Video summary
The Calais Selectboard meeting commenced with administrative approvals, including an errors and omissions report that adjusted the grand list value by approximately $40, followed by a significant discussion on establishing the Adamant Community Trust through the Vermont Village Trust Initiative. Representatives from the Adamant Community Arts Center explained their strategy to secure funding for critical infrastructure projects like the co-op barn and music school by activating the existing arts center as a 501(c)(3) entity, thereby creating a trust envelope since the group itself cannot directly accept donations or grants. While the board recognized the need to address property ownership concerns if the current landowner faces difficulties, they agreed to approve a support letter with softened language to avoid implying immediate resource commitment before the September 8th application deadline. The agenda then shifted to infrastructure improvements, where two curb cut applications were reviewed; the request for Ledge Hill Road was approved pending the removal of an old stone culvert and installation of a new covered one, while the Maple Corner Community Store application was tabled due to a conflict of interest involving board member Jamie. Although there was general support for expanding parking at the store by removing a central island, the decision was made to wait for cost quotes regarding converting a lawn area into parking spaces, potentially delaying that specific work until next year while proceeding with other feasible improvements this fall.
Broadband expansion efforts were advanced through the approval of applications from Northeast Kingdom Broadband for five locations, including Moscow Woods and Ledge Hill, which incorporated feedback from recent site consultations to utilize existing telephone poles rather than digging new ones. The board addressed community concerns regarding road maintenance and flooding risks near rip rap, receiving assurances from Northeast Kingdom Broadband representatives that their installation methods minimize damage to dirt roads and ditches. Consequently, the applications to bury fiber optic conduit and adjust pole locations were approved immediately, allowing crews to proceed without waiting for the next regular meeting. Following this, Elizabeth Brown of the Adamant School Board presented an update on district developments, noting that two candidates withdrew from the superintendent search, prompting a shift toward hiring an interim leader while organizing a new permanent search under state regulations that limit contracts to one year due to ongoing mergers. The school year beginning on the 26th will feature new leadership with Principal Katie Treale at Callus and former Principal Jared Weiss moving to the middle school, alongside a call for community engagement during the upcoming budget season to help preserve programming and student outcomes amidst anticipated financial challenges.
The meeting continued with an analysis of Calais Elementary enrollment trends, which remained stable despite the absence of Pre-K and Kindergarten classes, currently operating at approximately 80% capacity while implementing a co-teaching model across grades one through six. Board members acknowledged growing constituent concerns regarding property tax rates, emphasizing that education constitutes 70% of the tax bill and highlighting the necessity for both local efforts and legislative advocacy to manage these costs. Updates from the Friends Town Hall reported significant organizational progress, including the election of two new board members, successful cultural events like plays and piano tuning, and the completion of facility upgrades such as wire cleanup and curtain installation, with legal requirements for nonprofit registration now fully met. The Town Administrator discussed potential restrictions on the general fund balance to prepare for FEMA reimbursement finalization, estimating a remaining balance between $0 and $90,000, while capital budget updates included specific allocations for the Moscow Woods Bridge and county road repaving, alongside discussions on consolidating reserve funds for highway infrastructure versus equipment needs.
Administrative actions concluded the session with the approval of minutes from previous meetings, including a correction regarding Vicky Arthur's name, along with the authorization of board orders and employee leave requests for paternity purposes. Journal entries were approved after clarifying the fiscal year date, granting staff the authority to sign on behalf of the board. The Fire Department's capital needs and funding sources were reviewed, noting their insurance revenue stream and upcoming plans for truck replacement. The meeting officially concluded with a motion to enter executive session to discuss the East Fire Department contract, ensuring that sensitive contractual details could be addressed privately before any further public action was taken.
Read the full video transcript
So, we're going to call the meeting to
order. Um,
and uh,
if anyone could just let me know if you
have any agenda changes, everything all
set?
Um otherwise sorry for the lack of video
on screen but we are going to move ahead
with uh since our audio is okay. So the
first um item on the agenda is the
listister errors and emissions and John
and Kobe are here.
>> Everything's okay now.
>> The errors and omissions have been
fixed. There were two errors and there
was one uh there was one data station.
>> Okay.
>> And so those are changes to the green
list.
>> Okay.
>> Uh great. And do we have any
questions
Jamie about these?
>> Are those forms that we have to sign off
on or not?
>> Yes.
>> Yeah.
>> Yeah. There's a form here,
>> right? And what it does is it decreases
the grand list value by how? 43.
>> 40 if you add them up.
>> Yeah. One of them didn't have an impact.
>> One of them was one of them.
>> Okay. Um any any questions or
discussion?
>> Any of you have questions?
>> Yeah.
>> I'm very comfortable back with the same
lunch again.
>> Yeah. Okay. Thank you. Hi.
>> Um, so we need to approve this before we
sign it. Right. Okay. So, um, can I get
a motion to approve the errors and
omissions report?
>> We need a second.
>> Thank you. All those in favor?
>> I. Okay, that is done.
>> Great.
>> Great. Thank you very much. Appreciate
it. Um, the next item is the Adamant
Community Trust.
Um, and Liz, I think you're on to chat
with us about that.
>> Um, yeah, I can chat about that. So, um,
Skipper and I are both part of this
group. Um, what do you have questions
that you want me to answer or should,
um, do you just want like a brief
overview of what this is all about?
>> I think the overview would be helpful.
Um, uh, we do have, uh, a background
email that folks, I believe, have had a
chance to look at. Um,
So yeah, background would be helpful.
Sure. Where?
>> Yep.
>> Um so so Adomia came across the um
village initiative trust and Skipper,
you can feel free to jump into whenever
you've got other things to say. when we
were when we were initially looking for
more funding for um for our barn which
we're renovating right now. And um to
back up a little bit, we had started a
few years ago in the village of Adamant
talking about do we want to create a
trust because the music school owns most
of the property in Adamant and we were
worried like what if the music school
goes under then what happens? Do they
sell it to just a private investor? you
know, what if the town can come up with
a way to have an envelope of funds that
we can then use to purchase parts of the
music schools? Should that, you know,
should that be a thing that needs doing?
And then that conversation kind of
ended. So, we we've started to pick up
this conversation about starting a
village community trust when we started
looking at our barn and the
infrastructure needs that it has. Um,
and the village initiative trust or the
village trust initiative is a program.
It's a multi-year program that is
offered
through um I think it's through the
Vermont Historical Preservation People
and they they offer if if a town is
selected, they offer
um educational activities and sources of
funding and a lot of like brainstorming
to help a village come up with projects
that could feed into a trust. Um sorry,
I'm it's been a long day. I'm kind of
losing my words. Do you Skipper, do you
want to jump in?
>> Yeah. Hi, I'm I'm Sarai also.
>> Sorry to confuse everyone. Um
uh it it's there's a group of us that
just have been talking since we started
renovating the barn and and we're
excited to continue
um developing the the Adamant Community
Arts
>> um center which was started a while ago
um but bringing it um
into life more um to to just be a place
to to receive funding and to apply for
grants and um yeah, we have
we just have infrastructure needs like
Liz said. Um you know, the co-op uh
needs some some handiwork and some
funding to to come up to speed,
>> right? And it's I think too it's it's
about the co-op and the barn, but it's
also about um the future of Adamant
really as a viable village because it is
really the village really is owned
mostly by one landowner. Um and so
it's it's a little complicated in that
it's a group of us from the co-op who
are interested in following up with the
village trust initiative, but it's not
just for the co-op. sort of blossomed
from the co-op into more of a
communitywide
discussion. Um, the reason we reached
out to you all as a select board is that
one of the criteria for applying is a
is a letter from you guys saying that
yes, we think it would be a good idea um
if Adam were awarded this opportunity.
>> Okay. Yeah. And I think um one of the
things that um stopped us and wanted
made made us want to come and you know
hear more from you was the letter states
after reviewing the project details and
the village trust initiative program
details we strongly support your right.
So we felt like we didn't have the
information um on what your what your
intention was, what the idea is and sort
of what um what alignment with this and
just just another just friendly
amendment the village trust initiative
is is a a initiative of the preservation
trust of Vermont but with VCRD they do
with Vermont um Vermont community
foundation
>> right so there there's a there's a whole
collaboration there that happens um
So yeah. So um you know the the question
around the project details is what I'm
still a little bit stuck on.
>> Mhm.
>> Um yeah. Well, it's a it's a good
question because it sort of spans like
it it stemmed out of this idea of where
can the co-op get more funding to
complete our barn restoration project.
And then then when we found this
opportunity, the group of us who've been
meeting um started revisiting this idea
of starting a community trust, an
adamant community trust, um not just for
securing funding for a barn because the
co-op itself is not is not a nonprofit.
