
something the community enjoyed so much
and uh really brought attention to those
properties in meaningful ways. So I
reached out to the woman who tends the
goat herd and is a Lexington resident.
We got together at Pawn Lane to talk
about the project that's slated to
happen there and she was willing to
volunteer herd to come out and you know
conduct a bit of vegetation removal.
Um,
I want to stop here and just mention
that we have $90,000 in community
development block grant funds for Pond
Blain, which has just
been announced is forthcoming from the
federal government. So, we can count on
those funds for the preliminaries.
um our CDBG coordinator is going to be
working out what exactly are eligible
expenses and so forth.
But I wanted to bring this question of
making a donation to um the goat herd
to your attention so that we might start
off on the right foot with
uh this woman who tends the herd and
maybe be able to do more work together
in the future. So,
as I say, she's she's volunteered. has
even signed a volunteer waiver and so
forth. But I went and did some market
research and figure out what these
services generally cost and would like
to propose that we allocate $2,000 from
the
stewardship fund that we jointly hold
with the land trust
to basically
approximate what she could get paid for
her time.
So this is not something that you know
is is being contracted. It's not subject
to procurement because it is a volunteer
job. But I would like the commission to
consider
pitching her that amount as
a gesture
being able to work together in the
future and
you know start off on the right foot.
David, would that be for a one-time
service fee kind of thing or is that
more general uh participation?
>> Yeah. No, that's a good question. Like
what is the scope? So, she would bring
oh, I think it's about a half dozen
goats to Pond Blane.
If we're able to, you know, get her on
board for
um
the end of September and into October,
it would be like a 3-w weekek stretch of
time that they would be there. only
certain days of the week, but they would
do a good amount of land clearing.
We
inventoried
the biodiversity on site with with the
help of volunteers. I mean, I went out
myself and did a whole bunch of
cataloging of the plants and such that
are there. And
when we met on site, she said that they
could eat probably 75% of what we had
indexed.
So they'll put a significant dent in the
project that would give us a very
meaningful head start on the pond lane
project to come this fall.
So, it's essentially
site prep before we get into doing
things like infrastructure work.
>> Good.
What plants would they remove?
>> Oh, that's a great question. I would
need to pull up my
>> There's a huge FYIA that she says that
they love. There's a large patch of
poison ivy that they would wildly eat.
Um,
trying to think of what else. There's
mulbury. I think that she said that they
would touch those.
>> Mhm.
>> Certainly
the, you know, saplings and grasses and
things of that nature
in the clearing in the center.
She said that they would get lower
branches on the other native trees,
which could just be helpful for, you
know, making passage, but generally
wouldn't touch things that were um like
a multiflloral rose that's in the middle
of the property or
>> God, what's the stuff called? Porcelain
berry that's growing over it. So, it's a
mixed bag, but in total,
>> she said, or well, put it this way, by
species, she said that it was about 75%
of what
the goats would eat 75% of the number of
species that are on site. They're not,
of course, all equally represented. So
the biomass is, you know, different what
they're going to take away, but it is a
big clearing job that they'll perform
>> and that would save us money to hire
from hiring somebody.
>> Yes.
>> And also save us herbicides at at least
at this point.
>> Definitely
>> because it's a it's a naturebased
solution versus
>> herbicides, right? get a little
fertilizer out of the deal as well when
those those
we know that uh they're lacking in
potassium
um the soils there. So that could be
helpful.
But I think the money would be well
spent simply for the community
engagement around that project. the idea
that we can build some buzz around that
project, which has been out of the
public mind for a while, you know, since
we did
>> definitely
>> and um you know, start to build buzz
ahead of like breaking ground doing the
infrastructure work with the CDBG funds.
I I think that alone is worth
the expense. So
suppose I rest my case.
>> Thank you, David. Are there other
questions?
>> It seems like a small expense overall
for some benefit. I'm just usually don't
pay volunteers. I don't know what that
>> So we usually pay them for materials,
>> not for their time.
>> Materials, not their time. Um, and I I I
am, you know, supportive of this, but
legally I'm wondering what we can do
because this is a fund we have that pays
it does. It is a volunteer fund.
>> It's used to pay supplies, right? And
and physical things, not labor.
>> Not labor at all.
>> Um, and not donations,
right? they went to pay receipts, you
know, like like a scout troop said, "I
need five, you know, $250 worth of
lumber to make this trail, you know,
that's where it went." Um,
so David Morgan, have have you had a
chance to ask town council if we could
do this?
>> No, I haven't.
>> No, you need view the agreement too with
the land trust.
>> Right. That that I think will be the
next stop. I I think the question is
whether it meets the commission's
approval
and if we have that in hand then we go
on to find out what the parameters of
the agreement might be. So, you know,
I'm I'm suggesting a vote on the uh
donation
and if it runs into some kind of hurdle
down the road, whether it's the land
trusts
rules around how to use that fund or
town council's concern,
>> it can be brought back in front of the
commission to, you know, change the
scope accordingly or, you know, just
pick a different cat,
>> right? I saw a comment from Elaine
Crowder that it could be, you know,
earmarked for goat supplies or something
like that. And then
>> that might be a way to do it because
then it's it's supplies. It's a it's
for its materials for the purpose of
this volunteer doing this volunteer
project.
>> Yeah, that that's a helpful insight. We
we talked that
herd tender and I about the expenses
related to keeping a herd. They're
pretty low surprisingly, but um
>> Mhm.
>> you know, this I I think this would put
a pretty meaningful dent in her
overhead. So, we may well be able to
work with her again on a volunteer basis
for having sort of
>> provided for the herd. Yeah. And created
goodwill. Yes.
Um any any other
>> CDBG might be used for this at all?