So we can't accept donations and you
know have the donors have tax write offs
like we um we can't do that. So we can't
and that means also we can't accept
grants really for anything to do with
the co-op. So the co-op started
wondering how we could partner with this
a currently existing 501c3 within the
community of Adamant called the Adamant
Community Arts Center. Um which is
inactive. It exists but it's inactive.
Um, so the idea that we're having right
now is to is to turn well the acronym is
called AAC for Adamant Community Arts
Center is to turn AAC as a 501c3 into
um
into the envelope that could accept
funds and education as a trust,
>> a village trust.
And so it really it really expands um
this vision of like you know the co-op
is the community hub of Adamant but
there's also the community center of
adamant there's also all the music
school possibilities um you know it it
feels like it's it's a really important
time to think about like this re this
extended future of Adam and what that
might look like in the next 20 or 25
years and and then to also really if we
are awarded this opportunity to really
come together as a community and not
just as the co-op, but invite all
community members in in Adamant to
really envision and work towards um what
we collectively want the vid the village
of Adamant to, you know, to look like in
25 years or 20 years.
>> One of the questions ask
the timeline for the application.
When do you need a letter come up?
>> The the application's due September 8th.
>> Yeah.
>> So, is there a a written description of
what you're uh proposing that we can
take a look at?
>> Yeah. Do you have a the proposal? Is
there a proposal for this process?
>> Sure. Yeah.
>> Yeah. There's there's a bunch of qu
application questions that we've had to
answer.
>> Okay.
that we could if you're interested we
could send them the questions and our
answers along to you.
>> Yeah, we don't have that. Correct. I
>> No,
>> I haven't seen that. No, just
>> we're working on it.
>> Um, yeah, I guess that would be I I
would want to see that, but we're not
going to meet before the 8th,
>> are we? I mean I don't see
nothing
>> any
but I don't see any
>> downside
you know it's like sometimes you there
can be unforeseen
>> consequences of being designated a
historic village or something and then
it changes things
>> would it help to temper the language of
the letter a little bit to say that you
>> not that you've reviewed all the details
of the proposal but
Yes, I think the that's actually where I
was headed for sure. Um, Krie, that the
the the letter is just a little more um
of a statement than we're probably ready
to make since we haven't seen the
details and you know that that whole
piece. So, um
do we want to do some editing while
we're sitting here?
>> No.
>> No. Um I don't either. Um, I mean I
>> during a break I could edit it and have
you look at it before we leave tonight.
>> I also feel like we could just take out
the first half of that sentence just
like we strongly support this group
advancing this project.
>> Yeah.
>> Or just take out strongly. Yeah.
>> We support
this project.
>> Um I the I don't I don't know that the
project identified by this group aligns
with our town's goals. That's another
that's another place where I mean it
probably does but
you know um I just want to be
anyway I think um car your suggestion is
correct that if we do some um editing to
the language that we'd be able to submit
this for to you all back before the 8th
so that you could submit your
application on time.
Is that or do I have an agreement with
>> Yeah. the board member, Mr. Chairman?
>> Yeah.
>> Okay.
Um Okay. So,
we are
we can we could approve the letter with
um edits, expected edits, or do we
approve it later? Sorry.
>> No, I was just checking to make sure I
have an editable version
and seems like I did.
So I I what I got was um removing the
phrase about review the the plan project
details. Yeah.
>> And remove the word strateg.
>> Yeah.
>> What is the role? I mean is this it says
the select board is committed to
collaborating with the project team and
support its successful implementation.
So is there an expectation of of further
involvement if you were to be selected
for this by the select board?
>> I don't think there's necessarily a you
know any
any other further collaboration with the
select board. It was it was honestly it
was a it was a template letter that the
DTI gave to us to pass to you guys.
>> Um which we did amend a little bit
because there was even stronger
language. We felt like well we don't
need to really go that far. But um
>> but honestly I can't
>> I I don't foresee really the select
board
having much to do at least you know if
we are selected at least in the early
stages um in this project.
>> Okay. Now I understand why if I mean if
Okay. So, um
I think it's much more like the select
board looks forward to collaborating
>> should it be awarded. Um
>> uh
>> I think that
>> right so I think there's just a couple
places where so that first paragraph I
think we're clear. the second paragraph.
Um
um
I
I don't think the first sentence I think
we should take out the first sentence
because I'm not sure.
It's not that it isn't aligned with that
goal, but I'm not sure how we
>> we haven't seen it. But I mean yeah
don't have information. I mean at this
stage sort of the project is created the
creation of the trust.
>> Mhm.
>> And then the trust as it evolves over
time can grow and assume it would have a
a board or something that would decide
how sort of what what separate projects
the trust takes on. Is that like a
reasonable understanding? Yes, I would
say that that's a reasonable
understanding.
>> This is the idea of like creating a
community trust is a fabulous idea.
>> I agree with you. I just um I don't I
just don't want a letter to to indicate
that we're in lock step with this and
ready to commit resources or imply that.
And I think um you know there's been you
know this like this is what Greensboro
did. This is like there's precedent
>> uh I'm not sure I I'm not as familiar
with one at the
you know a village level but um but I'm
sure that's what they're you know
they're providing technical assistance
and funding and support to create a
routine free. So um
yeah so I I guess uh
yeah other so if you have any if you
don't have any other edits that's what I
would I would suggest is what we
suggested already for paragraph one
paragraph two maybe just delete the
first sentence and just say we believe
it and then just say the um
the select board, you know,
looks forward to collaborating with the
project team if it's successful. And
I think the last last paragraph's fine.
>> For the collaborating sentence,
>> I would say the select board is looks
forward to the select board looks
forward to collaborating with the
project team as and supporting its
successful implementation. Got it.
>> Others thoughts that sounds good.
Thanks. While we work through this,
appreciate your um patience. Um
I think we'll uh what we'll do is
um
approve this with the edits discussed.
>> Yeah.
>> Okay. Can I get a motion to approve the
letter to the village trust initiative
in support of the Adamant Community
Trust?
>> With edits as identified. Sorry.
>> With edits as identified.
>> Second. All in favor?
>> I
>> I Thank you. All right, I think we're
good, folks. Thank you.
>> Thank you so much.
>> Thank you.
>> Good luck with it. Let us know what
happens.
>> Okay, thanks so much. Bye-bye.
>> All right, bye bye.
>> All right, 620 on the nose. Um, all
right. Curb, we've got two curbcut
applications.
Um the first is uh for Ledge Hill Road.
Um has the
>> Connelly is here.
>> Um
Kelsey's news people and she and Tom
her husband have already applied for and
received one cur permit. Now they'll be
going for the second one which will be
towards the east side of Lech Hill Road
where they plan to build in a little
while. But go ahead there.
>> Nice to meet you.
And so John and I then uh took a look um
and meets the specific need
at least
>> and the call was that an issue at all
the culvert um
>> no the only issue is installation the
road crew installed the first curve um
uh culvert and they're not probably
going to be available for a little while
>> so
>> and that here that's not Yeah, we're
trying to figure out timing in that
anyway. So, um the issue is the curb cut
is there now. The culver that's there
now is an old stone one,
>> right?
>> So, we can't really bring any heavy
equipment over it right now. So, we're
just trying to figure out we're meeting
with a logging truck to see can they
come over it or not? If not, then what
can't log until we get the new covered.
>> Okay. So, we'll basically just keep
doing what we're doing um until we can
either find somebody to put a Duke over
in or if it's late in the fall and they
can do it, then we'll do it then.
>> Okay.
>> All right. Have you all had a chance to
look at this?
>> Question two applications. One was an
original and one was it different or in
the
application?
>> You mean the it's labeled original
layout?
>> Yeah.
>> Versus what is the other version?
>> There's Well, there's a sketch drawing
that we snuck into your box, but I
thought it was a little small. So then
we put the bigger picture with it. So
>> Oh, in the application.
>> In the application. But the box the
wording would have might have been a
little too small for you. So I got it.
Okay.
>> Thank you. You're right.
>> Try to fit in that box.
>> Yes. Got it.
>> So there is no change to it.
>> Yeah. Okay. Yeah.
>> Thank you.
>> And does the um the existing uh covert
that needs to get pulled out is that
that's not in the same location of where
the culvert needs to be?
>> It is. It is. Okay.
>> Yeah. So, the curb cut from talking to
John and the crew, they they were
suggesting a 30 foot 30 foot curb uh
cover.
>> Uhhuh.
>> In order to put that in, the old stone
one would have to be removed because it
it would hit up into that anyway.
>> Okay.
>> So, there's a telephone hole and there's
a culvert that goes across ledgeill.
>> Yeah.
>> So, we can't go further down. So
starting at where that cover comes
across ledge going 30 ft in gets you
kind of where the old stone one is. So
the idea would be to remove the stone
one and put a new 30 foot across.