>> No, I don't think so. I so I met with um
Mary our CDPG coordinator today and our
conversation like like I kind of
described at the top was about how to
decide on the right category
for
>> essentially reimbursement right for the
grant expenses
>> and the federal government prescribes
those and I don't know if this kind of
activity is covered in there. I mean, we
were we were actually going for more
recreation
uh themed categories because of the
eligibility of doing infrastructure work
like the water connection for irrigation
or making paths to have people walk on
and so forth. So, edged in a different
direction.
>> Um,
>> you have another question, David? But
just note that we raise money for the
funds from volunteer donations. We say
it's for stewardship activities
basically materials. So um if we somehow
frame it as some sort of material
support rather than time support would
be a better deal.
>> Seems like a good way to frame it.
>> Yeah. supporting the goat herd to do the
job of what we would hire,
you know, somebody with with herbicides
to get rid of, right? You know, a
landscaper or whatever. Yeah.
>> Yeah.
Okay. Um, can I get a motion from a
commissioner then? Because we can't
accept a motion from David. He can
request it, but we can't we can't accept
it.
I move we try to find somebody to
support this gold activity on okay on
this property.
>> Okay. And whether it be the ALT fund or
another avenue.
>> Yeah.
>> And do you want to put a dollar amount
on that Dave on that motion, David?
>> I think David mentioned 2,000. I to
frame it as a
>> somewhat material support for the
activities
>> for for and and for Pawn Lane and
potentially other activities. Okay.
>> I'll second that. And you'll second
that, Mike. Okay. Um, any further
discussion? There's only a few of us, so
there's not much discussion. Um, I'll
take a vote then. Brian McBride,
>> yes.
>> Okay. Um,
Mike Gildisgame,
>> yes.
>> David White,
>> yes.
>> And Susan Chapnik says, yes. So, I don't
know where that leaves us. David Morgan,
is is this the this drop in Jackie's lap
or do you need somebody somebody else to
>> um
figure out if we can do the ALT funds?
Okay.
>> Tomorrow morning.
>> Okay.
>> I will at least start the ball rolling
to
>> Okay. compare the ALT requirements with
what we just voted on and
>> okay,
>> potentially even put it in town council
and just copy Jackie so that if he makes
a decision, we'll be off to the races if
it's an approval.
>> Yeah, we'll all get on the same page in
the morning.
>> Sounds good. And and Jackie and the
office has all the contact information
for this person with the herd anyway,
correct?
>> Yep. Yeah,
>> okay. Thank you, David. Um I am going to
um delay your administrative report,
David, um which might be lengthy because
we're going to talk about your
transition and go to the next go to the
hearing first so we're not keeping um
the public and the applicant waiting
that much longer if that's okay with
you.
>> Absolutely. Yeah. Thanks.
>> Okay. So, um the the first hearing was
listed as a notice of intent for Zero
Reed Street. Uh this was a continued
hearing and that the conservation
commission was going to hold um to
consider a notice of intent for a single
family home. However, um the applicant
has asked us for continuance. So, we
will um continue this meeting without
opening the hearing. I I need a uh
commissioner to make a motion to
continue this to October 1st.
>> So moved.
>> Thanks, Mike. And can I get a second?
>> Brian.
>> Brian. David.
>> Okay. Brian seconds. Okay. Then I'm
going to take a vote to continue zero re
street to October 1st. David White.
>> Yes.
Brian McBride,
>> yes.
>> Mike Gildescape,
>> yes.
>> And Susan Chapnik says yes. Thank you.
The next hearing is D number 091 0379.
The notice of intent at 53A Park
1337-1339
1341-1347
and 1349-1357
Massachusetts Avenue and Zero Park
Avenue. This is commonly known as
Arlington Coen Lumber in the town. We're
holding this public hearing to consider
the notice of intent for paving an
existed parking area with the addition
of on-site storm water recharge for roof
runoff at 53A Park a um etc. those I I
just said all the uh names of the
locations and the areas proposed to be
altered uh under the wetlands protection
act and our local bylaw include
bordering land subject to flooding
riverfront area to Millbrook buffer zone
and the adjacent upland resource area
which is the buffer zone in our town.
And who do we have um with us tonight to
present this meeting? I see a hand
raised. There we go. Um,
>> hi. Good evening.
>> Is this Lim Limhood?
>> Uh, yes. Um, for the record, my name is
Limhut Tiff. I'm an engineer at Ghost
Mid Press and Ringwall, GPR for short,
and I'm here tonight as a representative
for Arlington Coen Lumber. Uh, I see
that Bob McNamera, the the owner, is
also here tonight. Um,
so let's see here. Um, do I have
permission to share my screen so I can
pull up the uh the plan?
>> You should be able to li
>> All righty.
>> Is that right, Jackie? See, try it and
see if it works.
>> Yes.
>> Great. All right.
>> Can everybody see the plan? Okay.
>> Yeah.
>> Yes. Thank you. It's a little small, but
>> uh let me see. Zoom in a little bit.
>> Yeah,
>> there you go.
>> That's better. Thank you. All righty.
Um, so I believe I was here um, oh gosh,
I think
>> was a while ago.
>> Quite a little while ago. Yeah. Um, I
was here before in in uh, in an attempt
to to ask the commission as well as the
the town um, to consider allowing us to
repave an existing area, the sliver of
land that my cursor is covering uh,
hovering over. Um we have gone back and
through research confirmed that you know
in order to actually get permission to
repave this section of the existing
pavement that belongs to the town it
would require you know town vote and
therefore have opted to
um
ignore or discount that area outside of
the scope of work that we're proposing
to do uh for the project.
Um so to to sort of recap what um we had
talked about last time is that um you
know this area over here um located at
the back of these buildings is an
existing
uh parking area that's been there for
very very long time. Um it has since you
know been degraded and topped off with
gravel a few time just to you know to
have some sort of a solid surface to
drive over. Um this is an area where
there is currently no on-site storm
water management or treatment of any
kind. So any wa storm water runoff that
you see you know following the contour
uh really from this point of the the
driveway and going down as well as all
the roof runoff from all these abuing
buildings um they all sheet flow onto
Mil Brook that is located on the north
side of the uh the site and and parking
area. M
>> um currently there is a spot right about
where my cursor is. Um that is been
eroded you know due to long exposure of
sheet flow and and storm over the years.
Um that area you know there's been some
attempt to try to fix it but more or
less is a problem area and you know
continues to be a problem area for a
very long time now. Um what we're
proposing to do is we're proposing to
um essentially peel off the graded
asphalt and repave the surface
um so that we can get rid of the problem
of you know sheet flowing sediment on
and discharging it into the brook. Um,
additionally, we're looking to peel
back, you can see my cursor, this
section here where you have an existing
retaining structure of some sort that's
holding back parking. Um, provide um an
actual curbing, concrete curbing, and
restore this section and provide some
planting uh to act as a a uh vegetative
uh buffer strip. um as well as a way to
create a physical barrier between the
park vehicles and the resource area.
We're also looking to pick up the roof
drain and roof ramenoff from these two
buildings over here and putting them
into the subsurface
um tanks. Um they're called our tanks.
Um, we selected these because
they they fit well in and for for an
area that we're trying to have vehicle
load over. Um, they're they're
relatively shallow and, you know,
they're they're essentially plastic
carton boxes that you can drive over.
So, they're they're strong and they're
shallow, so it's making it a lot more
easier to work with in an area where,
you know, we're relatively close to the,
you know, the water. Um so we have sized
these to capture and provide storage for
1 in times the roof area of these two
buildings.
Essentially
um you know taking out as much runoff as
we can from what's currently
contributing to the sheet flow problem
going into the brook itself. Um, so you
know, we're reducing the site total
impervious area while providing a way to
treat clean roof runoff to remove TSS as
well as phosphorus nitrogen before
discharging it back into a stone apron
and a stone diaphragm at the area where
we've had erosion issues for
um that's the extent of the project. Um
I'm more than happy to answer any
questions the commission may have.
>> Thank you. Um I appreciate that. I have
some questions, but I'll go to David
White has his hand up and then Brian. Go
ahead, David.
>> I was going to ask about snow storage.
Well, I believe right now snow storage
for the most part is just, you know,
they're pushing snow to the back of this
location over here. Really anywhere they
can really anywhere they can fit snow.
Um, not a whole lot of room to work with
to be honest with you.
>> On site,
>> not in the stream definitely.
>> Yeah. So, so we would put a condition to
make sure that the snow doesn't get
pushed into the stream. And um if you
have snow storage on site and you run
out of room, you're going to have to
truck it off because it can't get put
into the to Milbrook as you know.
>> Understood. I would ask that approval
condition would be appropriate.
>> Okay. Thank you. Um, Brian,
>> yeah, sorry, my connection has been
coming and going, but my um my
familiarity with the site is that the
parking is in general on the Park Avenue
side in the lot at the top right of your
diagram.
Um,
>> oh, we lost you again, Brian.
Brian, you're going in and out. So, we
heard that you had a question about the
parking and it's in the top right.
>> So, we missed we missed a few a whole a
whole uh discussion. Try again. Try
again.
>> Okay. So, sorry. Um I'm my big question
is are you adding parking spaces beyond
what's normally in the top right of the
diagram?
>> No.
>> Okay, that was my concern. Thank you.
Mike.
>> Yeah. I was wondering that area by
Milbrook
uh which is has had erosion problems in
the past. How is could you say more
about how that's going to be stabilized?
>> Yeah, of course. Um the area currently
because it's been eroded for so long. Um
it's you know if you tried to walk over
it is just silky lom material. Your foot
would sink in that area. the subbase
with that would have to be excavated
out. You know, we're not peeling a whole
lot, but just getting out all the muck.
Um, and then putting down rip wrap stone
um so that that area can stabilize or
long-term um discharge point from the uh
the two set of chambers that we have on
site that's you know dumping back water
um out to the brook. Um so that
essentially creating um the rip wrap
apron armoring so that we don't have
erosion problem um in the future.
>> But that area wouldn't be paved over.
>> No, it would be stone.
>> Just stone. And it would receive the
flow from the two tanks. Is that
correct?
>> The the flows are coming that are coming
from the tanks are overflows. The the
pipes are set at a high elevation. So it
has a chance to,
>> you know, uh, retain and infiltrate
water and and overflow once it's full.
Once they're full.
>> And any overflow would go to that area
with the rip wrap.
>> Correct.
>> Mike, I have a question. Oh, there's
David Kaplan. Yay.
Hi, David. I was hoping you would show
up and help us with the storm water. I
have a few questions, but I'm going to
let you go first.
Oh, I can't hear you. Maybe you're
muted.
>> We lost him.
>> Did we lose him? Oh, no.
That's terrible. Well, I'll wait till
you come back. Oh, no. There you are.
I still can't hear you though.
I don't know what's going on with your
connection.
All right, I'll come back to you, David,
when I can hear you. You just shout out.
Okay, feel free. Um, so
yeah, you're trying to reconnect. Okay.
Um, I did have a question. So the the um
the two infiltration units that you're
using are just getting storm water from
the roof or are they also capturing
storm water from the paved areas?
>> They're only for the roof.
>> Okay. So where does the storm water from
the paved areas go? Does it still just
go sheet flow?
>> It still goes sheet flow.
>> Is is there anything we can do about
that or not that you understand?
You see where I'm going with that?
Because pavement can have some, you
know, chemicals that are harmful to our
wetland environments and it's nice to
kind of capture them and trench drains
or somewhere before they could just go
sheet flow directly into Milbrook.