>> Okay. And do we understand that the
removal of the old one is is on the
>> owners? Yeah.
>> Right. And that that coordination will
happen with the road crew. They can put
in the new one
>> if if we end up doing the work. Yeah.
>> Okay.
So yeah, can be determined.
>> Yeah, we we've talked to group and
nobody thinks it's historical or
anything else. They remember when they
put it in, we asked those questions just
to make sure. So it was putting put in
back when they uh opened or opened up
Ledill to the north side,
>> closed the old little T section that was
there. We put in for that.
>> Okay,
>> great. Well, I don't have any other
questions. Do other members of the board
have
de
>> I think um we would be moving to approve
>> my I don't want to read into Christy.
Are we moving to approve? Yes.
>> So um I need a motion to approve um the
application for the 00 Lill Road curb
cut.
We get a motion.
>> So move.
>> Thank you. All in favor?
>> I
Great. That passes. So that's all set.
>> Thank you.
Um always glad to have people moving in
and building homes. So thank you for
doing that. Appreciate it.
>> We've got one more coming in a couple of
months.
>> We look forward to seeing you.
Um great. So the other one is for the
Maple Corner community store. And so
that means that we're going to have
discussion, but Jamie will be
recusing herself from the um
any vote, which we might have to delay.
So we'll have to let's talk about that.
>> Yeah.
>> Since um
>> Do you have a better sense? Well, last I
heard, we haven't heard from Hans when
he's available,
except that it's supposed to be soon.
>> We don't meet again for 3 weeks,
which puts us
>> 14.
>> September 14,
>> right? We have two people out tonight is
the issue.
>> I I mean what I was going to say before
is that if we had um we can have
discussion and then um we'd have to
table it but and not vote. But if it
became an issue for you all timingwise
that we would maybe
have a
>> special meeting
>> special meeting online.
>> Yeah.
>> I mean that that would be the option,
right?
>> You can't really there's not really
another way around it. um
given our schedule
>> 48 hour
right
>> and it will take us just a matter of
>> yeah exactly
>> it seems like a reasonable back
>> reasonable if he ends up able needing to
do the work sooner than three weeks
>> so
um I
I don't I don't know if um I didn't hear
any uh questions passed along from
Jordan on this application and I think
it was discussed fairly
well in the couple meetings ago went out
of time here but
>> is there anything you want to add to the
um in your general manager role
to the application?
>> I don't think necessarily. I mean, this
feels like the it's sort of the one
place on our property that we can or the
two ways on our property that we can add
parking.
>> Um,
so like the next logical step.
>> Um,
>> um, can you help me understand uh, you
know, the extended I understand the the
slots that are going against the grass
sea area. Yeah.
>> Um the extending, you know, removing the
place where the old gas tank was.
>> Yeah.
>> How does that end up helping?
>> Well,
>> help me understand how you're going to
manage that. You know what I mean? To
generate more parking.
>> It's it's a good question and some of it
will be
trial and error.
But what happens now, you know, five
years ago,
there were very visible curves across a
stretch.
>> Yeah.
>> You know, almost I don't know if I put
it in here, but 25 plus
>> feet long and maybe 10 feet wide. And
that was all grass inside granite
curves.
>> And nobody parked in that area. And then
over the last I don't know what five t
years
people have naturally been driving or
the curbs have been sinking and cars
have been driving onto the grass
naturally
>> and no no flowers have been planted
>> right and no flowers been planted and
now what we find is it's just kind of a
hazard. M
>> you know people park with their tire up
on the cement thing in the middle and
people trip on the curbs that are still
sticking up out of the driveway. So I
think beyond the added parking removing
that whole thing is a benefit to the
safety of the parking lot. I think it's
still a little bit of a question, you
know, when you have that long of a
stretch, how you delineate
parking lot from road edge. Right.
Right. And I think you can the roads
got some curve to it and the parking
lot's got some curve to it. So I think
you can grade it in such a way that
there's a little bit of a drainage
swale that's a visible line between the
two that probably just has to be you
know maintained every couple of years
and re regraded reurfaced
or shape.
>> Mhm. Um, we bought temporarily we bought
some, you know, the sort of three or
four foot orange, not cones, but posts
>> with a a water heavy water base
>> with ropes between them. So my thought
is that once like when we do the work,
we'll put those out sort of delineating
a few of the spots
>> and then we might even temporarily paint
some lines on the gravel
>> to get people used to the traffic
pattern. Of course, those tools aren't
useful in the winter,
>> but um but it would at least get people
sort of trained into a new parking
layout,
>> and see how people respond to,
>> right?
>> Right. There's an element of people are
going to do what people do.
And with gravel, there's just no way to
have painted car parking spots that that
last long.
>> Okay.
>> Great. Well, Christy, do you have any
questions at all?
>> No. I think Jamie has explained it. Um
and I think
the board has previously said we're
generally a sport. Um the story needs
more parking and the road crew is okay
with the changes.
>> Yeah. And these these were fine. It was
the the concern was the other idea about
going up that hill. The the other thing
I'll just put out there is we have not
yet received the quote for the the
bigger project the sort of turning lawn
into parking spaces. Um and I don't read
the grass there yet.
>> So I don't I don't have any idea what
it's going to be. Um but I would my
guess we have a board meeting
like the first Tuesday of the so coming
up soon. Um, my hunch is if it's way
more expensive than we think, the the
four new parking spots and the retaining
wall might get pushed till next year,
but that we'd probably do the removal of
the center island anyway.
>> Um, which sort of in my mind, the curb
cut application is really for the
removal of the central
>> center.
>> Yes. part and the other parking is added
bonus we'll get to when we can afford
it.
>> Okay.
>> We're hoping to do it this fall, but
we haven't fully committed to it.
>> Okay.
>> Okay. Good. Uh any anything further
>> based on that? for me. Um,
>> and yeah, I mean, if the timing works
out, I'm certainly willing to, you know,
get together on a quick emergency
meeting.
>> Yeah. Yeah.
>> It would just be a special meeting that
needed warning. So, we just have a, you
know, two days to the extent you can
figure that into your planning. I'm
hoping we'll get the um
well the plan is to get the quote by the
end of the month and then make a final
decision
>> the last Tuesday
>> the first Tuesday in September.
Um,
so as soon as we see the quote and have
a good idea, we'll we'll let you know if
it and Hans's time we'll learn Hans's
timeline.
>> Um, if the works if if he's like if
we're going to do it this year, we have
to do it.
>> Yeah.
>> The first week of September or
something, then we'll
>> let you know that.
>> Well, I think you can, you know, share
with the board that there's general
approval of this and um that it
wouldn't, you know, wouldn't be a
concern, but Okay. So, we're going to
table that for now. Um, and move on.
>> So, thank you for that.
>> Um, thank you, gentlemen. Uh,
anything. So, now we're going to move to
the Northeast Kingdom broadband use of
rightaway applications.
Um, I understand, is it Jeff that's
here?
>> Jeff. Jeff with a G. Jeff.
>> Yes, there's two Jeff's here tonight.
>> Yeah, double Jeff.
Jeff, is it Dodge?
>> Dodge.
>> Yep. Um, is the installer who John
Stafford and I spent a good chunk of
last Wednesday morning with driving
around. It was quite an education
actually.
>> I'm sure
>> and um reviewed the sites that resulted
in the updated uh application that you
have before you. So, and just as a
reminder, most of these projects were
approved by Select Boore back in 22, I
believe.
>> Yes. and then that permit expired and so
they're here to um apply again and that
some there's been changes from the
original.
>> Great. Um one thing I'll just say is I'm
sorry that you're seeing a still image.
We are having a little technical
difficulty. So hopefully you can hear us
fine but the video is not currently
working.
>> Yes, we can hear we can hear fine.
>> Thank you. Uh okay. So we and thank you
also for the modifications. U made based
on the conversations with our team. I
think that's um made um that's great.
>> Looks like he's starting.
>> Okay, great.
>> Oh yes. Well, hi.
>> Hi.
>> I just had to speak nicely about it.
>> Okay. So, um so I think Christy and
Jamie, do you do we have any questions?
I think uh K's memo shared um the
background on what changes were made
um which seem prudent. Um
otherwise we're looking and and I don't
know um Jeff and Jeff if you have
anything you want to add currently to
what we're discussing.
>> Um I don't have anything to add as far
as the details of this um just as far as
the logistics. Um, I did have our
accounts payable team send a check for
the permitting fees for each of these to
you. I'm not sure if you've received it
yet, but it is if you haven't yet, it is
in the process and you should be
receiving it soon. But other than that,
everything um on my from my end is up to
date on this.
>> Okay, great. Um,
good. Uh, I really appreciate um the
having included the previous minutes.
That was helpful. Um, so thank you for
that.
>> Great. Yeah.
>> Any questions um Chrissy or Jamie on
this? Have you had a chance to look at
it? It's a lot. It's a lot.
>> Well, but I did see that changes were
made based on this consultation.
>> Significant changes were made to the
biggest project, the Moscow Woods back.
So,
>> and we appreciate that because sounded
like that was a good
>> back and forth. It was a real meeting.
>> Yeah, of course. Thank you for meeting
with us out there and making this work
for both of us. That was that was an
excellent meeting.
>> So, thank you.
>> Agreed. I think the changes were
definitely for the better. Um, you know,
it'll be it'll be a a lighter touch when
we go through there. So, that's a good
thing.
>> Nice. Like that.
>> Anything else? No. Bill.
>> Yeah.
>> A pro fiber group here.
>> Is that what you would show people for?
Is that Moscow? What is that still going
to happen?
>> Still going to happen. Yeah. They're
going to use the utilize the poles that
exist. Um Moscow. Oh, and Leilge.
>> So ledge instead of digging, they're
going to use the telephone poles that
are there.
>> Yeah. Yes.
>> And and then on Moscow, will they be
going down or will they be using the
poles?
>> There combination. They're using the
poles that exist, but there aren't
poles. There are gaps in the poles on
both ends
>> both to the north of you or to the east
of you and to the west
>> because we're going to be putting in
more electrical line there. So, I don't
know about the timing if that works or
not.
>> Yeah, I don't think we discussed that.
Jeff in there. just so happens we have
some folks that are um building off of
Moscow Woods and Ledge Hill and they're
going to be um installing couple poles
on Moscow.
>> There's two to three poles depending on
from the Chowski property up to ours and
then up our driveway and then across
Ledge Hill to um there and then
potentially from ours over to forms
down. So, there's going to be potential
polls coming around.
>> And do you know the timing of that
project?
>> Uh, we're supposed to be meeting with
the electrical Mike's supposed to come,
I think, in a week or two. He just
needed he needed a look at the driveway,
the rough in driveway we have to tell us
what trees need to come down for us to
come out. But he wants to do it all
because I said just do the road because
we we've given hey, we'll pay for the
road part and then next year do the
driveway. But he wants to do it all as
one project. Um, so we have to kind of
wait for that.
>> So you might consider instructing them
to hold off on that one till last until
we can see how this develops and how we
might be able to utilize these pools.
>> Right. What's your what's your proposed
time frame for these projects?
Um Jeeoff, I don't know if you have a
more specific time frame than I do, but
my answer would be um we're looking at
doing this, you know, sometime before
the end of the construction season, and
I don't know exactly when that is for
you guys. Um, of course,
>> you guys control that end time. Um, and
we
Jeff, if you have anything to add to
this as far as the specifics, I think
that we're we don't have anything on the
calendar right now. Um, we're looking to
get this permit cleared and work it into
where it does fit in.
>> Yeah, I I think it's kind of we didn't
want to put the cart before the horse
kind of situation.
Um,
>> so yeah, once once everything's approved
and the fact that there's new poles
going in that they might be a player,
you know, the other polls are older.
They're they're comm's polls. So I would
think any any electrical pole is going
to be an upgrade from that. So we we'll
probably maybe want to try to jump on
those polls and get permission. Um, so
that might be something we want to wait
on.
Just my opinion.
>> There'll be no polls on ledge.
>> No. Okay. Yeah. Just Moscow would. Yeah.
>> Just Moscow. Yeah. They're going to go
up Moscow up our driveway and across
ledge, but we're not putting any poles
on a ledge.
>> Yeah. Not a problem. Yeah. L ledges.
Ledge is all set for us to jump on.
>> Yeah. That's all above ground any or
aerial anyway.
>> Yeah.
And then am I remembering right that you
go down sort of the center of a travel
lane is where it's buried as opposed to
the ditch.
>> I um so the under so what I took out of
that meeting um the ride out meeting was
that we on Moscow Woods for the
underground we were going to stay on the
west side of Moscow Woods Road and I
think all the way up all the underground
is on the west side of that road. Right.
Correct.
>> And is that in the travel route or is
that in the ditch?
>> No, we'll be off the edge.
>> Okay.
>> Off the edge of of of of the travel
zone. Yeah.
>> On the west side. Yeah.
>> Correct.
>> Does that answer your question?
>> Yeah, I think mostly it's but it's not
interfering or needing to redo with like
all the extensive
>> ditch work.
Yeah, that that Yeah, we're just above
the rip wrap because that was part of
the issue was we don't want to mess with
that because who knows how deep it is. I
I know it's very deep.
>> That was my question.
>> Yeah. No, that's a good one. Yeah, we're
above that. We're above that trouble
zone. So, yeah.
>> Good.
>> They are in different places.
So,
>> yeah.
>> Um, you know, we talked about that,
Jeff. you know, tries to to actually go
around them where possible because
that's obviously place that's going to
need to be dug eventually.
>> And
I'm also sort of wondering about
duration or logistics of road closures,
like if if the way the work's happening,
it would stay open one lane
>> or if we're looking at like three or
four days of the road closed.
No, we would um we would we would get a
flagging company and just just close one
lane down and have flaggers at each end.
>> Cool.
Can you guys just I don't know if this
is a brief I I want it to be brief so
you can tell me that's involved but
>> do you have do you have examples or
evidence that like this kind the way
you're burying this is working fine with
the maintenance of dirt roads the way we
have to do them here and
you know given given the dirt road
structure that we have and that edge of
that of those those ditches with the rip
raft Have you had positive experience so
far with that installation and also
duration?
>> Yeah, as far as Yeah, as far as I know,
any underground that we've done, we
we've it's definitely been positive. Um,
you know, we're doing it a bit different
than how it was done in the past to
where a lot of it was direct bury. It
was very shallow.
>> You know, we're trying to come in here
and maintain a minimum of 3 to 4 foot
>> um and compact everything when we leave.
Um, so that way it's,
>> you know, because we don't want to
damage any more than anyone else wants
to damage and we don't want to impede on
the road. Um,
>> and uh, especially when I was working
there with NRTC, I saw the floods
happened and I saw the the problems that
happened, especially on Moscow. So, um,
yeah, that's the last thing we want to
do is is be the problem child in the
area. But, um, you know, everything
we're doing is fairly new as far as
depth and and and where we're putting
it. So, to be honest, we're I haven't
heard anything bad yet. So,
>> I would also like to add that we've had
this exact situation in a couple other
towns where you do have that road, you
have steep areas that are prone to
flooding and have been washed out in the
past and have that rip wrap down the
side. And you guys are requesting that
we do exactly the same thing that
they've asked us to do. So,
>> um, the decision tree is, I think, right
on with the experience of other towns
and what they're what they've seen and
what they're asking us to do.
>> Great. Great. Okay. Really helpful.
Thank you. That's great. All right. Uh,
so any other questions before?
>> Okay. I know we have um Jordan's um has
said that he's he's in support of this.
So, okay. So, um I need a motion to
approve um the applications to bury
fiber optic conduit in town right away
in five locations as well as the
adjusted um location pole locations that
are um articulated in the application.
>> So, move second.
>> All in favor say I. Hi. Great. All
right.
>> Can I ask one more Can I ask one more
question? Um, yes. So, as far as getting
a signed approval of this, how does that
process work on your end as far as
signing off on this, getting us a copy
of it so we can send it to um, you know,
our crews that knowing that this is
something that we can move forward on?
>> I can help you with that. We'll get
gather signatures tonight and I'll get
them out tomorrow.
>> Okay. So, we don't have to wait for the
next uh select board meeting to get
that. We can get that in the interim in
between the two.
>> Yeah.
>> Yes, you can. You'll have it. Yes. Yeah.
Yeah. We have a quorum for this. We just
didn't have it for the other um action.
>> Okay.
>> We're all set.
>> Yeah.
>> Okay.
>> Awesome. I appreciate you getting this
on the agenda and thank you very much.
>> Yeah. Well, thank you for the extra time
to work this out. It's really helpful.
>> All right.
>> Yep. Have a great evening.
>> Yeah.
>> All right.
Great.
>> Okay. Um, great. So, now we are at the
school district update. We're going to
start that a little bit early for
everyone if you're here to me.
>> Yeah. Yeah. Great to sit here or
>> if you'd like or you can come closer if
you'd like, which whatever feels
comfortable.
>> Yeah. So, I'm Elizabeth Brown. I'm one
of the school board members. Um Daniel
and Michelle are the other two board
members and I've never given an update.
So I'm curious as to what y'all would
like to hear about just kind of what's
going on with the school board or the
start of the school year or all of the
above. What are you thinking?
>> Um it's really all the above. We we just
are we do sort of a regular check and
this is part of a regular process that
we do with the um the school district to
understand what the issues that are
before the the um board and um anything
coming down the pike that we might need
to be aware of.