>> Um the answer is yes. Um there is
potentially more we could do. Um the
problem is we generally tend to try to
keep flow coming off of a roof. um you
know separated from flow coming into a
pavement.
>> Sure. Because it's different. One's
cleaner than the other. Right.
>> Right. Right. Because roof runoff is
considered um clean discharge.
>> Right.
>> Um that way you're not dealing with you
know um trying to pick up the TSS that
would potentially clog up the system uh
later. um
>> you know, in order for us to consider
trying to capture anything on the
surface, you're looking at, you know, uh
a capture structure that has a 4ft sump
in order for us to get the TSS removal
credit because we're discharging into
uh critical resource area.
Um so you know it would be in a a
separate set of chambers
um to get that address. Um what we're
doing currently is already a reduction
to you know the existing runoff just by
reducing the total impervious area on
site on top of infiltrating you know the
roof area for these two buildings which
you know if you're looking at it from
just the parking area as well as all
these separate buildings. associated
with this project. I mean we are taking
out a big chunk you know roughly about
40% of the area and then capturing
treating it and retaining that area to
mitigate for the you know the runoff
that's currently sheet flowing
uncontrolled.
>> Okay. Um, I know I I I'll have to do a
little digging on this because I don't
remember what it was, but I know that
that a project
um similarly
in where they were repaving their
parking lot on Dudley Street in one of
those businesses, we did have them put
in a system to capture
the um the parking lot
uh runoff so it wouldn't she'd flow to
Melbrook. Um, I don't remember what that
system is and I don't remember the
number on Deadly Street. Um, so I'll
have to I'll have to go investigate that
myself. But I do have a few more
questions while you're here. Um, the you
show some trees next to the brook in
that is that the reveated area you're
talking about?
>> Yes.
>> Okay. And what are you proposing to put
in there? So, I actually had a chance to
speak with the uh the landscape
architect that was working uh currently
working with the owner. Um okay. What
when he looked at this area and you
know, he basically said, "Well,
realistically, you probably can only get
two trees in there and okay, the other
three will have to be shrubs just
because of how limited the area is."
>> Okay. um you know he he recommended um
red maple and uh tapello um as the
replacement tree or the proposed
planting and then just you know three
smaller shrubs or midsize shrub I guess
um to act as a physical barrier for that
area. Um
>> and then some are you lman seed some
seed or some low grasses or something.
Okay.
>> Yeah. the the organic in that area will
have to be scraped off I have to imagine
just because there's invasive in that
area
>> but yeah scraped off new loom seated and
you know go from there
>> okay
um
oh David it's raising his hand maybe we
can hear him now Dave Kaplan
no still can't hear you oh No, technical
difficulties. I'm going to go to David
White who has his hand up.
>> What invasive do you have there?
>> I'm sorry. Could you repeat the
question?
>> What invasive plants do you have?
>> So, he's asking if you have invasive
species in that area where you're
looking to replant.
>> I believe we saw a few Japanese notwheat
that popped up in the photos. Oh,
>> well, that's a big problem.
>> It's going to keep coming up. So,
there's going to be have to be some
control of that. Maybe cutting and
um dabbing or something if you can.
We'll have to see because the roots are
going to be in there. Yeah.
>> Yeah. We'll we'll work with the
landscape architect to
>> Okay.
>> figure that out.
>> Okay. So, we do have certain limitations
on using herbicides right near Brooks.
Um, but we so for example, no aerial
spraying. If you need to use them, it
has to be cut and dabbed so that they're
>> injected
>> used in a very right limited fashion so
they don't get into the water um in the
resource area. So, we have some controls
on that when we get to to discuss that a
little further. I I might need a site
visit because it's hard for me to
picture
um where everything is. I've been by
there, but I I don't think I've ever
walked in the back. I know David White
has um in the past. Um
>> my neighborhood,
>> right? I also have My other question
was, have you um had the town engineer
review the storm water um systems?
Because we we want to make sure there's
enough separation between the bottom of
the stone underneath the chamber and the
groundwater. So, infiltration works.
We have not um the system the bottom of
the system or both system um were cited
based on the elevation level of the
brook adjacent to it because we're so
close
>> um I believe at the time I try to
maintain 2 feet of separation between
level of the water to the bottom of both
these systems
>> right
>> um just
>> is that listed somewhere do you have a
storm water report that shows that or is
that just on here and I can't see it.
>> It's unfortunately it's not on here. Um,
>> okay.
>> It I I think I do show bottom of stone
right there and elevation 147,
>> right?
>> And the reading for the water was
elevation 145
>> 145.
>> Yeah.
>> Okay.
>> And that's how I we cited the the
chambers.
>> Okay.
>> I I think I Oh, I can hear you now. Yay.
Sorry to interrupt. I just wanted to
test it.
>> No, please, please. I was just talking
about storm water and separation from
the bottom of the chambers, and I would
love you to to uh butt in. Go ahead.
>> No, I I I like where the conversation's
going. I think it's good that it's two
feet. I mean, I think this is maximum
extent practicable and we're getting
roof runoff in there. I think it's going
to vary based on the seasons. So, maybe
some seasons it'll work better than
others. There may be some variability in
that two feet, maybe more, maybe less.
Um, but I think, you know, it's designed
the way it's designed, I think, works
for me.
>> Great. Did Did you have any other
questions, David, about the project?
>> Yeah, I did actually. It's like since I
haven't been to this site, I don't have
an idea of how much width we're talking
about here where that stone apron is.
that's going to take the overflow from
the So I guess my question for that
point is that is that where all the
sheet flow is sort of concentrating from
the parking lot as well or is that just
where the pipes are going to be
outleting from the storm water
structures?