>> Um question the opportunity for
questions from the select board members.
>> Great. Well, normally I can't make
Monday nights because I teach college
courses on Mondays. So I'm excited to be
here. It's nice to meet you guys. Um,
>> so I think there's quite a few things on
the school board's mind and on our
docket for discussion and conversation.
Um, we are in the process of searching
for a superintendent and that search has
um kind of concluded with our two
candidates withdrawing from the pool. Um
and so the next step is that our um
steering committee will be meeting with
our interim superintendent um Jen Miller
Arsenal and um Alicia at EMS
Alicia Lifford at EMS um to determine
next steps. Um, typically what happens
in a school district when they don't
have an a superintendent moving into the
school year, they bring in an interim
person and often bids those are retired
superintendents that have worked for
many years. And so, uh, two names came
forward for that possibility. Um, and I
believe that the steering committee
would be meeting soon to discuss that.
Um, and then share their recommendation
with the board. So, um, there isn't a an
end in sight in that we're not really
sure what's going to happen next, but
the next step is it's moved from the
superintendent um screening committee to
the steering committee of the board to
to move forward with it.
>> Okay. Yeah, the screening committee is
is now out of out of a job. Is that
>> No. Yes. The screening committee is that
um it we haven't decided exactly when,
but it will be sundown. Um and um and
then once we begin the process to search
for a superintendent that is not interim
um we would reinvite folks to apply for
that screening committee.
>> Yeah.
>> Was there any reason for the withdrawal
that is sharable?
>> Nothing that's sharable. Um both
candidates did withdrawal at different
times in the in the process. So
>> um yeah. So unfortunately it didn't end
up the way that we had hoped it would.
But I think there's always, you know,
there's always reasons for everything.
Um, and I have confidence in our
steering in our screening in our
steering committee um that they will
have some really good conversations. And
I really think the biggest piece is
thinking about what are the needs of our
district this year um because the state
has essentially put a moratorum on
superintendent staying longer than a
year. So regardless of who we hired, it
would be for a year.
>> Wow. and then we would because of
everything that's happening um with the
merging and the ceases and all that
stuff. So um so in some ways it would
have been an interim anyways but um we
were really trying to look at her as
somebody that would come in for a year
and do kind of a year-to-year renewable
contract. Um so now we're pivoting a
little bit to interim and then hopefully
we'll begin the search shortly after
that's all settled.
>> Okay.
>> Yeah. and hopefully we'll have more time
to do the search this time around.
There's a lot of meetings during summer.
Um we had a vote as you guys are aware
of amendment vote uh that did pass. Um
and yeah, that was the vote. Um there's
no real update from that other than how
the vote ended.
>> Um and then school is starting on the
26th for everybody which is really
exciting. and staff came back. All the
staff came back today, including um
support staff, etc. Um and they had
their kind of come all together today. I
wasn't able to go because I have my
kiddos at home with me. Um but yeah, so
they'll start on the 26th and um
everybody's doing really well. I think
all the schools are excited to get
started. Um they've got resources in
place. We've got a new principal at
Callus um who's wonderful. Her name is
Katie Treale. So, if you have the
opportunity to meet her, I encourage you
to reach out. She's also a new Callus
resident. Um, she just moved here, so
that's exciting. And then our former um
principal, Jared Weiss, has moved to um
the middle school, so he'll be the
middle middle school principal there.
And then we also have an interim high
school principal. So, lots of new faces
and lots of really good new energy,
which is exciting. um you know and with
that comes lots of questions, wonders,
worries. Um but I've had the opportunity
to connect with some of the leaders um
in the school and I feel really good
about you know their excitement and
their passion and their experience. So
um we're in a good place. Yeah. Any
questions for me?
>> Have you all met since the amendment
vote?
>> We have. Yes, we've had I think one
board meeting since the amendment vote.
There really has not been a lot of
discussion um around it other than it
had passed. Um I suspect that more
discussion will occur as budget season
arrives. That is one thing that we're
kind of bracing ourselves for is budget
season because all all arrows point to
really looking at a very challenging
budget season this year for us
>> um as a district. And so really making
sure that I know many board members are
really thinking about you know what are
the out of the box things that we can do
to preserve programming and preserve
student outcome. Um but it is something
that I I know not just the board the
administration has on their mind all the
time. So I think it's going to be a very
robust budget season. Um and I encourage
residents to come out and share their
thoughts and their ideas because it's
really really important. And yeah, so
>> wonderful. Uh, any questions?
>> Um, I actually don't know the final
number for Tara Elementary School, what
the what the number of students is or
the
>> That's a great question and I I can get
back to you on exact. I know that
there's been some new students that have
come in and some that have left recently
um have moved or relocated. Um, but I
will say that the numbers are fairly
stable, if not slightly higher than they
were last year. Um, that tends to be
Callus's trend to be honest with you.
I've been here now for six years and I
really haven't seen a significant drop
in enrollment in Callus specifically.
So, I would guess
>> in total it's a it's when you look at
class to class.
>> Yes. Right. Right.
>> And you're doing the prek to
>> Yeah. So prek and K are currently at the
MES this year.
>> Um and so uh Callus Elementary has in
first grade through sixth grade. And uh
so they have a let me see if I can get
this right. They have a one two
a third grade. Well one, two, and three
are kind of the lower school and then
four, five, six are the upper school.
And they're kind of doing a co-eing
model this year. Um, so, um, the classes
are all kind of they're not, um,
blended. They're not all blended
classes, but they're definitely shared
classes where certain teachers are
teaching certain subjects and kind of
supporting that way. Um, so it'll be an
interesting year. Um, I have twin twins
who are in third grade and very excited
about their what, fourth, fifth year at
Callus. So, they went to prek there as
well. So, so yeah. So, I would say I
would say probably um without prek and
without kindergarten we're probably
about 80. Um but I came up in my
>> Yeah. Yeah.
>> Thanks for having me.
>> Thanks. I'm so glad it worked out that
you could be here tonight.
>> Yeah. I can actually make this. So,
>> yeah. But I and I
>> Oh, I sorry to interrupt. Um I just
wanted to share and and thank you for
your service. You're really difficult
>> and it's here.
>> It's going to remain difficult for a
while,
>> but um
>> not to add to it, but just for your
information as a person who helps
collect the taxes,
>> the level of concern this year about
property tax rates,
>> yes,
>> is is much higher than it has been in
the past. pretty high in the past.
>> But I'm really hearing a lot of people
say that they're feeling pushed to their
limits.
>> Yeah.
>> And that's a theme that's coming
through. And so just important for you
to know because I always tell them 70%
of the tax bill is is on the education
side.
>> Yeah. It's it's really tricky. I think
it's a it's a funky tax formula in my
opinion. I come from Southern
California, so it's a very different
system alto together. But um yeah, now I
can I can share that the board we all
think about those numbers very
carefully. Yeah.
>> Um and we also have the spending
threshold that is set by the state.
>> Um and that's going to go down over time
and so it's going to be like I said it's
going to be a robust
>> budget season. But yes, I I
wholeheartedly hear you and I think it's
something that's on our minds all the
time. Um, and I think we're also feel,
at least I'm feeling as a board member,
I've only been on the board, this will
be my second year, so I'll be in the
board for a total of two and a half
years because I came in to cover some of
these. Um, but we're starting to see
more and more how important it is to
speak up at the legislative level level
as opposed to just local because there's
so much that's happening and people are
being affected by
>> the decisions that we're making. So,
>> absolutely.
>> Yeah.
>> Right.
>> Yeah. Well, I I ki, thank you for
speaking up because I completely concur.
You know, thank you um to you and the
others for serving. It's it's a lot of
work and u a lot of emotional engagement
um over the last bit um here. So, we're
glad to be um moving on from that, but
but I'm sure there's more more to come
in terms of just challenging issues that
we're facing as a community as a whole.
For sure.
>> So, so thank you. And what I say to
people all the time is please reach out
to me. Please reach out to our board
chair. We want to hear from our
constituents. We want to hear people's
concerns. It is it is a big job. It is a
lot of work. There is an emotional
investment in it. But a big piece of it
for me is making sure that I can hear
directly from my constituents because I
have my own ideas that they have.
Sometimes they're different than mine.
And so I want to make sure that I'm
>> giving the voice of our community the
best.
>> Yeah.
>> Right. Thank you guys. So, thank you.
Thank you.
>> for dinner.
>> Okay. Enjoy that.
>> Thank you. Thanks a lot.
I don't know if you signed in,
Elizabeth. Okay. All right. Thanks so
much.
>> Thank you. Yes.
>> Okay. Well, we are a little ahead of
schedule, but um
I don't see any public for public
comment.
So,
>> Michael Miller, maybe.
>> Oh, Michael Miller. Is Michael Miller
wanting to make a public comment?