>> It's both.
is both sheet flowing from the existing
site and um that's where we're
designating the discharge point because
everything else dumps out to there.
Okay. So, so all the parking lot runoff
is sort of parrowing to that point.
That's not it's not just sort of
diffusely,
you know, falling
contributing perpendicular to the bank
evenly throughout the width of the
parking lot, right? It's it's all being
coralled to this stone point.
>> That is correct. And and admittedly that
is mainly due to this big chunk of
retaining structure that's on site.
>> Water sheet flow you know starting from
here going towards
>> and you know some of it will hit that
structure and is getting picked up or
you conveyed
>> by that structure and then dumping out
to that that low spot.
>> Um unfortunately is creating a shallow
flow.
>> Right. And you're recreating that
condition with the proposed cur Irving.
>> We are. Yes.
>> Okay. Yeah. I mean, I guess I think it's
this is a tough engineering call because
you are, you know, I I guess I'd like to
see sheet flow kind of more diffusely go
and then using that planted area as kind
of a buffer and sort of a polishing
before it falls into the brook. Um, but
if everything's being coralled to that
point, I guess I'm a little bit
um,
you know, to see bank turn into stone,
you know, if it if it needs to. Yes,
sure. But, you know, if there's a way to
sort of bioengineer it or redesign it in
a way where the sheep flow can
maybe that could put like sort of a a
swale detail
running parallel to the brook and have
it overflow kind of the natural area.
But I again I don't know the width that
you're working with. I don't know what
kind of engineering it would take to do
that to make
um to reduce that discharge point, you
know, from one concentrated point to
spreading it out through the entire
width of the parking lot. I think uh
>> I think that's the the biggest concern
that I have with with the consideration
like that is that you know mass storm
water handbook generally asks that you
try to maintain existing drainage
pattern especially if we're discharging
to a critical area. If we're, you know,
taking an area where we have
concentrated flow and that's where it's
dumping out to a resource area
currently, I would be hesitant to try to
spread that across uh a longer stretch
of area that wasn't happening before.
Um, you know, we're talking about an
area where you have
a
um, sorry, I'm blanking on the word. we
have a regulatory uh floodway that we're
in. Um you know any changes to a
regulator uh regulatory floodway is uh
is generally a big no no. Uh so we try
to avoid doing that if we can help it.
Um but I do see your point of you know
allowing it to sheet flow into a buffer
strip. Um but you know the buffer strip
itself is only about 8 to 10 ft. Um, so
it's not it's not like we have, you
know, a 25 foot strip that you typically
see for trying to get a flow dissipated
and properly spread before, you know,
before it reaching the resource area.
Um, that's our primary concern.
Yeah, I guess, you know, I think it's
the best of we do want to armor the
slope or at least design it in a way
that's not going to continue to erode
and and destabilize.
And I'm just not sure if there's another
way to do it other than stone to to
bioengineer it or do it in a way where
it's going to um at least keep some of
the natural character of that bank
rather than seeding it with breath.
Um, I'm also wondering I'm also
wondering if it would be helpful to have
the town engineer look over this and see
if they have any suggestions
um
about that or anything else because it
is a complex site. It's very tight. Um,
I would feel more comfortable I think if
the tan engineer looked it over as well.
I do like David Kaplan's idea about
looking at naturalizing that area if we
could. Um to me it's almost like I was
just down on the Mystic River looking at
some of our um outflows there that come
from streets up beyond Mystic Valley
Parkway underneath the parkway and they
discharge right into
um the river Mystic Mystic River and um
when it's done right there are um there
is rip wrap and there is stone, but
there's also plantings around it um to
help um naturalize the area. So, but I
just don't know if we have the room here
to do that or not. Is that something you
could look at um Limhoot um to see if if
there's any way we could do a little bit
of naturalization of that area and still
get the benefit of you know the
the water not like just rushing through
there.
>> Um we can certainly take a look. Um,
generally speaking, the the the
bofiltration area that I believe David
is referring to, uh, generally has a
certain square footage. It has to be
met. Um, if you're trying to go that
route. Um, a u mainly for the fact that,
you know, you still have sheath load
that we're dealing with. So, you still
have to have stone in order to slow down
the water first and foremost. and then B
having sufficient area to plant
something in it. Um, you know, on on,
you know, once you slow down the water.
So, uh, I'm not really sure. I have to
take a look at it a little bit closer to
see if we actually have the area to do
something like that. Um, it might be the
case where, you know, we have to cut
back a bigger a bigger chunk of that
area to to fit something in. Uh we can
we can take a look at it.
>> Yeah, I mean I'm not I'm not sold on my
soil idea. Like you said, I'm not sure
we have the size for it and and just
redoing the drainage patterns. I thought
that was a good a good point you brought
up. Um but yeah, just taking the curse
off of that. I I don't have a scale in
front of me, but I don't know how wide
that
spillway is going to be, but sort of
taking the curse off of it and planting
around it in a way that softens it and,
you know, creates a more naturalistic
surround.
>> Um, at least it
>> Yeah, it's a good idea.
>> And my other question too, I had just a
quick one, but we're ready to move on.
Um but if we're not please somebody
>> um David Morgan is your question about
this or something else. I have a comment
about the swale idea which is
>> okay
>> just that
>> stay on that for a minute then
>> this area is in a heat island and so you
know with the addition of pavement right
there we're going to need to be very
attentive to drought and heat resri
plantings
and to the extent that you can add shade
back there in such a site beautiful but
we're already contending with the uh
spatial constraints and so forth. So, I
wouldn't expect terribly much to come of
that. Just wanted to tip you off to
direct the landscape architect to
consider those things as they're putting
together a planting plan.
>> And there looks like there could be one
tree near there anyway, which might help
a little with shade depending where the
sun is.
Okay, Dave Kaplan.
>> Yeah. And and I'm not sure. It seems
it's a pretty busy site. I imagine
there's a lot of vehicle traffic and the
fact that so much muck has built up at
that discharge point. I assume there's a
lot of sort of sediment that's generated
or flowing through the site. Is that is
that a safe assumption?
>> It it is and and mainly has to do with
the fact that this is an area where you
have a degraded asphalt surface. So
loose asphalt is constantly being sheet
flow washed off and and continue to kind
of you know spill into the resource
area. Um that's which is why we want to
make sure it's paved properly so that
you actually have a smooth surface so
that mud tracking and stuff like that is
not
you know making sure that the parking
area is not a problem in of itself
essentially.
>> Yeah. And and I understand your
constraints on, you know, the the TSS
side of the maximum the storm water
standards just based on the site
constraints and then degrading and how
to corral it and put it into a
collection sump working with some other.
Um, but I was curious if you would be
willing to consider, you know,
additional source controls, regenerative
air sweeping. I noticed that was put in
to the O andM plan, but if you would
consider four times a year instead of
two, I think that could, you know, help
with the lack of TSS removal and
opportunities on the site. Um, help a
little bit with source control.
>> I'm I'm sorry. Um, I just turned up my
volume. I couldn't I was having a hard
time hearing you, David. Um, could you
repeat that?
>> Yeah. I just I was wondering if you'd be
willing to consider um additional
sweeping maybe four times a year instead
of two. I noticed that was in the on&m
M. I think that could help out with you
know a lack of opportunity for TSS
removal from storm water management
structures and help out a little bit
with source control.
>> Yeah, of course. I think I think that's
always an appropriate um you know ask.
Um yeah um I would ask that it would be
made into an approval condition. Um, I
think street sweeping is something that
if you have a freshly paved area, you
generally try to want to keep up with if
you can help it. Um, so that's not a
problem.
>> Good. Thank you.
>> Thank you, Dave. Um, any further
questions from the commission or I'm
going to open it to public comment.
Don't see any. Okay, I'm opening this up
for public comment and if anybody who is
here from the public wants to share a
comment or question,
um you can raise your hand in the react
button on the bottom of your screen or
you can open your video
and wave to me. Um, whatever works. So,
let's see if I see anybody.
Do you see anybody? Any I don't see
anybody.
Is there? No, I don't see anybody.
>> Okay. So, I'm going to close public
comment. I'm going to go back to the
commission if there's any further
questions and then I'm going to
summarize what we've said.
Further questions? No. Okay. Um,
Limwood, I I thank you for this. You you
were very clear in what you're doing and
in your answers. So, I appreciate that.
It's It is a complex site. Um, I'd like
to do a site visit. I'm going to ask
Jackie Ye to help us set that up. Um,
and I'd like to ask for town engineers
review of the storm water. Um, and I'
So, those are two things. Um, I'd like
you to um define, we usually have this,
we require a definition of an area on
the plan where you're going to sto
store snow.
Um, if you could just highlight that. Um
the
uh so the town engineer review the snow
storage
uh site visit um consider the source
control which we've said we can put into
a condition of of additional sweeping
and then um if you could look into
softening the uh the outflow the stone
spillway. see what what you can do with
your landscape architect to get that a
little more naturalized without
sacrificing um what you need to do to
make sure that we're not getting erosion
in that area and we're we're slowing
down the flow a bit. Um do those those
things make sense to you?
>> Yes.
>> Okay. Um and with that, would you um
would you like to request a continuence
to our next meeting?
>> Yes, please. or the meeting after. I
don't know how long it will take you to
respond.
>> Um hopefully pretty quick. Um okay.
>> When is the next meeting date?
>> October 1st.
>> Yes, I believe we should be able to
respond in that period of time. Um
hopefully everybody's available to meet
uh before before that meeting as well.
Meet on site. Um
>> right. because I I'd love to if I have a
chance or an opportunity kind of provide
some of the answer during that sitewalk
without discussing it just
>> No, it makes it easier. Sure. Sure. I'm
Dave Kaplan, I'm going to put you on the
spot. Are there any times during the
week that you're available either early
or late because I know it's it's
challenging for you to make site visits.
>> Yeah. Um,
see, uh, Blen, were you thinking of
having it sometime next week
>> or the week after, I guess, because Do
we have two week? Yeah.
>> Or weekend?
>> No,
>> that that's harder for
>> Okay.
>> a lot of people, but um
next week if he's going to get the
paperwork to us a week before the May
next meeting,
>> right? or Yeah, that's true.
>> Um, Susan, can you hear me?
>> I can hear you. Yes.
>> McNamera.
>> Oh, okay. Did you have a question, a
concern?
>> No. No. Um, but we opened our business
at 6:30.
>> Oh, wow. Okay.
>> So, and I could um happily meet everyone
there as early as possible if you'd like
any day.
>> Okay. Thanks, Bob. I appreciate that.
And I will I've listened to the
commentary here. Just if I could just a
couple things.
>> Sure. Sure.
>> Um the building 134947
which was the ORIc store for a number of
years. We've owned um since the early
80s, we just last June bought the
building 1341
um 47.
And we don't own the building on the
corner which is where the UPS building
is, UPS store. So we have a runway or an
easement across for access.
>> Okay.
>> So in the past the the snow plowing
particularly has been troublesome
>> because we didn't own the property. The
previous owner
>> um basically just pushed it anywhere.
And so this past winter which
>> we um pushed everything straight all the
way to the back and then removed it.