Hearing none.
>> Um, good. Do does anyone else in the
room want to make a public comment?
First, please
draft is the updated bus.
>> Thank you.
Um,
>> okay. So, I I guess what I would just
say, we're going to move on to reports
and um
I am prepared to do the friends town
hall report.
Um, if we do end up Oh, I'm sorry. I
thought I was seeing somebody pull in.
Um
so on this uh
the friends of house I was I was we had
we hadn't had a meeting for for some um
for a month or so um but um we had a
great meeting last week um at which uh
Jim Ventresca was voted in as a new
board member as was um Ryan uh
Ryan
whose last name I know,
Ryan
Edwards. Okay. Ryan Edwards, who is um
an architect that's worked on a couple
of important projects here in Cal and
elsewise. Um who's an architect uh who's
also donated significant time and um
expertise. So, um, we're really happy to
have him on and he's also on the, uh,
historical,
>> what is it called?
>> Committ historical
>> historical. No, it's the it's the
>> commission.
>> Historical commission. Thank you. Um, so
that is terrific. Um, so I'm really
pleased. We've got um essentially three
new board members since um in the last
six months. So, I'm really happy about
that. Um, NY's, uh, play was in June.
Um, uh, great, um, full houses, um,
success by most measures. Um, six
performances. They didn't, um, feel that
there were any issues, um, and had
things back in good order after, um,
after the, uh, play. So, um, and she was
proactive about, um, reaching out to
committees who had meetings here during
rehearsals and was encouraging,
um, Chris to do the same. Um, the
piano's been tuned, um, and deemed a
real good piano.
Um,
uh,
let's see. Um, one of the reasons that
we were excited about having Ryan
Edwards join the board was to um get a
bigger um get a better handle on the
long-term plan for the the cultural
center and use of the building and what
what would need to be done because um
any um sort of the conversation around
what kind of fundraising should we then
be doing? or kind of um effort should be
made for the building um centers on sort
of what what's the end goal. So that's
part of the thinking of bringing um Ryan
on to help think that through uh and be
um both realistic but also aspirational
at the same time of what what should
this building look like to be a cult a
cultural center that they've um tried to
identify and um and be able to set some
um sort of phases in motion of what that
would be. um which is why they decided
not to do the um to try to kind of
insulation in the interim. Um upcoming
events, there's a concert, Steve Owens.
Uh there's a wedding uh reception here
um already and Nancy's daughter and um
Chris's play is going to be in the
October time frame and then it'll then
there'll be a closure for the season. Um
there's, you know, they've brought the
legal um requirements up to speed in
terms of the IRS nonprofit registration
or, you know, form for um the website
domain as well as the secretary of
state's um registration. So things are
a little more
tidy and higher performing, I would say.
Um there's a regular meeting. We did
miss um July, but it was basically, you
know, everyone was on the holiday. Um
and I think just a generally a very
positive um forward motion for the for
the um
for the group. I don't I haven't heard
any feedback about um scheduling and how
that's going. Um, and Tegan's not here,
but um, Meadow, I don't know if you have
any experience with folks calling for
use of the town hall.
And has it been going okay in terms of
coordination?
>> Yeah, anybody who's who's come across
either my email or phone, I've directed
them to the form to fill out on the
website. um with regard to the people
who already have calendar items are just
like editing those calendar items. So
it's pretty easy to edit the calendar
now.
>> Yeah.
>> Where we have it. So right this feels
pretty smooth on my side.
>> Right.
>> That all sounds very positive. Thank
you.
>> Yes. I think it's in good shape.
>> And they was at the play and I thought
they did a really good job sort of with
some of the wire cleanup and
>> Okay. So, if you haven't been upstairs,
Yeah.
>> Looks
>> it looks really good.
>> Yes.
>> I I skipped right over that. That that
there was a concerted effort
>> before
was it before Scots. Well, before before
there was a memorial, but then um and
then another push um to really tidy
things up and paint and um
>> and and so forth and uh install the
curtains for some um better experience
for the um attendees and so forth. So I
think
>> pass on our appreciation.
>> Thank you. Absolutely.
>> Yeah. Really nice.
>> No. They I mean Nancy in particular did
a lot of work and and they also just
coordinated Arty with like they just did
a great job coordinating um up there as
well. So it's good.
>> So yes,
>> great. Uh
so town clerk, we don't have Keegan here
and I
>> anything. Are you aware of any issues
that
>> uh not that I know of. Um
we just got through the election. Um I
think that we had talked about that last
time a little bit.
>> Yeah. I'm mostly in
the office. I've been focused on uh
tax stuff, assistant treasurer stuff.
>> Um it's been really slow in the vital
records department.
But I think that after the wave of fact
processing starts to calm down a little
bit, uh we're looking ahead toward
scanner, um that that projects on the
horizon sometime.
>> Mhm.
>> But uh yeah, everything else it was
pretty pretty status quo.
There's really much to report.
>> Okay, thank you. Oh,
>> chugging along. All right. Uh, town
administrator update or report.
>> So, the main thing I wanted to talk
about, the grainiest thing I think is
the um possible assigning some of the
general fund balance towards the FEMA
fund.
>> So, we expect to have a deficit because
the reimbursement is 90% FEMA, 7 and a
half% state. At least that's that's the
plan. Um and uh so the lead auditor
asked the question, would you like to
set while you have some general fund
balance, would you like to set some
aside? You'd be restricting it, right?
Could change that under the select
board, but it'd be a you know, it'd be a
a step towards preparing for the
eventuality of having to transfer funds
to to zero out the FEMA fund actually.
And I'm hoping that that'll be in the
next year. We FEMA is now assigned the
last project um you know construction
project uh meet. So their final project
what they call a project is um just the
reimbursement categories is management
costs. That's the the last thing to go.
So they'll pay us for Toby's time and
the time that I spent and the like. Um
and we expect that will happen within
the next few months because there's
nothing else to do. Um, and then I have
really don't have a bunch of idea about
how long the state will take for their
reimbursement, but
they go fast. So, um, I'm hoping we'll
have everything within a year and then
be making a decision about zeroing out
the full amount. And currently, we
estimate it to be around $90,000. So,
something between zero and 90. If you'd
made the decision, I think you could
verbalize it tonight. Then we could do a
formal transfer at the next meeting and
have it warmed. But this would allow
Rick to start preparing the financial
statements
>> for the final audit.
>> So he requested that in within a week or
10 days something like
>> in order because you want it so that
will take care.
>> Yep.
And it's not affecting our cash.
>> It's just moving money from one place to
another.
>> It's just
>> Yeah. say that
>> it our
>> it's an important bounty issue.
>> It is important. Yeah. Yeah.
>> Yeah. So, um it what it means is that
our the general fund balance that we
have been looking at is not as quite as
robust as but it's but it's still well
above the target.
>> Right.
>> I think it makes sense to do it in
stages rather than that.
>> Yeah. you know, as you said, rather than
like a year from now, right? Oh, 90,
>> right?
>> Something like that.
>> Yeah, I think that's that's wise to get
ahead of him.
>> Okay.
>> Yeah. I didn't have any questions about
it.
So, do we need to stay an amount?
>> If you want to specify an amount and
then we can do a formal warned um
45
>> half or what do you half?
>> That would be my recommendation.
So that would be
>> great.
>> Okay.
>> So we'll we'll get that prepared. And
then the only other things I wanted to
say were just scheduling items. So the
housing group is going to meet for the
first time on September 8th at 5:30. So
if one or two of you would like to
attend, I'll be there. But uh um just
wanted to offer that up as getting
getting that conversation going.
>> Okay.
>> And then town fairs on October 7th. both
Meadow and I are planning on going if
you're interested. Um, and then the
leadership, the Vermont Community
Leadership Summit looks particularly
good this year and Tegan's going
with somebody or with you.
>> Yes.
>> Yeah. Here you go.
>> Yeah. I thought it was
um there's two in particular workshops
that I thought were pertinent. One was
about
rural housing
>> development. Y
>> um and one was about repurposing former
school buildings.
>> Um and I thought it would be good to
>> unfortunately there's two workshops at
the same time.
>> So I can't go to both of them.
>> Well, I'm sort of hoping Tegan will go
to one and I'll go to the other.
So again, if you'd like to be
registered, just let us know.
>> Those deadlines are coming up.
>> Um, is the housing group meeting here?
>> It's going to be at the office.
>> At the office. Okay.
>> And you said that's the 8.
>> I'll be out of town.
>> 5:30.
>> 5:30. Wait. We should
>> we should make sure we're not all
showing up.
>> Right.
>> Right. Right.
>> Right. And I will not be able to I mean
I'm interested but not
if other people want to attend because
it tastes
>> I will let you know as
>> if anybody else tells me that they want
to come but
sounds like it's
widely available and obviously there'll
be more meetings.