>> Okay. it was taken out with the smaller
the couple small storms we had but the
two big storms we had in January and
February we trucked it all out
>> thank you
>> and and Limhot's you know drawing here
the scale the challenge I think just
looking at this from practically is that
the flow goes to the back right behind
our old building so the the grade the
natural grade all the water flows in
that in that direction u behind 1349
Massav
>> okay
>> and It's very limited for we can fit as
we're planning on
10 spaces. Uh part of the reason that we
really want to get this paved and
cleaned up is that it's kind of
haphazard right now with tenants. Um
we're re redeveloping the building and
hopefully we can get it so that it's an
orderly parking system, but there is not
a lot of space between the edge of the
brook and the building. Um
>> Okay.
>> Right. And so I think practically
speaking the plan the way he's on along
the Mill Brook side. I think he's done
as much as we could possibly do. Um and
then and and prevent the water fizz from
flowing in as it's just it's just
there's no no barrier right now except
for a couple pieces of granite curb,
right? So,
>> thank you.
>> But anytime I mean I can move all of you
there and we can walk. It's not a not a
problem at all. So,
>> thank you. I appreciate that. Um Dave
Kaplan, what's your availability?
Um, I could probably do
like 2:30 on Tuesday. Would that work
with people?
>> The 22nd?
>> Yeah, the 22nd.
>> Okay.
>> 2:30.
>> Okay. I don't know if Jackie can do
that, but um
>> No, I can't. But I think it's okay if
you guys go without me.
>> Okay. Yeah, I I can't make it either,
but go ahead.
>> And Mike, can you make it?
>> I can. I'll just have to change another
appointment. That's not a problem.
>> And Dave, David White,
>> 2:30.
>> Can you make 2:30 on the September 22nd?
>> Yes.
>> Okay. All right. Um, and I'll see if if
Chuck can can make it. He may not be
able to, but we can at least get a few
people there. Um, so let's let's make it
2:30. Site visit 2:30 for September 22nd
for those of us who can make it um on
site. And who should we meet there?
Should we meet you, Bob, or
>> Yeah, I'll be Yeah, I'll be there. I
would
>> Yeah, you can be there.
>> Yes, definitely.
>> Okay, great. That would be helpful to
answer questions directly. Okay.
>> If you're walking or if you're going to
park, I would suggest parking in
>> Lumberyard parking lot and we walk right
behind. So,
>> okay.
Okay. And um
let's see what else do we need to do.
So,
oh, I'll need you Limh who to to send
the the storm water specs to in the plan
to our town engineer
um
who is
um
do you have that information or do you
need it? I guess Jackie can follow up
with you and give you that, right,
Jackie?
>> Yeah.
>> Okay. All right.
>> Yeah. So, you'll be coordinating with
Jackie Ye from now on because David is
leaving. Um,
>> yes.
>> And and she'll help you with this.
>> Understood. And I just want to say that
the storm water memo um as well as all
the details associated with the actual
system. It's already on the plan or
within the application package already.
>> Okay.
>> So, application package and onm, you
know, we can definitely get that over.
I'll coordinate with Jackie.
>> Okay. and yeah, with the plan and and
have him review it, that'd be great,
Jackie. If you can tell them that we're
trying to get this on the next by
October 1st, if if there's any way they
can review it by then. I know they're
very busy, too, but you know, we don't
want to delay things. So, if that's it,
then I need a motion from the
commissioner to continue this hearing
until October 1st.
>> So moved. That's Mike Gildis Gang. Do I
have a second?
>> Who is that?
>> Brian. Okay.
>> Brian. Okay. Brian. All right. Any
further discussion? I don't see. I'm
going to take a vote. Dave Kaplan,
>> yes.
>> David White,
>> yes.
>> Brian McBride,
>> yes.
>> Mike Eldiscane,
>> yes.
>> And Susan Chapnik says yes. So, we will
see you on October 1st. We'll actually
see you before that for a site visit and
then on October 1st. And you know the
materials for that meeting need to get
to the conservation commission's office
a week before for supplemental
materials.
>> Understood. Thank you very much
everybody.
>> Thank you. Thank you. Appreciate it.
>> Good night. Now, okay, we're going back
to our agenda and we're going to head
back to administrative
and take it away, David.
I'll keep it short and sweet for
everybody. It's past 9:00 and we're not
in the mood, I'm sure, for lengthy,
heady conversation about very logistical
things. But I've prepared a memo that
addresses I hope everything that the
future agent will need to take on of
course as well as the planner role. So
here I'll just briefly it was in the
meeting materials for this meeting on
drive but some of you may have missed it
because it was added later. So I'll just
walk you through it quickly and we can
touch on the concom stuff.
Um it's ordered by
I'll just say hierarchy of importance.
Um so hazard mitigation plan for example
is ongoing. It is the topmost thing that
needs to be done within the planning
sphere. That's not important to you.
It's just an example of how this thing's
set up. So um I go through all of the
planning projects that are
in the department currently. Some of
these pertain to concom
um the Metobrook Park and lower Milbrook
survey is one that uh Brian was
wondering about in relation to the CPA
uh application that we were discussing
earlier and details can be found there
about the uh contract amendment that's
ongoing with Wesley and Samson to add
$15,000 of stream
stabilization analysis and concept
design to their scope.
Um
the Milbrook model update is another one
that lives with Weston and Samson. That
of course is the hydraulic model that
they maintain for us and um a heads up
that the vendor there wants to do a
review of that with engineering and
conservation and any other interested
stakeholders. So that will happen
probably in the fall or winter.
uh may or may not need to wait for my
replacement.
Priority flooding analysis. Here is the
proposal to reroute Milbrook over by
Colonial Village and
all the details are included there. Um
just skipping down to talk about the
storm water ress update. This is
something I've been working on with
engineering to bring the town bylaw and
regulations for storm water in line with
conservation commission's regulations
and so forth. Um
I I think that's enough said on that
one.
There is a separate section for
construction and capital projects where
we touch on Cooks Hollow and Pond Lane,
both of which we discussed in the CVA
context. So, look there for information
about where those projects sit.