>> Yes.
Okay. Um,
all right. Moving right along. Um,
the FY28 budget work. Sorry. Thank you
for continuing
>> to move us on this path.
>> Yeah.
>> Like we're looking at two things. One is
the an updated capital budget
which frankly we've got so much in the
pipeline currently.
not really contemplating a lot of
additional,
but there is some the new items for
fiscal 28 that we put in here are
a $25,000 allocation for the Moscow
Woods Bridge,
which should be more, but that's seems
like a starting point. And then
this wasn't originally in there, but the
county road repaving.
Um,
it's probably about a $50,000 uh item
and
when I had it just in in in fiscal 29 at
50,
the total just jumped up. It didn't it
didn't see it wasn't a very um
smooth transition.
So that was the reason for moving a
portion of it in there. None of this has
to be set to tonight. That makes sense.
I split the 15 to 225. So the fiscal
>> bore some of it,
>> right? that that sort of presupposes a
reserve fund to put to park it in
>> which which I hate to recommend any more
reserve funds.
>> But you're
>> but I got a great idea for a reserve
fund
>> which is a highway infrastructure which
would capture bridges, culverts and
repaving.
>> And you put the Moscow woods in that
thing.
>> Yeah.
>> Yeah. I mean the all you could have a
dedicated fund for Moscow was bridge
>> is highway capital fund specifically
>> equipment
>> for equipment.
>> I was just wondering
>> you could propose repurposing that fund
to include infrastructure.
That's another
>> would that
fund has been approved by voters,
>> right?
>> So even you you can't change that.
>> That's up to them.
>> Do you know what there I mean are there
is there a norm that we are we're we're
against at this point in terms
>> I my sense is that we're on the high
end.
>> Yeah.
on the high end in terms of having the
number of funds,
>> this number of different reserve funds.
>> Yeah,
>> that's my sense. But that's just a gut
reaction.
>> And and I think for the average
residents like what is all this, you
know?
>> Yeah. Yeah.
>> Much
>> we could look at consolidation maybe of
some of them
>> like the town office and the town hall.
Do those those need to be separate?
Maybe not.
>> The garage one now, too.
>> Anyway,
>> that's probably a different
conversation. But getting back to the
the budget, it, you know, that
presupposes we have a place to park both
of those allocations if we were to do
that.
>> The Moscow Woods bridge and
>> reserve funds have to be created by
voters, right? So it would be a a warned
item to create it and then a separate
warned item to add to it.
>> Yes.
>> At a town
>> at town.
>> Right. Right.
>> Yeah.
Is there is it um fair to ask at some
point um
Ki if there's a
mean or for you to consider andor
investigate whether others other towns
do this of of having like the the
infrastructure projects as well as
equipment in one.
>> Yeah. Why don't I do a little research
on
>> just to see I mean I can see why it
might make sense to keep the equipment
separate just because
>> what
>> I mean I can see why it would make sense
to actually keep them separate but
>> right
>> deplete your
fun
>> we should take a holistic look I would
all all
>> right
>> well and I and I I think I you know I
very much appreciate what you're doing
here with um these suggestions, but
are we in a situation where we can do
that is a qu, you know,
>> where we can afford
>> where we can afford to do this
>> Moscow Woods.
>> That's the point of this exercise.
>> Yes.
>> I I don't see how we can afford not to
start socking away for Moscow Woods.
>> Yes.
>> County Road is is a more of a question,
>> but even Moscow Woods, like how much is
the right amount,
>> right? Yeah,
>> this is
>> a big it's a big for us.
>> Million project a start.
>> Yeah,
>> we're saving for the match is what we're
trying to do,
>> right?
>> Okay.
U was was there something else?
Oh, the the other new item in here is
the loader.
And so I mean what this is just the
first sort of step in actual numbers on
the budgeting and
>> I can plug in these things into the
annual budget. We see see what things
look like. But
>> the loader is an example of something
that could be put off. But let me bring
you the numbers on what we spent on
maintenance of that loader in the past
few years. I know last year was
>> was very high. Uh,
>> so at some point, we've all had Subarus,
right? At some point, it's worth getting
a new one.
>> Yeah.
>> Or switching away.
>> Um,
uh, so, uh, in terms of the loader
though, um, the new cost is that, have
you, is that the actual new cost?
>> So, the loader is another example. I
split that first payment into two years.
So what what what this complates
actually is is
purchase making the first full payment
29.
>> Yeah.
>> But that is based on
um forget where that number came from.
We haven't gotten a quote but I think we
well I think we have got but it's been a
little while need to verify that. I just
wonder, you know, how much more that
might It just seems like equipment costs
are going to be.
>> Yeah.
>> Continuing to
>> Yeah. So, let me verify that. But
>> just to give you a sense where this is
heading.
>> Yep.
>> Thank you.
>> 2010. So, that's the second oldest in
our fleet. The old grater is
that old grater is an EMT.
>> Imagine how many
How many roads at rated with that?
>> Yeah. How many miles?
>> Amazing.
>> Okay.
>> So, I guess you know you questions. Do
you do you see think there's anything's
missing or or could be adjusted before
using this as a starting point for the
annual budget?
We'll be re revisiting those items.
>> Well, sorry, just quick the Curtis Pond
is the bond paying.
>> Yeah. So, that's that we're locked in
on.
>> Yeah.
>> And the coverts don't have any numbers
against them.
Don't have any planning,
>> right? I I could pull those out. Um
Yeah, that's sort of like that one.
This has been evolving, but that's sort
of eventually we'll have a master
inventory of all the pieces of capital.
>> Yeah.
>> That we need to plan for. And
>> if they're not in this plan, they live
somewhere else. But eventually, we want
everything to be in a plan, right?
>> Yes. Yeah. No, I appreciate them being
there, but
we're we're continuing to acknowledge
that we can't do anything about it.
>> Yeah. Yeah.
>> All right.
>> And the reserve fund that's listed
there. I'm lying. Oh, it's the garage.
Excuse me. Got myself
garage.
>> Yeah. Again, that's just sort of I know.
I know.
You got to do something.
Was there anything from the
East Fire Department meeting that
>> right
>> translated into this?
>> I was just say that it's that they
talked about a new truck in the next
>> couple years and so I was
>> it looks like the old truck is only
three years left. So we might assume
that that'll essentially be
>> you know I I want them to tell me and
you know that's we keep going around in
circles that you been part of that
conversation where
>> the capital budget needs to show us how
they're actually going to pay for those
things and it goes there's this
>> severe deficit that they show on their
budget and that's that's not what we're
going to do. That is just not going to
happen.
>> So what is the plan? And I've tried to
say it in many different ways. If if you
think as the fireman you're going to
come to the towns and ask us to help pay
for capital items, we need to know as
soon as possible, like years in advance,
>> right?
>> And um the but the other thing is they
have this source of revenue that is uh
you know the from insurance monies
that's significant. It's over 200,000 a
year and been growing.
um and that um you know is there for
them to purchase equipment and it's a
steady stream
>> as long as we can run our EMS service.
So so that needs to be
you know reflected in the home
>> and in a way that we
>> and yeah it doesn't seem they've
>> I think you've said it three different
ways and it's not it's not
>> coming through. Uh the last meeting,
Troy Sackington sort of committed to
working with me or whatever.
>> Think you heard what I say and I
followed up with it as well.
>> Okay.
>> So, here's what we're looking for.
>> Okay.
>> Yeah. But anyway, good point. If
>> if we need to plug in a fire truck or
something,
>> right? They were saying that
>> they were
>> they
>> they're starting to look good.
>> Yeah.
>> Yeah. that like like our plow trucks,
they're often two or three years out.
>> Yes. And can they fund that out of their
cash flow,
>> right?
>> You know, not paying for it in one fell
swoop, but financing over time
>> presumably.
>> Yeah. So, I'm telling
>> I don't know what to put in here until I
get a perfect answer.
>> Yeah.
>> So,
>> but the financing piece just isn't in
there the last part of the presentation.
>> That's the puzzling thing. It's like
Yeah. just
extend it out.
>> Yep.
>> I'm going to plunk down three, you know,
$500,000 or $750,000,
>> right? There's no reason to,
>> even if you can.
>> So, um Yeah.
So, sounds like
>> Well, that's one to watch.
>> Yeah,
>> absolutely.
>> Okay.
>> Um
>> the other item for tonight was the
messaging,
>> right? if you folks got a chance to look
at that, but it's a draft and
>> um presumably would be a new
um page on our website or incorporated
into
and we don't really have a budget page.
So, this new that we direct people to,
but also the kind of language we want to
use for front porch forum posts and
otherwise
um to help people understand how the
budgeting process works. there is a
process and how they can engage with it
if they want to goals.