Very briefly, we got 140K for Cooks
Hollow from CPA.
we're not going to be able to use that
funding because we didn't get MVP
awarded
and so that might just get turned back
or repurposed or whatever. Up to you.
Well, up to planning, but since you have
a stake in it, you can chime in. Uh pond
lane there, of course, is the money that
I described earlier.
Uh the other pieces here don't really
have terribly much other than to do with
uh
Concom. We discussed the window on the
mystic earlier.
uh Mlin and actually this one does have
a brief update
that we're again working with Won and
Samson to install a trash rack at the
outflow so that it's easier to maintain
that pipe that gets buried and um
clogged all the time and causes all the
headaches with the water levels and
concern about flooding and
sort of damage to the
plant life on the shoreline and so
forth. So, um, hopefully that will help
again one that's slated for years end
potentially get it installed by then.
And now I'll just skip all the way down
to concom.
You have your own special section of
course separate from the other boards
and committees that I've staffed.
Wetlands permitting is the bare bones,
you know, crash course in
basically just you have to do
permitting.
What a surprise.
There's not terribly much to say about
that.
There's a lengthy section here on
aquatic invasives and water quality
management. This is all of the things to
do with the water bodies working group
and it goes soup to nuts from our budget
to the kinds of invasives that we manage
in the locations that we manage them uh
the working group members, the contracts
and vendors that we work with, who's
responsible for tracking those details,
so on and so forth. Um,
so everything is
detailed here. David White, you are more
or less our leader in the working group.
So I I nominate you for the point of
contact. And here is where we talk about
the aquatic management contract that we
discuss in the update section.
>> Thanks. and uh some other finer points,
contact details, etc.
Mount Koboa is a Concom project. We've
decided not to touch it, so I'm
recommending no action for the time
being, but pick it up when you so
desire.
I go into the conservation land stores
program, the pink plants campaign and um
here is just you know working to sort of
revive the traditional land stewards
program and then work with uh army on
coordinating the pink plant
installations around town.
SIMCR. That's what uh Brian gave an
update on earlier. It's just basically
working with Brian to make sure I keep a
schedule with those folks and they're on
target.
And I think this is the last one. Yep.
Talking about the uh bylaw and rags
updates. Since we were midstream on
those, I wanted to make sure that um
we're tracking changes, developing
language to suit what has been proposed,
and fundamentally we're just getting the
stakeholders back together
um
to finalize those updates and issue the
new rags. One important piece of this is
updating the bylaw.
Last town meeting, you might remember, a
bunch of the content I had submitted for
revision was deemed out of scope given
the way I'd written the warrant article.
So, a better warrant article suiting the
remaining changes
needs to be refiled with town meeting
this spring. And then we'll just iron
the rest of those things out. Um,
Susan, Jackie, and Nathaniel if he is so
brave
and willing. So, um,
that is what I have written down for the
commission. I wonder if there's anything
glaring out of this list that I have
missed. I see Mike's hands popped up
already, so hit me with it.
>> Well, first of all, I want to say
congratulations. This is an excellent
piece of work. It's thorough, it's
clear, it's well written, and I think it
sort of is the Bible for the next uh
agent that comes in. But I just wanted
to congratulate you on a really well
done piece of work.
>> Thank you. Glad to hear that. Yeah.
Thumbs up from David, too.
I I'll just tell you real quick that the
transportation
planner that we had
uh before we hired the new one prepared
sort of this template that
this was 20 pages long and I keep razing
him that I got to like twice as long as
he did. So
he was he was here this this evening. We
were just having that conversation. So I
Yeah, trust it is as thorough as I could
possibly make it.
>> Yeah, it's great. Well done.
>> Thank you.
>> Yeah, I appreciate it, David. Um, you
know, we've been through this transition
before and it's always painful, but um,
this will help make it a little less
painful. So, I really appreciate you
spending the time um, documenting
everything. Um, and you will be sorely
missed as as I've said before.
So,
>> thank you. I'm going to miss you a lot
as well.
>> Really enjoyed work working with you,
right? But you'll still be in town, so
we'll still see you around, right?
>> I'm in town. I might even pop in for a
meeting here and there on new
applications and say, "What's going on
with this?"
>> You never know, in in five years, you
might be a conservation commissioner.
>> Yes, I was thinking that.
>> Stranger Things are definitely
happening.
>> You never know.
Nice.
>> Okay. Thank you. Any other um comments
or questions from David?
>> Okay. Um and David's last day is
tomorrow. He promised me he's going to
be in the office. If anybody wants to um
say their final goodbyes.
Okay. Um so the Yeah. Um
lost my agenda, but I think we're pretty
much at the end, right?
Where'd it go?
>> Yeah,
>> that's what I get for having too many
screens open.
>> Okay,
>> Jackie, would you mind sharing the video
of the meeting with me? Sorry, I was a
little later than I thought it was going
to be. Hopefully I didn't miss too much
and saw Reed Street was on the agenda.
>> We did it. We continued Reed. We
continued Reed. So, you didn't miss it,
which is good. Um, and you got you got
in on the one I was hoping you would
help us with, which is great. Um, that
was the Arlington call number. So, thank
you. But yeah, if you want to hear the
rest of our
>> Yeah, I'll share it with everyone who
was absent at some point and ask ask
people to do well in forms if they
missed the hearing.
>> Yeah, thank you. Um, and I think we're
up to the end where there's any new
business anybody needs to
anybody has to talk about.
No.
Okay.
So, I will accept a motion to adjourn if
we're ready.
>> Move.
>> All right. Mike second.
>> Second.
>> All right. And I'll see everybody
October 1st. Well, I'll see you before
that at the site visits. Hopefully some
of you
>> at some of the site visits. Okay. Thanks
everybody.
>> Take care.
>> Take care. Bye.