>> The only one of the things that jumped
out at me is just the the first
paragraph last sentence um where it says
um and voters at town meeting approve
the budget for the following fiscal
year. I just think we shouldn't presume
they're going to approve it.
>> Okay. in that language
>> consider and vote on
>> voters voters are that town meeting
and presents it to the voters
>> for consideration whatever something to
>> present some some deference
>> just yeah it is their job
um
our department sheriff and
>> so Um, I was wondering about the
distinction you make about community
partners, other community partners and
then you talk about the local nonprofit
organizations are invited to submit
requests.
>> That's the service appropriations.
>> Right. So the um can we use the language
that appears in the
So I'm not sure who the other community
partners are, but I think then the next
sentence is referring to the social
service organization um line item. Yeah.
Right.
>> Yeah. Right.
>> So I just want
>> just just mimic the language in the
>> Yeah.
>> the um application
>> just Yeah. So that it's so that it
it's clear that it's the same thing.
I I guess yeah to be approved for that.
>> Okay, good.
>> Um
well, yeah,
do you mention that there's a committee
that looks at those requests also?
>> Well, it's it's listed down in the
against 121426.
It says in the calendar, sorry,
>> services appropriations committee.
>> Yeah.
>> So that's what I saying like we want to
use the same language so that
>> um
>> Okay.
>> So social services.
So for social services organizations
may submit requests
which are reviewed by the a committee
>> right
>> so yeah
makes sense that's part of the process
and I think people want that and
appreciate that got to ask for it.
>> Well, we'll um you know, this is what
the community a few community members
had asked for. So, we'll we'll see how
>> Yeah.
>> how people decide to put this.
>> I think we would want something like
this on the website anyway. Yeah, any
future resident could go on techn
>> and this timeline is is really helpful.
>> Yeah,
>> like the optimism of the December 28th
>> budget.
I'm not sure.
>> Okay. Um,
anything else? Sorry. Any
>> Okay. Um,
>> so we're moving on to administrative
um and possible action items. So, um,
approval of the minutes of July 27th,
August 6, and August 13 select board
meetings. Um,
Christie
was not at August 13th. Is that
accurate?
I was well I was here for July 27th and
not the August 10th and 13th.
>> Okay.
>> I know.
>> So now well I'm just thinking about it
in terms of I'm
>> great for you. I'm happy for you. Um no
but uh in terms of approval we usually
have the person who wasn't there
recused. No
>> not to worry about that. Okay.
>> See why
>> I personally feel fine. Did Did everyone
read through the minutes?
>> Yeah. I did.
>> Do you have any questions or concerns or
changes?
>> One tiny typo.
>> Okay.
>> July 27
>> on page two. Um I'm talking about the
planning commission. Um I think it's
Vicky Arthur, right? I think her name is
misspelled. Last name.
>> You got it. Thank you.
>> Thank you.
All right. Um
If we're all set, then we'll need a
motion to approve the minutes of July
27, August 10, and August 13.
So move second.
>> All in favor, I
>> Thank you.
Board orders. Um, please let's let's
make sure we've looked through these.
Um,
we've got
um payroll tax, payroll warrant, AP
warrant. And does anyone have any
questions on that? And I believe Ki
included the GL
we missed, isn't it?
>> Oh, the journal entries.
>> Yeah,
>> that's that's coming up. That's in a
couple items.
>> Okay. Okay. Thank you. Um yeah, so any
questions on the words as they were
presented?
>> No. Can we get a motion to approve the
board and sign the board orders?
>> So moved. Second.
>> All in favor?
>> I.
>> Great. Thank you. Um and next up is
approving an employee leave request.
>> Yeah. So I'm requesting we reconsider
Tyler Ster who yay had a little baby
girl and his wife. Congratulations.
>> Holly
met her the first time. Adorable. Um
>> nice.
>> They um Tyler's planning to take three
weeks off and he had requested to be
able to use some of his sick leave for
um maternity leave and that's not
explicitly allowed in the policies. It's
not explicitly not allowed. It's not the
common arrangement in in my experience.
Um, I did ask Larry Mopin from the union
about this and he said his response was
this doesn't come up.
>> Nobody has newborns.
>> Um, but there certainly they would be
happy to have Tyler be able to utilize
some of his leave. And um, I think it
would be a small financial I mean really
we'd be paying out the funds the money
anyway. It's just we're foregoing a
little bit of productivity theoretically
down the line. It's it's it's a small
thing for the town and I think it's a
big thing, you know, a bigger thing for
for them personally. So, I think it' be
a nice nice thing for the town to do to
offering to convert two or three weeks
of this weekly to try to
>> I think it's a nice gesture and not get
outside. I don't think we're going to
run into this on the ways.
>> I'll just agree. Did he make the
request?
>> He did. Okay. And he wants to use the
sickly.
>> Yeah.
>> Knowing that like if he got sick later,
he might Yeah.
>> not have it.
>> Yeah. So, yeah,
>> seems pretty healthy and he's got a lot
of sick.
>> Yeah. Yeah.
>> And and just for like we we did chat
about this earlier um this issue and
since it wasn't in the
agreement, we were at first feeling that
we should just let it lie and not um
approve it. But um further consideration
was merited in this case. We think we
think uh you know it was it it's a
really good idea and it's a it's prudent
and and well well invest you know strong
investment for our community.
>> Yeah.
>> So great. So can um I have a motion for
approval of the employee leave request
as stated by CI
moved.
Um let's be clear about what we're
doing.
>> Okay. Uh we are permitting our um
employee who requested sick leave
requested to be using sick leave
as part of
>> I can't specify an up to amount
>> extend up to 3 weeks um up to three
weeks uh is approved for paternity for
>> family yeah
>> sounds
those
>> and a second. Thank you. All in favor?
>> I
>> I congratulations.
>> Yeah. Okay, I'll pass that along.
>> Thank you for clarification. Uh Christy
appreciate it. Um
and on to the journal entry.
Has everyone had a chance to look
through the riveting
on it? I told I was so excited. I told
the auditor, "We're doing it. We're
doing just like you said." And he goes,
"Oh, is it leading to good discussions
>> this is a lifelong account basically?
>> Yeah. I don't feel like
I have any questions really.
>> Do others.
>> We're moving money around. Sorry. What's
going on?"
Yeah, I think this is the batch that
included the interest allocations.
>> There were a lot of interest.
>> So at the end of the year as inspected
by the auditor, we aortion the interest
that we earned from the bank in our
checking account
>> to all the fund
>> based on the average size of the fund.
So each when you get that due to from
report each month, they log that. Then I
average it over the course of the year
and I take
>> its percentage of the overall fund
balance and and uh
>> give it that amount of interest.
>> So fun to see we have all those
interest.
>> Yeah.
>> It's going to increase as a result.
>> Yeah. Now that we've got some
investment. Yeah.
>> Yeah.
>> Well, that's great. Thank you for doing
that.
can report we had a good discussion.
>> We can report back that we had a
discussion.
>> I will move that we approve the journal
entries for July.
>> Second.
>> All right. All in favor?
>> I wait a second.
>> I know.
>> Oh,
>> wait a second. What?
>> No, I do approve, but they should be the
July 2026 journal entry. Oh,
>> is it written as well?
>> Doing that
>> in the agenda.
>> Oh my goodness. Yeah.
>> Well, fiscal year, right?
>> Okay. Ah,
>> we circle back to Adamant before we
>> Yes, please. Thank you. Um, I was just
curious why this letter says I like
who's signing it.
>> Oh, I think it's written.
approved one person to sign it on their
>> I should say we right
>> on behalf of the select board we are
pleased or it's saying on behalf of so
>> right
>> it's written as if we approved ki or
somebody to sign it
>> right
>> on behalf of the select
>> oh I see that's just how it's written I
>> is that going to be you then you want
whatever you
What are we Is everyone happy with the
edits?
>> It's fine.
>> Yeah.
>> Yes, it is fine. Um, we're just not Are
we just We could submit it. We
>> You don't have to sign it,
>> right? I mean, I think I think we should
authorize Krie to sign that letter on
behalf of the select board and
>> Okay.
>> So, you are so authorized.
>> Do we have We don't make
>> Oh, is that a motion? I think there's
>> Okay, I will second motion that we
authorize K to sign the letter as
edited.
>> Great. Um, all in favor?
>> I
>> lovely.
Good luck to that.
>> Curious.
Uh,
okay.
The next item is the East No Play
Department um
which um the the primary business is uh
discussion of a contract. So we would if
there is to be discussion then we would
need to enter into executive session
which we do have updates to discuss. So,
I would like to ask for a motion to um
enter into executive session under one
state 313A1A
to discuss our contract.
>> I would make that motion and invite Har
to join us.
>> Thank you.
>> Not a second on a second.
>> Thank you. All in favor, please say I.